Activity Type in SAP PM

Dear Masters,
We have a field in order screen "PMActivType" can anybody explain me what is it used for and what is it necessary to define PMactivity types in configuration?
Thanks in advance.

Hi,
Activity types are used to calculate the Internal Labor cost based on the Planned hours & Actual hours. In the Maintenance Order, Planned labor hours for Internal Operation will be maintained in Operation tab.
Activity Pricing will be done by FICO people in KP26, for the activity types against cost center. For example, there are electricians, mechanics & technicians.
For those people, based on their salary (in case of permanant employee of the company) or hour basis (in case of contract employee), these pricing will be done.
For Electricians, Per hour charge would be 10 INR.
For Mechanics, per hour charge would be 8 INR.
Work centers would have been created for these people. In the costing tab of work center, activity types & cost centers will be assigned. For these activity types & cost center combination, pricing will be done in KP26.
In Maintenance Order, based on operation type, work centers will be assigned.
For Example
In the order, first operation will be done by Mechanics. Second operation will be done by Electricians, again 3rd operation will be done by Maechanics.
Based on that work center selection in operations, activity types will be assigned. For the activity type & cost center in work center, we have defined the price in KP 26 already.
For first operation, work hour is 3 hrs. So planned cost would be 24 INR (3 hrs * 8 INR / hr)
For second operation, work hour is 5, so planned  cost would be 50 INR.
For 3rd operation, same calculation based on the hours in operation & cost.
Once you do confirmation, actual cost will be calculated in the same way.
I hope this will be clear.
Regards,
Maheswaran.

Similar Messages

  • Actual activity price does not exist for cost center / activity type

    Hi,
    We are trying to upload the time sheet related data(number of hours an employee workred on a project) ect from Non SAP to SAP.
    We have used a customized program and have loaded the data from se38.
    All this HR data will be saved in CAT2
    Later we transfer the time related data into SAP FI/CO using CAT7.
    +When  tested  with a couple of employees time sheets, they got uploaded in SE38 proerly and when transfered it through CAT7 it was properly taking the hour*rate is cost and was reflecting in the respective cost element.
    For a few time sheets in SE38 we were getting an error saying that the cost center(100501)/ activity type(EAT001) does not exist for 2010.
    Hence we have taken, FY 2010, the cost centes and activity types in KP26 and have given the planned Activity as 1. No planned cost in KP06.
    We have run the price calculation forr the FY 2010.
    Then we were able to uplaod the time sheets, but when we tried to transfer the data through CAT7, it throws an error saying no activity price exist for cost center 100501/ activity type EAT001. If I ignore the warning an proceed, no amount is being calculated.
    When uploaded employee time sheets before, all the cost were getting claculated and were entering into  the respective cost elements, but now no amounts are being calculated and it is taking Zero.
    When checked the previous years data i.e, 2009 all amounts are fine, in KSII I can see the activity quantity filled with some numbers in 2009, where from are they comming? I have checked KBk6 nothing was mentioned.
    PLease assit
    Regards,
    shilpa

    Hi
    I never used CAT* though, but the error means that you need to maintain a activity price in KBK6 (Actual price)
    Regards
    Ajay M

  • Use of activity types and cost splitting

    Hi All,
    We would like to track activities for cost centers, but don't necessarily have the need for a sending cost center/object.  I understand in a traditional manufacturing set-up, you have sending and receiving cost objects that incorporate the use of activities.  Our business is a service that we provide, not a tangible product that we produce.
    Here is the scenario.  We have activities that a cost center performs.  Cost center 1 will perform 2 types of "pick-up" activities, so this would require two activity types.  Throughout the course of the month, the activity quantities would get posted to the cost center.  So my first question is how can you post only quantities to a cost center--what is the t-code?  We're not concerned with incorporating an activity price, we just want quantities.
    Second, as primary costs get posted to the cost center in FI, we want to split the costs onto the activities.  I have researched t-code KSS2 and can't seem to split the primary costs based on the activity quantities.  It keeps refering to target costs, which I don't really want to have to worry about.
    What we're trying to do is a makeshift ABC scenario.  Since the use of true abc seems almost non-existent, there's not much info out there on it.  Does anybody have any good docs on abc in SAP?
    Thanks
    Kory Squire

