BAPI_KANBAN_CHANGESTATUS - Control cycle correction (Change status and qty)

Hi Experts,
I have a requirement to upload the kanban status change and actual quantity to SAP either through PK31 or calling BAPI_KANBAN_CHANGESTATUS. In online transaction, I can change the status from "WAIT" to FULL or any other statuses and i also can put in the actual quantity, there is no issue as long as i entered through transaction. But when i try to do the same thing using BAPI, the system actually prompt me several restriction; I can only change the current status to the next status E.G.: current status is WAIT, i can only change it to EMPTY but not In Process or Full.
My question is: Is there any other more flexible ways to change the statuses? If need to use this BAPI to change status WAIT to FULL (01 to 05), i need to do several BAPI calls before i can change it to FULL!
And even i specified the change of actual quantity through the BAPI, it does not update into SAP (no matter how i tried). It strikes me that we could not possible change the actual quantity manually through BAPI, instead the actual quantity is only reflecting the available amount of the material in the stock (something like that). But the thing is i can change the actual quantity in PK31. To me, it seems like the online transaction bypasses some of the business checking.
Anyone successfully changes the actual quantity through the same BAPI? shed some light please.
Hopefully someone can answer my question, thanks.
Regards
Jay

Hi,
I use BDC to do this one, BAPI has too many checking which is not necessary in my case. However i also hit problem with BDC, which is the screen problem (Selecting row in table control). I jsut copied the transaction and made slight change to it, the BDC work like charm.
Regards

Similar Messages

  • KANBAN control cycle quantity changes tracking -reg

    Hi,
    Which tables and fields are to be used to knwo the changes in the kanban quantities in the control cycle of a part number
    for a part number over a period of time what and all changes are done to the kanban quantity we would like to track
    how to go about ?
    pl guide
    regards,
    madhu kiran

    Hi,
    Try Table PKCH and field PKCMG.This would be your best bet.

  • Authorization change price and qty for approval

    Hello all,
    please help me..
    i have scenario
    Person A ( Requester ) : Create Shopping Cart
    Person B ( Manager    ) : Approved
    Person C ( Director )     : Approved , but this person have to change qty and price.
    In SRM, when Director approved , he also can change qty and price. is it possibe ? instead the shopping cart goes to requester.
    Thanks for your help.
    regards,
    Angga

    Hi
    Once PO is goods receipted and invoiced, it becomes statistical, which permits you to change the fields like price and quantity.
    Thanks

  • Change mass status and desscription documents.

    Hi all,
    I would like to know how is possible mass change status and description from all documents in SOLMAN?
    Thanks in advantage.
    Warlei Figueiredo

    Hello Warlei,
    Unfortunately i don't know such functionalitiy and i highly doubt that it even exists.
    I would advice you using transaction SI80 to change description and status because you ll get an overal view of all documents of your project in one and only screen
    For each entry (doc) you can click on button 'Set Status' to change status and button 'Change Attributes' to change other attributes such as Document type, Document Properties, Title, Technical Name, Content type...
    In order to have your list in SI80 Click on button '+ with search', then select 'Solution Manager', then in 'technical Name' fill your ptoject Name and validate.
    You ll see a new line that adds to your Favorites. By double clicking on your project you ll see the list of documents.
    If you need a mass update tool , you can ask a developer helping you achivere that. Table SA01PHIO contains description & status of all documents !!
    PHIOID is the hexadeciman id of documents; DESCRIPT is the description you want to change and STATE is status of doc
    A simple program mass updating this table (meaning description and status) won't be complicated for a developer to code
    Hope this helps
    Regards
    Khalil
    Edited by: Khalil SERRHINI on Jun 21, 2010 4:19 PM

  • Issue with control cycle

    Hello all,
    Can somebody please tell me how to find who created a particular control cycle?
    Is there a way to find the id of the person who created/modified a control cycle?
    If yes, please tell me.
    Thanks and Regards,
    Umakanth.

