Adding Field in DS Planning Board

Hi Experts,
In APO DS Planning board /SAPAPO/CDPS0 for "Deallocate" subscreen i want to add a field "Planning Group".
Is it possible to change the layout by Customising ?
Regards,
Karthi.

Hi Karthi,
Please check the below menupath under
APO customisation
spro > apo > supply chain planning >
ppds > detailed scheduling > settings for
detailed scheduling planning board
Regards
R. Senthil Mareeswaran.

Similar Messages

  • Adding field to the Planning cube

    Hi Experts,
    We use BPS and we have cube to phase data. We read some data from CRM and use this as a source data for phasing opportunities. We would like to add another field to the Cube and populate that field the same way as other fields in the cube. Can anyone help me with this since iam new to BPS and CRM,
    Thanks,
    DV

    Hi DVMC,
    This can be done without disturbing the existing business scenario.
    As usual create the CRM infoobject ,Create a new multiprovider ,by selecting the existing real time info provider and the newly created infoobject ,further planning on the new multi provider  for attaining the new reporting strategy with out altering the old one.
    Hope this helps,
    Regards,
    Rajesh.

  • Follow up to MRSS planning board how to populate

    Thanks for teh reply Varun. It was correct as I did not knwo that the create/save populate teh planning board data via the BADi.
    However 3 of the 4 added fields TPLNR, ABCKZ,  and ILARTa re being populated in the Order Change (IW32) transaction but the field called Remaining Work field OFMNW_2 is not. It is generally calculated when teh actual work in teh IW41 confirmation is changed to less than planned. I.E. if the planned work was 8 and the operator puts 4 in actual work, then the IW41 screen shows remeaining work field filled in with the difference (4).
    How can I populate this field via the BADi implementation PUSH_TO_MRS method.  I tried to link the user exit for confirmation save (Enhancement CONFPM05, user exit EXIT_SAPLCORF_005 INCLUDE ZXCOFU05) to then invoke the instance of the class method call in the user exit after saving the remaing work field in an EXPORT to MEMORY ID:
    Here is the code in the user exit that then fires off the BADI implementaion method PUSH_TO_MRS
    read table AFRUD_TAB index 1.
    EXPORT AFRUD_TAB-ISMNW to memory id 'z_OFMNW'.
    data z_ZCL_IM_MRSS_RSG_PM_INT type ref to ZCL_IM_MRSS_RSG_PM_INT.
    data zheader type BAPI_ALM_ORDER_HEADER_E.
    data wa_zCT_INFO type line of /MRSS/T_DEM_INFO_EXT_TAB.
    DATA: Z_DEM_H type /MRSS/T_DEM_H_EXT_TAB,
          zCT_ADM type /MRSS/T_DEM_ADM_WRK_EXT_TAB,
          zCT_PLR type /MRSS/T_DEM_PLR_EXT_TAB,
          zCT_PLRS type /MRSS/T_DEM_PLRS_EXT_TAB,
       zCT_INFO type /MRSS/T_DEM_INFO_EXT_TAB,
          zCT_TOOL type /MRSS/T_DEM_TOOL_EXT_TAB,
          zCT_RELAT type /MRSS/T_DEM_RELAT_EXT_TAB,
          zCT_QUALIF type /MRSS/T_QUALIF_REQ_DEM_EXT_TAB,
          zCT_ASSIGNMENT type /MRSS/T_***_KEY_EXT_TAB,
          zCT_STATUS type /MRSS/T_DEM_STATUS_EXT_TAB,
          zCT_PARTNER type /MRSS/T_DEM_PARTNER_EXT_TAB,
          zCT_OPERATIONS type /MRSS/T_DEM_OPERATION_TAB.
                                                                                    create object z_ZCL_IM_MRSS_RSG_PM_INT.
    z_zcl_im_mrss_rsg_pm_int->/mrss/if_ex_rsg_pm_int~push_to_mrs(
       EXPORTING
         is_header     = zheader
       changing
         ct_dem_h      = Z_DEM_H
         ct_adm        = zCT_ADM
         ct_plr        = zCT_PLR
         ct_plrs       = zCT_PLRS
         ct_info       = zCT_INFO
         ct_tool       = zCT_TOOL
         ct_relat      = zCT_RELAT
         ct_qualif     = zCT_QUALIF
         ct_assignment = zCT_ASSIGNMENT
         ct_status     = zCT_STATUS
         ct_partner    =  zCT_PARTNER
         ct_operations = zCT_OPERATIONS
      EXCEPTIONS
        failed        = 1
        others        = 2
    IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
                WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
    ENDIF.
                                                                                    ENDIF.

