Enable Valuate Inspection Point

Dear All
I have entered results in instrument calibration inspection lot (Inspection Origin 14). When i have save this results system suggest for valuation that A - Can be used, R1 - Adjustment is required and R2 - Cannot be used. I cannot select any of them. B'coz all are in disable form. Please give me suggestion that what can i do to select any one from this.
Regards

Have u maintained the UD selected set in inspection type 14 in SPRO. Also, in QS41, dont forget to mention the code group for the insp type 14.
Thanks
Sachin

Similar Messages

  • Batch creation at inspection point valuation.

    While doing sampling inspection thru in process inspn lot. I want to valuate inspection points and also need to use short text field for capturing qty information. During sampliong inspection some times a particular qty may get Rejected and it will be kept as blocked qty.
    Whats is the best way to capture that Rejected qty. Here we planned to generate Batch number at the GR time. Batch number is auto generated and can I create batch number at Partial lot screen of inspection point valuation.
    Is there any way to skip batcha ssignment during inspection point valuation.

    Hi,
    When the Material is subjected to Quality management & batch management is active for that material.
    Then during Goods receipt you can use automatic batch for that material so the material will be in Quality inspection with batch update
    when you do the GR in 101
    Whenever you do the usage decision then the same batch will flow.
    rgds
    Chidanand

  • Automatic valuation of inspection point for physical samples.

    Hi,
    My requirement is after recording results (QE11) for each and every sample,  automatic valuation of inspection point to be done.
    Inspection point valuation not done automatically even though I have created the required details in inspection Plan.
    I have maintained the following details  in inspection plan
    In Inspection plan header:
    Inspection Point :  200 &  Sample Drawing Procedure
    In Inspection Plan Operation Details:
    Insp.Point Completion: Automatic valuation based on inspection point definition.
    Is there any settings to be done in customiszation.
    Please help me to solve this issue.
    Thanks & Regards
    V.Devaraj

    Hello Sap-Guys.
    I am facing the same problem, and I did several workarounds, to evalueate the inspection point by myself.
    The problem is this :
    We are using RFC-techniques to evaluate samples.
    Shortly, there is an inspection , which is defined, to be per point, consisting of two user fields, date and time. There must be three things (characteristics )controlled, two manually, by the workers, and the third will be calculated internally by sap via formula.
    The rfc-possibilities are provided by myself, building a rfc-enabled z-module, which calls some SAP-BAPIS, from which one is called
    BAPI_INSPOPER_RECORDRESULTS
    Until now I do not think, it behaves like tha sap-gui.
    Am I doing something wrong, or does this module really not behave like the sap gui ???
    If I evaluate the very first char , I check, whether this is the only one for this actual inspection point.
    If so, I delete the code groups, if any, (only quantitative evaluation til now ) and the point stays grey, ok, because there are still two other char-evaluations missing.
    If my char to evaluate is not the first, then I check, which are stil left, AND , if there are any left without evaluation, I also erase code and codegroups ( if any ) in the insppoint structure, so the char gets its evaluation and the point still stays grey.
    But if there had been already any evaluations, I manually check , whether my actual value meets the tolerances, and then I manually tell the inspection-point structure, which code must be used, in order to set its own state correctly.
    This means, if my actual sample meets the tolerances, and only one sample was rejected , I tell the inspection point, to stay red, by setting the approoriate code manually from qplak.
    If all others were ok, but the actual evaluation ( calculated manually again, tolerances ... ) is not ok, then i tell the inspection point structure, to get "red".
    I do this every time, a evaluation takes place, and it works nice for simple values.
    And here is my big Problem :
    My last characteristic of the three to be evaluated, must not be evaluated by the workers, but BY calculation inside sap, BECAUSE IT HAS A FORMULA.
    Especially for this case I left a comment in my code, and now this case occurred.
    So, what could be a better approach , to use this bapi, AND trigger automatic inspectionpoint evaluation WITHOUT MY ENTIRE WORKAROUND ( where I now see, that it cannot deal with formulas ) ???
    ( It could, if I debugged deep enough, to check, how it builds the formula ) , but bapis are there to use them.
    Aren`t they???
    Could anybody give me a hint ?
    Thx and best regards
    R.Dornfeld

