How to Upload WIP Production orders in production during Cutover.

How to Upload the Open Production orders in production system during cutover activities.
my client is having 1000 open production order(WIP), during cutover activies how to upload this in production.
Please guide me
Regards
Sunil Patil.

Hi,
I somewhat agree with what Raj has to say. Something which is already in process how can that be uploaded, how can one compensate for the time which has been consumed in the production activity.
I hope Rupesh Brahamakar sir would throw light on this issue, as most of us are under the dillema at the time of Cut-Over activity.
Sir, hoping your valueable inputs.
Regards,
Harris

Similar Messages

  • How to Upload WIP Stock

    Dear All
                      Here an issue regarding WIP stock
    1. One semi finish material having 4 operations , out of 4 operations,2 operations are completed before Go live ,remaining 2 operations has to be done after Go live
    2. WIP stock as on cut off date is 100 pieces ,for 100 pieces, the raw material of 10 kg is issued.
                 Some body is suggested as raw material of 10 kg has to bring in stock, then order to be created for 100 pieces , raw material of 10 kg to be issued for that order ,confirmation to be done for first 2 operations the  remaining 2 operations will be confirmed after Go live .
       please  suggest me in what way I have to proceed
    Regards
    Anil

    Hi,
    As of the cut off date, ideally there should not be any work in process. All the open production orders should be closed and semi finished goods should be dismantled and should be added to Raw materials. This strategy should be followed for all production orders where lead time to complete the production order is not large.
    Since, the production orders are for longer duration and it is not possible to dismantle the product and add it to inventory, following can be the strategy for migrating the data to SAP:
    - Create a material master for the work in process and set the standard price as the cost incurred for that product (ie. Work in process)
    - Create a bill of material (which will be used only for this production order) including this material and other materials still to be consumed.
    - Create Routing for rest of the production process.
    - Bring the work in process material into inventory as of the cut off date.
    - Create the production orders in SAP for the Work in process and issue materials to production order.
    Complete the production process after the cut off date of the project.
    Regards,
    R.Brahmankar

  • How to Release Mass Purchase order in production server

    Hi
    i have to release mass purchase order can any one help me how to that
    thanx

    Hi,
    Tcode ME28 will sove your problem,
    Enter:
    Release Code
    Release Group
    and press F8.
    Now here click on Release + Save button.
    Cheers
    utsav

  • How BOM and routing is selected for Planned order and Production order?

    Hi,
    Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?

    Hello Mathisuthan,
    BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
    Production version you maintained
    MM01/MM02 -- MRP4--- Production version
    Or you can create Production Versions in Mass also with Transaction Code "C223"
    In the case no production version maintained/created  for the material, then system by default  will pick the first BOM and routing.
    I hope this information helpful to you.
    Regards
    Umesh Mali

  • How to restrict reversal of Goods issue against production order.

    Dear All,
    How to restrict reversal of Goods issue against production order if production order status is CNF or DLV.
    i want that user can not reverse the goods issued against production order, if they want to do so, then user has to reverse the GRN and reverse the GI then only.
    Please suggest the solution.
    Regards,
    Sandeep Dhruve

    Hy Sandeep,
    You have to use User Exit for this.
    The following enhancement is available for production orders:
    o   CCOWB001    User exit for modifying menu entries
    You can use this function module to deactivate menu entries or
    functions. The locked functions can then no longer be executed by the
    user.
    The enhancement CCOWB001 contains the following components:
    Function exit
    o   EXIT_SAPLCOWB_001   Good movement: Deaktivate functions
          Display documentation
    Regards,
    Dhaval
    Edited by: Dhaval Choksi on Aug 22, 2008 3:01 PM

  • How to know whether recalculate the cost of production order?

    Hi Masters
                    We know, the valuation of  goods receipt is determined by the plan cost of the production order for production order. But often, production order was recalculated after partial delivery to stock.
    So I want to know when was the PO recalculated?

