Create / Update a work center into an organization Unit

Hello, everyone.
I'm trying to create a new work center in HR related to an organizational unit by using the bapi: BAPI_HRMASTER_SAVE_REPL_MULT.
For some reason I'm getting an error message:
"Object [work_center_id] does not exist in status 1".
This status comes from the field PL_STATUS at 1001, 1032 infotypes that I'm sending to the bapi.
Does anyone have a solution for me ??
Thanks in advance,
A.S.

check if you have the object existing in Infotype 1000. If not, then you need to create 1000 also.

Similar Messages

  • How do I create a new Work Center for the transaction launcher and links

    Hi
    The requirement here is for me to find out if I can create a new Work Center that will contain up to 6 assignment blocks and each block having either links to websites and BW reports, or triggers to R/3 applications via the transaction launcher.
    Can I do this purely through customising or do I need to create a new view using BSPs? If I can do it through customising please could I have a few pointers to what component I would need to use/copy?
    Regards
    Declan

    Hi Robert,
    Thanks again for taking the time to reply.
    Just so I understand, if I want to show a work center I need to link it to a component / view? I think this was the original query - do I need a developer to create the view that contains the 6 blocks with their links to reports, transactions and websites? I think when I talk about blocks I mean 1 viewset containing 6 views. There is no SAP standard view that would suit my requirements is there? Even if the work center had 8 views, I can always hide the two views in configuration.
    After the developer has created the view, I then reference that component in the target Id in the define logical links section of my work center.
    If my understanding is right, then it follows that it is not possible to create a user specific work center without some development.
    Is this correct?
    Cheers
    Declan

  • How can I create a new work center

    I try to create a new work center.I found a transaction 'OP42' . But I can't set a personal number and name.where should I write them, or should I use any other transaction??
    Thanks...

    Hi,
    Pl go to <b>CR02 -Capacity-Goto menubar select Goto -Individual capacity -Enter personal name here</b>.
    Hope this helps.
    Regards,
    Mani

  • Block PP Work Center capacity  when breakdown maintenance order create on that work center

    Hi All,
    My Client want to Block PP Work Center  capacity when breakdown maintenance order create on that work center, how can i do it ..
    Please help me.
    Payal

    Dear Sir,
    I have Done Every think but still Production Order is create.
    CM50
    OIOI
    CO02
    Payal

  • Inspection time Capacity Updation in work center for skipped lots

    Hi Guys,
                 I am using in process inspection type 03 along with DMR criteria at lot level i have defined the DMR rule and assigned it in routing header.DMR rule is inspection lot 1 in 5 will be inspected i.e when the inspection lot will be created and if there is no quality level exists it will first create the quality level with 1st inspection lot which will not be skipped lot and then it will skip next 4 lots and 5th will be inspected again.Quality level is updated during lot creation level.
                 what i am looking is when you have the skip inspection lot he capacity which has been planned for inspection for that work center should not be considered since there is no inspection done because of skipped inspection on that work center although it's the part of Routing/production process.
    please let me know if any more inputs required.
    your inputs/feedback is really appreciated
    Regards
    Ashutosh Shende

    Hi Krishna,
    It is distributing unevenly because of the Int. Dist. key maintained for "Labour" capacity category.
    Following are the available dist keys.
    I think for your scenario, you should select SAP020
    SAP000     Overall load for latest start date
    SAP010     Overall load for earliest start date
    SAP020     Equal distrib. earliest dates, fact.cal.
    SAP030     Equal distrib. latest dates, fact. cal.
    SAP040     Equal distrib. latest dates, discrete
    SAP050     Equal distrib. earliest dates, oper.time
    SAP060     Equal distr. latest dates, operat. time
    SAP070     Overall load at latest finish date
    Please let me know if this works for you.
    Regards,
    Abhay Kapase

  • Pooled Capacity Not updating in Work center

    Hi All, I want to update pooled capacity in Work center. But when i delete the existing capacity it is giving error that " Capacity still being used". Can any one suggest,how to tackle this problem? I want to give solution to Client. Thanks in Advance..!