    Hi,
    1. I understood your case in this way .
    Cost Center A performs 2 activities . The cost center collects cost by Fi posting through out the month.
    Now you want the activity type should nt have price , only it should have quantities.
    And now you want to allocate the cost of the cost center to other object by activity types.
    If i am right..
    then instead of activity types why not create SKF(statistical key figures) . At the month end by t.code Kb31n post the activity qts. for combination of cost center and SKFs.
    Then as per your requirement run allocation cycle.
    The kind of you are planning , in that case activity types to be converted as cost object ( it can be done in control area setting) and then you want to allocate.. seems to be little complicated..
    Hope i understood and in turn i conveyed the message properly..
    Assign points if found helpful
    Regards
    Prabhat

  • CONTROL DATA FOR ACTIVITY TYPE NOT MAINTAINED

    dear all
    i get this error when calculating production order cost
    control data for activity type 1000\4230\1420 not maintained for fiscal year 2007
    i hv maintained data in kp26
    can any one pl help. i am learnign sap pp and hv 4.7 version
    thanks and regards

    Dear Anshuman
    my prob. started during cost cal. in prod. order first error was version 0 not maintained for fiscal year 2007, THEN i maintained it in the path as told by you T code OKEQ.
    but after that error changed to CONTROL DATA FOR ACTIVITY TYPE NOT MAINTAINED ( 1000/4230/1420)
    i maintained data in kp26, but the error is still coming
    pl. suggest some solution as i am not able to proceed further.
    Thanks and regards
    Raj

  • Quantity for activity type

    Dear CO,
    SKF quantity is connected to receiver cost center.
    May I know Activity Type quantity is connected to receiver cost center or sender cost center? My understanding is connected to sender as sender will allocate the activity base on quantity multiply the rate. But some say not correct.
    Example quantity in KB21N. this quantity multiply rate would be the activity allocated cost.
    Kindly correct me if my understanding is not correct.
    Thank you very much
    help.sap.com

    Hi Vaithiyanathan,
    Go to table AUFK and pass order number and get the OBJNR. This OBJNR you need to pass to table COEP to get the relevent actual cost details.
    Thanks & Regards,
    Ramagiri

  • Error saying "Enter the sender activity type also"

    While trying to upload the HR details from NON SAP to SAP through SE38, an error reflects asking to enter the sender activity type.
    Can any body help me.

    Hi,
    Please refer to the online documentation help whose link is listed below :
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/c3/c6c2a40f4f11d2956400a0c930669b/content.htm
    This link mentions four different data entry scenarios that can be configured for data entry profile in CATS.
    if you want to have the activity transfered to HR, you have to activate this Controlling object for pers. cost assignment in your
    customizing:
    - Personnel Time Management
      - Time Data Recording and Administration
        - Integrating Time Management with Other R/3 Applications
          - Recording Personnel Costs
            - Enter Controlling objs permitted for pers. cost assignment
    here you can find in the documentation:
    'In this step, you specify which Cost Allocation or Funds Management  objects the personnel costs can be assigned to.
      and, in addition, for account assignment to activity type:
      COBL-LSTAR Activity type
       In cac1 'cost accounting variant' is set to 'Assignment of personnel costs to master cost center'. In this case, the cost center is not transferred to HR. Activity allocation is done directly from cats through the other (non-hr) components. Check for 'activity allocation' in the online documentation.
    the cost assignment variant 'B' (Assignment of personal costs to sender) needs a receiving accounting object.
    If there is no receiving object the cost assignment variant changes to '0'.
    regards
    Waman

  • Activity type in routing that was pick to compute the PO date

    Hello,
    Where in SAP could i find where does a production order pick what activity type it will pick to compute the production order finish date?
    Thanks
    Ryan