    Hi Stephen...
    I think you are going wrong...
    From you post I understand that:
    1) You have implemented the user exit EXIT_SAPLCORF_005.
    Note: This is called when you enter the confirmation in IW41.
    2) Your understanding here is right that you need to integrate this information into MRS and you can do it from the above user exit.
    3) But you are wrong -- if you call the BADI here.
    Note: BADI methods will not work if you call them arbitrarily anywhere !! They work only when called in a specified program flow.
    The given BADI is called during the forward integration -- meaning when the order is saved. After the BADI is called MRS save is called and the data is saved in MRS.
    Calling the BADI method alone has not effect.
    I suggest that you read more information about BADIs and User Exits.
    Regards
    Varun.

  • Ability to display multiple texts within graphic planning board Gantt chart

    I have been unable to change the planning board Bar Chart Graphic Profile (OPG0 and OPG9) to be able to display both material text and a user field within the Gantt chart graphic.  I have copied the SAPSFCG011 profile and created my own.  The profile is displayed below from CMCH.
    Overall prof: ZBWSFCG011           SFC: View work center/capacity (3 graf.)
    ...... Select.profile:                     ZBWSFCS001      SFC: View work center -> cap.(3 graf.)
    ...... Control profile:                    ZBW___C002      Gen: Planning table
    ...... Time prof:                           ZBW___Z002      Gen: Medium-term (3 months)
    ...... Evaluation prof.:                 ZBW___A001      Gen: Standard evaluation profile
    ...... Strategy prof.:                    ZBW___T001      Finite scheduling forw./all functs.activ
    ...... Capacity planning table:      ZBWSFCL010      SFC: only main cap. (3 graf.)
    .......... Graphics profile                      ZBW___X002      BARC    1  Default profile 2 Capa. planning board
    .......... Chart sequence                      ZBWSFCT002      SFC: Main caps. (3 graph.)
    .......... Layout ID                                 ZBWSFCLA10      SFC: Work center view     (graphical)
    .......... LineRepresSelection                 ZBW___ZR02      SAP standard 2
    .......... Scale time axis                         SAP___M031      Stand. weekly per. split rough
    .......... Graph.object.select.                ZBW___OA02      Pool group order path
    .............. DStat Sq Structur Field na ROp Comparison val NStat Struct
    .............. 00000 01 KBED     TYPKZ    NE  1                      00001
    .............. 00000 02 AFVG     OBJNR    ST  SAP005         00000 SAP002 Standard operation partially confirmed
    .............. 00000 03 AFVG     OBJNR    ST  SAP006         00000 SAP003 Standard operation completely confirmed
    .............. 00000 99                   DEF                                  00000 ZJB000 Standard operation
    ................... Graphical object type               ZJB000          Standard operation
    ........................ Form type                           22              Plan. board:Graphic obj. w. ordNo matTxt
    ........................... Form group                          ZBW001
    ............................... Form definition                     PLTO22          Planning board graphic order and mat.txt
    .................................. Layout definition                   [[$a//$b]]
    .................................. Layout definition
    .................................. Layout definition
    .................................. Layout definition
    In addition to the profile change, I have configured the graphical object type ZJB000 (in OPG9) to look as follows:
    0     AFKO     Order header                          MATXT     Material description                                                                     
    2     KBED     Capacity requirements     A     SSTAD     Latest start / date     SSTAU     Latest start / time
    3     KBED     Capacity requirements     A     SSSBD     Latest scheduled start: Processing (date)     SSSBZ     Latest scheduled start: Processing (time)
    4     KBED     Capacity requirements     A     SSSAD     Latest scheduled start: Teardown (date)     SSSAZ     Latest scheduled start: Teardown (time)
    5     KBED     Capacity requirements     A     SENDD     Latest finish / date     SENDU     Latest finish / time
    6       AFVG    Order operation                       USR08    User field for date                                                                               
    I have found that the 2nd text field (USR08) must be added as the last step (#6).  When I had it as #1, the planning board did not display the USR08 value.
    Now both are displayed in the Gantt chart graphic.  However, it is difficult to see this long string of data as the bars in the Gantt chart may not be long enough to display the data. 
    Therefore we would like to use the "hover over" text which is displayed in the status line at the bottom of the screen.  We have tried using both the Info Text and the Quick Info options within the Bar Chart: Options Profile (OPG0).  Only the first text (the material descirption) is dislayed within either the Quick Info or the Info Text.
    Is it possible to have multiple object values appear in Quick Info or Info Text?  Or is it possible to control which text is displayed in the Quick Info or Info Text?
    Any help in this area would be greatly appreciated, as this is a make-or-break issue for the business to use the planning board.  Thank you!

