Changing Billing Schedule Level for Service Contracts created in OM
Hi,
When we create a Service Contract from Order Management, the Billing Schedule Level is always set to Top Level and only one Billing Stream gets created.
Can we get the Billing Schedule Level changed to other Levels viz., Equal Amount or Covered Level using any setups.
Has anyone did any customization/extension to be able to change the Billing Schedule Level.
The basic requirement is to have multiple billing streams for the contract, created from Order Management.
Gurus, any ideas/suggestions to get this accomodated.
Sid,
I don't think you are on the right track (in my opinion). You are right that we can only create service contract from the order management (service or Extended Warranty Lines).
If I understood correctly, you sell electronic subscriptions (like my internet service I have at home) and you are looking for way to take it from the order management so that you can bill it from Contracts and not from OM. As this is electronic service, looks like you do not have fulfill any tangible product (like magazines) from contracts. Hence you do not care about the schedule for the contract shipments. Is that correct?
As this is not something Oracle offers (I did not find anyway), you may want to consider extending OM workflow or a batch program to create a subscription contract once the order line is fulfilled (not the program where we create service contract). This way you have flexibility to create the contract the way you want it.
But you can always create a service contract covering a subscription item as covered product. Like I have internet service as subscription but they cover me for any incidental visits of technicians for this subscription charging me some amount every month.
Thanks
Nagamohan
Similar Messages
-
Changing Billing Schedule Level for OM originated Service Contracts
Hi,
When we create a Service Contract from Order Management, the Billing Schedule Level is always set to Top Level and only one Billing Stream gets created.
Can we get the Billing Schedule Level changed to other Levels viz., Equal Amount or Covered Level using any setups.
Has anyone did any customization/extension to be able to change the Billing Schedule Level.
The basic requirement is to have multiple billing streams for the contract, created from Order Management.
Gurus, any ideas/suggestions to get this accomodated.Sid,
I don't think you are on the right track (in my opinion). You are right that we can only create service contract from the order management (service or Extended Warranty Lines).
If I understood correctly, you sell electronic subscriptions (like my internet service I have at home) and you are looking for way to take it from the order management so that you can bill it from Contracts and not from OM. As this is electronic service, looks like you do not have fulfill any tangible product (like magazines) from contracts. Hence you do not care about the schedule for the contract shipments. Is that correct?
As this is not something Oracle offers (I did not find anyway), you may want to consider extending OM workflow or a batch program to create a subscription contract once the order line is fulfilled (not the program where we create service contract). This way you have flexibility to create the contract the way you want it.
But you can always create a service contract covering a subscription item as covered product. Like I have internet service as subscription but they cover me for any incidental visits of technicians for this subscription charging me some amount every month.
Thanks
Nagamohan -
Bill Schedule in Oracle Service Contracts.....
Hi frds,
I can able to create a new Billing Schedule for the Contracts in 11.5.10 Version.But, according to our Client requirement I am in need to update already existing Schedule.
I am creating a new schedule using oks_contracts_pub.create_bill_schedule.
if anyone worked on this area will you please let us know how to insert scheduling option in the Contracts.
Thanks,
Chandrasekhar V.Hope you can use OKS_BILL_SCH package for re-creating billing Schedules.
-
How to create Subscription Schedule for a Contract created from Sales Order
Hi Gurus,
Need help in creating subscription contracts from Sales Orders.
We know that Service Contract is created from Sales Orders by adding covered item and service item as two lines in a Sales Order.
1. Does anyone know how to a create Subcription Contract by adding single item or BOM item(Model) to a Sales Order?
2. Can we have a BOM item created as Subcription item and reference this to the Service Item in the Sales Order, so that we get the Service Contract created with the BOM item as Covered line.
3. Whenever we create the Service Contracts from Sales Orders, the Billing Schedule Level is set to 'Top Level'. Can we get this changed to 'Equal Amount' by using any profile options.
Please advise as we are in a critial design phase and need to make a decision quickly.
Thanks,
SidHi Mani,
I have a similar requirement but i need to transfer the values to the same page... what then. I have seen the developers giude and the example shows how to tansfer values to another page but no clues what so ever if i have to transfer them to the same page different region. Do u have any suggestions ....
Regards,
Amit. -
Mile stone billing for service contract
Hi gurus,
can you help me for the following:
i want to configure mile stone billing for service contract in my client business process,
can any one send me the complete configuration process steps for mile stone billing.
I'll reward you full marks,
Thanks in advance
nitchelHiya...