  • QM Inspection Points

    Gurus
    I require that inspection points should be created automatically for inspection lots when i view QA32
    To do so i have done settings in SPRO > QM > Quality Planning > Inspection Planning > General > Define identifier.
    Here i kept 2 under field Time for field combination 150 assuming system will create inspection points every 2 hours automatically but i cannot see inspection points created
    Where am i missing? Please reply
    Regards

    Dear,
    Have have to assigned inspection characteristics in routing that will be your in process inspection
    When you Release the order the inspection lots will be generated.
    Please maintain the Quality management Inspection point on the operation details and select time related. For Inspection point completion select Quantity, Valuation and Confirmation(Production).
    mention the time as 1 and unit a HR (Hour).
    You can record the results for every hour.
    But if you are not doing inprocess inspection & inspection with GR in that case you have to create insepction plan for material assign inspection type as 04 in material master
    Now for hourly analysis this you can enter by selecting scope not fixed & single value in master inspection characteristics
    You can enter time & other deatils of sample by using inspection point in inspection plan.
    Or else QAPP_CUST_IP_CREATE for generation of automatic inspection points.
    Then it will work for you.
    Regards,
    R.Brahmankar

  • Inspection points

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point
    If its SAP's Limitation then please let me know how to hide inspect and inspected columns in result recording screen.

    SIr, I am repeatng my problem again,
    I have a plan for inspection type 04, i have used inspection points 100 as free inspection points.
    each mic have same sampling procedure as:
    Sample type 100 % inspection
    Valuation Mode   Manual
    Inspection Points Free inspection Points
    In inspection plan base quantity for each mic is 1 and unit of measurement EA
    Now  i have created process order of 50000 EA
    Whn process order confirmed lot of quantiy 50000 comes in quality
    Lot quantity come 50000 EA, Sample size comes 50000 EA
    but the problem is that when i do result recording, in the field of Inspect and inspected systm shows default figure 32,767
    as in inspected field it should come 50000 EA if i make PO of less than 32767 then it appears fine same, bt more than PO quantity 32767 it shows default value 32767.

  • QM: Sample Size is 32767 if freely defined inspection point is used

    Hi,
    I am using Inspection plan with freely defined inspection point (100).
    Inspection type: 04
    I want to do 100% inspection. Material master setting is done for early lot creation.
    If I use freely defined inspection point in the plan and create an order of any quantity > 32767, I get a sample size of 32767. If create a order of 100000 qty still sample size is 32767 and I can't even change it during result recording. If I don't use freely defined inspection point I get a sample size which is equal to the order quantity.
    My Requirement:
    I want to use freely defined inspection point in the plan... and also I want to get a sample size equal to production quantity (not 32767 always when production quantity exceeds the this quantity).
    Please let me know how to control this fix sample size 32767 when my plan is with freely defined inspection point.
    Regards,
    Abir.

    Hi,
    Sample size under 'Inspect' column in result recording screen is always 32767, if order quantity >32767.
    I use EARLY lot creation (through material master setting), because I want one lot for one production order... do partial confirmation. Lot is created with production order release, before actual GR takes place.
    Say I have an order with qty 100,000 and if I open the lot after REL of order I see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             0
    Sample Size:                100,000
    Even if I do confirmation and GR for say 100,000 qty and open the Lot I can see,
    inspection lot quantity: 100,000
    Actual Lot Qty:             100,000
    Sample Size:                100,000
    When I go to result recoding screen, against every MIC there is column 'Inspect' (there I get 32767), there is another entry field 'Inspected' (here system don't allow to enter more that 32767)
    Sampling procedure I have used:
    Sample Type:     200    100% Inspection
    Valuation Mode: 500    Manual Valuation
    Free Inspection Point
    May be I made mistake in pointing out the issue; the problem is with 'Inspect' quantity in result recording  - which always appearing 32767. For smaller quantity order its equal to order quantity.  How change the 'Inspect' quantity.
    Also not if I remove Inspection Point from the plan I get "Inspect' quantity equal to Production order quantity.
    Best regards,
    Abir.