    HI,
    You can go to Administration tab in production order, you can find who has changed last the production order.
    I still doubt, is it possible to recalculate the production order after partial delivery.
    Vijay

  • Production Order settlement to Sale Order

    Hi Gurus,
    I have crated a sale order through VA01, I crated sale order specific BOM through CS61 and after that I executed Cost Estimate for the sale order.
    Sale Order No: 260
    Finished Product : 610
    Semi Finished: 611
    Semi Finished: 612
    I executed MRP for sale order 260, System has created planned production for Material 610,611 and 612.
    When I am trying to convert the planned production order to production order, system is automatically picking up settlement rule as Material instead of sale order for all the production orders. System is not allowing to change the settlement rule manually.
    Our requirement is, Production Order of SFGs(611 and 612) should be settle to Production order of Finished Product(610). and the total cost of the production order of Finished Product(610) should be settle to Sale Order (260).
    How can I get the above settlement rule into my production orders as default.
    Please help me in this regards and guide me if i am going in wrong way.
    Thanks in Advance
    Ganesh
    Note:
    1. Our scenario is Make-To-Order.
    2. I am using same Order Type for all the production orders.

    Hi Venkat
    When u manf SFG - SFG declared to stock and all calculations for WIP or Variances are done for SFG material depending on the order status
    When u settle if the material is SFG in the production order - FI postings are done to relevant accounts for SFG matl
    Now when the SFG matl is used in production of FG, SFG is consumed and Production order created for FG will have either WIP or variances and settlement is executed. 
    For settling to sales order
    Create settlement profile with sales order selected as valid receiver, and assign the profile to the Production order type.  Here u need two production order types
    1)  One normal production order - here normal settlement profile is attached
    2)  One order type for sales order production.  Here u attach sales order settlement profile.  Create allocation structure for this purpose
    You can only one order type and settlement profile for both SFG and FG
    Postings to relevant accoutns for SFG and FG is taken care thru valuation class and account determination
    Hope the above clarifies - pls assign points if the above is useful

  • Report for planned or prodcution order for production in Alternate plants

    Hai gurus,
    I have two plants - X and Y
    Plant x have finished goods A and B to be produced  and procured from plant - Y
    plant Y have finished goods C and D to be produced  and procured from plant - X
    The production in alternate plant concept is used in plant X  for Product A and B
    The production in alternate plant concept is used in Plant Y for Product C and D.
    Now my requirement is how to get the report for the Purchase order raised by the
    plant X for the Finished product A and B , also how to know the planned order
    and production order with reference to purchase order for Finished product A and B
    under plant - Y
    and VIce versa for the Finished product C and B in plant X and Y
    Waiting for the positive reply.
    Regards,
    Sekar chand

    There are a few reports that you can use to display STO requisitions and orders, by supplying plant, material, or MD04 like was mentioned.
    The only thing that you don't have in a report is the link to the production order. In SAP in a MTS situation there's no fixed link (pegging) between the requirement (STO) and the supply (prod Ord).
    You can view the pegging dynamically, for example in MD04.
    Edited by: Mario Adler on Oct 27, 2011 12:13 PM

  • Sales Order Conversion to Production Order

    Dear All,
    I am from SD and have a doubt reg SD - PP ...
    If i have 3 sales orders and each sales order has 3 line items. Now i need to make a production order --- the production order to have 1 line item from each sales order so in all 3 production orders for the 3 sales orders and each production order has 3 line items and each line item is from diffrent sales orders i.e as above 3 sales orders.
    is it possible and how ?
    I am awaiting for a suitable solution ASAP...
    Thnks
    krishna

    Hi,
    In PP always 1 production order is for only 1 product ( if no co-product is added in BOM).
    In your scenario, If the PP settings & master data are maintained perfectly.
    System will create 9 production orders ( this may vary with respect to the lotsizing procedure used).
    Reward points if useful
    Thanks & regards
    Mahesh babu
    Edited by: Mahesh Babu MG on Jan 30, 2008 7:19 PM

