We are running into an issue with the final issue indicator for components when we are using CO19 to confirm orders.  The Process is that we first complete a B10 (Processing Started), then a B40 (Processing Finish), then a V40 to complete the variable activity finish.  The reason we are doing the V40 is because we are using BAPI_PRODORDCONF_CREATE_TE, which cannot set the field FIN_CONF with the B40 (note 1230750), so the V40 (finally confirmed) will complete the final confirmation.
Here is the issue:
After the B40 record is processed, inventory tries to relieve for all back flushed materials. If there is NO inventory available to back flush, an error will appear in COGI, and the order reservation will stay in MD04. This is desired. However, once the V40 activity is completed (finally confirmed), the problem is that the Finial Issue Flag in the Production order is also getting checked.  With the final issue flag being checked, it is removing the order reservation in MD04 for the back flushed material that is still in COGI.  Because the error is still in COGI, we DO NOT want the Finial Issue flag checked, which will allow the order reservation to remain in MD04.
Is there something we are missing in configuration that will prevent the order reservation from being removed from MD04 if the material is not yet issued to the production order?  In OPK4 we do not have the "Post Open Reservations" box checked.
I appreciate any help.
Thank you.

Hello Ann400,
I am afraid that there is no simple solution. If you set - for whatever reason - the FIN_CONF indicator, this leads automatically to final delivery indicator as well as final issue indicators for the components. This is a system design and it is idependent from the confirmed quantity even if it is zero -> therefore COGI records are not considered. 
As a workaround you may think about not to call the BAPI for the V40 (because you're calling it just for the final indicators) as long as COGI records from the B40 exist. This would solve your issue. But this is something you need to do in your source code environment.
Hope this helps.
Regards, Andreas

Similar Messages

  • Backflush - final issue - Cogi

    Hello
    I have a problem with the final issue for the components of production order.
    I have the component in COGI transaction, and the final issue is done (without issue) in the production order.
    When I want to do it manually, I have an blocking message (for me it is normal).
    Normaly, If I have a COGI, I must to have the final issue not closed.
    I have the  special case not for all, but often, and I can't find the origin.
    How is it possible to have this case ?  The production order confirmation is done by a batch in the evening (because we confirm "time" and "quantity" with another sofware)
    Thanks

    Hello,
    if you do more than one confirmation for the same order via batch job and with same backflushed material, this may happen. Because the goods movements are posted together later in update task.
    One example: The goods issue for the first (partal) confirmation fails ans goes to COGI (for whatever reason) but the goods issue for the final confirmation (with the final issue indicator ticked on) does not. Then the reservation becomes finally issued despite a record i in COGI. Not sure whether this is the your case but it is ojust ne example - beneath others - which explains it.
    Regards,
    Andreas

  • How to deactivate automatic setting of final issue indicator in reservation

    Our client has a requirement to deactivate the automatic setting of the final issue indicator after the reserved quantity on a reservation has been fulfilled.
    The requirement comes from an overnight shift that does not have access to the SAP system, so the final issue indicator that is automatically set after the reserved quantity is fulfilled cannot be reset manually when the material is needed during the overnight shift.
    I do not believe backflushing is an option because the material is issued to a cost center (orders are managed outside SAP) and thus there is no confirmation.
    Is there a standard method for deactivating the automatic setting of the final issue indicator when the reserved quantity is reacched?
    Thanks.

    Bob_Smith1103 wrote:
    The requirement comes from an overnight shift that does not have access to the SAP system, so the final issue indicator that is automatically set after the reserved quantity is fulfilled cannot be reset manually when the material is needed during the overnight shift.
    Please see my earlier comment that the overnight shift does not have access to SAP and therefore cannot manually reset the final issue indicator until the next day when someone with SAP access is present.
    Obviously the goods issue could wait until the next day, but the client is not satisfied with waiting until the next day to post-process the goods issue.