    I'm also looking for a standard customizing alternative to do the same thing.
    Still, if you're interested, I've already done it successfully with user exit PLAT0001.
    Hope this helps.
    Best regards.

  • MRS (Multi Resource Scheduling) - Show operation status in Planning Board

    Because the current MRS thread is some long and complicated I chose to move this question into a seperate thread:
    Initial question:
    Like many companies, it is not unusual at my customer for their Planners to create orders with multiple operations, particularly since many orders require different crafts to perform the work. When the Planning Board is launched and Planners lok at work scheduled for the past week they want to be able to see at a glance which operations have been completed and which operations, perhaps from the same order, have not and may need to be rescheduled. Their preference is to select "final confirmation" when using transaction IW41 and thereby set the operation system status to CNF when the work on an operation has been completed. They then want to somehow use this CNF operation status to drive something visual in the graphical Demand layout display and Resource layout display to enable the Planner to see at a glance that the operation has been completed. I've tried several approaches with configuration of abstract statuses and the user interface profile without success. My customer's interest in being able to see the completion status of an operation in the MRS Planning Board makes a lot of sense to me. I'm hoping someone can help me with a technique for modifying the Planning Board so that it displays the completion status of an operation in a visual way.
    Response from Varun Verma:
    Hi Mark,
    The problem at your customers end is nothing new.
    What you can do ( many other customers have done it in similar way ) is:
    1) you integrate the status CNF into MRS.
    Check the customizing: Basic Settings -> Assign ERP Objects -> Status
    2) configure in MRS that for status CNF, the assignments and demands (only in item work list or Hotlist) is colored to GREEN (or any other color)
    Check customizing: Set Up Scheduler Workplace -> Workplace Profiles -> Define User Interface Profiles
    Thus the users will know visually, that the green colored assignments are already completed.
    By the way, in your work list you can also filter the demands based on their status
    Regards
    Varun.
    Followup question:
    Varun,
    Thanks for the response.  I thought I had tried this but perhaps it's because in the UI profile I had not entered something in both the status groups for assignments and the status groups for demands.  I have a bit more testing to do but it appears that the demand status now gets updated from the operation status of PCNF (linked to abstract status WORK_START) and CNF (linked to abstract status WORK_STOP).  I also get a red bar (C4) for PCNF and a green bar (C1) for CNF.  Do you have a better status group I should be using in place of C1 and C4?  Status groups C1 and C4 give me a bar but it doesn't look like the demand bar with a outline and alphanumeric description of the demand, it's just a colored bar.
    I know the work list can be filtered based on their MRS "planning" status, however, it doesn't appear to permit filtering by the status of the operation unless I add the operation status as an additional field in the worklist.  Is there something I'm missing here?  And even if it did, my customer wants to be able to see the CNF status indication in the Demand layout and schedule using the work centers so the worklist is not being shown like it is in the Resource layout.
    Mark
    Edited by: Mark Scott on Aug 10, 2009 3:35 PM

    Hi Mark,
    Well I assumed that you have confirmations integration active !! But I guess not because you say that the status is not integrated always.
    What you need to do:
    1) I assume you have SP05 or later.
    2) Implement the user exit: CONFPM05. In the implementation of this exit you need to call FM: /MRSS/RSG_PM_ORDER_CONFIRM
    3) Go to customizing: Basic Settings --> Assign ERP Objects --> Status
      -- Here, define an abstract status (MRS Status) for confirmed and partially confirmed
      -- map it to R3 status CNF and PCNF.
    After this, whenever you enter confirmation for PM order from transaction IW41, the status will be integrated.
    Now you can use the MRS statuses defined in step 3 to configure the colors.
    Implementing the user exit CONFPM05 might require some technical input. But it is easy. Just a few double clicks and copy paste.
    Contact an ABAP developer for the same.
    This should solve your issue.
    Regards
    Varun

