Hi,
we found that functional location in Measuring point and M.plan functional location Measuring point are differrent, how to restrict that one ,we need automatically flow of functional location from measuring point to Maintenance plan.
--Ganesh

Hi,
If you created the Measuring Point for the selected FL, then that measuring point will be populated automatically. If you have more than one measuring point, then you can select using Possible entries option.
In this case, I think its not possible to restrict with configuration.
   IPRM0004 Maintenance plan / item: Customer check for time "SAVE"
Use this user exit, while saving check for the functional location for the selected measuring point & give error message.
Use tables IMPTT to get Object Number of FL. Use IFLOT to get the FL.
Regards,
Maheswaran.

Similar Messages

  • Equipment Efficiency through Measuring Point and Counters

    Hi gurus,
    I am planning to get the efficiency of equipment by using Meauring points and counters.
    Against an Equipment I have created a Measuring point as counter.
    I am capturing Actual output of the machine as mesurment reading.
    In order to set the Target output i dont find a solution.
    I am expecting from all you guys to give me some solution to set the Expected or standard output against an equipment.
    so that i can compare the target vs actual as well as efficiency.

    The purpose of measuring points and counters is to genrate call objects at given overflow reading or points I dont think so that they can help in calculating the effiency in a way that this machine perfomence is let say 80% and other one is 70%.
    However you can maintain it manualy while entering the measuring points in format of % .
    Regards
    Iftikhar

  • Diffrence between Measuring point and Counter

    What is the difference between Measuring Point and Counter ?
    -Md

    Hi,
    _Measuring Point_
    Measuring points in the SAP System describe the physical locations at which a condition is described, (for example, Temparature and Pressure on a Boiler ). The characteristics associated with the measuring points which record the value can only be numeric characteristic. Measuring points are located on technical objects, in other words, on pieces of equipment or functional locations. For every measuring point there should be some characteristics to measure the reading.
    To enable you to differentiate more easily between the individual measuring points and provide them with a unit, you assign each measuring point to a characteristic.
    The parameters like Running Hours, Temperature, Pressure etc,, on equipments can also be mapped under measuring point.
    Counter:
    A type of measuring point, where a continuous reading is recorded (e.g. Milometer). In case the measuring point is a counter, it needs to be defined likewise.
    Counter readings are taken at counters at particular intervals and in particular measurement units.
    For Example, counter readings for kilometers driven or electricity used
    Regards,
    Krishna Mohan.

  • Unable to Inport Measurement points and Measure documents from R/3 to clien

    Hi,
    I am not able to import measuring points and measuring documents into the client device even after assigning the measurement point varaint in the back-end config.
    Please help!
    Thanks & Regards,
    Kanwar

    Hello Kanwar,
    I am thinking of two reasons at the moment.
    1. The equipments/Functional location which you had downloaded to your device were not having measurement points. If this is the case, you need to make sure that corresponding Equip/FL's are there on client (provided case 2 is not valid)
    2. The measurement points were not replicated. Hope you had checked MEREP_207 table for the required measurement points.
    Hope this helps.
    Best Regards,
    Subhakanth

  • Measuring points and counters

    Hi all,
    Can anyone please tell me the process of how to use measuring points and counters and in which scenario it will be used in plant.It would be great if anyone can tell the process with an example and also how to create measuring points and counters iin SAP  as  well.
    Thanks in advance.
    Regards,
    Vijay

    Measuring points are physical and/or logical locations at which a particular condition
    is described - for example, the temperature of coolant in a nuclear power station
    after an outflow from the pressure vessels, or the number of rotations per minute of
    the rotary blades of a wind-driven power station. Measuring points are located at
    technical objects.
    Counters are resources that enable you to represent the wear and tear of an object or
    the consumption or reduction in its useful life - for example, the mileage indicator of a
    motor vehicle or the electricity consumption meter of an electrically-powered system.
    Counters are located at technical objects.
    You can enter measurement or counter readings for each object to be maintained. This
    makes sense if you want to document the condition of an object based on measurement
    readings or if the regular maintenance of an object depends on its meter readings.
    You can also check these links:
    http://www.sap-img.com/plant/recording-measuring-docs-against-work-orders.htm
    http://www.sap-img.com/plant/measuring-points-questions-in-sap-pm.htm

