CProjects to IO, IO to RPM - costs not showing up

Hi,
Having created an internal order from cProjects, I can see the costs in IO.
To start with, costs from cProjects Role-Task assignment is all I am trying with (using role rates).
Simultaneously, I have created the Finance Categories, Groups, and Views in RPM.
I have tried a few juggleries to bring this cost under a finance view in RPM. Not through yet.
I have run the programs that fetch this IO cost into RPM. But the link doesn't seem to have been estd. and therefore, though the program shows all green, it says there's no cost in the db to fetch.
What all should I have completed before I get this through?
Thanks...

HI Deepak
Please advise how you got the planned costs to show up in PS.
I face the same issue now.
I have exactly the same settings as you have PS06 on both sides.
However, when i look at ECP in PS, it requests a planning form and no planned data is being pulled through, its just blank.
I am not sure what i could be missing, is a costing model mandatory ?
Please advise soonest.
thanks
Ihsaan Mayet

Similar Messages

  • CPr-PS integration - cProjects costs not showing up in PS

    Hi,
    We are on PPM5.0. Accounting integration results in successful replicaition of cPro structure as WBS in PS. However, the costs do not flow.
    We have used PS06 (ECP) as the costing variant. All configurations seem to be done, and yet, we do not see the costs replicating.
    Additinal Information:
    We are not using "Org" structure. We understand that "Cost Element" and "Activity Type" aligned with the cost/revenue rate is all that we need to maintain for costing to take place.
    Please advise on what we might be missing.
    We are able to replicate all accounting charateristics including cost/rev rate, and project type to the ERP system.
    The costing variant has been defined as PS06 (both under "Create and Change controling scenario", and "Settings for "Easy Cost Planning"). And yet, when we click on the "costing" button (under the "accounting" tab), we get the following warnings:
    - Error occurred in controlling cockpit (and yet we see nothing in COCPCPR)
    - Costing data may not be up to date
    Please advise.

    HI Deepak
    Please advise how you got the planned costs to show up in PS.
    I face the same issue now.
    I have exactly the same settings as you have PS06 on both sides.
    However, when i look at ECP in PS, it requests a planning form and no planned data is being pulled through, its just blank.
    I am not sure what i could be missing, is a costing model mandatory ?
    Please advise soonest.
    thanks
    Ihsaan Mayet

  • Landed Cost not showing in Inventory Audit

    I have a query that goes against the OIPF/IPF1 tables to locate all Landed Cost transactions for a particular item. To test/verify the query, I ran the Inventory Audit report for the item. There are transactions returned from the query that do not show in the Inventory Audit report. Is there any reason or circumstance under which a Landed Cost Transaction would not show in the Inventory Audit report. I checked against all warehouses. This does not seem to be a singular event in that I have found random occurences of this for different items yet the majority of the time the Audit Report returns all entries.

    Dear Cristian
    Please check the Following things.
    1)First check audit report for a Single Product.
    2)Select all warehouse in Audit report.
    3) Check you landed cost entry if your JV not pass in landed cost, so landed Cost not reflected in you audit report. (Auto JV not pass in SAP 2005 Version)
    Please check and Let me Know.
    Regards
    Mangesh Pagdhare.

  • Internal Activity Costs not showing

    Dear all,
    I'm creating a production order and all my work center activities are not being costed nor showing. I've made sure my activity types have "variable" rates from kp26 and I made sure they're assigned to the production operations and shown in the production order operations list.
    I'm also facing this when I run ck11n.
    What could possibly be wrong?

    Hi,
    A few quick checks
    1. Check if the operation is relevant for costing (control key)
    2. In KP26, click on the first icon at the left hand top corner & check if the rate is mentioned for the present month.
    I suspect that the 2nd point could be the issue. Check & revert.
    Regards,
    Vivek
    Added
    Rafiq, you've marked the thread as answered, but not bothered acknowledge the inputs provided nor assigned any points. Great way to appreciate the forum members....!!!!
    Edited by: Vivek on Jun 18, 2009 6:27 AM

  • Fan rpm not showing

    I have just installed an Enermax EG465P-VE power supply to my system.
    Motherboard is KT4V-L with bios ver 1.9
    When i connect the fan monitor cable from the psu to the sfan1 connector on the
    motherboard the rpm does not show in the bios.
    I am also running SpeedFan 4.09 and rpm does not show .
    What is going on ???

    Does the connector have three pins or two.
    If it has two the RPM counter wont work.