  • Creation of Order in DS Planning Board (/SAPAPO/CDPS0)

    Hi all,
    My requirement is i want to create order manually in DS planning board by passing product, location,resource,runlength etc.
    Again i am using PPM to calculate the setup time (between previous order and the current order).
    In order to get the PPM data, i am calling FM "/SAPAPO/DM_PPM_GET_PLAN" and here i pass planid to get the details.
    To get planid, i call FM "/SAPAPO/SOS_FIND" i.e. to get source of supply information which includes planid
    Please tell me
    (1) what is planid ?
    (2) How planid is this linked to PPM ?
    (3) What do we mean by sources of supply? Can't we get the same info from pegid ?
    (4) What is the structure of PPM ? I mean what are activities, components, alternative components etc.
    Regards,
    Deb

    Hi Nandha / Vikas
    Thanks for your input.
    I am summerizing the whole concept, Please correct me and answer my questions in between :-
    In order to create an order in DS Planning board manually, we need information like product,location,resource,quantity etc. (User's input).
    Then we should follow the steps as follows -:
    Step 1 :- Find Sources of Supply
    Since this gives information like how we are going to produce or procure the product. It can be PPM or PDS or Transportation lane.
    For PPM we will get the Plan id (Unique ID for PPM) and then we will get the details of PPM accordingly.
    But, Please mention what about PDS and Transportation lane ?
    I mean from source of supply how can we know that the product can be produced or procured by PPM or PDS or Transportation lane ? Any field indicator is there for PPM or PDS or Transportation lane? Because in my requirement, First i need to check which one is active for the entered product:- PPM or PDS.
    (2) Once we know that the source of supply is PPM or PDS or transaportation lane, then we will call different FMs to get the details.
    For PPM we know how to proceed. I mean using planid we can get the details.
    But for PDS and Transaportation lane please mention the FM name and i/p parameters to get the details like setup group id, production rate etc.
    Thnaks once again for your valuable inputs.
    Deb

  • Viewing CO versions in project planning board

    Hello,
    I have saved two CO versions of my project. When i go to the project planning board the approved plan column is full of data and looks great but the other version as no information. I have SAPALL so this isn't an authorization issue. Can someone please help me work out was is wrong?
    Thanks a lot
    Jason

    Hi,
       Basically there are possibilities of creating Plan version.
    1) one you can create in CJ40 by manually feeding the Version ex:0,1,2 etc....
    2) create one version in CJ40 and copy the same to another version in CJ9BS.
    once the versions are created make the changes of values in the respective versionand save the changes.
    Please check the version comparission in S_ALR_87013539 - Project Version Comparison: Plan.
    Comming to plan board which fields did you picked up for comparission?
    Rgds
    Sudhir Reddy

  • Activity Confirmation  -  Gantt Chart  -  Planning board

    Hi
    suppose i have a activity duration from 1st february 2009 to 28th february 2009
    on 15th february i confirm 0nly 10% of the work as completed in the activity confirmation screen in the degree of processing field and also enter the start date as 1st february 2009 and the finish date as 15th february 2009.
    when we look at the planning board in CJ20n transaction subsequently (gantt chart) the activity bar shows a colouring from 1st february to 15th february instead of showing only 10% of the activity bar coloured for completion of the work
    where is it possible to see the percentage completion of an activity graphically as 10% this data is available in table format in CN48N transactio

    Hi,
    we can view in table format by selecting the fileds related to percentage of completion in the project planning board (gantt chart).
    The requirement you had explore is possible in MS projects, but in standard SAP we can't view in the graphically mode.
    Regards,

  • Rescheduling the order in planning board

    The error is "Activity is outside the planning period" and the detail Log contians 'reschedule activity 180501 0010 0015 S, which is outside the planning period'
    (I found that the order valid to order is 04.10.2010 for this perticuler order if this is the reson then how this field is getting updated?)