  • Measuring point and characteristics

    what are the measuring points and characteristics to be created for the thermal power station , sap plant maintenance

    Hi,
    Its based on the equipments in Power Station & Parameters to be measured for the Equipments. For example, for Boiler, Temperature, Pressure, Water Level, etc., will be measured.
    So here we need to create Characteristics for all these. For Boilers, Measuring points will be created for these characteristics.
    Equipments under Thermal Power stations could be Boilers, Transformers, Electric Generators, Coal Turbines, Condensers, etc., For each equipment, there will be different critical parameters to be measured on periodical basis.
    Create Measuring points for all of them.
    Regards,
    Maheswaran.

  • Removing of the Measuring  point and superior equipment

    Hi,
    Can any one tell me the steps to followed for removing and setting og deletion flag for measuring point and superior equipment.
    I ran thr Tcode IK05 and deactivated it is it sufficient to do so.please help me.
    Regards,
    Yashwanth

    hi
    why you want to deactivate the measuring point ,if you have created a maintenance plan you can deactivate the maintenance plan so that system will not generate the maintenance call object.
    or it is better you deactivate the equipment itself if you have done that you cannot able to enter further measurement documents for measuring point
    regards
    thyagarajan

  • Graph of Measurement points and a charecteristic vs time

    Hi SAP Masters,
    I am currently having a problem and I hope you can help me to solve this. I am trying to create a graph where I can compare one of  my Design data which is in my characteristic against the graph that i can generate from the measurement point vs time graph.
    How can I add the characteristic into this graph?
    And How does SAP know that which two column should be used for the graph? I know It can add a secondary y-axix but doesn't allow me to chose any data for that axis.
    My objective is to compare the measurement point data(movement) vs time with the design data(design movement). I can generate a column graph of movement vs time from the measurement points and I can display it over last couple of years. but if I can show design movement along with the measurement point movement then it is good for us to see if it is more than design movement stored in the classification tab of the Floc.
    thank you
    Edited by: sam1188 on Mar 16, 2011 2:24 AM
    Edited by: sam1188 on Mar 16, 2011 1:48 PM

    If you've been charged twice for the purchase (you didn't click on 'buy' twice and it appears twice on your purhcase history ?) then try the 'report a problem' page to contact iTunes Support : http://reportaproblem.apple.com
    If the 'report a problem' link doesn't work then you can try contacting iTunes support via this page : http://www.apple.com/support/itunes/contact/- click on Contact iTunes Store Support on the right-hand side of the page, then Purchases, Billing & Redemption

  • Error while creating a Planned Order

    Hi SAP Experts,
    I have an error encountered while creating a Planned Order which is "Mode linkage problem with mode number".
    Diagnosis:
        An application program called an LCA routine and the following error occurred:
        An order has at least one condition with mode linkage with the same mode number. The activities of this condition must have compatible modes. The modes are compatible when each mode of one activity has a mode for the other activity with the same mode number. The first activity that violates the condition is given in the return code table in ABAP.
    Please enlighthen me what is this error and what should be done to this error.
    Thanks in advance,
    Raymond

    Check the PPM or PDS being used in the Planned Order.
    Most likely you have a Setup Activity followed by Produce Activity. However the Mode (i.e. Resource) used in the two activities are different. The same Mode needs to be used both in Setup and corresponding Produce activity.
    Hope this helps,
    somnath

  • Error while creating Inspection plan

    Hi,
    While creating inspection plan in QP01, system is showing error  "Material type ZROH is not defined for task list type Q''
    Please help me to solve the error.
    Thanks
    Prasant