    HI,
    Capacity Utilisation rate = Actual Capacity / Theoritical Capacity
    Theoritical Capacity= Shift period * No. of machines available
                                 = 8 hrs * 2 = 16 hrs
    Actual Capacity value depends on how the company decides it. Say if the break 30 mins has to be considered, then the actual capacity will be 15 hrs for 2 capacities and hence,
    Capacity Utilisation rate = 15 / 16 = 93.8%
    So, decide the utilisation rate based on the Company's requiremnt.
    Hope the above gives you an idea.
    -Thaila Shree

  • Create a portal user with a specific Organizational Unit in the OID??

    I would like to split my portal users by Organizational Units in the OID.
    e.g.:
    ou=country1, cn=user1
    ou=country1, cn=user2
    ou=country2, cn=user3
    is it possible?
    is it possible trough the administer tab of Portal?
    Any experience ?
    feedback??
    Thanks
    Didier

    I think it is feasible.
    But not through Administer tab.
    Use your own api to add users (DBMS_LDAP.add_s + WWSEC_API.add_portal_user)
    cn=user1, ou=country1, cn=user_search_base
    cn=user2, ou=country2, cn=user_search_base
    or maybe try to change dynamically user_create_base, I don't know if it is possible or not

  • Change of Cost Center Assignment for Organization Unit in HR

    Hi,
    Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
    Create new cost center referencing to old cost center is done too.
    However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
    How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
    I am new to HR module.
    Thank you for your help.

    Hi,
    As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
    Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
    Cheers..
    Ajay

  • Work Center update during work order save (SAP PM) using exit IWO10009

    Hi All,
    I am updating the work center in the operation record of a work order using exit IWO1009. In the debug, the internal table for operation is updated successfully. But once the processing is done and I see the order though t-code IW33, I couldn't see the updated workcenter. And surprisingly, plant field which I am updating with work center, is getting updated in the operation and I can see this in IW33.
    Pls help.
    Thanks,
    Bhaskar

    Here is the code:
        REFRESH : lt_afvgd.
    Getting Operation details
        CALL FUNCTION 'CO_BO_OPR_OF_ORDER_GET'
          EXPORTING
            aufnr_imp = caufvd_imp-aufnr
          TABLES
            afvgd_get = lt_afvgd.
        IF caufvd_imp-AUART = lc_auart1 or caufvd_imp-AUART = lc_auart2 .
    Determination of Work Centre for Operation Relevent To PTE Eng.
          CLEAR : ls_afvgd.
          READ TABLE lt_afvgd INTO ls_afvgd WITH KEY usr00 = 'PTE'.
          IF sy-subrc eq 0.
            ls_afvgd-arbpl  = caufvd_imp-VAPLZ.
            ls_afvgd-WERKS  = caufvd_imp-VAWRK.
            MODIFY lt_afvgd  FROM ls_afvgd TRANSPORTING arbpl WERKS WHERE usr00 = 'PTE'.
          ENDIF.
        endif.
    **-- Updating operations buffer
        CALL FUNCTION 'CO_BO_UPDATE_OPR_OF_ORDER'
          TABLES
            afvgd_upd = lt_afvgd.

  • Create new work center in HR by using bapi.

    Hello, everyone.
    I'm trying to create a new work center in HR related to an organizational unit by using the bapi: BAPI_HRMASTER_SAVE_REPL_MULT.
    For some reason I'm getting an error message:
    "Object [work_center_id] does not exist in status 1".
    This status comes from the field PL_STATUS at 1001, 1032 infotypes that I'm sending to the bapi.
    Does anyone have a solution for me ??
    Thanks in advance,
    A.S.

    Not relevant anymore

  • IW51-52 - Updating fields Main work center and Maintenance plant

    Hello Experts.
    I Have a task which includes recieving a file and using the data to create new notifications. I need to update the fields above (Data elements GEWRK & SWERK ) but i can't find the right BAPI or Function which will do this work for me.
    Thanks for your help.
    Motty Gal.

