Actvity type in work center
I assign cost center the activity type in kp26
In work center when i a assign the cost center not automatically seen in the activity type tab
In the order creation when is assign work center am not able to see activity type in the bottom
Where to do the setting
In KP26 , You Have maintained Activity Type , Price for Activity Type & Cost Element , Not Cost Center
After this In Work Center , in Costing Tab , You Have to Maintain Cost Center , Activity Type & formula.
When u input this Work Center in Maintenance Order , you will get Activity type in Order
Regards,
Edited by: Srinivas Narayana Gowda on Jun 15, 2009 9:17 AM
Similar Messages
-
Where to assign cost cnetre and actvity type
hi
all
can any body tai lme
where to assign cost cnetre and actvity type
i assgn this actvity type in work center
so than when ia ssign ctr to work cnetre
actvity type automatically seen therei got some thing
whats about teh date teh date mentioned in
ctr-01.04.2007 to 31.12.2999
kl01-01.04.2007 to 31.12.299
now iam going to craet work cnterin costing tab the validy date i also mention the same 01.04.2007 to 31.12.2099
what should imaintain in kp26
should i maintain the version 0 and what to writte in from to to period
any idea -
Hi Experts,
I av an issue..
I am not able to assign the activity types to cost center in work center..
when i tried to assign the activity types thro KL01 it is giving a message as "Activity already assigned"
When the same i tried to assign the actvity types in work centre it is giving a error msg as " No activity types assigned to cost center"
Kindly let me know is there any customisation settings for the above issue...
Thanx in advance..
Bhanuhi bhanu ,
process goes like this...
in KL01 create activity types ,
in kp26 assign activity type to cost center and mention planned price in the next screen ...
then in work center costing tab mention cost center , then under [activity in process ] field mention activity type and mention formula at the side field as SAP008.
you can assign any no of activity types to one cost center...
regrds
pushpa -
Work center selection during UD
harhe e Hi,
We have the following scenario,
Production guys confirmed order confirmation or make backflushing confirmation to update the WIP/FG stock,
then quality cleared such stock through posting to unrestricted or blocked stock or rejection store location,
Quality person requires during UD posting ,work center/Machine selection should be there in QA32 transaction,
so that the analysis could be made for the work center,
Best Regards,
DevendraUsing Inspection Point assignment, you can record the Work Center / Machine.
But with Inspection Point, you can't have F4 selection option in standard. You have to type the Work Center code manually which may prone to error.
You can check for some user exits to define Sub screens to pop up.
QEEM0029 User-Exit for Characteristic Overview Subscreen
QEEM0030 User-Exit for Subscreen: Characteristic Single Screen
QEVA0004 Exit for changing information line in usage decision header
QEVA0005 User subscreen for displaying add. data for usage decision
QEVA0006 Entry to usage decision transactions -
Assignment of activity group to work center
Hi,
We want to assign activity type to work center more than six,
how we can assign activity type more than six to work center?
i have created activity type group in klh1,
in activity group i have assigned activity type more than six,
How we can assign activity type group in work center?
Regards
GajjenHI
It is not possible to assign more tha six actvities to a cost center as per SVK defined in the WC.
Check with the business process field for assign with your CO guy in thw WC.
A business procedure within an enterprise that uses resources and can involve activities from a number of different cost centers in a controlling area.
When executing a business process, activities can be utilized for several cost centers of a controlling area.
Check and revert
Regards
Anupam Sharma -
How to create a copy of a Work-Center?
Dear Experts,
in SAP CRM 7.0 i have made a copy of the Work Center SRV-MD. The name of the copy is: ZSRV-MD. The most important data can be found in the following table:
Workcenter Standard Workcenter Copy Logical Link Destination ID Component
SRV-MD SRV-MD SRV-MD-WC SRV-MD-WC WCC_SRV_ACC_PRO
SRV-MD ZSRV-MD ZSRV-MD-WC SRV-MD-WC WCC_SRV_ACC_PRO
I want to use both Work-Center for the same Role. My problem is that I want to define for both workcenter different Logical Links. But when I change the links on the first workcenter it is changed too for the other one.
Do I have to create a Z-Component to avoid that? The problem might be that the same Destination ID is used which is leading to the same Component?
Best Regards
OliverHi Experts,
under:
Customer Relationship Management -> UI Framework -> Technical Role Definition -> Define Work Area Component Repository
I have defined a a new Target-ID (ZSRV-MD-WC) for the created Z-Component: ZWCC_SRV_ACC_PR (Copy of WCC_SRV_ACC_PRO).