  • Problem with final issue of production order components

    Hi Gurus,
    Currently we have a problem with the production order components.
    The problem is that, we needed some components (components which are categorized as dangerous goods) deleted from the production orders.
    So we tried to manually tick the final issue indicator and save the production order. However, the reservations reappeared after the MRP Run.
    Hence, we then tried to delete the component line items, but then again the reservations reappeared.
    Also, since the components are externally procured materials, new purchase requisitions are generated by MRP for these materials.
    Kindly request your help on the same.
    Thanks and Regards,
    Sanju

    Hi Kiran,
    Please find the screenshots of MD04 for the header and component in the attachment:
    MD04 for Header:
    MD04 for Component:
    For the header material no entry is available for 07.01.2015 as the status is delivered for the production order of the header material.
    Kindly help me with the same.
    Thanks,
    Sanju

  • Final Issue Indicator not set in maitnenance order after ECC 6.0 upgrade

    Hi,
    We encounter this problem after upgrading to ECC6.0 from SAP R/3 4.6C
    Final issue indicator (RESBD-KZEAR) is not being set in maintenance order (IW33) for sub-component non-stock items in General Data page
    Would be great if anyone could guide in this regard
    Detailed Scenario:
    1) Maintenance Order is created (IW31) is created in plant A
    2) For non-stock items, reservation created by maintenance order creates a purchase requisition
    3) Account Assigned STO (against maintenance order) is created from purchase requisition
    4) Transfer Posting done from Plant B (351 movement) for complete qty
    5) GR at Plant A done (101 movement) for complete qty.
    6) Final Issue Indicator is not set in General Data page eventhough the complete quantity is delivered.
    Thanks
    Edited by: muthukumarv on Apr 2, 2010 8:59 PM
    Edited by: muthukumarv on Apr 2, 2010 9:00 PM
    Edited by: muthukumarv on Apr 2, 2010 9:03 PM

    Hi,
    Please check in the STO if the "Delivery completed" indicator is checked or not?
    If Yes, then search some correction notes of SAP and get it implemented or raise OSS message with SAP to get the Final Issue indicator to be set in maintenance order.
    If No, then ask your MM consultants to investigate that. They can check the config of "Goods Receipt" Or check if the total quantity GR has been done Or some Under delivery/ Over delivery tolerance has been maintained.
    Thanx.
    Nilmoni.

  • Bapi Error:Quantity and / or " delivery completed ind. Or final issue ind.

    Hello Gurus
    We are working on BAPI:bapigoods_mvt_create with movement type 103, for goods receipt when we execute program am getting this error message "Quantity and / or " delivery completed ind. Or final issue ind. " will you pls help me to over come this error.
    Thanks in advance
    Madhava

    Hi,
    You are posting good movement for quantity 0.
    SAP can accept zero goods movements if this meant for setting up the delivery completed indicator.
    So either quantity should be entered or delivery completed indicator should be ticked if qty is zero.
    Check the quantity you are supplying for this bapi.

  • Final Issue Indicator on reservation

    I am looking for the answer to how the Final Issue Indicator should function when it is checked doing a partial goods issue to a reservation.
    I've found differing documentations.
    1- Final Issue indicates that a reservation item is completed. Further goods movements in respect of this reservation item are not anticipated, although they are still possible.
    2- If the Final Issue Indicator is set that it will no longer be suggested as a selectable item for issue.
    My problem is that when the Final Issue Indicator is set while doing a partial goods issue, the item still shows up on MIGO as a selectable item when you are issuing remaining items. I did not think the item would still show up as selectable. (seems to be following #1)
    When the Final Indicator is set before issuing anything on the item, then the item doesn't show up as selectable on MIGO. (Seems to be following #2)
    Thanks for any help.

    Hi
    Final issue indicator behaviour in reservation.
    1) Create reservation and in change mode set the FI indicator.
    In this scenario system will not not allow you to use reservation saying that XXXX does not contain selectable item.
    2) Create reservation and do the partial goods issue then set the FI indicator.
    In this scenario system still allows to do the goods issue for the remaining item.As per standard SAP it is still possible to do the GI for the partial issed one even the FI is set. If you want to restrict then you can either set the deletion indicator or remove the movement allowed indicator.
    Hope it helps at some extent.
    Karthik

  • Mass change final issue indicator in production order

    Hi
    Is there any report can show final issue indicator for all production order? How can I mass change the indicator?

