Change Table Fields in "Costing" in with Project System (PPM 5.0)

Dear Gurus;
I need to know, how can I change fields in "Costing" with Project System (Project Management in tab name "Accounting").
The integration works well, but I need to view the values of: Actual, Plan and Commitment.
In the Standard way, just only can see the Plan (with the colum "Costs").
Please, help.
Best regards.
Mariano.
Edited by: Mariano Sabiche on Apr 27, 2011 3:17 PM

Hi Mariano
The particular screen you are referring to will only show the planning on Easy Cost Planning due to the labour costs and revenues planned on the cProject.  You can use the services&deatil on the assignment - click on the WBS assigned to get the detailed list of services for the assigned WBS element.  You can then click on Detail Data to get detailed data on the assigned WBS element.  If you want a report with all the data, best use the BW cubes for that to combine cP and PS data.
Hope this helps
Regards
Duan

Similar Messages

  • Passing Changed  extended fields using ALE-IDOC to receiving system

    Hi all,
    Please tell me how passing changed  extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    For ex. in matmas05 extended for classification and inspection view and then created using 'CREATION'
    related bapi.Do i also need to incorporate the changes by change related bapi or ir can be handled by change pointer concept.
    Thanks.

    Hi Sanu
    1) Please tell me how passing changed extended fields using ALE-IDOC to receiving system can be achieved. Is it possible by Chnage pointer concept.
    => Looks like you have extended standard IDOC here. so you need to find User Exit or BADI for the Push program to populate the additional fields. Yes, it is possible thru change pointers as well.
    1) Do i need to do some coading after data enters into receiving system as it is required while creating the entries in database table.
    => Yes, as suggested in 1 try finding User Exits/BADIs.
    Regards
    Shital

  • Sales order with project system

    Hi,
    Is any one can explain for the mentioned scenerio pl:
    In production cost by Sales order, is production / process order will be linked for production booking or always is it best to implement the make to order with project systems - Sales & Process / production order is used as WBS element?
    Also, can u pl. exlain me how to activate the same?
    Rgds
    SMK Ganesh

    Hi,
    Is any one can explain for the mentioned scenerio pl:
    In production cost by Sales order, is production / process order will be linked for production booking or always is it best to implement the make to order with project systems - Sales & Process / production order is used as WBS element?
    Also, can u pl. exlain me how to activate the same?
    Rgds
    SMK Ganesh

  • Report Painter Drilldown on Cost Element for Project Systems

    I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.

    Hi Avinash,
    See my replies below.
    1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
    When  you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
    coming to equipment cost - are you capturing using PO through GR?.
    2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
    Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
    When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials  have their own valuation class and have default CEs accordingly. that would not be big issue.
    Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
    The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
    3. I have answered the relevance of Cost relevance check box in above.
    Hope above makes sense.
    Thanks,
    Sudhakar

  • Regarding configuration cycle for sales order linking with project systems

    Hai Sap professionals,
    i have a scenario like engineer to order. where i manufacture PC's for my customer as per their request.
    Some may order AMD's and some Intel processor etc... now how i should start linking everything a brief idea if any can tell it will be helpful...
    with regards

    hi,
    In make-to-order production with cost management using a project, all costs and revenues relating to the make-to-order item are collected and allocated to a project in the SAP Project System. The costs are allocated to profitability analysis.
    Prerequisites
    Make-to-order production is controlled by the requirements type. The requirements type is determined on the basis of the MRP group and the strategy group in the material master record.
    Up to Release 3.0, the requirements type is determined on the basis of the item category. For this reason, special item categories are used up to Release 3.0 for controlling make-to-order production. To carry out make-to-order production for a material with cost management using the project, you must maintain the following fields in the material master:
    MRP 1
    MRP Group
    MRP 2
    Strategy Group
    Screen
    Field
    In addition, a plant must be assigned for make-to-order items in the sales order.
    for detailed set up please refere the foll link:
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/dd/5600b1545a11d1a7020000e829fd11/frameset.htm
    regards,
    Siddharth.

