Actual Costing: Alternative valuation : "Relevant for Costing" indicator

Hi:
We are using alternative valuation in our Actual Costing
We would like to know the use of the "Relevant for Costing" indicator. (XPCP field).
Documentation said: "If you set this indicator, the results of the alternative valuation run can be used in the standard cost estimate for the material." But there is not a clear explanation in the online doc or other info sites.
How does it works? What is the exact meaning of "can be used in Standard cost estimate"?
How can we get these values from Product Cost planning?
Best Regards:
Manuel

Manuel,
If that Field is checked, it should update the Planned Price in the Costing 2 Tab of the Material Master Record. I did not try this though.
regds

Similar Messages

  • Material Master (Material Ledger- Product cost actual costing)

    When I create a material in MM01 and no Standard price is set the columns "Company code currency" y "Profit valuation" are disabled.
    The only column available is the one corresponding to company code currency. The field "Price unit" starts with the number of 1000 and this information is not copied to the other price unit fields unless you introduce a value in the Standar price - Company code currency field.
    Does any one knows a user exit that can modify this values (Price unit - Group Currency and Price unit - Profit valuation) ?
    Kind Regards

    Hi
    1. It is not  mondatory to activate Material ledger to create Product Cost collector.
    2  It is not  mondatory to create product cost collector if we actovate Material Ledger.
    Material ledger Activation
    1. In OMX1 activate ML and price determination 3 for production plants and 2 for sales depo plants (if need)
    2 In. OMX3 assign ML type standard
    3. Configure dynamic price changes : assign price release  1
    4. Assign material update structure to a valuation area
    5. Activate actual costing indicator and assign  2     Activity update relevant to price determination
    PCC:
    1.In KKF6N,enter the material,plant and select create button and select the order type as
    RM01, radio button selected for production version and assign the production version here
    2.Save the PCC for preliminary costing
    3. PCC integrates with PP module in production version selection
    Regards
    Dev

  • How to make Delivery Item Relevant for Proof of Delivery

    Hi,
      How is it possible to make the Delivery Item relevant for Proof of Delivery (POD). What are the configuration settings required?
    Regards,
    Priyanka.

    Hi Priyanka,
    Following is the method to make Delivery Item Relevant for Proof of Delivery:
    1.  SPRO --> Logistics Execution --> Shipping --> Deliveries --> Proof of delivery
    a.Set POD-Relevance Depending on Delivery Item Category
    (In this activity, you can set the proof of delivery (POD) relevance depending on the delivery item category.)
    Put (X) Relevant for POD, for the relevent Item Categories
    b.Define Reasons for Quantity Differences
    (Define how the quantity is to be calculated (add or subtract the difference quantity, depending on whether you are dealing with an overdelivery or an underdelivery for eg. due to damage during transport).
    2. Set the Relevant for POD indicator on the Shipping tab page of the customer with whom you would like to carry out POD-processing.
    Hope it helps.
    Regards,
    Anirban Roy

  • Actual Costs for Production Order

    Hi All
      I have a scenerio where they dont want any product costing methods say WIP,Variance calculation & Settlement.
      When the Goods receipt is done for production order the actual costs and the Activity costs to be valuated.
    Regards
    Jayshankar.A

    Hi,
    In our case the Standard price is updated in the material master. For this, you need to create a costing estimate using T-Code CK11N and update & release in CK24.
    When CK11N is executed the standard price is calculated for the material by taking Moving Avg Price of RM (Price indicator V) and the activity costs are calculated as per data given in KP26. These cost components are added and a final cost estimate is prepared, which is updated using T Code CK24.
    the pre-requisites are:
    1. BOM should be maintained.
    2. Routing should be made.
    For executing the same procedure for all the materials, you can use T Code CK40N.
    Hope this is what you were looking for.
    Revert for further details.
    Regards,
    Rohit.