    Hi,
      In reports such as COOIS and COHV you can select in the initial screen "List: Components" and check your "Change layouts" to view the report with the "Final Issue" indicator.
    But you cannot do a mass change in this option. One way is : You can just select the particular order -> goto Component Overview of the order to be changed and do the necessary changes and save to get the required result.
    -Thaila Shree

  • Status 51 qty and/or delivery completed ind or final issue ind are missing

    i am using we19 to test an inbound idoc mbgmcr02
    i get status 51 qty and/or delivery completed ind or final issue ind are missing
    i have the quantity filled in.
    so i must need the delivery completed ind or final issue ind filled in.
    i cannot find either or these???can anyone point me to them???
    also on the e1BP2017_gm_code i am using 02.
    can anyone give me a rundown on the valid codes to use here and what they mean

    Hi Janice,
    i saw your posting and we are also having the same issue and when i trie to open the link, it's not opening ' page not found'.
    we are having an issue while moving the stock to vendor maintained stock.
    The scenario is:
    We have an externally processed operation in prod. ord and 2 of the components in the prod.ord are batch managed.( These components can have multiple batches) so when we released the prod.ord, P.Req and PO are getting created automatically. here we have two scenarios:
    1. When we are maintaining single batch for the 2 components and release the prod.ord, every thing works fine i.e. stock is moving to vendor maintained stock i.e 541(o).
    2. The problem is when we are maintaining multiple batches for the same components, the P.req and PO are getting created but stock is not moving to vendor maintained stock i.e 541(o)
    when we debugged it's giving this message: " Qty and / or "delivery completed" ind. or final issue ind. are missing ".
    Do i need to make any settings or am i making any mistake?
    Plz guide me and it will be really helpful if anybody can give some steps to follow.
    Thank you ,
    kanth

  • Final issue indicator on the general data button on the work order

    Hi Gurus,
    can anybody please let me know why the final issue check box is checked automatically even before the goods are issued via migo against the work orders. This check box is on the general data tab of the material entered on the components tab of the work order. Please help. As a result of this, the store room clerk cannot issue the material againsth the work order, because this check mark is checked. I want to understand what is causing the check mark to be checked automaticallu even before tthe materials are issued out
    Thanks
    ANusa

    Hello!
    This might have occured due to completion confirmation of order before goods issue. Generally this happens if final issue indicator is set as default in completion confirmation tab. Please check and reply if problem is something else.
    Regards,
    Vaibhav Mishra
    Edited by: Mishra_Vaibhav on Jan 27, 2011 5:23 AM

  • Final Issue Check box ticked still PR does no get deleted

    Even after ticking the Final Issue check box for a material whose Procurement Parameter is (Requisition + reservation for WBS element ) the requisition does not get deleted. It is still showing up in Md04 transaction. Can anyone let me know the reason. Waiting for your feedback.
    Harsh

    Hi Harsh,
    If the PR is already created, Please go to the PR and in the line item Quantity/dates tab, please tick "Closed". then the requirement should go off from MD04.
    warm regards,
    Srinivas Potluri

  • 'Final issue' indicator automatically

    Hello,
    A flow has been developed to transfer material (assigned to network activity) from 1 plant to another plant through a stock transfer order with a specific movement type . Find that 'Final issue' on material tab is not getting flagged automatically (and reservation not getting closed) automatically on PGI of delivery from STO.
    Like to know the probable reason or the setting which does it automatically on PGI on complete quantity.
    With regards,
    Mrinal