  • Document number of Planned cost booked on Project system

    Hi All,
    I have a requirement wherein i need to find out the document number of the cost booked in Project and WBSE. Like for eg in Report S_ALR_87013532, there is planned cost.
    also in the same report S_ALR_87013532, we have OVERALL VALUES and TOTAL OF YEARS. What is the difference between the two ?
    Thanks in Advance
    Regards,
    Ajay

    Overall is derived from the Overall values planned for the project (at the overall level) - look at config of your planning profile - transaction OPSB.
    Total of Annual is the sum of the all annual values planned for the project.
    To get the document number, you will need to go to the line items. To go there, select the WBS element or whichever level you want to drill down to and then goto menu Goto -> Line items. You will be given a list of line items available (actual, plan, etc...). Once you get in there, you should be able to select the "Document number" field from the available fields or click on the "Document" item to view the posting document.

  • Cost plannin in Project Systems

    Hello SAP PS Gurus,
    I am working on implementing SAP project systems for the client
    that I am currently with.
    I am having problems in cost planning for my WBS elemented related activity. for example when i confirm an activity my actuals are getting updated in the actuals column whereas my planned isnt getting updated even though i have done my planning through KP26 and also through CJR2. please advice what is the right way to do planning or assign costs for activities.
    i dont know if i am missing something.
    your feedback as soon as possible would really be appreciated.
    Thank you
    Pranita

    Hello
    Check this link on Project Planning Board.
    http://help.sap.com/saphelp_erp2005vp/helpdata/en/4c/225cff46e611d189470000e829fbbd/frameset.htm
    Reg
    *assign points if useful

  • 8900 printer changed black cart. error code problem with printer system

    Changed black cartridge in 8900 series all in one printer error message says trouble with print system call HP.  Have removed and reinstalled catridge still same error message. HELP!!!!!

    Hi @melvinc 
    Welcome to the forums
    I read about the issue you are facing on your printer, as it's now showing a problem with the ink system. I cannot locate a "8900" printer, could you possibly have the Officejet 8600? If so, please try out the steps from the guide below. If you reach a step where it asks to replace the printhead or printer, call us directly to see what your replacement options are with HP.
    A 'Problem with Ink System' Error Message Displays on the Control Panel or Computer During Setup
    Please call our technical support at 800-474-6836. If you live outside the US/Canada Region, please click the link below to get the support number for your region. http://www8.hp.com/us/en/contact-hp/ww-phone-assis​t.html
    Have a great day
    R a i n b o w 7000I work on behalf of HP
    Click the “Kudos Thumbs Up" at the bottom of this post to say
    “Thanks” for helping!
    Click “Accept as Solution” if you feel my post solved your issue, it will help others find the solution!

  • Classification with project systems

    Dear Experts: We are evaluating a possibility of using classification system with projects in project systems. At this point our understanding is we need to do some configuration and custom development to achieve the same. If anyone has some prior experience or knowledge in this area please advice.
    Appreciate your help in advance.
    Thanks & Regards
    Giri

    Some places where integration could be useful
    Projects Area
    1) Attaching in Statement of Work for the project , by creating a seperate document type
    2) Project planning ducuments could be attached.
    3) Risk management plans could be linked using dir
    Engineering Area
    1) Engineering Drawings for redlining and manufacturing
    Production
    1)Work instructions for the production as to how products would be manufactured
    Quality
    Safety related documentsand origina certificates
    Purchasing
    Procurement related specifications in terms of drawings , shipping instructions
    Sales
    1) Inquiry
    2) quotation
    3) Contract
    Anshvinder Singh

  • Problem with Project Systems authorizations

    Hi All,
    We are implementing project systems module and are facing several authorization issues. The SAP default values do not seem to work and there are several objects which showup as "not checked" in SU24 showup in the SU53. e.g. tcodes are CJ20n, CJI3. Are there any steps for activation / pre-requisites, etc?
    Thanks for your inputs
    Vijaya

    Hi
    There are chances that some of the transactions codes will call other tcodes while execution.
    in this case also CJ20N is calling many tcodes, those auth check would not be inserted as check points in SU24 , hence you should identify them in the testing phase or using the TCDCOUPLES table.
    You can check the calling & called transaction values in the table TCDCOUPLES in SE16, according to that you can build your SAP roles.