  • Report painter/writer for actual cost component split

    Hello Gurus,
    Any of you guys ever explored possibility of creating a report using report painter or writer that can give both Standard and Actual cost component splits in one report? Is it even possible without custom ABAP involvement?
    Thanks
    RG

    Hi Raghu,
    After your reply, I am getting a doubt..
    Have you Activated Material Ledger? When you say Actual Cost Component Split, are you talking about it what you get in Actual Costing/Material Ledger?
    If yes, then you can map your cost compnents for Actual Costing in the path SPROControllingProfitability AnalysisMaster Data Valuation--Setup Valuation using Material Cost Estimate -- Define Access to Actual Costing / Material Ledger
    Further, there are no standard reports available in COPA. Try to build a report comprising two columns, 1st column with the value fields which are mapped for Standard Cost Components and 2nd column with the Value Fields which you have assined for Actual Costing under the above path.
    You will be able to get the comparison...
    Pls don't hesitate to call me for further assistance....
    Srikanth Munnaluri

  • How to analyse actual cost for each operation in Process/Production Order?

    Hi all,
    IN SAP, I know that we can analyze plan cost for Operation in Process Order/ Production Order.
    However, I can not analyze Actual cost for Operation .
    I know the object when I good issue material is ORDER, not OPERATION.
    But, as requirement of users, they want to analyze actual cost for each Operation.
    CAn SAP do this analyze?
    If Yes, What should I do in SAP to have this reports?
    THanks in advance,
    Emily Nguyen

    Hi Emily,
    as I see from one other message that you're using material ledger. Then your expectation is apparently to also see the actual costs of materials in your production order by operation.
    This is not supported. Actual material costs are handed up in material ledger multi-level settlement from one material to the next, bypassing the production orders.
    That means the production order will always contain the material costs valuated at plan price, not at actual price.
    For activity prices that might be better, when you revalue the orders at actual activity prices with CON2. But even there I am not sure that it will always be assigned correctly to the operations.
    There is currently an enhancement in development, the operation level costing. But that will affect more the planned cost side not the actuals. Might be interesting to learn more about your requirements and the use case behind.
    best regards,
                      Udo

  • Plan cost & Actual cost in KKBC_ORD for CO Prdn Order

    Dear Experts,
    We are not able to findout the why difference is appearing during T code KKBC_ORD order analyse for Raw materials, please suggest wht may be the wrong thing in the order?
    Before this i would like to brief you on the process.
    Raw matls are created with "V" as price control. & Finished Goods as "S" control.& we create one BOM. Say example
    My finished Goods will be 500555 code & Raw matl code will say 1001010 & 1002020.
    My BOM will contain these raw matls with qty of 1kg each.
    FG code 500555 of 2kg Bag
    Items are 1001010 & 1002020 of 1kg each.
    Here my mvng price are 2 & 4Rs for raw mtls 1001010 & 1002020 respectively.
    In Material master we define overhead key as 10% to a Finished goods (500555) in Costing view.
    1) Now i create a Base planning object T code KKE1 & I update the 10% as overhead cost & raw matls qtys as per BOM.At the end you can see the overall manufacture cost of the FGs in this case you will get for
    FG 500555 about 6.6Rs. then save it.here it is done for 1bag only.
    2) Create a CO PRDOUCTION ORDER T code KKF1 system will generate one number & save it. Now go to KKF4 add the base planning object name & enter the required qty say 10 bags...
    You can see the COGM will now 66Rs for 10 bags as per the planning.
    3)Goods issued to Order 261 with refc to BOM & Order number entred qty as 10. Sytem will calculates the qtys of raw mtals based on 10bags & save it.
    4)Goods  receipt done against CO PRDOUCTION ORDER (Finished  goods 500555).
    *5)KKBC_ORD i hav updated the CO PRDOUCTION ORDER & choosen cost trend. Here i am seeing a diffc in actual cost column & variance of 26%.but how it is possible*
    Regards
    TG

    I can think of a couple of areas where there may be differences.
    First, your CO order is probably not getting any overhead costs.  Your base planning object had 10% overhead built into it, but that is only for developing the preliminary cost estimate for the order.  The allocation of actual overhead must occur through some other method (i.e. overhead costing sheet, activity allocation, or template allocation).
    Second, the actual material costs assigned to the order will be based on the material's inventory valuation at the time they are issued to the order.  Since you said the materials are valuated at weighted average cost, it is possible that their inventory valuation changed between the time the base planning object was created and the time they were issued to the order.
    thanks,

  • Actual Cost Component Split for cross company code transfers.