    Hi Ahmed,
    We have created a new flow in PS , wherein materials are transferred from one plant to another plant through Stock transport . A new movement type (copy of MT 641) has been created for STO so that the cost is booked on project on PGI from STO Delivery.Materials are assigned to different activities (assigned to different plant) under the same network.
    Observe that the reservations on WBS on source plant is not getting reduced on PGI of delivery from STO.
    With regards,
    Mrinal

  • Final issue and mf60

    Dear expert;
    I use mf60 for material staging , so when a component get final issue it does not appear in mf60, is there any way to make final issue component appear in mf60 ( configuration ) ??
    please advise

    Hello
    As I pointed previously, the final issue indicator is set automatically when the withdrawal quantity reaches the planned quantity. You can try to use BAdI WORKORDER_GOODSMVT to prevent the final issue indicator to be set during the convfirmation.
    Nevertheless, if the withdrawal quantity already reached the planned quantity, there is no open quantity and I don't think that the reservation will be displayed on MF60.
    BR
    Caetano

  • Final issue indicator for component

    Hi
    I have requirement to set final issue indicator to all components when process order has DLV status.
    We have confirmation configuration which will set  final issue indicator when operation is finally confirmed.
    Iam using special control key to identify operation for which components are attached
    If i use COHVPI mass confirmation then it confirms all operations though i select special control key in layout filter. We dont want to confirm all operations
    Is there any STANDARD way to do mass confirmation of selected operation / phases. ?
    Or
    Is there is any  STANDARD way to set final issue indicator for all process order components, when order is delivered?

    Hi Caetano
    My requirement is to do this in background with confirmation of only one operation for which i have special identifier like control key.
    I dont want to confirm other operations.

  • Final issue indicator for Reservation Item

    Hi,
    The issue is as follows:
    The Componets for the Process order are issued through T. code COIK. Some componets are not appearing in COIK list . when the picking is done for the order, the final issue indicator is set in the process order where the componets are not picked and also the final issue indicator is not set where the componets are picked.
    Can anybody tell me what could be the Reason/s for the above.
    Regards,
    Prasad

    Dear,
    FI indicator can be set manually via MB22 though the Reserved qty has not been withdrawn.
    There is indicator in MB22 to tick for the final issue, this indicator is set automatically for a goods movement when the total reserved quantity has been withdrawn or delivered.
    Final option is to clean only the reservation for a given material, just go to the ordern in change mode, and then to the material details, and set the flag "on" for the field "Final Issue".
    Reservations are created when order gets released.
    1. can clear these reservations at the time of the order confirmations by clicking on checkbox for clear open reservations.
    2. You can also clear this reservations by using transaction code MB22 & deleting the reservations.
    3. You can delete all reservations by deleting material documents or by cancelling process order confirmations.
    4. Or by checking final issue in process order transaction COR2.
    Hope this will resolve your querry.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • Custom error message on constraint violation?

    Hi All, I have a table with couple of columns where only value can be inserted but never updated. So the users do not have permission to update those couple of specific columns. So when the front end application which is a vendor supplied product iss

  • My wifi has never worked

    Hi, so for some reason, my wifi refuses to connect to the server. It's a brand new phone. My router is working correctly, as I can access the net on my computer. I try to load a page, and an applet pops up saying "page cannot be found. cannot connect

  • Configuring NAC MANAGER HA - link failure detection

    Hello, I'm configuring HA in NAC Manager and want to enable "eth0 link failure detection based failover". Is this possible in version 4.1.2.1 ? Where can i configure this in NAC Manager? See my configurations for the Primary HA on pic attached. kind

  • Newbie: Struts Linking Problem

    I am currently learning struts and i am having trouble implementing my jsp page to link to a method in my struts action. I have a jsp page my.jsp with a link to my home page (home.jsp). Before going to the home page i wish to call UserRegistration.do

  • Unable to convert ABAP Spool in Thai to a PDF.

    Hi I an issue where if I try to download an ABAP List output (Spool) to a PDF using CONVERT_ABAPSPOOLJOB_2_PDF (Also checked with RSTXPDF4), I am getting junk characters in place of Thai characters in the PDF. Any pointer on this will be of great hel