Then under:
Customer Relationship Management -> UI Framework -> Technical Role Definition -> Define Navigation Bar Profile
I have created a new Logical Link with the following data:
Logical Link ID: ZSRV-MD-WC
Type: B Work Center
Target ID: ZSRV-MD-WC
This Logical Link I have assigned to the Z-Work-Centre:
Work-Center ID: ZSRV-MD
Logical Link: ZSRV-MD-WC
But the problem is that the system still is calling the Standard Component WCC_SRV_ACC_PRO. In which method I can make a debug or look for the problem? -
Send Work Center Master data through IDOC
Hello All
Kindly provide me the standard IDOC type for work center master and the transaction to send work center master data using ALE and IDOC.
Regards
AvishekHi,
try IDocs LOIWCS01 or LOIWCS02 via PFAL or PWKC.
Regards,
Kai -
hei all,
if you see in partner function configuration, there's partner type A (work center) and partner function PA (work center).
i want to use it in sales order, but it couldn't. there's an error said
"Partner type PA is not permitted
Message no. VPD007"
can anyone explain about this error?
best regard,
Hendrydear JP,
thx for relply, but I dont think your answer is suitable for my query.
Thanks,
Hendry -
How to assign work center to class
hi any one tell me how to assign w c to class
Mukesh,
In the Workcenter Create(CR01) or Change mode (CR02), in the basic data tab down you will find a function button "Classification" hit this button, system will prompt for Class assignment.
Class Type for work center is 019.
Regards,
Prasobh -
Hi Friends,
I have A REAL URGENT REQUIREMENT as far as activity type and assignment to Work Center is concerned.
I work for a client who is a manufacturer of Paint equipment. I'm responsible for capturing the cost of an assembly activity of spray guns, which is the last step of routing. However, there are 4 processes/steps of routing which are outsourced to the subcontracting vendors. we recieve the facbricated, anodised guns which are assembled in our factory.
I need to get the cost of assembly, which I have created as an actvity type in KL01 and planned for the same using KP26. However the system is throwing up errors related to costing, and I'm not sure about the assignment areas in work center.
And above all I'm not sure of various fields in KP26 like capacity field and what do we assign.
can anybody help me with the series of steps for me to be able to pick up the cost. or if there is any sort of material in this regards, plz mail it to: __ email removed by moderator
regards
sandhyaHi,
You need to do the following:
1) Create an Activity type for the Assembly activity.
2) Define a Work Centre in PP (T-Code CR01) which represents the location where the Assembly is carried out.
3) Define a Cost Centre corresponding to the above Work Centre.
4) Plan for the Activity quantity for the combination of the Cost Centre and Activity type (KP26)
5) Plan for the Overhead Costs which are incurred on this Cost Centre which need to be included in the Standard cost of the Assembly.(KP06)
6) Assign the Cost centre & Acivity type to the Work Centre in CR02.(This is possible only after you do 5 above)
7) Execute the Plan price calculation (T-code KSPI)
After you do all of the above, when you do the Costing Run, all the relevant costs will be picked.
Ofcourse all the relevant master data for PP like BOM, Routing with the relevant assignments of materials to operations, etc should be in place.
Regards,
Assign points if useful -
IW41: automatic update of activity type when changing the work center?
Hello colleagues,
when doing a time confirmation with IW41, we have following problem:
In the PM order the operations are assigned to a neutral executing work center, as it not known which individual technician is completing the operation later on.
Now when the individual technician is entering the time confirmation with IW41, system is proposing the work center indicated in the operation from the PM order, then technician is overwriting the work center proposal with his own individual work center ID (and pressing Enter), but the activity type is not getting updated automatically. So the technician must jump to field "activity type" and choose the correct activity type.
Is there any solution (hopefully with user exits!) to have the field "activity type" automatically updated with the one indicated in the work center, which was entered manually?
Thanks for your ideas!
Regards,
PatrickHi Maheswaran,
yes, as usual all PM work centers have only 1 activity type assigned in the costing tab.
We also checked the settings of the activity type (KL03), but we just found one difference: the price indicator was set on 3 "Determined manually" - we've changed to 1 "Plan price, automatically based on activity" (..same setting as for the act. type of the work center with working update of act.type).
We tested already all possible constellations and scenarios, but we have not found any good reason for the behaviour.
Thanks for your efforts so far!
Patrick -
What are the control functions of Suitability and setup type key in work center?