    Hi
    Use Transaction AUT10 with T-codes PK01/PK02.
    Give the period for which you want to find changes.
    keep the changed by field open , i.e dont put your user id there.
    and execute, you will get list of all changes done through creation or chage transaction of control cycle.
    check it out and revert back for further discussion.
    Hope it helps you.
    regards
    Ritesh

  • SNC Kanban Issue - Control Cycle Master Data

    Hi,
    We are testing the SNC Kanban scenario with contracts (PO) between ECC & SNC.
    We have created a control cycle for the ECC material and have sent the Master Data to SNC. We are now trying to send over the control cycle info to SNC and are getting hte following message when we run KANBAN_MD_TRANSMIT:
    "Kanban control cycle 70666: No address data available; processing terminated"
    Any suggestions would be appreciated.
    regards.

    Hi Anjan Bellur
    As per the error message, the address details for your supply area are not maintained
    Kindly go to the transaction PK05 in r/3 system
    For your plant and Production supply area, Shift+F5
    Maintain the address details
    Then the reported error message will not appear
    Best Regards
    Vinod

  • Change KANBAN Status Sequence in Control Cycle

    Hi guys,
    Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
    Regards,
    Ileana

    Hi
    In the kanban process the actual sequence is
    Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
    If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
    When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
    Eg: Ur present sequence is like
    Empty>In process> In -transit --> Full -->  Empty
    Now ur bin status is "Full" then u have changed the sequence in the control cycle.
    New sequence is like
    "Empty--> In process > Full> In use -->Empty"
    Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
    Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
    So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

  • KAMBAN: Change Status Sequence in Control Cycle

    Hi guys,
    Can anyone please detail which are the implications if I should change the status sequence for a control cycle, which is in use now?
    Regards,
    Ileana

    Hi
    In the kanban process the actual sequence is
    Wait>Empty>In process > Intransit> Full > In use>Empty.This is complete cycle
    If ur present kanban bin status is "In use" then then u changed the sequence in the control cycle.
    When ever u trigger the kanban card, then system  move to control cycle and checks the kanban sequence by referring the standard sequence it move to next status.  
    Eg: Ur present sequence is like
    Empty>In process> In -transit --> Full -->  Empty
    Now ur bin status is "Full" then u have changed the sequence in the control cycle.
    New sequence is like
    "Empty--> In process > Full> In use -->Empty"
    Now u triggered the kanban card of " Full" status bin, then system refer first sequence in the control cycle and then standard sequence then status is changing to " In use"
    Means when ever u change the sequence in the control cycle system checks the sequence in the control cycle by reference of standard sequence it will changes the bin status.
    So if ur bin is in the "In -use " status, then what ever the next  status in the sequence is taken when u trigger the kanban signal

  • BAPI /FM to create /change KANBAN control cycle

    Hi
    Is there any BAPI or FM to create or Change control cycle?
    Thanks.

    Check
    BAPI - BAPI_KANBANCC_ADDEVENTDRKANBAN
    Short Text
        Create Event-Driven KANBAN for Control Cycle
    Functionality
        With this method you can procure a material quantity for a control cycle. To procure this material quantity one or more kanbans are created in the control cycle and set to status EMPTY.
        The essential entry parameters are:
        o   Control cycle (if the function module is called as a method for the object kanban control cycle, this parameter is not available, but given by the object.
        o   Material quantity
        Information about the status change is issued.
        COMMIT and ROLLBACK WORK: the function module does not carry out any COMMIT work. Command off. This must be ensured by the initiator after ending the function module. Each time the function module is called, a COMMIT WORK must take place. It is not permitted to call this FM several times and to post the result with a COMMIT WORK. If, during the process,
        the FM comes across an error, in some cases the command ROLLBACK WORK wil be carried out. In these cases the kanban is either set to ERROR status, or in the parameter RETURN an error message is given.
    Hope this helps.
    Regards
    Vinayak

  • I inadvertedly changed a setting where the top of my screen no longer shows the apple logo in the top left or the clock and wifi status and strength on the top of the screen, how can I get it to show both of these things again like it used to?

    I inadvertedly must have changed a setting where the apple logo and files and things that used to be in the top left corner of the screen are no longer there as the clock and wifi status and other installed settings used to show up in the top right hand corner of my screen.  When I move my mouse to the very top of the screen they drop down but when I move my arrow away from the very top of the screen they both disappear again.  So I was wondering how can I get it to revert back to the way it used to be?  I hope this isnt confusing.