Billing Plan for Milestone Billing
Milestone billing means distributing the total amount to be billed over multiple billing
dates in the billing plan.
As each milestone is successfully reached, the customer is billed either a percentage of
the entire project cost or simply a pre-defined amount.
During sales order processing, the system determines from the item category whether a
billing plan is required and, if so, which type of plan
The type of billing plan that is determined at this point is set up in Customizing and
cannot be changed in the sales document.
Billing plans for periodic billing and milestone billing plans for project-related milestone
billing have different overview screens so that you can enter data relevant to your
processing.
For example, for milestone billing, you must be able to enter data to identify the
individual milestones.
IMG configuration requires :-
1. Maintain billing plan types for milestone billing in OVBO.
2. Define date description in SM30 - V_TVTB.
3. Maintain Date Category for Billing Plan Type IN OVBJ.
4. Allocate date category in SM30 - V_TFPLA_TY.
5. Maintain date proposal for Billing Plan Type in OVBM.
6. Assign Billing Plan Type to Sales Documents Type in OVBP.
7. Assign Billing Plan Type to Item Categories in OVBR.
8. Define rules for determining the date in OVBS.
Milestone billing is typically used for billing projects, such as plant engineering and
construction projects. Such projects often include a series of milestones that mark the
completion of different stages of the work. In the SAP R/3 System, milestones are defined
in a network along with planned and actual dates for the completion of work. The milestones
are also assigned to the billing dates in the billing plan.
Each milestone-related billing date is blocked for processing until the Project System
confirms that the milestone is completed.
Delivery-relevant order items for which a milestone billing plan applies are billed on the
basis of the requested delivery quantity and not on the total of the confirmed quantities.
The connection between the project and the sales document item is made in the individual
schedule lines of the item. Each schedule item can be assigned to a network in a project.
To display the project-related data for a schedule line, proceed as follows:
In one of the overview screens of the sales document, select
1. Item -> Schedule lines.
2. Mark the schedule line and select Procurement details.
The following figure shows an example of milestone billing where only the Contract have
been billed :
Order Item Turbine 100,000
Billing Plan
Billing date Description % Value Billing Block Milestone Billing Status
01-10-94 Contract 10 10,000 - x x
01-03-95 Assembly 30 30,000 x x
01-04-95 Maintenance 30 30,000 x x
01-05-95 Acceptance 30 30,000 x x
01-06-95 Final invoice .. .. x
Network/Activities
Milestone Estimate Actual
Assembly 01-03-95 01-03-95
Maintenance 01-04-95
Acceptance 01-05-95
For each billing date in a milestone billing plan, you can specify whether the billing
date is:
1. fixed
2. always updated with the actual date of the milestone
3. updated with the actual date of the milestone, if the date is earlier than the
planned billing date for the date
Keep Sapping
Regards -
How to create service items and sales order for service contracts.
Hi,
I have created item using Purchased Item template and one more item(service item) using service /warranty program template. Then I have used these items to create sales order with service item in it and closed that order , but Iam not getting this order in service contracts. Is this right way to create sales order for service items. I
item name:- personal_computer
copied from purchased order template. service is enabled and install base is checked and enable service coverage is enabled.
item name:- service_item
copied from service /warranty program template
service is selected to inactive,
service type: service
duration: 1 year
template: Gold
and saved the item.
Then I have used these two items in sales order for service contracts. But that sales order is not hitting in service contracts. Is there any error with item creation.
Thanks,
Bharat G.Following SAP Notes to be referred for Service Tax:
1. 778976 u2013 Service Tax and Ecess on Service Tax
2. 1032265 - SEcess on Service Tax
Regards
AK -
Resuls Analysis for Service Contracts - Revenue in Excess of Billing.
Dear Experts,
We are running RA for Service Contracts.
COntract period is 01/11/2010 to 30/10/2011. Montlhy Value is 1000, Yearly value 12000
1) The Billing Plan is Quarterly Billing (deferred).If we Run RA in KKA3. Planned revenue showing is 12000 / 4 quarters = 3000 .
If we Run RA in KKA3 , the planned revenue shown is 3000 instead of 12000.
2) We have incurred some cost for the month of November 2010. If we RUN RA on KKA3 for the month of november 2010 , we should get 1000 as Actual Revenue and 2000 Should be shown in Revenue in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
Please help.
Regards,
Shareeq
Edited by: K M AHAMED SHAREEQ HUSSAIN on Oct 28, 2010 2:55 PM
Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 4, 2010 4:18 PMDear Experts,
The Planned Revenue problem is solved now. We will have to run a Program(OSS Note). The Revenue in Excess of billing is there. Please help.