  • Goods Issue from Production Order in SAP

    Dear experts,
    I faced one issue not yet solve is that my customer created the production order
    then already issue for production for all quantities of child item .
    Example:
    Production OrderItem A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    Issue for Production Item A
    Item A1 = 2 Qty
    Item A2 = 2 Qty
    Item A3 = 2 Qty
    But later on, my customer found out that 1 Qty of Item A1 already damaged.
    So they want to issue one more Qty of Item A1 instead of one that already damaged.
    How can I issue one more Qty for this item?
    Please your advices are necessary for me.
    Best regard,
    Borey

    Hello Borey,
    Solutions may depend upon the way you want to book the cost for the damaged part A1.
         (a) If you want to book the cost to the production order itself (production order is a cost object), manually book consumption for another quantity using MB1A, 261 movement (you will have to mention the production order during posting this consumption).
         (b) If you do not want to book higher cost to that production order, you can:
               1. Extract damaged quantity of A1 from that production order using MB1A 262 movement.
               2. Create a manual QM lot and after rejection, move that damaged quantity to blocked stock.
               3. You can scrap or rework from that blocked quantity later.
               4. Issue another quantity of A1 from unrestricted stock to that production order using MB1A                261 movement.
    Hope I could help you.
    Best Regards.
    Rajen        

  • User Exit/BADI for Production Order Availability Check

    Hi PP experts,
    Is there any user exit or BADI which can be used for Production Order Availability Check during order creation/release or while running collective availability check (COMAC) to include additional check conditions such as do not commit quantity (commitment qty = 0) if storage location for a component is missing in the production order due to storage location is not maintained/specified for that component in the material master.
    Note: In this case the availability check is set (configured)  to check at the storage location level.

    Dear ,
    Availablity Check is not Plant Specific or Storage Loaction spefic .ATP does not check the stock for any particualar stock in storage loaction rather it cheks various stocks based inward and out ward movement time through PR/PO/Dependent /Planned Order /Stock Type  irrespective of any Storage Location .
    BAPI which can be used :
    1.BAPI_PRODORD_CHECK_MAT_AVAIL
    can we exclude materials of prod order in availability check
    what is availability check concept  how it is used in SAP
    Check the above if it is useful
    Regards
    JH

  • Planned order to production order conversion in APO

    Hi Gurus,
    Can you please tell me how i can convert planned order into production order in APO? How that production order will be transfer to ECC?
    Regards
    Rajib Pathak

    Hello Rajib,
    The following are required -->
    1. Active Intergration Model for production orders in R/3 .
    2. Distribution definition  (T.Code /sapapo/cp1) in APO.
    3. Retransfer settings (optional, read the F1 help here,before setting one) (T.code /sapapo/cp3)
    Also make right setting for transfer for inhouse production in /sapapo/rrpcust1 in APO.
    Then create a planned order and check the "Conversion indicator" in the product view (/sapapo/rrp3). or use transaction /sapapo/rrp7 to convert orders in mass.
    Thanks,
    Mahesh

  • Reprocessing of Production order/Process order

    Hi friends,
    Can anybody explain me what is reprocessing of production order.
    Plz explain me in a step by step manner.
    Thanks very much.
    Kind Regards