    Hi,
    Check in the initial screen of the access to DS Planning board the planning start and planning end period defined.
    You are doing a rescheduling activity which is out side the planning end period.
    In the strategy profile you can define that in case of scheduling error termination can happen .
    Thanks,
    nandha

  • Network Header at  the Project Planning Board gantt chart

    Hi again,
    Does anyone knows a configuration to allow the network header to appear in the project planning board gantt chart?
    Tks
    James

    Try transaction OPT7
    Double click on the appropriate Profile
    On the Table Area Tab, select the flag for the field "Display Network"
    Hope this helps
    Regards
    Steve

  • If library is put on another computer will 'Date Added' field be lost? Thx!

    Hi there, I'm planning on reformating my PC (virus problems) and of course i want to take my music along on an externam HD with but I'm not sure how to put my music back while preserving the Date Added field as well as Ratings and Play Count....
    any help/suggestions would be greatly appreciated!

    Hi, Bryan!
    To preserve your playlist and related information, you have to include the iTunes Library files from your old computer in the transfer to your new computer.
    They tell iTunes what songs are in your Library, where the song files are located as well as playcounts, ratings, etc.
    It's important to maintain the exact same directory structure for your music files on the new computer as you had on the old one, i.e. if the path was C:\Documents and Settings\ user name \My Documents\My Music\iTunes\iTunes Music , it must remain the same ... including the same Windows User Account name.
    For some more info, Hudgie's User Tip .
    You might want to have a look at

  • Adding field in Report Painter

    Hello Gurus,
    I am working in the Report Painter PR20-001.
    My requirement is to add a new column in the output of the report but even when i am able to add a new field and save it on the reports execution i am unable to view the added field in the output.
    Kindly tell me the entire procedure to add a new field in the output of the respective report painter output.
    Regards,
    Swati.

    Hi,
    Go to Global Parameters Definitaion in report painter, variable will be used only along with the field, just in global paramerters enter your desired field and click in next column, system will show you a pop up select your variable for that field...
    now its just done run the report and test it!
    If you still not make it refer to standard report of such kind, you will surely get it....
    Regards,
    Sayujya

  • Unable to capture data from drop down list in custom added field in migo tcode at item level

    Hi guys,
    need bit help in resolving query related to custom added field in Tcode migo.
    i have added a field in migo at item level ,in this i have used drop down list
    to get data but unable to capture data from drop down list.gown through
    many blogs in scn but unable to resolve.
    Please help me out in this.
    Thanks,
    Umakant.

    Hi,
    U can use following code to fill the list box
    write this code in PBO
    In layout editor please select listbox in dropdown attribute of input field and put some fctcode attribute
    TYPE-POOLS vrm.
      DATA values TYPE vrm_values WITH HEADER LINE.
      TABLES: <ur custom Database table>.
      clear values, values[].
      SELECT * FROM <ur custom Database table>.
        values-text = <TABLE FIELD TO DISPLAY IN DROPDOWN> .
        values-key = <TABLE KEY FIELD TO DISPLAY IN DROPDOWN>.
        APPEND values.
      ENDSELECT.
      CALL FUNCTION 'VRM_SET_VALUES'
        EXPORTING
          id              = '<SCREEN INPUT FIELD NAME>'
          values          = values[]
        EXCEPTIONS
          id_illegal_name = 1
          OTHERS          = 2.
    Also please define the following before accessing the listbox value
    data: <listbox input field name> type <table field name>,
            <inputfield name where text to display> type string  in top include
    In PAI, select the text from the table into <inputfield name where text to display>  depending on value selected which will be called when enter key is pressed or any vale is selected

  • Newly added field not getting displayed in ALV output

    Hi All,
       I'm adding one more field/column to be displayed in an old existing program that uses REUSE_ALV_FIELDCATALOG_MERGE to generate the ALV fieldcat.
    DATA: BEGIN OF it_salary OCCURS 0,
            pernr LIKE pa0000-pernr,
            ename LIKE pa0001-ename,
            rtext like lv_rtext, -
    added field
            waers LIKE pa0008-waers
      CALL FUNCTION 'REUSE_ALV_FIELDCATALOG_MERGE'
        EXPORTING
          i_program_name         = driver
          i_internal_tabname     = 'IT_SALARY'
          i_client_never_display = 'X'
          i_inclname             = driver
        CHANGING
          ct_fieldcat            = lv_fieldcat[]
        EXCEPTIONS
          inconsistent_interface = 1
          program_error          = 2
          OTHERS                 = 3.
      CALL FUNCTION 'REUSE_ALV_LIST_DISPLAY'
        EXPORTING
          i_callback_program      = driver
          it_fieldcat             = lv_fieldcat[]
          i_default               = 'X'
          i_save                  = 'A'
          is_variant              = lv_tmplt
          is_layout               = lv_ls_layout
         i_callback_user_command = 'USER_COMMAND'
        TABLES
          t_outtab                = it_salary
        EXCEPTIONS
          program_error           = 1
          OTHERS                  = 2.
    The newly added field is not getting populated in the lv_fieldcat table. Tried running programs BALVBUFDEL,
    BCALV_BUFFER_DEL_SHARED then logging off and logging in but of no help.
    Please provide suggestion for this issue.
    Regards,
    Sridevi S

