Defining Vendor  Num Ranges in ECC and  BP  Num Ranges in SRM

Dear Experts,
System information ECC 6.0, SRM 5.0
Wanted to know if I need to define any additional BP Number ranges in SRM  to cover the External Vendor Numbers coming from ECC.
This is the ECC Vendor Number Ranges:
No    From No                       To Number                     Ext
01     0100000000                 0199999999
XX    1AAAAAAAA                1ZZZZZZZZ                      YES
Z1    0000001000                  0000009999                     YES
Z2    01TAX0000                    09TAX9999                       YES
Z3    A                                  ZZZZZZZZZZ                      YES
Z4   0000010000                    0099999999                       YES
This is the corresponding BP number ranges in SRM:
No       From No                         To No                        Ext
01      3000000000                   3999999999
AB     1000000000                   1999999999                  yes
MD     9000000000                  9999999999                   yes.
Do I need to define a ext number range in SRM for the alpahumeric vendor ranges defined in ECC(XX, Z2, Z3)  or will that be covered in the AB range in SRM ?
Points will be rewarded for answers.
Thanks in advance.
Best regards,
Bob.

This can be closed. Lalit
Edited by: Lalit  Sharma on Dec 17, 2010 8:55 AM

Similar Messages

  • /SAPAPO/SDRQCR21 program is not working correctly if we run the program for range of material and plant wise

    Hi APO Experts,
    In our project, we have received more sales order inconsistencies which is not clearing by CCR program and it is clearing by  program /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow, So We have decided to schedule the background job on daily basis for program /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow, performing the testing in our quality system and observed the below strange behavior. 
    When I am running the program /SAPAPO/SDRQCR21 with Range of products and some location range with option as Build Reqmts from Doc. Flow, in Background job. In output it is suggesting to delete one sales order. If I checked that Sales order in ECC, it is for an different location, that is not part of my selection and the order is open. In MD04 the Qty is showing 1 ( as per sales order) but in APO RRP3 view the order qty is showing Zero. I have run the CCR, it is coming in different in content and if I push, the different is not going to APO.
    I have tried running the program /SAPAPO/SDRQCR21 with plant which is mentioned in that sales order with option as Build Reqmts from Doc. Flow, in Background job , it is suggesting this sales order under update option correctly.   
    Can you please help me understand why it is behaving differently like the location is not part of my selection and why it is suggesting the wrong action. And also whether is it advisable to run the /SAPAPO/SDRQCR21 with option as Build Reqmts from Doc. Flow at plant range and material range in background job.
    Thanks & Regards,
    Sundaram Radhakrishnan

    Sundaram,
    It sounds to me like the sales document records in the OLTP and in APO were created at different times.  This is common in Dev and Qual environments when the systems are commonly created at two different times, and each was a copy of an existing system that contained sales data.  The order number you see in //rrp3 is somewhat irrelevant; system generally uses the guid for many activities.
    FYI during Dev and Qual refreshes, if you are copying from a production environment that contains data, it is always best to create the OLTP and SCM images at the same time, and to copy them both to the Dev and Qual systems at the same time.  If you don't do this, you are faced with the additional tasks associated with getting the copied systems back into synch.
    If this is Dev or Qual, I suggest that you just completely wipe out all sales orders in APO and rebuild them using the CIF.
    If this is a mature production environment, the only time I have ever seen this issue is due to improperly created CIF enhancements.  Speak to your developers to find the root cause, and correct this problem.  Then, wipe out all sales orders and rebuild with CIF.
    Best Regards,
    DB49

  • Vendor Number Range Conflict SAP ECC and CRM 2007

    I need to load SAP ECC Vendor data from SAP to CRM and have setup most of the configuration as required. However I have an issue, the vendor number range used currently in our SAP system is already in use in our CRM system and has been for some time (for Prospects and Contacts).  What is the best approach to dealing with this issue...
    My initial thought was to see if we could have two different numbers for the same vendor in ECC and SAP CRM
    eg SAP Vendor "50000001" equates to CRM "VEN50000001"
    Is such as approach supported?  Can you point me to the documentation that shows how such an approach could be implemented.  What approaches have others done to address similar issues?
    Thanks in advance
    Eddie
    By the way we are on CRM 2007 sp4

    Hi Eddie,
    SAP Note 1044637 - Customize Vendor Numbers
    Implement the code present in the attachment. You can
    change it according to your own requirements. The example code
    suffixes 'VEND' before the first six digits of the vendor
    number before it is downloaded to CRM.
    Thanks,
    Vaibhav Shah