    Hi Arun Kumar,
    Reprocessing
    Use
    In the area of confirmation, you can separate confirmation entry from processing. As a result, errors may occur when confirmations, or the processes that follow them, are posted. You can eliminate these errors by reprocessing them. The following reprocessing functions are available:
    Confirmations
    Actual costs
    Goods movements
    Reprocessing Confirmations :
    Use
    You use this function to process confirmations for which errors occurred as they were being automatically processed. With this function, you can either delete or, if possible, eliminate the errors and post the confirmations again.
    Confirmations with errors can arise if they were entered in one of the following ways:
    Upload from a PDC system (see Upload)
    Online entry ( Fast Entry or Mass Processing)
    Entry via BAPI interface
    Possible errors include:
    Order does not exist (for entry via PDC system, BAPI interface)
    Order was locked
    Sequence of time events incorrect
    Individual capacity does not exist
    Work center or personnel number does not exist
    Features
    Reprocessing has the following advantages:
    Selection
    On the initial screen, you can enter your selection criteria for selecting the confirmations that you want to reprocess. Possible selection criteria are: Production order, plant, confirmation, WBS element, sales order, MRP controller, work center, created by, created on.
    Navigation
    The screen for reprocessing confirmations is split into two areas:
    Overview list of the confirmations
    Detail screen for the selected confirmation
    In the standard setting, the overview list is on the left and the detail display of the confirmation is on the right. To change the position of the overview list, choose  (move the list in an anti-clockwise direction, select the position of the overview list). This last setting is saved for the particular user who created it and is used again the next time the function is called up.
    Reprocessing
    The confirmation that you have chosen from the overview (cursor position) is displayed in the detail screen. In the detail screen, you can remove the error in the confirmation.
    The following confirmations can be reprocessed:
    Order confirmation
    Operation confirmation
    Time event confirmation
    Activity confirmation
    The layout of the detail screen is determined by the confirmation that you are currently processing. The layout can be set up flexibly for an operation confirmation (see Single Screen Entry).
    Display error
    To display a long text about the error for each confirmation, position the cursor on the confirmation and choose .
    Check confirmation
    You can check one or more confirmations. To check confirmations, select them and choose . In the Status field on the overview list, the result of the check is displayed with a symbol.
    Delete confirmation
    If a confirmation is not to be posted because, for example, it has entered the SAP System by mistake, you can delete it. To do this, select the confirmation and choose . The confirmation is flagged for deletion and is deleted when you save.
    Delete a line
    To delete confirmations from the overview that you do not want to process at the moment, choose . The confirmation is, however, retained for reprocessing at a later stage.
    2.Cost Determination Error Processing
    Use
    You use this function to gather information about errors in cost determination and if necessary to repeat it.
    If errors occurred when determining actual costs online, you can decide whether or not the confirmation and the error records are saved. If you are using Decoupling Confirmation Processes, the errors are recorded during the execution of the background job or during updating.
    Features
    This function includes:
    An error log which displays the cost determination errors in detail
    Errors are, for example: missing activity prices, invalid cost centers or incorrect assignment of an activity type to a cost center.
    Rerunning cost determination
    Starting a New Costing Run
           1.      Choose either
    ¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs
    ¡        Process orders: Logistics ® Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs
           2.      Enter your selection criteria.
           3.      Choose  (Execute).
           4.      Select the confirmation in question and choose  (Error Log).
    Analyze the errors.
           5.      If necessary remove the errors.
    To remove the errors, you have to exit the reprocessing function.
           6.      Choose Production ® Shop Floor Control ® Confirmation ® Reprocessing ® Actual Costs or Production u2013 Process ® Process Order ® Confirmation ® Recalculate Actual Costs or open a new session.
           7.      Enter selection criteria for the confirmations for which you want to restart the actual cost calculation.
           8.      Choose  (Execute).
           9.      Select the confirmation and choose  (Save).
    Failed Goods Movements Processing :
    Use
    This function allows you to process goods movements that failed when posting confirmations. After correcting any errors that occurred, you can then post the goods movements a second time.
    Features
    This function includes:
    Detailed display of errors
    Errors can be caused by insufficient information such as missing storage locations or missing batch numbers. Errors can also include locked material data, insufficient stock, or attempts to post goods movements in the wrong accounting period.
    Opportunity to correct failed goods movements
    Option of posting goods movements a second time
    Reprocessing Goods Movements
           1.      Choose either
    ¡        Production orders: Logistics ® Production ®  Shop Floor Control ® Confirmation ® Reprocessing ® Goods Movements
    ¡        Process orders: Logistics ® Production - Process ® Process Order ® Environment ® Material Movement ® Failed Goods Movements.
           2.      Enter your selection criteria:
           3.      Choose  (Execute).
           4.      Select the goods movement that you want to reprocess.
           5.      Choose  (Display Errors) to display the errors that have arisen, in detail. To leave the message, choose  (Continue).
           6.      Select the required goods movements and make the necessary changes (for example, Edit ® Replace ® Storage location).
    For example, you can delete incorrect goods movements.
    When incorrect goods movements are deleted, the system does not carry out an automatic adjustment of reservations.
           7.      Choose  (Save) to restart the execution of goods movements.
    When you are reprocessing the goods movements for the confirmation, you can go to the goods movements overview.  Choose  Change Details, to change the goods movements.
    Hope this details is enough for clearing your doubt.
    Revert if any doubt and reward if useful.
    Regards,
    Tejas

