Inspection plan with multiple specifications

I have to maintain 1 inspection plan for 2 vendors for incoming inspection.
Eg: Vendor A & B
Vendor A, I have to check parameter Fe, Mn, Si
Vendor B, I have to check parameters Fe, Moisture (For B, no need to check Mn, Si. Also Fe specification will vary for A and B vendors)
How can we do this in SAP. I cannot maintain 2 inspection plans.
Vineeth

Dear Vineeth
1) Dependent characteristic
For MIC 1000 - Vendor  A specification 10 to 20, For Vendor B spec is 30 to 50
Suppose we receive 10 pc from vendor A , after GR inspection lot will be created from the 10 pc and the specification for MIC (1000) will be automaticaly assgined to the inspection lot ie 10 to 20. If the vendor was B then the specification would be 30 to 50.
In inspection lot there will be only one specificaton either it will be of Vendor A or that of B
2) In multiple specification is normaly used for Customer, country etc.
you have customer A , B , C & D with differnet specs for one  single mic and you want to valuate the mic with all specification seperately at one time
In this multiple specification is used. here we can valuate the mic with all the specification of A, B , C & D and results in a seperate window in the result recording tab. accordingly you can check wehter the mic has passed as ok with all cusomter specification
Regards
Gajesh

Similar Messages

  • Using inspection plan in multiple plants

    Hi,
    I would like to use one inspection plan in multiple plants. Are there any disadvantages or pitfalls? (besides the fact that if I use workcenters, the same workcenters must exist in all plants using the plan)
    Marcus.

    I love to use material specs.  They can be used alone or in conjunction with a plan. 
    There are several reasons why plans must be used in certain situations.
    Dynamic modification is one of the big ones.  You can only use DMR in inspection plans.
    You also need plans to work with PRT assignments.
    Security based on workcenters.  Some plants require that only certain techs or personnel perform certain inspections.  And the people who can do results recording is strictly monitored.  This is especially true for those using SAP in the Pharm and food industries.
    Using calculated characteristics.  These can only be taken advantage of if your use inspection plans.
    Enginerring change management.  Plans can used ECM to track and document changes.  Another big requirment in Pharma and food.
    If a material spec is used it is an all or nothing situation.  In many places, there might be 20 or 30 characteristics on a given material spec.  If you inspect by material spec then all the characteristics in the material spec are copied into the inspection lot.  If you inspect in conjunction with a plan, any characteristics that don't match up with an inspection plan characteristic are appended to the last operation of the plan.
    Since in many places, inspections are done at various stages, or maybe derived from batch derivation, they often want to pick and choose what tests get performed at what inspection.  A good example would be 03 and 04 lots.  Many places might test some characteristics via the 03 inspection that get the tests from the routing/receipe.  If the test is done in a later operation, there may not be any need to repeat the test in the 04 inspection lot.  Using a material spec, they wouldn't have that flexibility.  Anther example are 09 recurring inspections.  Many companies may only inspect a certain subset of characteristics to requalify the material at reinspection.
    Capturing costs for specific testing must use an inspection plan.  (yes, you can use general QM order in the material master if you want, but the operation header of a plan has various values and settings for working with costs)
    And now in 6.0, if you want to use the multiple spec functionality, you have to use inspection plans.
    If you integrate with EH&S and maintain specs in EH&S then EH&S can create and update all the inspection plans as changes are made.  But not material specs.
    I think I hit some of the big reasons,  I'm sure others can probably come up with ones I've missed.
    Craig
    Edited by: Craig Snyder on May 1, 2008 9:35 PM

  • Inspection plan : Dependent characteristics specifications

    Hi all ;
    We want to list our inspection plans with a alv report. We use tables MAPL - PLKO - PLMK - PLPO - PLMW .
    But , we can not find dependent characteristics in tables , when i click f1 , i get belowed result. It is a structure.
    How can i get plmwb-lifnr with their characteristic results ?
    Regards.
    M.Ozgur Unal

    Hi all ;
    You can join with ZKRIZ between MAPL - PLMW to contact related lines.
    Regards.
    M.Ozgur Unal

  • Manual inspection lot with out specification

    Hi gurus,
                    can anybody  give me an example for Manual inspection lot with out specification?
    regards,
    sbabu

    Hi,
    Actually it is not useful in manual inspection lot because manual inspection lot used to check your quality of material at  any movement.
    Means for example your raw material is in store department but some time you suspect something about quality & you take decision to check quality of material that time it can be used.  So in this case result record is mandatary,
    Because your intention to create lot to checked material so not use ful without specification .
    Also not any posting happening through  this lot.just to check the material at any instance.
    For any further clarification revert me back.
    Some time client want to create lot but do not want to take results for that just they are interested in giving
    UD & stock posting in that case you can remove tick task list required .This requirement mostly demanded for certain Engg items they do not want go material directly to unrestricted. it will go through UD.
    But manual inspection lot I do not think it much useful.
    Regards
    SANIL