  • Define groupings and assign number ranges

    Hi,
    I want to ask about customizing
    In Recacust --> business partner --> Relevant setting for BP in RE context --> number range --> Define groupings and assign number ranges
    There are Internal Standard Grouping column and External Standard Grouping column.
    What is that for ? if i set both of them to active, what's the effect ?
    Thank you

    Hi,
    If I tick the "ext.std grping" in one of BP grouping (for example in grouping 0002). Grouping 0002 will be used as standard grouping. The BDT selects this standard grouping if a business partner number was assigned to a business partner when the latter was created, but not a grouping.
    Then,,, when i try to delete external grouping that used as the standard grouping, there was a message "External standard grouping 0002 must not be deleted"
    How to un-tick this "ext.std grping" ?
    I think this affected the BP creation. Now, I can't create BP, there always an error message "GET_BUSINESS_SYSTEM_ERRORAn error occurred when determining the business system"
    Thank You

  • BP via vendor master creation in ECC.

    Hi Friends,
    Can we have BP number automatically ( define no range)  while vendor is created in ECC6.0 . We  donu2019t have SRM/ CRM.
    There should be 1:1 relationship  between BP number and Vendor Number in ECC6.0 environment.
    Regards,
    Lalit

    This can be closed. Lalit
    Edited by: Lalit  Sharma on Dec 17, 2010 8:55 AM

  • Replication of account master with 2 diff number ranges to ECC.

    HI All,
    Wish you happy new Year....
    I have a doubt in Master Data replicating from CRM to ECC.
    Here is a situation where i  have to create 2 number ranges with groupings in CRM for prospects and has to replicate to ECC SD. I heard that only one number range(ie Z1) can only be used to replicate to ECC and ( I.e. Z2) number range masters can not flow to ECC.so can you guys please tell me what are all the problems in replicating the master to ECC if i use 2 number ranges with groupings.
    Thanks and Regards,
    Arun

    Hi Deepak,
    Have you downloaded R/3 sales area(ie,. org + distribution Channel+division) to CRM? If you are not using standalone CRM scenario, then you have to maintain R/3 sales area in and then download it into CRM through customizing adapter object dnl_cust_s_area.
    Then you have assign R/3 sales org to ur created organization in CRM and define distribution channel and division in the attribute tab of ppoma_crm.
    Kindly check have u done all the above mentioned steps?
    Thanks & Regards,
    Anirban

  • Keeping Business Partner numbering same in ECC and GTS

    Hi Experts,
    Does anyone have experience on projects/clients where the Numbering for Customers/vendor in ECC and the related Business Partner in GTS is same?
    For an example: Customer# 12345, BP#12345 in ECC.
    In GTS: BP# 12345.
    We are planning to use MDG system for Master data distribution across systems. I believed it is possible to keep the Numbering same just like we do in SRM.
    But on checking further in detail, I feel it is not possible in standard. Can someone provide their inputs on if this can be achieved with standard setup.
    On checking the code in GTS, I can see Number range group in GTS is determined in FM BUP_CHECK_GROUPING. This FM uses Internal numbering always when there is no BP# is sent from ECC for the Customer/Vendor#. Only if the BP# is sent, system will look for external number range.
    In ECC, the standard code is always keeping BP# and Numbering grouping as blank/space in FM /SAPSLL/DEBMAS_1006_MAP_R3. Which means standard SAP doesn't allow keeping BP Numbers sync'd in ECC and GTS.
    So, I am not sure if this is possible with standard setup. Can someone confirm please?
    If not possible, I will look for enhancements.
    Thanks in advance!!!
    Regards
    Dhilipan

    Hi Dhilipan,
    I briefly checked the program code.  In the API1006_HEAD structure, field BPARTNER is transferred to GTS with value <SPACE> (hard-coded in Function Module /SAPSLL/DEBMAS_1006_MAP_R3), and I think that might be the field you'd need to use.
    From what I can see, that field is used as the Partner Number in GTS if it is filled; otherwise field EXTERN_NO is used.  So it would be worth a try (in debug) to fill the BPARTNER field (max. 10 characters) and see what happens.
    I'm not sure how the Number Range is assigned - it could involve some "profiles", or perhaps be a nice surprise.  I'm sure you'll have fun in finding out: do please let us know.
    Regards,
    Dave

  • Document types, number ranges in ECC 6.0

    How r u.
    I have a question in ECC 6.0. When we are defining document types and document number ranges what is “Define Document types for entry view in a ledger”, “define document types for general ledger view” and “Define Document Number Rangers for General Ledger View”
    Please explain clearly
    Thanku

    In New GL functionality introduced by SAP we have the concept of Leading Ledger (used by Classic GL or ledgers used before ECC) and Non Leading Ledger (multiple ledger concept).So the Document Type for these 2 Ledger types needs to be defined seperately
    For Classic GL or Ledger used before ECC use the : Define Document Type for Entry View (Classic GL means GL Functionality available in R/3)
    For Non Leading Ledger use: Define Document Type for Entry View in Ledger or Define Document Type for General Ledger View (Applicable only for New GL Functionality)
    Similarly the above classification is also applicable for Document Number Ranges.