Hi all,
Can any1 plz tell me what is suitability and setup type key in workcenter default values tab?
what are the functions controlled by these keys?Hello,
Control Key in Defaut value keys screen is mainly for defining how the work center will be used in routings.
Almost in all the PP we define same Control key to the work center as well in the routing.
For example in work center control Key PP01 is used to define Routings/Internal proc. activities. When we go to the routing screen even if we do not see our components, work centers or control key we have to manually enter these details ans here control Key will remain the same as it was in Work center.
No. of individual capacity defines how many machines are there of the same type in the work center. E.g if I have 5 CNC machines then I will make One work center and in capacity screen I will put 5 as No. of individual Capacity.
Regards,
Piyush -
Work Center takes only 6 activity types
Hi
I have 6 types of labor activity type ( L1 to L6 ) , 1 machine and 1 set up. Total 8 activity types.
Now if the planned labor is eg L1, the actual may be L6. But I cannot assign all 6 labor type in the work center. Work center allows only upto 6 activity types.
I checked in HR module, where in CAT2 we can record ACTUAL activity type / order / employee data. This can be moved to controlling. But when it is planning, then I dont know.
How can I accomodate all 6 labor type in the work center.
Thanks
kamalaHi Kamala
If you are in a production order scenario -
You will have to create 2 work centers... One for Labor and another for Machine/Set up... there by you will have 2 operations in routnig
If you are in a process order scenario -
You can do with one single work center... This will accomodate 6 act types..
Apart from work center, there is a concept of "Secondary Resource" in Process order scenario, which can accomodate your other 2 act types...
Regards
Ajay M -
Activity Type Changes in Work Center
Hi Experts,
We now want to change the activity type in a work center, and hope all the routings that have the work center being changed automatically. Currently, the existing routings can not be changed automatically. Is there a way to have all the routings changed as well?
Best Regards,
HelenHi,
In Costing tab next to the activity you should find a check box for Reference Indicator. If this is ticked, then the changes done in work center will be automatically read into routings.
If it is not, then you will have to manually change in routings. For individual, you can use CA02, for mass work with CEWB, working area as SAP_OPERATION
Regards,
Vivek -
Activity Types for a Work Center
Dear Experts,
I have done KL01 and KP26 transactions. That is I ahve defined the activity and assignes a cost conter to it.
Still, when I am trying to enter the activity type in costing tab while creating the work center, the system throws an error as "No activity types are assigned to the cost center XXXXX, controlling area XXXXX....."
The Msg No. is CR 091.
Please guide me to find out where I am missing something?
Thanks & Regards,
Rohit.HI,
Create a Cost center using T code - KS01.
Create an activity type using T code - KL01.
Assign the Rates for an activity type & cost center combination using T code KP26.
In the input screen of T code KP26 ,enter version as 0, from period 1 and to period as 12 and the Fiscal
Year as 2009,enter the cost center, activity type click on overview screen (F5) & enter the per hour Rate
After performing this in work center assign activity type & cost center
should be assigned. Then while creating routing/task list this work center can assigned for performing
as per the operation time, whichu2019s used by the work center, the cost is getting calculated.
Overhead cost is the indirect cost which's spent during production.
So when the cost rollup is taken using T code CK40N (or else using CK11N estimating & CK24 for
Hope You will get some idea
Thanks and regards
E.Rambabu
Maybe you are looking for
-
Apple tv can't find my photos since I switched from iPhoto to Photos
I recently switched from iPhoto to Photos on my imac which is running Yosemite 10.10.6. and since then my Apple TV version 2 can't find my photos. Also, the taskbar on Photos is nothing like they show in the description.
-
Interactive Report - Default settings
Where are the default settings for an interactive report stored? When I run an interactive report, modify settings, save as default settings and export/import just the page to another environment, the default settings don't go for the ride. Of course
-
I have blocked a sites for view the picture. But I want now to view the picture from this sites. How do I unblock the site again???
-
Automatic log on WAP Enterprise
I am having difficulty with my iPad connecting to the network at work. My work network is hidden, so I add it to my iPad. It uses a WAP Enterprise, I enter my credentials. Once it logs on to the network I enter the proxy settings. Boom, I am online!
-
Notes repeating in iTunes playback
Occasionally when playing tunes stored on my hard disk in my iTunes collection a short section of less than a second repeats three or four times. I'm not sure whether this is what is sometimes described as "stutter". I am using iTunes 11.0.0.163 on W