Issue in Repair Order

Hi Guru's,
I am replicating the repair order scenario. I am trying to create repair order of document type RA and i did the configuration setting for item category IRRS to be coming for repair order.
In this scenario, System is throwing the error material does not exists for the plant. But this material is used so many times. I doubt that there is some issue in repair procedure (t-code--vorp). and what is the right item category(is it irrs or irrp or any other.)
in this scenario i am creating repair order and creating return delivery so that the stock will be coming to my plant for repair. I am not giving any loan item to the customer. Please let me know what is the right requirement type and requirement class.
Please suggest the solution for my repair scenario.
Thanks,
C Chaitanya
Message was edited by: G Lakshmipathi
Please use the subject effectively and avoid using "Please Help", "Urgent" etc.

Hi Santosh,
Thanks for the reply. My scenario is I am getting the material from customer for repair. So I should create repair order w.r.t service notification. After creating repair order, I should create return delivery (LR).
In this scenario i don't have service material. If material no 1808 is delivered to the customer, I need to get the same material back to the plant for the repair.
If IRRS is not the right item category what is the right item category.
I dont have any serviceable item. In my scenario IRRS is not serviceable item.
What should be the setting for VORP (Repair processing). Any idea?
Is this configuration is right? Please suggest.
Thanks,
C Chaitanya

Similar Messages

  • Billing issue with repair order(RA)

    Dear Experts,
    I am getting the following two errors while processing a repair order type RA for product swap (no repairs),using 101 Accept repair stage in repair procedure for creating a credit memo (as per client's req).
    Is tehre a work around, please suggest.
    Error 1: 0196000023 010000 Billing not possible because repair is not yet completed
    Technical data
        Tech. data details
         Client                                 100
         Group Number
         Sales Document Number                  0196000023
         Item Number of the SD Document         010000
         Schedule Line Number                   0184
         Counter in Control Tables              00
         Message Identification                 VF
         System Message Number                  184
         Output Type                            E
         Message Variable 01
         Message Variable 02
         Message Variable 03
         Message Variable 04
         Group Type                             F
    Error 2: 0196000023 020000 The item is not relevant for billing
       Technical data
      Tech. data details
      Client                                 100
      Group Number
      Sales Document Number                  0196000023
      Item Number of the SD Document         020000
      Schedule Line Number                   0044
      Counter in Control Tables              00
      Message Identification                 VF
      System Message Number                  044
      Output Type                            I
      Message Variable 01
      Message Variable 02
      Message Variable 03
      Message Variable 04
      Group Type                             F

    Dear SAP Experts,
    We are implementing SAP CS for our customer and I faced the same error while Billing the Repair Order. I had made an error in assigning the Transfer of Requirements correctly to each of the item category in the Repair Order.
    By SAP standard, the status of the main item of the Repair Order will be changed to "Repaired" as soon as the Service Order is Technically Completed (TECO).
    I had wrongly assigned the same Requirement class to both the main item and also the repair item. So the system was expecting there were 2 service orders created for the main item and the repair item. So when I TECO'd the actual Service Order, the main item status was changed to "Partially Repaired" and not "Repaired".
    So I corrected the Requirement class, and assigned the class SE to the main item and the copy of Requirement class 204 to the repair item.
    This solved the issue and once the service order is TECO'd the status of the main item in the Repair Order changed to "REPAIRED".
    Then I was able to invoice the Repair Order without any issue. So please check the requirement classes assigned to each of the sub-items in the Repair Order.
    Thanks,
    Siraj

  • Issue while creating repair order via IW52

    Hi All,
             I am facing an issue while creating a repair order from Service Notification.
    In IW52 for service Notification , we have option of Create repair order in Action box of service notification, when i am clicking that i need to enter the sales order type.. when i am selecting standard order type KD01 or any other it is saying that
    1)Order type KD01 does not have the sales doc. identifier "repair"
    Message no. QM127
    Diagnosis
    You entered an order type that is not assigned to the sales document identifier "F" or "G" = repair order.
    Procedure
    Enter an order type that has the sales document identifier "F" or "G".
    Where can we see sales document identifier in config ?
    2. I would like know is there any setting where we can give default sales order type to service notification type ..
    regards
    giri

    Dear,
            Thanks for your inputs. It will be great help if you can let me know the below :
    1) Diff between Repair order, spare parts order..
    2)I happened to create a service order from a sales order following IDES Model for CS -4.6C / the service order type created is SM01 is created and my sales order type is OR .. now my question is there any setting where we assign Service order type to sales order type ???
    Note :- In OIOL Tcode for SM01 Order type i have IRC Sales order document type linked ..
    regards
    giri