Regards,
Shareeq
Edited by: K M AHAMED SHAREEQ HUSSAIN on Nov 7, 2010 4:32 PM -
Which BADI will be triigrd for dates in service contract creating
Hello CRM guys ,
Which BADI will be triigrd for dates in service contract creating.
regards,
ram.Hello CRM guys ,
Which BADI will be triigrd for dates in service contract creating.
regards,
ram. -
BOM IN CRM Only for Service Contract
Hello
We want have a BOM explosion working in CRM for service contracts
Here are the details :
We have replicated the materials from ECC to CRM. We are not maintaining any BOMu2019s in ECC.
The idea is that we maintain the BOM Structure in CRM only, as we donu2019t want to have the Items as a billable item in a position, only for information purposes (or later on for metering)
We have maintained the product category for the header product in CRM so we are able to maintain depended components
(Relationship type SCDEC S Dependent Components (DC) )
Not we are able to assign dependent component to the header material
Item category groups:
We understand that the standard item category groups that should be used are ERLA for the header product and LUMF for the Item product.
In order to support the same functionality for the given item category group , maintained at the product level in ECC we copied the same setting for the item category group from the standard to
our settings.
Standart
Tx type Item Cat Group item category structure scope
TA ERLA TAQ A single level Explosion of Structured Product
TA LUMF TAP A single level Explosion of Structured Product
So we have copied TAQ to ZTAQ and TAP to ZTAP.
ZS01 is a copy of SC (service contract)
Tx type Item Cat Group item category structure scope
ZS01 ZLEI ZTAQ A single level Explosion of Structured Product
ZS01 LEIS ZTAP A single level Explosion of Structured Product
But when we use a header product in the service contract, we cannot see the BOM is exploding.
We have also created some products in CRM with exactly the same Item Category groups as the standard and when we create a standard order (TA) in CRM, the BOM is NOT exploding.
Questions:
Is it possible to have the BOM setup only in CRM, like we try to do it?
Is it possible to use our own item category groups in CRM more is the functionality only working with ERLA and LUMF?
Is it possible to use the BOM Explosion in Service contracts as well ?
What steps are we missing to get the BOM explosion in CRM ?
Thank you for your help
Frank
Edited by: Frank Foerstner Foerstner on Dec 9, 2011 12:34 PMThanks Nablan, I could do that for multiple header coming in file. But I have a question for you on BAdI ALM_ME_006_GOODSMVT. I have implemented this BAdI , and this BAdI is called by a function Module ALM_MEREP_006_CREATE. When I test this FM giving the Material , Orderid and Movement type entries, this BAdI is triggered when giving a breakpoint. I've given this code for changing the movement type to 961. Cause the stanadrd scenario does not maintain Movement type 961 in Mobile Asset Management. The Movement type 961 for unplanned Materials comes to SAP and changes to 261 as maiantained by TCOKO table. To bypass this & retain the movement type 961 in SAP I'm using this BAdI. Currently this is what I'm doing and am stuck in the method interface how do I call the method.
method IF_EX_ALM_ME_006_GOODSMVT~CREATE .
break-point.
*DATA : i_ce_goodsmovement TYPE REFERENCE
ALM_ME_CUSTOMER_ENHANCEMENT.
DATA : lr_badi_goods_movement TYPE REF TO if_ex_alm_me_006_goodsmvt.
DATA : ls_user_data TYPE ALM_ME_USER_DATA-USERID.
*DATA : goods_movement TYPE ALM_ME_MATERIAL_MOVEMENT.
CALL METHOD lr_badi_goods_movement->create
EXPORTING
ce_goodsmovement = ce_goodsmovement
IMPORTING
user_data = ls_user_data
custom_user_data = ls_ce_user_data
goods_movement = goods_movement
changing
return = return[].
CALL FUNCTION 'ALM_ME_COMMIT_OR_ROLLBACK'
TABLES
return = return.
endmethod.
Please help me to get the data in this method. How do I call this. -
Automatic invoice generation for service contract
Hello,
I want to create the automatic invoicce generation for service contract based on the order.
whenever i raise service contract order system should create the invoice automatically.
could please let me know the settings?Hi JP Reddy
You can schedule VF04/VF06 for your requirement, such that VF06 will run every 15/30 minutes and will generate billing document for your contracts automatically.
Else go for Z extension development which will assign as output type to your contract and once triggered it will create invoice.
try and revert -
Conditions for service contract
hello,
I am creating service contract containing one line item ( i.e.activity) and no. of services in that line item. in the change mode i wanna put some condition on the activity level but not on service code level, but system is not showing the condtion in change mode. for activity level . pls adviceHi,
For service contract you can not assign any condition type.