  • Cancellation of Inspection point confirmation of quantities

    Hi Experts,
    How to cancel the inspection point confirmation quantities done via Result Recording ?
    When Co13 is used it throws out error saying the confirmation was done in another application.
    The requirement is to cancel the confirmation so that the previous confirmations can be cancelled.
    Any suggestions ?
    Rgeds
    Jomy

    Hi Gajesh,
    Solved the problem.
    One more query,
    Currently the confirmation can be done by CO11N for QC operation once the result has been recorded (either reject or accept)
    The system is not stopping production from not entering (via co11n) the confirmation even though the valuation of the insp point is a reject . Is this a standard behavior ?
    Is there a way to confirm the QC operation via Result recording only ?
    Thnx.
    Jomy

  • Creation of multiple inspection points

    Hello experts,
    I try to figure out how to create multiple inspection points for one operation at process order release.
    It means that the release of the process order triggers:
    - inspection lot creation (lot origin 03)
    - inspection points creation for operation with inspection characteristics assigned to it
    In the recipe header, I entered inspection points = 150 - generated inspection point, qty or time
    (module function QAPP_CUST_IP_CREATE is activated for "automatic creation of insp. points")
    In the operation header, I select time related -and enter 1 HR
    However no inspection point is created at process order release. Only inspection point identifier is created automatically when I select the next inspection point in TR QE51N.
    Do you have any tips on the subject ?
    Thanks in advance
    Best regards
    Amaury

    Dear Amuary
    Doubt if there is any solution in standard. Use exit so that thr first 3 inspection points gets activated quickly. Try these exits
    QAPP0001
    User exit QAPP 1 (create inspection point)
    |  QAPP0002 |User exit QAPP 2 (create inspection point & other data)    
    Regards
    Gajesh

  • Object Link to Inspection Point (QAPP)

    I am trying to set up a new obejct link to an inspection point.  So, to start with I am trying to create a bespoke screen that will perform exactly as screen 204 the Equipment master object link.
    I have created two new screens SAPLCVIN 9000 and SAPLCV00 9000 by copying SAPLCVIN 204 and SAPLCV00 204.  I have assigned these screens  to the new object type QAPP and assigned this to the document type.  I have copied the EQUI settings in the Key Fileds table and assigned them to QAPP.
    I have also copied the function module OBJECT_CHECK_EQUI into OBJECT_CHECK_QAPP but have not yet made any changes to the code in this function module.  When I try to view the new screens in CV02N I get a short dump telling me that DYNPRO 9000 is not found.
    Presumably this is because I haven't made any code changes to the function module.  At this stage I haven't even changed any of the fields from screen 204 I'm just trying to eliminate the abap dump. Can anybody help me with this please?

    1.  Copy FM QAPP_CUST_IP_PROPOSAL and use this in your inspec. point identire conguration in the Default for user fields in results recording.  You have to provide all the logic in the FM to identify the next serial number.    You can also us a copy of the FM QAPP_CUST_IP_CHECK in the verification of user fields to check to make sure the serial number wasn't already specified in an earlier lot is the next in the series.  Again, you have to put in the correct logic.
    2.  I think you are looking for the drop down list in this question.  Use FM QAPP_CUST_IP_F4 for this.  You can either develop a new new FM for each inspec point identifer you use, and hard code the values into the FM, or create a Z table that your FM references to look up the appropriate values for the insepction point and user field.
    3.  Same as number 2 above.
    FF

  • Setting up inspection point in a scenario require more than one inspection

    Hi all,
    Maybe I am still not very clear on the PP-QM conceptu2026 hope you can see my problem on the following questionu2026..
    According to SAP in the QM-production environment, we key in ONE inspection point in the task list header level (i.e. either the master recipe, routing, or rate of routing).
    Based on the following business scenario which is going to use inspection point for the inspection:
    u2022     Time-based intervals (for example, an inspection point every hour or for each work shift)
    u2022     Quantity-based intervals (for example, an inspection point for each container)
    u2022     Freely-defined intervals (for example, an inspection point each time a tool change occurs)
    Since each of the above scenarios require more than one inspection points to be created and to be assigned to the task list header.
    Thus, how to accomplish multiple inspection point assignment when the task-list header only allow me to assign one inspection point at a time?
    Thanks
    YY