    Hai mangalraj,
    Thanks for your reply. In case of the formulas which we use in work centre. The values for calculating the formulas in case of Capacity and scheduling will they come from Operations assigned to the workcentre timings. In case of costing will they come from the activity type specified for them?
    Is this right?
    Can you please correct me if i m wrong?
    Thanking you in advance.
    Regards,
    Kris.S

  • Valuation price with user Exit on activity types

    Hi All,
    Our customer could have different activity cost for different products even if they are processed on the same cost center, same activity type and same activity time. So I wonder whether SAP has valuation price with user Exit on activity types as what on material valuation, when we select "U" in the relevant valuation variant. Could anyone knows advise please?
    Regards
    Walter

    Hi Walter,
    an idea might be to include an ABC template into the costing. ABC tempaltes allow a big degree of freedom in determinin which processes to use and in which quantities. To use the product as a cost driver is certainly not an issue. I doubt that you can directly influence the process 'price' to be applied, but to change the quantity could bring the same result.
    See the docu for more info:
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/7e/cb7d1443a311d189ee0000e81ddfac/frameset.htm]
    best regards,
                        Udo

  • Activity types rate Project wise

    Is it possible to define activity type rate project (PS) wise since rate is different for each project due to its nature aor any other mechanism by which i can capture

    HI,
    This is possible in WBS level. You need to set the planner profile with the layout WBS element as input parameters. SAP standard is 1-701 layout for this purpose.
    Hope this answer helps
    Vijay

  • Activity types cost Elements not reflecting in Cost Centre Report.

    Hello SAP Gurus,,
    1. Here we are facing one issue in Zreport. total is not matching, compare with KSB1.
    Values are more in Zreport, in other words activity type cost elements are not reflecting in Zreport, but it reflecting in KSB1.
    example: flow from PM module.
    Actually we had used logic based on the Cost Centres, in that cost centre by taking Object number and it passes to COEP table, then we are getting values as same as KSB1.
    As per investigation i found that the object number is differ from COEP table and CSKS table.
    Exapmple : 1410000 object number in CSKS table, 1410000EL in COEP table, thats why in Zreport these values are not reflecting.Finally our requirment is , Zreport values should same as KSB1 vlaues.
    2. We need same functionality as same as KSB1 for match code or drop down menu functionality for Cost Centre Group and Cost Element Group,  but while user wants select from match code or drop menu (F4), as of now i didnt given any logic to abap for match code functionality or drop down menu (F4),so in this case which logic or table i have to use.
    So please give me inputs or logic how to over come the above points.
    Regards,
    Raj.

    The OBJNR field structure is as follows :-
    AABBBBCCCCCCCCCCDDDDDD
    AA = object type eg. KS (cost center)
    BBBB = controlling area
    CCCCCCCCCC = cost center
    DDDDDD = activity type
    Based on the structure, you will be able to filter the relevant cost center/activity types. You can also use other fields eg. cost element, partner object, source object, value type, etc. to get your desired figures as per KSB1.

  • Activity type E not allowed for equipment entered

    Dear Sir , We are using ETM . Following error is coming while creating  performace based document .
    Activity type E not allowed for equipment entered
    Regards
    Anil

    Give 1 for both type and give it a try.
    for target=actual which is type 5 pls check the link below
    http://help.sap.com/saphelp_46c/helpdata/EN/66/bc6faa43c211d182b30000e829fbfe/content.htm

  • Whats the important of "  table-type  " in sap abap?

    hi,
    i am ahmed. abap fresher.
    i want to what use and importance of table-type in sap abap which comes in      
                         datadictionary
                                V               
                        data types
    V----
    V                         V                                 V
    data element       structure                   table type
    i want to know about table type. plz give a brief idea.
    bye.