  • Changing Document Type after making progress with project. Is it possible?

    Can I still change my document type after I already started my project? I want to change it to print type.

    Just what do you mean by "print type"?
    Do you mean changing the document Color Mode to CMYK color from RGB color?  If so, sure, you can do that at any time.
    If you mean changing the "file type" (file format)  (say from PSD to TIFF, etc.) you just do a Save As to create a new document in whatever format you want.

  • Sales order changes- table & field name

    Hi gurus,
    last week i created a sales order for 250 qty, and today i have changed the quantity from 250 to 200.
    from which table i can find out the old qty,updated qty and the changed date.
    cheers,
    Sumith

    Hi
    For  Changes to sales order  Check Table CDHDR & CDPO for Item Changes
    goto SE16 , enter the table & Give the Object values as the Sales order number
    you will get the change details
    Thanks & Regards
    Kishore

  • Changing Activity Elements  under the WBS in Project Systems

    I have added additional fields to the AFVU structure and need to update the fields.
    I created a sub-screen using enhancement CNEX0008. This subscreen contains my added fields.  I wanted to use tcode CN22 to perform the updates.
    When i record a BDC for Tcode CN22 to preform the update, I find the screen numbers change. I am trying to update the internal activity entries.  I can not see a pattern as to why this is happening so i thought i would look for a bapi to perform my updates. But i don't know how to use the bapi's to update my added fields. or which one to use.
    Can anyone give me ideas as to which way to go - and how?
    Please and Thanks,

    Hi,
    Use BAPI BAPI_INTERNALORDER_CREATE. To add custom field, you have to user the table EXTENSIONIN of this BAPI. But before that you will have to <b>extend AUFK using append structure CI_AUFK ( enhancement COOPA003 )</b>
    This what SAP says about this table.
    You can use this parameter to transfer user-defined fields from  order master records. However, no fields are supported that are updated in user-defined tables. Only the user-defined fields created within the framework of the SAP enhancement COOPA003 that are updated automatically in table AUFK are supported. This means you must use the table extension BAPI_TE_AUFK
    The enhancement COOPA_01 includes the function module EXIT_SAPLRKIO_001, in which checks of the user-defined fields can be implemented.
    The documentation to the structure BAPIPAREX that this parameter is based on contains more information about the use of this parameter.
    <b>This is how you populate this table.</b> Check this code
    DATA: gt_ci_aufk     LIKE bapi_te_aufk
                             OCCURS 0 WITH HEADER LINE.
    DATA: gt_extensionin LIKE bapiparex
                             OCCURS 0 WITH HEADER LINE.
    DATA: lst_ci_aufk LIKE ci_aufk.
    ** Five variables used to handle the structure length changes
    DATA: lv_length    TYPE i,
          lv_length1   TYPE i,
          lv_length2   TYPE i,
          lv_length3   TYPE i,
          lv_length4   TYPE i.
    FIELD-SYMBOLS <f> LIKE bapi_te_aufk.
    DESCRIBE FIELD <f> LENGTH lv_length.
    IF lv_length > 720.
      lv_length4 = lv_length - 720.
      lv_length3 = 240.
      lv_length2 = 240.
      lv_length1 = 240.
    ELSEIF lv_length > 480 AND lv_length <= 720.
      lv_length3 = lv_length - 480.
      lv_length2 = 240.
      lv_length1 = 240.
    ELSEIF lv_length > 240 AND lv_length <= 480.
      lv_length2 = lv_length - 240.
      lv_length1 = 240.
    ELSEIF lv_length <= 240.
      lv_length1 = lv_length.
    ENDIF.
    * move custom field
    lst_ci_aufk-field1 = 'field1 data'.
    lst_ci_aufk-field2 = 'field2 data'.
    lst_ci_aufk-field3 = 'field3 data'.
    lst_ci_aufk-field4 = 'field4 data'.
    * move order number
    gt_ci_aufk-orderid = 'iternal order no'. "In create node keep this blank
    * move custom fields
    MOVE-CORRESPONDING lst_ci_aufk TO gt_ci_aufk.
    * This is for the EXTENSIONIN (Custom fields structiure - CI_AUFK)
    LOOP AT gt_ci_aufk.
      gt_extensionin-structure = 'BAPI_TE_AUFK'.
      IF lv_length1 > 0.
        MOVE gt_ci_aufk+0(lv_length1)   TO gt_extensionin-valuepart1.
      ENDIF.
      IF lv_length2 > 0.
        MOVE gt_ci_aufk+240(lv_length2) TO gt_extensionin-valuepart2.
      ENDIF.
      IF lv_length3 > 0.
        MOVE gt_ci_aufk+480(lv_length3) TO gt_extensionin-valuepart3.
      ENDIF.
      IF lv_length4 > 0.
        MOVE gt_ci_aufk+720(lv_length4) TO gt_extensionin-valuepart4.
      ENDIF.
      APPEND  gt_extensionin.
    ENDLOOP.
    Let me know if you have any question.
    Regards,
    RS