  • Inspection plan Vs Material specification

    What is the difference between this and their limitation ,,when we have to use Inspection plan and when for the Material specification ?..Any detailed explanation   please
    Thanks for the help

    Inspection plan and when for the Material specification
    Inspection plan is plant specific material & plant combination.Means if same material is used in other plant you can not have Inspection plan of other plant used.
    Whereas when you hava material specs then it is not plant specific.Nce created it can be used for any plant.
    This can be used when your specifications are not plant depeendent.
    Explore on sdn you will get more explainations..........
    Inspection plan Vs Material specification
    Material specification and Inspection plan - Task list usage
    Inspection plan and material specification

  • How to use Same Inspection plan for Multiple Plants?

    Hello,
    When I create a Process Order for material (M1), release and save it for a Plant A then I get the Inspection lot automatically.
    Now I have another Plant B that we have created. We would like to use the same Inspection plan that has been created for Plant A and M1
    So in the changed mode(QP02) of the Inspection plan for Plant A in the material assignment tab I added the Material M1 and the Plant B. I am assuming this means when I create the Process order for M1 in Plant B then it should use the same Inspection plan.
    But when I create the Process Order for M1 for Plant B, release and save it then it does not created the Inspection lot automatically(though I can create Inspection lot manually)
    Can you tell me if there is setting that will allow me to create the Inspection lot automatically on saving the Process order which should use the Inspection plan that I just assigned.
    And also let me know if there is a better way to handle same Inspection Plan for same material but multiple Plants.
    Thanks
    SAP Fans...

    Dear,
    For your message my understanding is that you are not getting Inspection lot created in Plant"B". Inspection lot for a material would get created based on the Inspection Setup for the material master "QM View", so compare the QM for the material in both plants and correct it for Plant "B".
    Probably I feel Inspection Setup is not complete for the material in Plant "B" - Generally when extending material by copying referance, in the QM view you need to click the Inspection Setup Button, for the data to be copied...otherwise it does not copy the Inspection setup from the referance plant.
    Regards,
    Prasobh

  • Inspection plan with copy function

    Dear All,
    when i creat an inp. plan by copy model , group is generated internally. But i need group to be given externally. Even when group generated internally, is there any option we can give group externally. please calrify my doudt.
    Regards,
    Vijay

    Hi,
    Check whether you have define any external number range for Insp plan in SPRO.
    If not , you can define external number range interval additionally  in SPRO and it should allow to give external number while creating Insp plan with copy model.
    Before selecting copy model button in QP01 , give the external number in the group field and proceed with copy model.
    Hope this will help you.
    Regards
    K.M.Arun

  • Multi-Counter Plan with multiple Equipments

    Hello,
    We would like to track maintenance costs at Equipment level.  In multi-counter maintenance plan, is there a way to enter multiple equipments in one mainteance plan?
    Thanks a lot,
    Venu

    Dear Venu,
    In multi counter plan, only one equipment may be assigned, as correctly observed. However, you may assign the same equipment with different task list, depending on the cycle set, so that maint order is generated with required operations applicable for that cycle.
    Eg: Cycle set 1   100Hrs/1month
                          2    500Hrs/3Month
                          3    1000Hrs/6 Month
    Create task lists as per above cycle sets and for each cycle set assign the same equipment, but with different task lists.
    This reduces the number of maintenance plans for a given equipment. This is particularly useful for vehicle management, where the running KM and time are the common counters.
    James Prabaharan

  • Searching for inspection lots with a specific result

    Hi,
    Is there a way to search for an inspection lot or point containing a specific result?
    Like show me all the inspection lots where characteristic "color" is entered as "red"
    thanks,

    Hi Alper,
    To get it for specific material, there is an STD report available.
    Try QGP1.
    Regards,
    Shyamal
    Edited by: Shyamal Joshi on Jan 2, 2009 7:00 PM
    Or there is an other way also but for that thing you need to strictly follow the below steps, without fail.
    - Go to any inspection lot (T Code QA13) where this MIC's result is recorded. Ideally UD should be completed for this lot.
    - In the "Characteristic" screen click on the "Chars relevant for usage decision", so it will display you all the results.
    - Now click on the appropriate MIC. e.g. click on the MIC "color".
    - Now click on the Result History or "Cntrl+F9".
    - A small selection window will pop-up.
    - Here there will be two main selections are available, 1> with Inspection Char. and 2> with Master insp. char.
    - We need to "Master insp. char." activated (GREEN)
    - Now at lower part of this screen there are four sub selection tabs such as Material, Object, Inspection lot, & time are available.
    - In all the tabs a check box "Selection Active" is available, deactivate it.
    - As soon as you deactivate it, the selection criteria will change into Yellow colored triangle.
    - Noe Execute this selection.
    - It will give you the data as you are looking for.
    Pls revert if there is any query.
    Regards,
    Shyamal