  • Item cost not found for one or more items - Inventory Posting

    Good Day Mentors,
    My user has encountered an error during Inventory Posting and its "Item cost not found for one or more items".
    The specific Message ID from SAP's System Message Log is 10001287.
    I found a similar post which addresses this error here.
    But unfortunately it did not help me solve my user's problem.
    I already checked if the items had a defined "Item Cost" in the Item Master Data Inventory Tab, and they all have "Item Cost" defined.
    I'm not sure if this will help, but below is the Inventory Audit Report of one of the items that is throwing the "Item cost not found" error.
    I am not a business consultant neither am I literate in accounting, so thanks for the patience.
    SAP Version: 9.0 PL5
    Valuation Method: Moving Average
    Thanks in advance!
    Sean

    Hi Augusto and Raviraj,
    I've already verified in our production database the points you made:
    - Is the "Manage Item cost per warehouse" selected in the Basic Initialization Screen?
    YES
    - Is the "Manage Inventory by Warehouse" ticked/checked in the "Inventory Data" tab of the "Item Master Data" screen?
    YES
    * I apologize for not have been able to give this information upfront.
    Anyway, the database only has one warehouse at the moment.
    I've checked the items, like the item in the screen shot above, and it does have an item cost.
    Below is the screenshot of the sample item from my original post,
    Thanks in advance!
    Sean

  • CN41N and S_ALR_87013533 report not showing Production order planned cost

    Hi Experts,
    I am having issue to get total planned production order values in my CN41N or S_ALR_87013533 cost report. I am facing 2 issues :
    1. CN41N repoet does not show individual material cost planned in BOM.
    2. CN41N report and S_ALR87013533 report does not show total value but only picking fixed value.
    Example :
    1. CN41N report :
    Above screenshot shows no values in Project plan cost & Order cost column but it shows total cost as a lumpsum on top for project. I need to know how can i get material cost populated here for Project Valuated stock material?
    2. S_ALR_87013533
    This report shows Total Cost of BOM as 1 line under Material Procurement activity similar to CN41N report. Also Order value is picking from Fixed cost from planned order and total cost is added on top. How can i get Total cost picked from production order?
    Is there any Setting in PS config which allow me to pick the detail production order plan cost in both report under planned cost.
    Thanks in advance.
    Ashish

    Hi Ashish,
    I doubt whether Item level reporting  in S_ALR... (hierarchy report) is possible or not because I haven't seen item level cost in them only the lump-sum cost because they are summarized at cost object level itself. Navigation path are there which we use to go into details of cost.
    Please check the following links:
    https://scn.sap.com/thread/1743833
    (In the above thread,focus on  Mr. Mohamed Rafi comment.)
    http://scn.sap.com/thread/3530080
    http://scn.sap.com/thread/1311820
    Order cost plan in report CN41N
    Display of plan cost., CN41N | ABAP, SAP, benX AG, benXBrain,&…
    Just an additional pointer ,have a look on your costing variant and variation variant settings for material section.
    Regards
    Saurabh

  • Error while adding  the issue for production (item cost not found)

    Hi all,
    The scenario is,
    when the user is trying to add the issue for production system is showing error item cost not
    found.The item which is issued is Inventory + purchase item with manual issue method.The valuation
    method for that item is FIFO.since the valuation method is FIFO,error related to item cost should
    not occur.
    Since the valuation method is FIFO.Item cost error should not occur.
    The error related to item cost must not occur at the time of issue for production.
    Regards-
    Mona.

    Hi!
    Please check these threads
    Sales Delivery Document
    Item Cost Error
    No item cost was found

  • Settlement of planned deliv. costs not possible if GR-related data entered

    Hi gurus,
            While doing T-code MRRL if i am entering the GR posting date and ticking the good + delivery check box an error message is trigerd 'Settlement of planned deliv. costs not possible if GR-related data entered'.PLZ reply the reson for this error.

    I Have the same problem them I realise  that :
    This message just appear if i am using doc. selection = 4 .
    tks
    Teresinha

  • MIRO- Unplanned Delivery Costs info. not showing on FS10N line items

    HI,
    Can anyone explain why when posting an Invoice with unplanned delivery costs using T-code MIRO, the purchase order info. does not show in the GL line item display T-code FS10N for any of the unplanned delivery cost line items. If anyone have a solution to allow the purchase order info. to show on the uplanned delivery costs line item that would be great.
    Thanks.
    Rickey.

    Un-planned freight is entered on the header of the invoice and therefore relates to the entire invoice. Since, its possible to have mulitple PO's on one invoice it would only be possible to assign the PO when there is exactly one PO on the invoice.
    Alternative, you can use planned freight or post the unplanned freight using the G/L tab in transaction MIRO. By using the G/L tab you can enter any information required for accounting (including multiple lines in case it is required to split the un-planned freight by several PO's.