  • Vendor ledger along with cheque and bank details

    Dear Experts,
    I have one developement my client is asking he wants to vendor all items without cheque and bank details we will get thru fbl1n but my client is asking with cheque and bank details i know these detials are getting from bsak bsik and payr tables we will get but i want to give me logics how can i get in a proper way.i will mention below my requirement kindly give me some idea.
    Vendor number 360002     Name      Neha Chemicals                                        
    posting date of invoice/payment     Document number of invoice / payment     document type invoice/payment     reference invoice/payment     documentdate invoice/payment     amount invoice/payment     partial clearing remaining amt     bank code     cheque number     cheque pmt date     cheque amt
    10.05.2009     10000001     KR     1     11.05.2009     500     100     SBI     100000     11.05.2009     400
    11.05.2009     20000000     KZ     1     11.05.2009     400          SBI     100000     11.05.2009     400
    11.05.2009     10000002     KR     2     14.05.2009     3000          idbi     100001     15.05.2009     3000
    12.05.2009     10000003     KR     3     14.05.2009     2000          idbi     100001     15.05.2009     2000
    13.05.2009     10000004     KR     4     14.05.2009     40000          idbi     100001     15.05.2009     40000
    14.05.2009     10000005     KR     5     14.05.2009     5000          idbi     100001     15.05.2009     5000
    15.05.2009     20000001     KZ     2     15.05.2009     40000          idbi     100001     15.05.2009     40000
    closing balance                          -     1000                    -
    The first document we have paid 400 only tha remaining amount is 100 (500-100) that amount they are asking in unadjusted amt                                                   
    and remaining all invoices they have paid with one cheque that cheque number they want against that invocie                                                  
    please observe you will get idea and give me your valuable inputs                                                  
    appraisals are waiting.
    Thanks inadvance
    Nauma.

    Dear Ramesh,
    I know this solution but my client is asking they want seperately for all these details and they want bank code also how can i main tain for all these things and  if u dont mine kindly tell me logic how can i map the detail from payr and bsak table details give me any idea.
    Thanks and regards,
    Numa.

  • Same Number Range for OTHR and DLFC

    Hi All,
    I want to know whether we can mantain different number range for OTHR and DLFC transaction Type for same Series Group.
    i.e for Returns Vendor Delivery Excise Invoice(MM side-OTHR) and Outgoing Excise Invoice(Sales Side-DLFC).
    Pls guide me..
    With Regards
    Azeez.Mohd

    even when you sell SFG / Trading goods -( HAWA / HALB) , then also you have to update RG1, though they are not FG materials.
    Material type in terms of excise, but not in terms of SAP.
    eg:
    When customer returns the goods, you can process it in 2 ways-
    either by creatign Excise JV - J1IH
    or by following MM route, nothing but by creating Incoming excise Invoice wrt:inbound delivery-LR in Tcode:J1IEX-
    where in excise tab, material type will be defaulted as "F-RG1", but it has to be changed to "Raw Material".
    similarly, Vendor returns also treat as the same,
    for your info, adjustment of excise duty for vendor returns will be routed through excise JV in J1IS & mov type:122 -ret to vendor is activated for RG1.

  • How BBPUPDVD determines vendor master change in ECC?

    Hi Experts,
    How is the vendor master change in ECC captured and what is the strategy/check that the BBPUPDVD transaction OR vendor update report uses/does in ECC to pick up the updated vendor with qualified fields for transmission?
    Qualified fields -> Purchasing block, curr change, comm method change, etc.
    For e.g, if a vendor is blocked for a P.Org today and if we either execute BBPUPDVD OR vendor update job, so how does it determine the change in vendor master in ECC?
    Thanks!
    Regards,
    Karthik

    Hello Karthik,
    just to complete what wrote Konstantin, those change documents are determined in ECC using CHANGEDOCUMENT_READ function modul inside BBP_SCAN_VD function modul which is called by RFC from SRM (report BBP_VENDOR_SYNC).
    Regards.
    Laurent.