  • Production order reversal in closed  period

    Hi Experts,
    I am having a iisue related to Production order
    This production order is in closed period ie 2 months back
    from this order i want to reject the material order is of 300 qty
    out of which 59 qty is rejected and now i want to reverse the production order
    It is possible and how ?
    This client is in Automotive sector and this happens regularly.
    Client want to show the rejection to supplier how to do this without opening back period?
    Please suggest. 
    Pert

    Dear ,
    Goto MMPV to open the Material Period .I think any business process can hev 2 motnhs material periods open .Please discuss the same with your MM consultant .same way you can do for OB52 to open the FI period because u need to cancal the docuements in MBST .
    Both the cases , you have to discuss wit your FI and MM consulatnt who are responsble for maintain materials and FY periods
    Regards
    JH

  • HU managed material consumption against Production Order

    Hi Gurus
    I am struggling to determine how we will consume HU managed goods in production.  The scenario is for the rework or repack of finished goods.  
    1)      The HUs are staged to the production area (either PSA or ST 914 in WM) based on need for rework or based on a production order
    2)      Production Order is confirmed and the inventory on HUs is goods issued.
    There are a few variations:
    Ø  In a rework the HUs are reused with a reduction; that is, they will send in 100 pallets to be reworked and get back say 90.  In this case they would reuse the 90 HUs and the remaining 10 would be inactive.
    Ø  It is also possible that 100 HUs are staged to production and not all the inventory is consumed in the production order.
    The basic question is:
    How do we capture the actual HUs used in the production order or staged but not consumed in the production order?
    Any kind of help will be highly appreciated,
    Thanks
    SK

    dear SK
    if i understand your process correctly - you're after the "Post Goods Issue with HU via Production Order"?
    as far as i know:
    -you create a production order and release it;
    -WM creates a pick request from which you can create a transfer order. the execution of the transfer order results in the components that are managed in HUs at the storage location, being withdrawn and made available for production;
    -you post the goods issue. depending on your organizational structure you can either use an outbound delivery or a transfer requirement as a picking document.
    good luck!

Maybe you are looking for

  • Getting a SAS URL by just creating a locator - how?

    I have code from a very helpful blogger that shows how to use JavaScript to upload to Azure. This means that he has created a webpage that will let any user who accesses it upload a file to a blog on his Azure storage. However, I want the user to upl

  • Adobe Reader 9 won't open some files -- jp2klib.dll

    I've had this problem for some time, and I think I've at least narrowed it down a bit. The problem is that some (but not all) PDF files cannot be opened in Adobe Reader 9.x on some computers, though they open fine on others. When you click on a probl

  • MP Rotation Untrusted Forest.

    Hi,  I realize you cannot force a client to use a particular MP, which is creating a design problem for us. We have multiple DMZs in an untrusted forest. I am not sure how to get around this problem. The clients cannot communicate with an MP outside

  • Job Opening - LabVIEW Software Engineer

    Belcan is an entrepreneurial and market driven organization committed to quality and customer satisfaction. Belcan is among the top 10% of the largest engineering firms in the country with over 6500 employees at 60 locations. The Advanced Engineering

  • Need a small program

    Need a small program that reads unlimited number of items and their prices until the user enters "Exit", after that the program should print out the total bill. Example: Enter Item : Disk 5 Enter Item : DVD 10 Enter Item : CD 20 Enter Item : Exit Tot