You can assign at service level.
Hope it will help you.
Regards,
Manish Agarwal -
Manual Billing is missing for service period 06/19/2009 u2013 7/21/2009
HI
Can anybody help me to fix the below issue?
Issue: The Manual Billing is missing for service period 06/19/2009 u2013 7/21/2009 for contract 9018967003.
After completing the Billing and invoicing using EASIBI t-code and looking at the refreshed ES32, i found that Manula billing is missing for service period 06/19/2009 to 07/21/2009.
thx
DGRHi,
It seems you have processed normal billing and invoicing process.
If the individual invoicing process is successful, the invoicing document should get created and posted unless outsorted.
In your case, if the invoicing document is outsorted, you would be able to see the billing document. (in refreshed ES32 view as mentioned) .
For the billing document, you can check the invoicing document as well, when you display the billing document ... check the print document tab on the same.
If the invoicing document is visible and is not posted, it would be out sorted. Either check the EMMA tcode processing for the same as it seems, an EMMA case might have generated as you are unable to view the same in EA05.
Hope this helps!!
Regards,
Rajesh Popat -
Scheduling agreement for service procurement
Hi All,
Am trying to create Scheduling Agreement for Services to Maintain Validity period for a longer time and do
service entry sheet and invoice manually.
But am not able to do service entry sheet , is there any option to do SES
Other Side
I did frame work order ( FO Document type ) with in ME21N, With validity periods and with GR/IR tick mark and Services tick mark and created Frame Work order . SES posted and MIRO posted.
If i want to through Scheduling Agreement is it possible or not
Regards
Ramakrishna
9840159223There are lots of discussion already there which are saying service entry sheet with regards to schedule agreement is not possible.
Service entry sheet is only possible with regards to the purchase order. Have a look into the existing discussion Scheduling agreement for services
Please search in SCN for more discussion.
Also please note: It is a public forum, you should not share you personal details with your any post. Please read The SCN Rules of Engagement -
RA for Service Contracts.
Dear Experts,
We are running RA for Service Contracts.
The Contract period is 01/11/2010 to 30/10/2011. The Montlhy Value is 1000, so the Total value of the Contract is12000
The Billing Plan is Quarterly Billing (deferred). We have incurred some cost for the month of November 2010. If we RUN
RA on KKA3 for the month of november 2010 , we should get 1000 as Actual Revenue and 2000 Should be shown in Revenue
in Excess of Billing(REB). But it is not showing as Revenue in Excess of Billing.
Please help.
Regards,
ShareeqPatch Updated.
-
How can we change the valuation type for a material created.
How can we change the valuation type for a material created.
Note : All open orders are closed for this material.3
Please guideHi,
You can change valuation class, or you can set valuation category for your material master. If valuation category is set you can extend your material master and in this way creating records for different valuation types.
Please try to set the desired changes in your mmr (MM02) > save > SAP will give you error message > push 'Display error' button and you will see what conditions must be eliminated to carry out the change.
- you are not allowed to have open transactional data
- no stock in the current and previous period (using proper posting date in MB1A + 201 you can reduce your stock level to 0, and after that you can set it back by MB1A + 202)
- in case of valuation category setting batch archiving may be necessary
BR
Csaba
Maybe you are looking for
-
Problems while uploading files using the FileReference API
I've built an image uploader module in Flex using the FileReference API and PHP. While this works perfect for images upto 1 MB, What I'm noticing is that for images greater that 1 MB even after the Event.COMPLETE has triggered, the file hasn't yet b
-
Using special chars in RegEx causes problems
Hello Folks, I have a single string of numbers positive and negative separated by a delimiter. I am trying to convert the negative numbers which are represented by brackets into ones without brakcets e.g. (1.235) to -1.235 Here is what I have in my c
-
Hi! all, Myself developing a jasperReport in BEA workspace studio 1.1 and always getting the below mentioned exception, though i have run the same code in NetBeans successfully with the same jar file. Even i have added weblogic.jar, wllog4j.jar, clas
-
Windows Server Functional Level
If we change the functional level of one domain controller. replication will happen in all the domain under single forest or we have to do manually in all domain under single forest. same question for forest too if we change in one forest it will hap
-
Hi all.. I download the lollipop firmware and updated through flashtool. All Is okay no issue but the camera is not working.. I mean its opening but it is not focusing anything and when I click the shutter the camera app freezes.. Please help