  • Shipment costs not yet calculated  error in vt01n

    When i try to create individual shipment in vt01n to check estimate cost there are shown error like this : shipment costs not yet calculated.
    Note : I have set TK11
    Please Help Me.
    Edited by: Dani Herdian on Jun 24, 2010 9:54 AM
    Edited by: Dani Herdian on Jun 24, 2010 10:11 AM

    Yes, this quesiton is answered

  • Cost analysis not showing up in production order

    Hi All
    Preliminary cost analysis is not showing up in the production order...can anyone suggest what could be the possible reason for this

    Hi,
    Once you issue goods(GI) to order then only you can see actaul cost in cost analysis in Production order.
    if you are looking for target cost in cost analysis,you have to post goods receipt(GR) from order to inventory.
    hope this helps you.
    Thanks,
    Rau

  • Target cost not appearing in process order

    Hi All,
    Please let me know the reasons for target cost not appearing in process order.
    Thanks,
    SAP PQ

    Two more scenarios:
    1. You have co-product.
    2. You reverse the variance calculation.
    It will show the target cost only after you run variance calculation.

  • GRR3 report is not showing cost centers monthly wise totals

    Hi,
      we are having cost center report for full year company code currency report which was working in R3 system. after upgrade it is not showing monthly wise total currency values but when drill down it to actual line item level it is showing all totals. can anybody hlep me to identy issue.
    Thanks,

    Dear Venu
    Check any other standard summarisation report and see whether they are giving data or not. If not you need to implement note 1817039 to fetch summarisation data. But before that I suggest once again you do data collection upto the period and try running your report.If no success then read the note and apply it.
    Regards
    Rajneesh Saxena

  • Project Plan cost report - not showing any output.

    Dear Experts,
    I have created several projects and done the planning.  I have used work centers and activity types for manpower cost planning. Also created some PRs against the project.
    When I goto the network activities and select the line item in the menu path Edit - costs - Planned/Actual - cost planned /actual
    It shows me the planned cost of the activity correctly.
    But when I am running the report CJI4, it shows nothing. The report is not at all executing.
    I dont understand why it's \not showing.
    I have checked the control key PS01 for the cost field is enabled (tick available on the cost friled)
    Can any one please help me??
    Thanks and Regards,
    Praveen

    1) Please check that the WBS element is integrated in plan, and the plan integration is fully activated in the project.
    2) Plan line items are only written in certain cases.
    The following rules are valid:
    1. Plan line items can be written in
    a) structure-oriented cost planning CJ40 (total values, annual values),
    b) cost planning on orders KO12,
    c) unit costing independent of cost elements,
    d) structure-oriented revenue planning CJ42 (total values, annual values)
    e) structure-oriented financial budgeting CJ48 (total values, annual values, period values)
    f) primary cost planning,
    g) activity planning,
    h) revenue element planning.
    2. Plan line items are never written in
    a) Unit costing on cost element level
    b) Network costing
    3. Line items are only written if a user status permits the business transaction 'Write plan line items' explicitly.
    Exception:
    For plan-integrated WBS elements and orders, line items are written in cost-element oriented planning if integrated corporate planning is activated in the fiscal-year parameters of the respective plan version, regardless of the user status.
    4. Plan line items for structure-oriented planning can only be displayed in the respective planning transaction under menu option "Extras-->Line items".
    Let me know if this was useful
    Ritesh

Maybe you are looking for

  • Camera and photo album not opening

    Everything opens camera will open then shut down, same with photo i'm restoring the phone tried initial restore, but same thing now trying restore from itunes and full backup anyone experienced this shize ? Hope it comes back i use camera every day.

  • Not possible to determine shipping data for material  in PO(STO)

    I m doing STO for intra copmany code(plant to plant stock transfer),I have done all STO setting ,maintain material with plant and storage condition,loading groups , maintain customer with storage condition,created vendor with supplying plant.setting

  • What is an energy report ................

    pls let me know and pls send me a dummy program for this .......... Message was edited by:         BALA REDDY

  • How to store and retrieve chinese characters

    Hi, I am facing some problem in storing and retrieving of chinese characters from oracle,9i . This is the character i am trying to store into the database 自动提款机网络 while trying to retrieve it, it shows 自?提款机网? ^ ^ you can see t

  • Wine cannot resize screen when in fullsreen using nvidia

    Hello when I switched from nouveau to the nvidia driver I get this problem when I want to start a game (Commandos) : fixme:win:EnumDisplayDevicesW ((null),0,0x32ece8,0x00000000), stub! fixme:win:EnumDisplayDevicesW ((null),0,0x32ec18,0x00000000), stu