    Hi,
    Fieldcat is buffered - so use
    I_BYPASSING_BUFFER = 'X'
    Since a while CL_GUI_ALV_GRID is available which does NOT need any fieldcat (is determined internally using RTTI). It is worth playing around whith this class if you have some time. This class is recommended for ALV Output by SAP (but no edit is possible - was never supported officially).
    A simple use would be:
    data: gt_output type standard table of (adjust!).
    *simple ALV output
    data go_alv type ref to cl_salv_table.
    data go_functions type ref to cl_salv_functions_list.
    data go_columns type ref to cl_salv_columns_table.
    data go_column type ref to cl_salv_column_table.
    *Exceprion handlig
    data: go_exception  type ref to cx_root,
          gv_errortext   type string.
    ** fill table gt_output ...
    ** ALV output
    if not gt_output is initial.
        try.
            call method cl_salv_table=>factory
              importing
                r_salv_table = go_alv
              changing
                t_table      = gt_output.
          catch cx_salv_msg into go_exception.
            gv_errortext = go_exception->get_text( ).
            message gv_errortext type 'A'.
        endtry.
    * enable all standard ALV functions
        go_functions =  go_alv->get_functions( ).
        go_functions->set_all( ).
    * hide MANDT
        go_columns = go_alv->get_columns( ).
        go_column ?=  go_columns->get_column( columnname = 'MANDT' ).
        go_column->set_technical( ).
        go_alv->display( ).
    Kind regards,
    Holger

  • Added fields not appearing in the DSO transformations.

    Hi,
    I have added three new info objects into data fields in the DSO then activated and not appearing added fields in the transformations.
    Please suggest me,
    regards,
    Jayapal.

    Hi Jayapal,
    i dont know whether it would help you...you can give a try on it.
    Instead of deleting the Transformation, just delete the mappings if any in the transformation.
    Goto DS->Fields Tab-->In the Column Template info Object. Try mapping corresponding IO with the Source IO.
    Then it will show a pop up give Copy . Activate the DS.
    Goto Info Provider>Select the Transformation> If it is active-->reactivate it by clicking the Pencil Icon with glass and click activate icon.
    If its not active, then reactivate it again by clicking the Pencil Icon with glass.
    Let me know if it Works... Cheers
    Regards,
    Syed
    Edited by: shameer83in on Nov 20, 2009 12:10 PM

Maybe you are looking for

  • Air print on iPad does not connect to officejet pro 8600 plus

    My macbook prints fine wirelessly to our hp officejet pro 8600 plus with an arris TC862 router. IPad, however, will not. Is there an easy fix that will not disrupt my computer's wireless connection because I did not find it easy to set up, so don't r

  • Support for CR2 raw files in Photoshop CS

    Newby here! I've used Photoshop CS (the original CS version) for some years processing CRW canon 10D raw files. Now I've upgraded to a later Canon 40D, which produces CR2 files which CS can't read.  Is it possible for me to download an update / plugi

  • The back plate of my shuffle came off!?

    While clipping my shuffle on my shirt the entire sealed backplate came off. I could put it back in place but there is a black seal that was definitely damaged....how big of  a deal is this? Will apply replace my shuffle under warranty? Thanks in adva

  • How to transfer data from Centris 650 to iMac?

    Hello community I have inherited a vintage Centris 650 running OS 7. The computer is perfectly working and it is connected to an external SCSI HD (original internal Apple disk encased in a box after upgrading the internal HD) to an IOMEGA ZIP100 SCSI

  • F.46 explanaion

    Dear Experts,   can any one explain what is the use of T-code F.46. Regards chandu