    Hi guys,
    Thanks. However, in the SAP help portal it does said the system allows several inspection points to be assigned to an inspection operation whether it is in routing or recipe.
    Therefore, does it means I can assign more than one inspection points in the operation detail level for either recipe or routing if I will to click the u201CNo relationu201D radio button in the u201CQuality Management: Inspection Pointu201D section. (i.e. is this is the right place to allows this assignment)?
    For example, on the change master recipe screen at the Operation tab, I highlight one line item (i.e. one operation line item and zoom into this operation line item, I donu2019t see any field box that allow me to assign several inspection points to an operation? Instead, on the u201CQuality Management: Inspection Pointu201D section, there are the following fields appear:
    - Insp.pointCompletion dropdown box
    - 4 radio buttons on the inspection interval (ie. Time-related, Qty-related, No-relation) and its subseq time and quantity value input box.
    - Quan.pt. lot checkbox
    - Last Part Lot Assgmt checkbox
    Thus, where is the section in the operation overview screen at Master Recipe or Routing level that I can assign several inspection points?
    Thanks
    YY

  • QAPP_CUST_IP_F4 - inspection point help

    Two related questions here.  I haven't set this FM up before.
    One:  the FM mention table T_TQ79_F4_VALUES.  I can't find this table in our system.  Should this table be there? 
    Two:  The FM indicates that the table is index by the user field attribute which is a one character field.  The problem I see is that if I have multiple inspection point identifiers.  I.e. I create 901 and 902. In 901 I use the field number(size =3) as a shift number... 1, 2 or 3.  But in 902 I use the same field as an employee ID number.. 213, 418, etc...  How can I limit the help information for each IP identifier.  The user would be clueless as to the IP identifier being used.  For 901 I want the help to display "Enter the shift number that sample was taken on."  For 902 I want to enter "Enter the employee number of the person that took the sample."
    FF

    Yes.. we saw the defined structure.  But the module help specifically states to maintain the values in the table T_TQ79_F4_VALUES.  The values are then read into the structure from the table.
    We have already designed a Z-table should we need it.  But we try not to use a Z-tables if SAP has a provided solution.  We have submitted an OSS note to them on this.
    I just wanted to see if it was just us that was missing the table, or if others were missing it.  If it is missing, I'm wondering if any one has implemented this FM and if they all used Z-tables for storing their data or if SAP provided something.  I searched OSS already to no avail.
    In any case, SAP either needs to update their documentation for this process, or they need to provide the table that is mentioned.  Seems pretty clear that there is an SAP disconnect here.  I've pasted the help documentation from the SAP provided FM below.
    FF
    F4 - Help for the Inspection Point Fields                                    
    You can use this function module to specify input help (F4) for the user field for inspection point identification. 
    The function module serves as a copy model for user-defined programs. Note that the interface for user-defined programs must correspond to the interface for this function module.
    You must enter values for the specified user field in the table T_TQ79_F4_VALUES to offer a list of values for the user. You can enter an explanatory short text for each value.
    SAP determines the format for the possible values. This means that possible values are determined and exported based on the table. 
    For more information, see documentation on the individual parameters.