  • Hierarcical cost planning in project system

    Hi,
    Can anyone tell me, as I am not getting the planned cost in any report for any WBS element for which I have entered the manual planned cost using CJ40. what are the settings that has to be made in IMG for getting that, as i have the maintained the planning profile for the hierarcical cost planning.Kindly advise.

    Hi,
    The planned cost can be obtained in report such as CN41/CNS41/CN41N etc. Please check the planning profile & assignment of that to project profile. Please check the costing variants also.
    Hope this will help you.
    Regards,
    Rakesh Pradhan

  • Need Tables and Func Modules related to Project Systems

    Hi
          I am working on a custom program that Creates Project ( CJ01) using standard Project Def.
         All WBS elements of  Standard Project Template  should be copied to the newly created Project
        I am not able to get any Standard Func Module which creates new WBS elements from Standard WBS elements.
      It will be of great help for me, if any one has info on this.
    thanks in advance.

    Hi
    See the Tables
    PRPS  -WBS element
    PROJ - Project Definition
    other tables are
    PRTE,PRTX,PSTX,PSTT  -Scheduling data for items
    PRHIS
    see the fun modules
    CJPN_GET_WBS_ELEMENT
    CJPS_GET_WBS_ELEMENT
    PSBW_GET_TEXT_WBS_ELEMENT
    PSBW_GET_WBS_ELEMENT
    K_PROJECT_WBS_PLANVALUES
    AIPR_GET_HIERARCHY_TO_WBSELEM
    CJDW_GET_NEW_WBS_ELEMENTS
    Reward points if useful
    Regards
    Anji
    Message was edited by:
            Anji Reddy Vangala

Maybe you are looking for

  • Why does status bar say that all items are not loaded?

    When I have the status bar displayed at the bottom of my page, and I load a page, it usually says 4 of 5 item complete, or 6 of 7, or even one time, 92 of 93. What does this mean exactly? And why does it never say all items are completed? Is anything

  • At first error code 205, Error code 1 when using new user profile

    Hi, I'm using Windows Professional 8.1 with CS6 installed. I now decided for CC, but as many other users I'm not even able to install it! On my admin account I get the error code 205 when trying to launch CreativeCloudSet-Up.exe. I read lots of simil

  • One user or more...

    Hi, Hi, we have an application in .NET -> Oracle and I want to know that he is more optimal One schema and all users of application connected like this one One schema for each user of application Thank's

  • Photosmart Plus b209 - won't see networks, won't run WPS, wireless light ON

    Hello. So I've had a Photosmart Plus b209 for the past three years. Never had a problem. Suddenly I switch my router to a Linksys e2500 and everything stops working. I've printed network tests; my printer has no IP address, even when I revert to fact

  • Real-time Blacklist (RBL) Servers are they worth using?

    Hi, are Real-time Blacklist (RBL) Servers worth using, and if so what's the best once to use? Thanks - Cameron