    Hi,
    My issue is as follows.
    Production process spans across 2 company codes.
    Goods are produced in production company code, transferred (via stock transport order) to marketing company code and sold to customers from marketing company code.
    Stock transport order follows sales scenario i.e.. marketing company code creates purchase order for goods from production company code and production company code bills marketing for the goods.
    Actual costing / Material ledger is implemented in both company codes.
    We would like to roll-up (transfer) actual cost component split from production company code to marketing company (in a similar way as in product cost planning in cross-company scenario).
    However, due to the fact that the transfer between the companies is in fact a "sales" the goods in marketing company code are seen as externally purchased and the only cost component we can create is based on PO conditions. But we want to get the info about production cost component split.
    Once again this is for ACTUAL cost component split.
    I would be grateful for any ideas.
    Thanks,
    Szymon

    Hi Udo / Szymon.
    I have a question about this issue.
    In the sap help  about multiple valuations / group costing:
    http://help.sap.com/saphelp_46c/helpdata/en/7e/cb848443a311d189ee0000e81ddfac/content.htm
    Its not clear if this can roll up the Actual CCS? or what it do? My question is because i read the documentation of  bussiness function: LOG_MM_SIT,and also the book *Actual Costing with The SAP Material Ledger*
    states that we can handle the rollup of actual cost component split inter-company only with this BF active.
    Could you clarify about this?
    thanks!!
    Arturo.
    Group Valuation
    Goods movements between affiliated companies not involving intercompany profits are processed using the group view. This view determines the actual cost of goods manufactured for the group, and does not include any intercompany profits. You can, however, display internal profits as delta profits in the legal and/or profit center views.
    When you define cost components, you can specify that internal profits between company codes and/or profit centers are shown in detail in the cost component split. You activate these delta profits for the group valuation in the attributes of the cost components.
    For each cost component structure, there can only be one cost component under which the delta profit is shown. This means that neither the legal view nor the profit center view can have more than one cost component for the delta profit.
    To cost multiple values, you define a costing type for each valuation approach in Customizing for Product Cost Planning. You use the costing type to specify which valuation approach you require. You define each costing type in a new costing variant and carry out a cost estimate with this costing variant.
    Group Costing and Multiple Valuation Approaches
    In-Depth Detail of the Value-Added Chain: Partner Cost Component Split
    You can display in detail the costs of materials and services of every company department in the value-added chain for every stage of the production process. The partner can be traced for every material used. To do this, you define a partner version, which enables the value-added portions of each manufacturing level to be displayed in detail. For further information about this, see Partners and Direct Partners.
    The group cost component split can be displayed according to your partner definition. You can display the cost structures of the partners hierarchically according to your requirements, such as the company code segments on the highest level and the plant or profit center segments underneath.
    To display partner cost component splits, define a partner version in Customizing and enter it in the costing type.

  • Confirmation with errors in calc. actual costs for PM-order

    Hi,
    We have a PM-order with notifications and good movements that has tecnical completion status and is already settled. So we want to set it with bussines completion status, but an error arises: "Unprocessed future change recs for order 5009385 prevent del. flag/completion"
    We already checked for automatic goods receipt pending, backflushes, etc. and the only found is an error record in actual costs calculation (trn. COFC). Looking at this record the message says: "No prices could be determined for object Activity type CONA/900097/PM-100" (message KW 407).
    We checked price set for the activity type and cost center and is set for all the periods of actual fiscal year. Then looking at the details for above message, we found the following: "No price could be found for object Activity type CONA/900097/PM-100 with price indicator 7 and value type 4"
    The question is: why system is trying to get price for activity type PM-100 with price indicator 7 instead of 3 as usual for our PM-orders? How price indicator is defined from actual PM-order parameters? Any idea?
    Regards,
    mr.