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Update Routing data after change in Work Center

    Hello All,
    I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
    Thanks.

    1) You can change as per Mr Anupam sharma Said
    or
    2) YOU can also Update the data IN CA85N
    In selection criteria enter the respective work center and Plant
    and In new Value Give
    Same work center, Plant,  activity value , Unit  and activity type
    execute
    select the all the work center  and then click mass change
    Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

  • Error message when creating a Work Center

    Hello
    A new machine was bought recently. When trying to create a new work center with CR01 by copying an equivalent one, an error message appear in tab u201CCostingu201D, saying that u201CActivity Type L003 not set up for cost center 02 13730u201D. How is it possible affect activities the new cost center 13730?
    Thks for hints
    sb

    Hi STANISLAS BRESIN,
    You have to setup activity type for this work center.
    You need to maintain rare for this activity for current year.
    Transaction code :KP26
    Enter your Controlling area, Period as 1 to 12, year as 2011, your cost center and Activity type as L003.
    In overview, maintain rate in the variable rate column and Fixed rate column.
    Regards,
    Abhay Kapase

  • PP work center integration with PM equipment

    Hello PM Guru's,
    I have a requirement for my client who is producing glass bottles.
    The single line producing glass, consist of some 10 stages of processing. The entire line is an integrated one. Like this line equipment they are having around 30 line apprx. During PP implementation, they had considered that line as only one work center/per line and established hourly entry of production confirmation.
    Now, during PM implementation, they wanted to consider that line as one equipment, and its sections as either as assembly/sub-equipment.
    Currently, if one section fails, the remaining sections runs, and the breakdown are considered as 1/10th.
    They are prepared to create dummy PP work center for their sections individually.
    Also, they don't want to attach that single PP work center to that entire equipment and its assembly/sub-equipment, because they don't want to have the impact of breakdown stoppage of single section into the whole line. (Due to discrete manufacturing set-up)
    They also want to have OEE established, section-wise. Please let me know, for this scenario, how to map that line equipement, and integarte with the PP work center.
    Thank you with regards,
    Sekar

    Hi
    If you want to interface between PP &PM. then only you have to think of disturbing already inplmented PP.
    Interface between PP& PP means , when PM order is created due to schedule breakdown on a particlur equipment, it should be unaavailble for planning for production.
    In your update , you have not mentioned  clearly this point.
    Is it rquired or not.
    Pl. update.
    Regards
    YMREDDY

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

Maybe you are looking for

  • Display header vertically in ALV report

    Hello Experts,   I have a requirement in which i need to display the headers of an ALV in vertical order and items in horizantal order.  It should appear as below. Parameter  |            Unit  |  Week under consideration | % of Net  Sales  | This we

  • How to learn and work CS6 from the middle of nowhere ?

    Hello all, I live along the cordillera de los Andes, and the first good internet connexion is 30 km away from my "casa de campo". Sooooooo, how do I do ? First question (thanks) 1. I go to "town" with my (light) MacBook Pro and I load programs and up

  • AudioBooks wont open-Crashes iTunes

    I have a Macbook Pro running 10.5.4 Leopard, iTunes 8, and an Iphone running 2.1, I have about 40 audiobooks (M4b) files that I cant open under the heading of "Audiobooks" in the iPod on the phone, every time I click on "Audiobooks" it crashes iTunes

  • Schema error after upgrade from 4.6C to ECC 5.0

    Hi all, We have recently upgraded from 4.6C to ECC 5.0. We are having problem in payroll run. When I did a syntax check in schema, I got "UDPM" rule doesn't exist. I checked, this rule is present in 4.6C. This is the standard rule. If I am right, it

  • I need help installing PS6 on an additional computer

    I have a new computer and I want to install my PS6 on it. I tried, but it says something about the code being counterfeit. Is this because I have it already installed on my old computer? Is there a way for me to install it on my new computer? Please