  • Inspection point

    Dear all,
    I have query
    my user wants to assign inspection point in routing (CA01) header .but that field is grey.
    but I am able  to assign  with my user ID(sap_all).
    what might be reason.it is not giving message also.
    if it is authorization problem what may be the object.
    regards,
    prasad

    hi
    1.after checking the routing from user id , execute the SU53 t-code if you get any maessage infrom to BASIS team
    or
    2.There might be screen variant used against the user id
    -ashok

  • Runtime error for Inspection Point Results Recording

    Hi,
    I am changing the already done Results Recording for using already used Inspection Point.
    I am getting the runtime error. Anybody came across such error?
    Regards
    Ramakanth

    Hi,
    In the in-process inspection I am using Inspection Points. Initially I have done Results Recording once with quantities.
    And then again I wanted to change the quantities for the same Inspection Point. So, I went to Results Recording for same Inspection Point and changed the quantities and saving. At this event I am getting Runtime error.
    I  have even deactivated one BADI INSPECTIONLOT_UPDATE and tried again. Even then I am getting same error.
    Ultimately my requirement is this:
    My client wants UD at operation level. They want only quantity which is accepted in Results Recording to be moved to the next operation. In the operation level confirmation the system should only accept the quantity which is accepted in Results Recording.
    Any suggestion in this regard.
    Thanks
    Ramakanth

  • Inspection point in SAP QM

    Dear  Sir
    My query is related to SAP-QM
    1,How to define INSPECTION POINT in Inspection planning?
    2.Where is default setting of Inspection point like at Plant level & material level?
    3. If inspection point of material is changed in Tasklist and a new inspection lot is generated then it again reflect both the Inspection point (the new one & the old one).So how to aviod this problem so that it shows only the new inspection pont at the time of Result recoding.

    Hello Alpana,
    question 1 How to define INSPECTION POINT in Inspection planning?
    In the transaction QP01 or QP02 you can define an inspection point at header level.
    This can also be done for production plans and process instructions.
    The inspection point definition is done in the customizing of the Quality planning.
    question 2 Where is default setting of Inspection point like at Plant level
    This can be found under the customizing point Basic settings in QM.
    Using the settings at plant level it is possible to define inspection points at plant level.
    If you want to use the setting at material level then this would be done in the inspection plan.
    question 3 If inspection point of material is changed in Tasklist and a new inspection lot is generated then it again reflect both the Inspection point?
    The changing of inspection points is not possible (Inspection point definition)
    The changing of inspection points in inspection plans is not recommended create a new plan in this case.
    I hope that this information helps you resolve your issue.
    Regards
    Isabelle

  • Auto creation of time based inspection points against in process required

    Hi
    We want system to create/generate inspection points automatically when process order is released and inspection lot is created. Currently we have to create inspection point manually using either QE71 or QE11. Previously when scheduling was active in PP, inspection points had been creating automatically for the duration of process order. But now PP scheduling is not required and as a results inspection points are not being created automatically.
    Please assist.
    regards
    Chris

    SAP provides a FM, (QAPP_CUST_IP_CREATE), to be used as a template to create your own FM for automatically creating inspection points.  There is documentation in the FM to explain it.  You then assign this FM in configuration where you define the inspeciton point identifiers.
    FF

Maybe you are looking for

  • External USB HD doesn't show up on the desktop

    I have an iMac G5 with 10.4.10 installed on it Last week after the update to 10.4.10 my LaCie usb conected hard drive still showed up on my desktop but after a second restart it disapeared and never came back. If I connect my external HD with a windo

  • Alerts from AS2 adpter

    Hi, We are using AS2 adapter to communicate with our B2B partner. We are successfully tested the File --> PI --> AS2 scenario and we are receiving MDN back as configured. Is there a way to trigger/generate e-mail alert based on the MDN message?? Than

  • Confused about standby redo log groups

    hi masters, i am little bit confuse about creating redo log group for standby database,as per document number of standby redo group depends on following equation. (maximum number of logfiles for each thread + 1) * maximum number of threads but i dont

  • How to read a particular word from the middle of the line from a .txt file

    BufferedReader reader = new BufferedReader(new FileReader("D:\\kiran.txt")); //given as a input String line = reader.readLine(); StringBuffer sb=new StringBuffer(); while(line!=null){ sb.append(line);//appended to line line=reader.readLine(); line=sb

  • Updating HRP table through abap codes - is it correct

    Hi all, In my hrp1001 table,I want that All Qualifications (Q) and Tasks (T) assigned to all the functional roles (ZF) existing in the system should be transferred to the positions(S) tagged to those respective functional roles. For that I am suppose