    Hi
    Whats your activity type category? I believe it should be 1
    Your point is right, price indicator shud be 3 because while confirmation system uses the planned rate.. And price indicator pertains to actual activity price..
    Check whether you have calculated or maintaned actual activity price or not in KBK6
    Ajay M

  • MR21 price change for actual cost of inventory

    Hi
    Material ledger is not active. We have four FERT materials and four production orders in April 2011. Material inventory is on standard price. We want closing inventory at actual value. I have tried to change the price via MR21 but system is not allowing me to change price because cost estimate is exist.
    Actual production order cost divided by actual production = actual cost per unit.
    I want to use this price in MR21 to re-valuate the inventory in current month.
    hope clear.
    regards

    Hi Imdad
    Here is a workaround which I used many times
    a. Create a New Costing variant, with Costing Type = Release to Prices other than Std Cost
    b. The Valuation Variant settings must be as below
    For Materials - Strategy J (Price as per Price Control as of Last Period)
    For Activity prices - Actual Price of Previous Period
    c. At month end, once you calculate Actual Activity price, you can create a Costing Run in Ck40N
    The Costing date can be 01.Apr.2011, if you are running the Cost Estimate for March 2011
    d. The price calculated to be stored in Plan price 2 field of the Material Master or Tax price field
    You can get a comparison of original Std cost and the revised std cost.... If need be, you can pass a JV in FI for the Stock (x) Revised price - Original Std price
    5. If need be, you can also revaluate the COGS in COPA using this std cost estimate

  • Actual Cost when using Valuated Stock

    Hi All,
    I am using valuated stock in my project. The process would be,
    Reservation -> MRP Run -> PR -> PO -> GR -> GI.
    In this scenerio,I am expecting the actual cost, when I do the goods issue. However, the actual cost comes to project when I do the Goods Receipt (GR).
    Where the setting is missing?
    Regards
    Prabu K

    Prabu Kaliappan wrote:
    > However, the actual cost comes to project when I do the Goods Receipt (GR).
    >
    > Where the setting is missing?
    Actual Cost you are seeing while doing GR is only a statistical postings, because you have maintained statistical cost element for the inventory GL.
    The real actual cost will hit project only after GI.

  • Relevant for Costing - Price Update

    Hi,
    SAP standard is offering Price Update for Inventory Costing through 'Relevant for Costing' against which price factors (50%, 75%, 25% etc.) is maintained.
    1. We would like to use this to devalue the inventory values on a particular basis. What transaction do I need to execute to devalue.
    2. I am using one material in BOM for SFG/FG, wherein I am entering the "Relevant for Costing' key. (50%). However, I am not able to see the result. The consumption is getting posted @ 100% rate and the cost of RM in FG is also 100%. It should have been 50% as per my understanding.
    Am I missing any link. Please guide me to resolve this issue.

    Hi Swapvik,
    Pls check in your Costing Variant--> Valuation Variant --> Price Factors..
    Here, Costing Relevancy is "X" for which you need to maintain your Price Factors. Pls check your entry and let me know..
    Srikanth Munnaluri

  • Actual Cost in Valuated Stock

    Dear PS experts,
         I am facing an issue in case of actual costs in 'valuated project stock' scenario.
          The scenario is as following:
       1. A material(assembly) is attached to network having planned costs as 100 Euros.
       2. The planned costs for project is also now 100 Euros.
       3. This material is assembly made from using 2 materials.
       4. The assembly is made by subcontractor.
       5. The breakup of the costs is 80 euro for 2 material components and 20 euro as subcontracting charges.
       6. When I run MRP and covert a req. to PO, the commitment is 20 euro for subcontracting order and 80 euro for material components PO.
      7. After I receive the 2 material components in stock, the actual cost(statistical cost element is hit) for project becomes 80 euro.
      8. When I send these components to the supplier and he converts it into assembly material, at GR the entries are like this:
              a. Commitment is reduced of 20 euro, actual cost is incurred for 20 euro for subcontracting charges.
              b. The consumption is booked for 2 components(movement type 543), actual cost incurred is 80 euro.
                 So total actual costs at this stage is 100 euros.
    9. Now the assembled material is issued against network activity ( movement type 281 Q), this again updates the the consumption at project with value 100 euro.
       In this way, I am seeing the actual cost at project is 200 euro. I think it is not correct, does anybody have any opinion on this. I am not able to understand if it is related to valuation categories.
      If you are having any clue about it, please let me know. Thanks in advance !
    Regards,
    Mahendra Dighe