  • Missing an element of One Time Vendor Address on F110 remittance and proposal

    Hi All,
    I have an interesting issue with one-time vendors on our F110 Run.
    For some reason, one line of the address is dropped. If I look at the document produced by F110 in FBL1N I can see the full address on the document detail as below
    If I look at the resulting output remittance or the proposal I see that the line with "SA" has been dropped and I think the "CITY" value used instead.
    As you can see there is a gap in the "payment to" where the full stop exists.
    Can someone point me to the code or config where I can configure what elements of the one time vendor appear on the output and proposal. Normal vendors don't seem to be affected by this, but I wonder if our teams maintain the master data differently in these cases.
    many thanks

    Are you using DME file for output  then You need to define there which field they want to use .

  • Modify vendor number when replicating vendor master data from ECC to SRM

    Hi,
    Is there a way  to modify vendor number(manually input vendor number e.g. from a file) when replicating vendor master data from ECC to SRM using the vendor master data user exit (SAPMF02K)?
    Does anyone have documentation on the user exit, how do I use it??
    Thanks and Regards'
    David

    Hi David,
    Please go through the link below:
    [Enhancement SAPMF02K Vendor Master Data  - question about LIFNR;
    Regards
    Anirban

  • Replicated vendor email address from ECC 5.0 to SRM 5.0

    Hi All
    Currently, we are trying to replicate vendor email address from ECC to SRM. We use Vendor Master – General – Email (SMTP_ADDR) to store different email address
    1. ) Case One
    - Vendor email address for vendor account receivable
    - Vendor email address for procurement
    - Vendor email address for return invoice
    Our system : SRM will only replicate defaulted vendor email address ( Standard Number )
    Question : Is it possible to replicate all email address ( the above 3 email address).
    2.) Case Two
    When we only one email address for vendor account receivable, we don’t want to replicate to SRM.
    Question: Is possible to block this vendor email address and do not replicate to SRM ?
    Thank You
    Alex

    >>Will XI 3.0 able to work with ECC 6.0 without any change or any change is required in the XI configuration level, please specify?
    As far as I know, no change is required in XI configuration.
    Regards,
    Praveen Gujjeti.

  • How to capture the data within the given range of maximum and minimum values ? from csv files

    My requirement,
    1. Here, the user will provide the range like maximum and minimum values, based on this range, the VI should capture the data within the given range. ( from CSV file as attached )
    2. Then VI should calcluate the average value for captured data and export it to excel.
    This is my requirement can anyone help me on this.
    Many thanks in advance
    rc_cks
    Attachments:
    sample_short.csv ‏2439 KB

    Hi,
    Thanks for remnding me. I forgt to attach the VI, 
    Here I am attaching the VI, what I tried. 
    From attached CSV file, I have to find an average value for columns B,C,D,E,F,G,H,I and AJ, AK. ( data range will be defined  by user ), focused only on these columns
    Here, the scope is to calculate an average value for given data range by user as MAX and MIN data.  
    FYI:  I tried manually for two instance i.e column H & I.  As per H column one steady state values from  7500 to 10500 and similarly in I column 7875 to 10050. So, I gave these as a limit to capture and calculate the average value. But unfortunaltely, requirement has been modified as per below requirements.
    More Info on requirement: 
    --> The user will define the range of data by giving some MAXIMUM and MINIMUM values(for above mentioned columns induvidually), then VI should capture          that data range and it has to caculate the average value for that range of data. This is the task I have to complete. 
    --> I am stuck in creating a logic for data capturing for given range of MAX and MIN value from user, 
         Can anyone help me on this. 
    If my explanation is not clear, Please let me know.  
    Many thanks, help mw
    rc
    Attachments:
    VI_rc.vi ‏25 KB
    sample.zip ‏4166 KB

Maybe you are looking for

  • Animated Gif Editing Help

    Im trying to add a face to every layer of the gif, so i can move the head, eyes, and mouth.. when i add the image of the face to layer 1 of the animated gif, its good, i hit play and the first frame is the head and it disapears on the second, but whe

  • Cost center creation in Batch

    Hi All, I need to create lot of cost centers. Is there any way to create them in batch. If there is a way, please let me know step by step procedure for the same. Thanks in advance. Regaards, S.Sumana

  • Modify query used in Materialized View

    Are there any ways to modify the query used in materialized view without dropping the materialized view. I dont think alter materialized view has such an option. Please provider me your suggestions.

  • GAP on credit control very important & tricky

    1.     Create a sales order with quantity 1 2.     Order is blocked because of credit limit check. 3.     Release sales order and delivery is created 4.     Change order amount on VA02 for this sales order as 10.000 Displays the following “warning” m

  • RE order related

    Hi All, Scenario 1: RE order should create with ref to or order and Re billing create with ref to RE order and  overall status should be complete. Scenario 2 : Same RE order If user check field in Additional data tab A in condition group- if they put