    I tried the zoom thing but it still didnt resolve my issue   Im gonna try to clarify my issue a little bit more, before the change, my screen when I would surf the web would have the apple logo and safari and file and edit and view buttons at the top left hand of the screen and the upper right hand screen would have the time and the wifi strength and my name and the spotlight box and a volume control but now they dont show while Im browsing the web unless I take my arrow and move it to the very top of the screen then those boxes will drop down like it used to be but when I take my arrow and move it from the top of the screen it disappears again and ll I get is a back and forward arrow and the url input bar.  Anyone else have any ideas of what I did to mess this up?

  • Change control cycle record

    Hi all,
    Can anyone please tell me the transaction code or if some config. required to change my control cycle record.
    I created one from PK01, now when I wish to edit it at PK02, it gives me the following error.
    Control cycle from WM/PP may not be processed here
    Message no. PK083
    Diagnosis
    Control cycles are created both for Kanban and for warehouse management. However, control cycles created for the warehouse management system may not be used in Kanban and vice versa.
    Any help is appreciated
    Rgds,

    HI
    I am also facing the same problem.
    I am working on r/3 4.7
    Please can any one help regarding this problem.
    Thanks in advance

  • Stanging indicator change in control cycle after production order released

    HI
    We have MM PP interface active
    i setup staging indicator 4 for one material via control cycle
    Production order is created and released
    now we would like to change staging indicator to 1 [pick parts]
    how we reread control cycles data in production order
    Thanks

    Try: CO02 > Functions > Read PP master data

  • Changing of iBase in Change Requests and Corrections being processed

    Good day!
    After going SP18 with Solution Manager our iBase component system has gone "mad": number for productive ERP-system has changed several times.
    Because of this change, a number of already approved change requests and corrections in processing can't be modified correctly. I can't change their status by regular operations from system document. Multiple correction/ change request change also won't work. And I can't change the iBase component in this documents, because the field is read only.
    How can I close all Change Requests and corrections with old iBase component number?
    Is there a way to change the iBase number in already approved Change Requests and Corrections, so i can perform operations with this system documents.

    Hello Raguraman!
    Thank you for your answer.
    Anyway I implemented the note to which you refer, and still can't change iBase component in corrections and change requests which are in process. The "iBase/Component" field is still read only and contains components which do not exist anymore.
    Do you know how can I change this values?

  • Problem using Change production and SFC step status with Simultanious group

    Hello,
    We just upgraded to ME 5.2 SP5 patch which was released two days back, the problem with Simultanious group is fixed and SFC gets the correct next step as per defined in the router (Previously there was bug).
    But when we try to use change production and put SFC in simultanious router at some particular operation as que it is getting in que at all operations and really can be started and completed even at the last operation.
    Same is the case with step status if we put it in que at some intermediate operation all operation listed above are becoming in que irrespective of the flow defined in simultanious router.
    Please let me know how to handle this.
    Regards,
    Pushkar Patil

    Hi Pushkar,
    It seems to be a bug. I would suggest opening a ticket on this.
    Regards,
    Alex.

  • Restrictions belonging relation between Change Request and Corrections?

    Hi all,
    In standard change process I only can create one change document (correction) to one change request.
    Releation 1:1.
    Is there a technical restriction belonging the relation between the change request and the corrections?
    Does anyone has experience with a 1:n relation in the change process?
    Thanks for your help in advance.
    Regards,
    Alex
    Edited by: Alexander Barth on Mar 16, 2009 11:24 AM

    Hi Prakhar,
    what you described is a process-restriction. It is not a technical restriction.
    E.g.: I have a change belonging BI. Therefore I have to change things in BI and ERP 6.0. Why not using one change request with two corrections? One for BI and one for ERP 6.0.
    So you are right if you want to create for that situation two change requests. There is no relation between them. How do you control them?
    Administration and documentation is important. But it should be useful.
    And I am able to set up more than one corrections to one change request technicaly in SolMan.
    But is there a deeper technical restriction inside which raise problems later?
    For me it seems that SAP wants that a 1:1 relation is used. But why?
    Does anyone have an idea?
    Thanks.
    Regards,
    Alex

Maybe you are looking for