  • Lifecycle planning with multiple locations

    Hi Experts,
    Imagine we have:
    1) Product A in Location A
    2) Product B in Location B
    Now there is a initiative to discontinue production of Product B in location B and it is expected that customers will buy instead Product A in Location A.
    So I need to map sales history of Product B in Location B to Product A in Location A. How can I achieve this functionality?
    - Life-cycle management allows me to do only within the same location.
    - Other option is to do a realignment, but it is too dangerous for often use from my point of view.
    Does anyone have implemented some development on this?
    Thanks,
    Art

    Art,
    1. If you want to consider using Life cycle planning only , Try creating the life cycle table on Product and Location characteristics. Create the life profile and then maintain both Product A/ Location A values in the lifecycle table.
    2. Realignment should be considered as one of the option, if your users are OK with actually copying the sales history to new product instead of just referring the sales history for forecasting without actually copying. Also, as mentioned earlier by Satish, execute realignment in two steps if you want to play safe. Copy first and then delete CVCs belonging to Product B/Loc B as a next step once you are sure the data has been copied correctly to Prod A/Loc A.
    Also you could do this in Quality first to feel confident about results.
    Hari Vomkarey

  • Planning with multiple plants

    Hi all,
    I have two production plants B and C.
    I have a stock of 100 in plant B and a stock of 400 in plant C. So the total stock is available is 500.
    I enter the requirement quantity of 1000 at plant A (planning plant) and do the MRP run.
    Now I should get the planned orders generated at the two plants B and C for the remaining quantity. What can I do?
    Rgds,

    Hi,
    As per my best knowledge you have no better solution in R/3 than the metioned process, that cannot realize your goal fully (you cannot optimize the process, you cannot consider the planning situation of all your plants during MRP run).
    As I mentioned, more advanced solution is SAP APO that could realize your / your client's idea.
    As for development: I cannot estimate how much and serious work could be to realize the multi-plant MRP run in R/3...but I'm afraid it won't be an easy job to do.
    Please also wait for the others, maybe someone can tell you a workaround / good idea.
    Regards,
    Csaba
    Edited by: Csaba Szommer on Oct 26, 2008 6:51 PM

  • Error during multiple specification

    When I am creating inspection plan with multiple specification, I am facing an error
    "No valid material-routing allocation exists for XYZ material".
    This is happening when I am trying to select Dependant Characteristic Specification. I went to that tab and entered, Material, Object and Object type. Could anyone tell me what exactly is missing here.
    Thanks
    Vineeth varghese

    hi
    can you please elaborate the steps you are following.
    Depent multiple specs are entered in a task list after proper assignment of vendor & material .
    please follow steps
    To incorporate these scenarios in SAP do following steps;
    Step: 01. Create an inspection plan; initially take any one as the specification limit for Length.
    Step: 02. Assign material and all three vendors to the task list group counter.
    Step: 03. Go to characteristic over view screen, select the MIC attached and click on the DEPENDENT CHARECTERISTIC button .
    Step: 04. System will populat a new screen. In this screen system will allow you to enter vendor wise different specification limits to a single MIC.
    Step: 05. Whenever the GR will be posted for the vendor. Lot will be generated and the relevant limits will be read by the system at time if result recording.
    Regards
    Sujit

  • UNABLE TO CREATE DEPENDENT REQUIREMENT FOR MIC - MULTIPLE SPECIFICATION REQ

    Dear Gurus,
    We have to create multiple specification for one MIC --> ECC 6.
    We did the following activities.
    1.Inspection Type 89 --> Multiple Specification is activated in customizing - Default Values.
    2. For the material 1259, Inspection Set up - for the Inspection Type 89 carried out in QM View  of Material Master.
        Multiple spec is activated in Material Master also.
    3. Inspection Plan is created.MIC
    4. I HAVE CREATED THE INSP. PLAN --> GROUP 236 AND COUNTER 1 USING QP01.
    5.I HAVE ASSIGNED THE MIC --> TESTQC  TO THE OPERATION.
    6.In customizing,
        QM --> Quality Planning --> Inspection Planning --> General --> Multiple Specification
        For the OBJECT TYPE 01 --> COUNTRY,
       I HAVE ASSIGNED 4 COUNTRIES --> (1) BAHRAIN (2) DENMARK (3) FRANCE AND (4) GERMANY.
    7.Now I want to create the Multiple specification using the Eng. Work Bench --> EWB.
    8.  Multple Spec. check box activated in EWB.
    9 While creating a dependent requirement for the MIC in EWB, if I assign the object type --> Country   
        and the Object -->  Bahrain, I am getting the error as -->
    =====================================================================
    Assignment of material 000000000000001259;1000; is not available
    Message no. QP306
    ================================================================================================================================================
    I could not proceed.
    HOW TO CREATE THE DEPENDENT REQUIREMENT IN EWB
    Please guide.
    With Best Regards,
    Raghu Sharma