    Hi,
    This is due to the configuration error,
    Just use T.Code OP50
    Create an entry for task list type "Q" with material type "ZROH" and save,
    Then try creating a Quality Inspection Plan, it will work
    Regards
    Merwyn

  • Error while creating manual planned order in apo

    Dear expert
    While I am creating manual planned order i am getting error as message /sapapo/rrp251
    Every thing is correct BOM and PV's no error after consistency check and it getting succesfully transffered to APO and it is also visible in APO
    But while creating manual planned orders planned order are not getting generated  I am using BLock planning with PPDS
    Please help How to resolve it
    Regards
    Virender

    Hi
    The error message /SAPAPO/RRP251 - Error occurred while creating order means While creating an order, the system encountered problems, such as, for example, no available components or components that are available late, orders that could not be scheduled, and so on.
    I think system attempted to solve the availability problems by using alternative procurement options. This was not successful. The order could not be created. Check the exceptional situations in the planning protocol, under Goto -> Planning log, and deal with the causes of the exceptional situations if this is possible or necessary.
    Thanks
    Amol

  • Sort Field to be made mandatory while creating maintenance plan(IP42)

    Hi Experts,
    Please suggest me the way by which i can make the field "Sort field" mandatory while creating maintenance plan (IP42).
    Regards,
    Vivek

    Vivek,
    There is no std config to acheive this. Please use IPRM0004 Maintenance plan/item: Customer check for "Save" to accomplish the same.
    Mahee

  • While Creating Maintenance Plan ip41- Sales Document tab is deactive

    Hi,
    while Creating Maintenance Plan IP41- Sales Document is deactive.
    Unable to fill the Sales Number.
    Can anybody tell what is the procedure to active the Sales Document tab,since i have to entry sales number in it.
    Thanks in advance.
    Mohit

    hi
    can you explain in detail ,you can create the maintenance plan for sales document using T code IP50 .kindly check
    regards
    thyagarajan

  • Using Sets while creating a Plan Layout

    Hi All,
    Please let me know whether we can make use of sets while creating a planning layout using report painter.
    Thanks

    HI
    We can make use of sets while developing a planning layouts using report painter.
    Thanks
    Sandy
    Edited by: sandesh shetty on Feb 6, 2009 11:17 AM

  • Function Module to get usage by supplying measuring point and equipment no

    Hi,
    I want to know what is the function module to get the usage on giving the measuring point,equipment number and month.Thanks in advance.
    Regards,
    SGR

    Try this Function Module : ALM_ME_EQUIPMENT_GETDETAIL

Maybe you are looking for

  • 32inch HDTV LCD

    Hello all - Im fairly new to the whole HDTV area, while ive had experience with one before but a blotch of dead pixel filled the screen and got annoying watching videos or using it as a pc monitor...ive found two monitors im interested in purchasing

  • Multiple pages, how ApEx handle it? (iframe)

    Hello, I have a application used by many teams in my company. This application have a stantard layout for all the teams and now I´m developing a personalized layout for each team. How it will work? The application will have a page (main page) with so

  • No events from CWDataSocket. Viewing from ActiveX Container Tool

    Using Labview 6.1 on Windows 2000. Exploring ways our C++ program can get and set values into a VI. Was looking at the CWDataSocket ActiveX Control in the VC++ ActiveX Test Container Tool and was trying to get it to fire events. I set both a VI contr

  • XML load (inc XSLT)

    Hello ! Could someone tell me how I can load 200mb XML files into an Oracle table while at the same time using XSLT to perhaps transform from a native flat file format to the XML format reguired by Oralce for save to my tables. Can SQL*Loader do this

  • Digital 3.5mm to optical cable 5.1 sound on Audigy 2

    http://www.radioshack.com/product.as...oduct_id=5-597 Can I used this to send a digital signal to a receiver that accepts optical in for digital? How?