    hi,
    Transparent Tables
    A transparent table in the dictionary has a one-to-one relationship with a table in the database. Its structure in R/3 Data Dictionary corresponds to a single database table. For each transparent table definition in the dictionary, there is one associated table in the database. The database table has the same name, the same number of fields, and the fields have the same names as the R/3 table definition. When looking at the definition of an R/3 transparent table, it might seem like you are looking at the database table itself.
    Transparent tables are much more common than pooled or cluster tables. They are used to hold application data. Application data is the master data or transaction data used by an application. An example of master data is the table of vendors (called vendor master data), or the table of customers (called customer master data). An example of transaction data is the orders placed by the customers, or the orders sent to the vendors.
    Transparent tables are probably the only type of table you will ever create. Pooled and cluster tables are not usually used to hold application data but instead hold system data, such as system configuration information, or historical and statistical data.
    Both pooled and cluster tables have many-to-one relationships with database tables. Both can appear as many tables in R/3, but they are stored as a single table in the database. The database table has a different name, different number of fields, and different field names than the R/3 table. The difference between the two types lies in the characteristics of the data they hold, and will be explained in the following sections.
    Table Pools and Pooled Tables
    A pooled table in R/3 has a many-to-one relationship with a table in the database (see Figures 3.1 and 3.2). For one table in the database, there are many tables in the R/3 Data Dictionary. The table in the database has a different name than the tables in the DDIC, it has a different number of fields, and the fields have different names as well. Pooled tables are an SAP proprietary construct.
    When you look at a pooled table in R/3, you see a description of a table. However, in the database, it is stored along with other pooled tables in a single table called a table pool. A table pool is a database table with a special structure that enables the data of many R/3 tables to be stored within it. It can only hold pooled tables.
    R/3 uses table pools to hold a large number (tens to thousands) of very small tables (about 10 to 100 rows each). Table pools reduce the amount of database resources needed when many small tables have to be open at the same time. SAP uses them for system data. You might create a table pool if you need to create hundreds of small tables that each hold only a few rows of data. To implement these small tables as pooled tables, you first create the definition of a table pool in R/3 to hold them all. When activated, an associated single table (the table pool) will be created in the database. You can then define pooled tables within R/3 and assign them all to your table pool (see Figure 3.2).
    Pooled tables are primarily used by SAP to hold customizing data.
    When a corporation installs any large system, the system is usually customized in some way to meet the unique needs of the corporation. In R/3, such customization is done via customizing tables. Customizing tables contain codes, field validations, number ranges, and parameters that change the way the R/3 applications behave.
    Some examples of data contained in customizing tables are country codes, region (state or province) codes, reconciliation account numbers, exchange rates, depreciation methods, and pricing conditions. Even screen flows, field validations, and individual field attributes are sometimes table-driven via settings in customizing tables.
    During the initial implementation of the system the data in the customizing tables is set up by a functional analyst. He or she will usually have experience relating to the business area being implemented and extensive training in the configuration of an R/3 system.
    Table Clusters and Cluster Tables
    A cluster table is similar to a pooled table. It has a many-to-one relationship with a table in the database. Many cluster tables are stored in a single table in the database called a table cluster.
    A table cluster is similar to a table pool. It holds many tables within it. The tables it holds are all cluster tables.
    Like pooled tables, cluster tables are another proprietary SAP construct. They are used to hold data from a few (approximately 2 to 10) very large tables. They would be used when these tables have a part of their primary keys in common, and if the data in these tables are all accessed simultaneously. The data is stored logically as shown in Figure 3.3.
    Figure 3.3 : Table clusters store data from several tables based on the primary key fields that they have in common.
    Table clusters contain fewer tables than table pools and, unlike table pools, the primary key of each table within the table cluster begins with the same field or fields. Rows from the cluster tables are combined into a single row in the table cluster. The rows are combined based on the part of the primary key they have in common. Thus, when a row is read from any one of the tables in the cluster, all related rows in all cluster tables are also retrieved, but only a single I/O is needed.
    A cluster is advantageous in the case where data is accessed from multiple tables simultaneously and those tables have at least one of their primary key fields in common. Cluster tables reduce the number of database reads and thereby improve performance.
    For example, as shown in Figure 3.4, the first four primary key fields in cdhdr and cdpos are identical. They become the primary key for the table cluster with the addition of a standard system field pageno to ensure that each row is unique.
    Reward if helpful
    Jagadish