    Dear Gajesh,
    I appreciate for your prompt reply.
    I have activated the multiple specification at client level as a first step.
    Will you please check and confirm?
    Expecting your reply,
    With Best Regards,
    Raghu Sharma

  • QM Material specification with inspection plan

    Hello,
    I'm trying to setup QM material spec with inspection plan and it doesn't work.
    I setup material master (With insp plant and with material spec).
    I Created a characteristic that I used in my inspection plan and maintained the characteristic in the material specification.
    When I create an inspection lot (89), the characteristic is always inserted at the end instead of redefining my specifications into the pre-defined characteristic.
    Have I missed something?
    Ghislain

    As per our business scenario for Pharmaceutical we use Inspection with attached MIC with Sampling and Sample drawing Procedure, Sampling scheme to check the Quality of RM/PM/FP, can u give me some idea regarding;
    1) Material Specificaton in Inspection plan
    2) Reference Operation set with its use.
    3) Dynamic Modification Rule
    As for pharma we do;
    1) Create MIC
    2) Create Inspection plan
    3) Attaching the MIC to an Inspection plan with sampling and sample drawing procedure
    4) Attacing an Inspection Plan to an Inspection Lot
    5) Result Recording and Usage Decision of Inspection lot for
    In Automotive and othe Process Industry how the Dynamic modification rule,reference operation set, material specification flow.
    Reply will be rewarded
    Thanks in advance its urgernt

  • Material specification and Inspection plan - Task list usage

    Dear Friends,
    In inspection type  Task list usage is assigned
    For Example
    inspection type 01  -  usage - 03
    inspection type 05  -  usage - 05
    inspection type 06  -  usage - 07
    inspection type 10  -  usage - 06
    In my scenario i want to use all the above inspection type for a product
    if i use mateial specification there is no any problem with my  Task list usage
    If suppose i use inspection plan do i need to create different inspection plan with different usage
    or is it possible to create one inspection plan with all the above usage
    what about universal usage 03  can i use it
    i try to use but system does not triggering inspection lot
    can any one Suggest some ideas
    Many Thanks & Regards
    Raj

    Hi Raju,
    All of first pls understand the concept of Task list and specification.
    If you need to inspection any material in very systematic manner, where you will have well segregated operations where the appropriate Work Centers will be bind and under that hierarchy MIC will be attached. The inspection will be governed by some inspection points. And according the the same Samples will be calculated. When you wanna go with all these functionality then you must have to use Task list (Inspection plan).
    And if you don't wish to have these functions then simply go with the material specification.
    Now it comes the actual query about task list usage.
    If there is a common inspection plan is supposed to be used for all the inspection types for your material then you can prepare only one inspection plan, put ant of the Usage to it it can be 05 or 03 universal. But what you have to do is,
    Go to SPRO->Quality Management->Quality Inspection->Inspection Lot Creation->Maintain Inspection Types Execute and set the Task list usage as the same it is set in the inspection plan for all those Inspection types for which that common inspection plan is supposed to be used.
    Note:- There is no any link between inspection lot creation and task list usage of inspection plan.
    Regards,
    Shyamal

Maybe you are looking for

  • Ffmpeg installation on Solaris 10 AMD opteron processor

    Hi All, I would like to know whether ffmpeg can be installed on Solaris 10 AMD opteron processor. -BR

  • Upgraded to 3.6.16 now New Tab function won't work

    Firefox did the automatic update to 3.6.16 and now it won't allow me to open a new tab. Page just refreshes if you choose 'File'-New Tab, and clicking on the tab icon doesn't result in anything. Have not noticed anything else that could be affecting

  • TS3899 I can not get my RED circle with # of messages in my mail folder to show on my phone?

    I can not get my mail icon to show th ered circle indicating how many pieces of mail i received - help?

  • IDoc to IDoc Mapping

    Hi , I am new to SAP PI. We are using B2B scenario in office. We are getting ALE idoc from one system and generating idoc to receiver system inbetween we need to map the fields by using PI. Please help me on this, How to Map the idoc fields in PI? Th

  • Publish Web Site

    Hi Team, I've a Project in which 8 libraries and 1 website is defined. And when I am publishing this web site it is giving successfully published but datetime of dll i.e. web.dll is not changing and also when I am deploying this to QA server the chan