    Hi,
    I hope this scenario clarifies your problem.
    assly- X- 100
    material A- 40
    Material B-40
    Sub contracting charges20
    MAterail A & B came to stock (project stock) so inventroy 80 INR(statistical)
    now subcontracting PO for 20 INR
    you can not issue project stock to subcontractor so you have to transfer A & B to plant stock. then do 541 for subcontracting
    now in project you are having actual -0 and commitment 20
    when you confirm subcontract PO then material X with 100rs will come to the stock. this will reflect as 100 INR in project as an inventory. just check cost element report.
    when you issue it to network then inventory become zero and actual consumption shows you 100 INR  again check yourcost element report.
    i think this is how subcontracting works... lets wait for other experts comment.
    I dont understand why you are doing 543 movement ( goods isue for sale order)?
    venkatesh
    Edited by: venkatesh  kulkarni on Dec 3, 2009 8:38 AM

  • Costing Relevncy had not set-CKSELKZ-Relevancy to Costing Indicator

    Dear Experts,
    I want to see that in how many cases is there in which Costing Relevncy had not set in Routing. So I need List of such material. ( I need Field Name......MATNR-Material against ..CKSELKZ-Relevancy to Costing Indicator) I had Already checked below mention tables for the same.
    TABLE NAME  - FIELD
    VSRESB_CN   - MATNR
    RESB              - MATNR
    PLPO              - ISTRU
    CKIS               - MATNR
    PLKO
    Kindly Help me on this asap. thanks in advance for your kind cooperation.
    Regards........Kaushal

    Dear Kaushal,
    First check this,
    Costing relevancy is generally given with respect to each operation and it has no relation with the
    material (the header or for the material's routing).Again here the material means you mean to say the
    component's which are used for peforming operation or for the parent material?
    Say for Eg If there's a material(parent) say X for which there are 5 operation in which the 4th and 5th
    operation has not got the costing relevancy indicator means this you can get it in PLPO,but for giving
    the input to PLPO you have to use MAPL.
    So your requirement cant be fullfilled by a single table.
    check and revert back.
    Regards
    Mangalraj.S

  • Report  for bom wise target and actual cost as well as qty at line item

    Dear Experts,
    Is there any standard tcode for bom wise target and actual cost as well as qty at line item level for the month.
    there is one tcode s_alr_87013127 but user has to double click in order to get line item details.
    I want to see line item wise breakup/bom wise target and cost cost as well as qty.
    Thanks in advance.
    regards
    RK

    Dear experts,
    I am still looking for a revert.
    regards
    RK

Maybe you are looking for

  • Key doesnt work

    hi! I bought new MAC OS and after few days my key "h" does not work. It works like option key. how I can modify my "h" key to work as "h" key? also when i push the key +shift = Ó???how can I fix that problem?

  • USB3 Display

    Hallo it is possible from MAC MINI with thunderbolt , displayport to connect with a Display (only USB3 port) thanks

  • Transforming data within SQL Loader

    Can I do simple data transformation while loading data? I need to "recode" a field rather than just copying its values from the source text file, e.g. case when scode = '000057' then '800' when scode = '000015' then '815' when scode = '000060' then '

  • Creative Suite Color Settings Error Message

    I have completely bought and installed Indesign CS5.5, Photoshop CS5 Extended and Illustrator CS5. The Adobe Bridge was of course installed with each of these packages. Now I try to setup one colour setting in Illustrator save it as required, than I

  • Anyone know how to get the wood panel background in Pages 09'??

    I was messing around with it when I started using Pages and I haven't been able to switch back! The wood pattern was so much more visually appealing. Someone please help!