  • CATS Problem with Activity types, it takes the first 6 digits of PERNR

    Hello Gurus!
    I have configured cats and maintained infotype 0315. When i go to CAT2, i dont see any default values on the screen from 315. When i try to call the cost center and activity type,. enter the times and hit enter, it hits an error saying: Activity type 001131is invalid for 00113199. It doesnt speak abt the activity type i assigned, it probably takes the first 6 digits of personal number as the activity type and throws an error.
    Please help me what to do with this... its very urgent..
    Points granted..
    Thanks,
    Soniya Singh

    Which version of SAP are u using. I don't see any message with your description in the message class.
          I think the values on CATS are only defaulted when u give the WBS element and hrs and press ENTER. Try this and u should be able to get the values defaulted from 315 assuming you have set the default values in CAC1 and also please check the settings in the Initial screen of CAT2 if any other values are getting defaulted in Persons tab and also check ur activity type has the valid Controlling area.
    Edited by: Madhu Gudur on Feb 21, 2008 5:58 AM

  • Activity type deletion

    Hi,
    Can somebody tell me how to delete and Activity type in the CO module.
    Thank you
    Sony

    Under certain prerequisites you can delete activities and activity elements directly, that is, delete physically.
    You cannot undo the physical deletion of activities and activity elements.
    You can give activities, and activity elements that cannot be deleted directly the Deletion flag status. They are deleted from the project logically.
    You can delete activity types either individually or using collective processing.
    http://help.sap.com/saphelp_46c/helpdata/en/6a/cb576b895211d4a81b00104b59c1ec/frameset.htm
    You can only delete activity types in the current controlling area if no transaction data exists for the activity type in the plan, commitments, or in the actual for the given fiscal year(s). You are also not allowed to plan any statistical key figures. The corresponding checks are executed by the system.
    http://help.sap.com/saphelp_46c/helpdata/en/08/51463943b511d182b30000e829fbfe/frameset.htm
    Hope this helps you.

  • Activity type is mandatory: enter value between 01 and 07

    Hi guys,
    I would like to ask you for help..
    Recently I updated the App CRM Sales to 2.0.3
    Now, when I try to create an activity/task in IPhone(IOs6), it shows me this error "Activity type is mandatory: enter value between 01 and 07".
    Do I need to apply any SAP note?
    Does anybody have any idea?
    Regards,
    Eder.

    Hi Masayuki,
    Thanks again for you help.
    So, When I create an Activity/Task in CRM Backend I don´t have problem. I can see in my mobile device (Iphone).
    The problem is when I try to create a new activity in App CRM Sales (Iphone).
    I think that there is some obligatory field in CRM Backend, but that in App CRM there isn´t to filled in it.
    Thanks,

Maybe you are looking for

  • Simple button navigation script

    This question is so simple-I can't really find the answer anywhere, but as a complete NooB I have no idea how to make this work. I have a nested movie 1 layer down from main stage that has several navigation buttons that move to different main stage

  • Ihave synced my IPAD to my IMAC and the password on my IPAD no longer works.  Can anybody help?

    I synced my IPAD 2 to my IMAC and my password on my IPAD no longer works.  My IPAD is disabled for longer and longer after each password I try.  I have tried my IMAC password and also my APple ID password.  Can anybody help?

  • HT201317 How do I get my photos off of iCloud and back on my phone?

    I have all of my photos connected to iCloud, so they can backup and be saved.  But since I have a very limited amount of space, and after my photos have been backed up, I end up deleting them off my phone so I can have more room.  I now have more spa

  • Solaris x86 on HP pavilion laptop

    I am trying to install solaris x86 version on my pavilion zt1000. The solaris install cd boots and then crashes with the following "boot panic: trap type 0 error 0 at 13bd7f" and bunch of register information. I have tried 3 different CDs and even tr

  • Best way to handle SSD that comes with X201 (Samsung drive)

    Hi, I have recently restore the ssd back to factory state, installed my programs and made a backup. I'm not so satisfied with the performance right now so I just wonder if you guys can give me some suggestions how to handle the SSD? should i COMPLETE