  • Issue in triage codes in reactive repair order

    Hi,
    I am working on service module of SAP CRM 5.0 system. When I create a service order for reactive repair, I am able to add a few triage codes for items.
    when I try to create a confirmation order for the same reactive repair service order, the triage codes mentioned in Service order are not getting copied to the confirmation order.
    If any one had experience on such kind of issues and could guide us through this, please respond back to me.
    Waiting for your valuable suggestions.
    Regards,
    Lakshmi.Y

    Hi Santosh,
    Thanks for the reply. My scenario is I am getting the material from customer for repair. So I should create repair order w.r.t service notification. After creating repair order, I should create return delivery (LR).
    In this scenario i don't have service material. If material no 1808 is delivered to the customer, I need to get the same material back to the plant for the repair.
    If IRRS is not the right item category what is the right item category.
    I dont have any serviceable item. In my scenario IRRS is not serviceable item.
    What should be the setting for VORP (Repair processing). Any idea?
    Is this configuration is right? Please suggest.
    Thanks,
    C Chaitanya

  • Issue in creation of new line item in repair order-Reg

    Hi all,
    I have a query in Service Management Module of SAP while working in standard IDES System.
    I followed the procedure given in the IDES material.
    As per the standard system the fourth line item in the repair order should be automatically created, once the service order is technically confirmed and completed. In my case iam able to get the first three (Item Categories - IRRS,IRRE,IRRP) line items but even after completing the service order technically iam not gettin the fourth line item (IRAL). Only based on the Fourth line item we can create the Outbound delivery for the repaired item. After that the billing process need to be processed. My query is how to get the fourth line item automatically in the repair order after i technically complete the Service Order. 
    To brief you on the entire process that i have followed:
    1. The QM Check need to be activated for the material.
    2. Creating the Service Notification and the repair request.
    3. Posting the GR of a piece of equipment to be repaired.
    4. Processing the technical check.
    5. Displaying the repair request and the service order.
    6. Editing the Service Order.
    7. Processing and Confirming the Service Order.
    8. Technically Completing the Service Order.
    9. Delivering the Repaired Piece of Equipment.
    Then Comes the BILLING.....
    In the above, after the eighth Step the Fourth Line item will be created automatically created but it DOESNT....
    regards
    Venu

    Hi ,
    Review your repair procedure and copy controls defined for this stage...mya be some thing is missing over there causing this behaviour.
    As you told completion of Service order will determine the last item and enable us to delivery the item to customer...
    Thanks,
    sudhi

  • CRM 7.0 Repair Order: goods receipt against order stock

    Hi gurús,
    We are implementing CRM 7.0 Service and one of our business processes is Repair Order. We have done almost all customizing following Note 806768.
    We have our repair orders replicated in ERP, where logistics processes take place without problems as far as we do not set special stock indicator to order stock at level item, therefore receiving and issuing products to be repaired into unrestricted stock. Processes are correctly updated in CRM.
    The problem comes when we try to use order stock, as mentioned in SAP Help. Return to repair enters into unrestricted stock, even though it is supposed to entry order stock, with movement 653-E (Schedule categ. IR). When we try to deliver repaired product, movement 601-E (Schedule categ. IA), we are getting errors, since there is no order stock, and return and deliver are managed with two different item positions.
    I suppose this is a logistics issue, not a CRM problem, but I would like any advice in case anybody has already dealt with it.
    thanks in advance and take care.
    Pablo

    What resolution did you get for this issue? Did you do an enhancement?

  • How to send replacements in Repair Order in SAP CS

    Dear CS Experts,
    We have a scenario where in we need to send replacements before repairing the returned goods. I have maintained the Repair Procedure as below and maintained all the item category customizings. But when I try to add this manual step of "Send Replacement", the system is not creating a replacement item for the outbound delivery.
    I tried to automate this step by setting the "Automatic" flag, then the replacement item is generated by default. But then the system is not determining that this item is Delivery relevant. I had maintained all delivery relevant settings and also the copy control settings for delivery. Still I get an error saying that there are no delivery relevant item.
    So I was just wondering how can we send replacements after the initial step of repair goods receipt. Any help is highly appreciated.
    Send Replacement will actually create a Outbound Delivery item or it has to be achieved using a different movement type. Please help!!!!
    Thanks,
    Siraj

    Dear CS Experts,
    I think I have sorted out the issue.
    I changed the Repair Procedure as below.
    1. I create a Repair Order and enter 4 goods to be returned.
    2. I want to send 1 replacement item.
    So I add this manual step in the repair scheme for 1 item to be replaced.
    3. So the replacement item is created. The mistake I was doing initially was that - I was trying to do this manual activity after the return delivery. After return delivery, the repair procedure has already gone to the next step of Start Repair. Hence this replacement FLAG was not showing.
    4. Now I do the return delivery of the 4 goods.
    5. I trigger the outbound delivery of the replacement item. The issue with the Outbound Delivery before was that - I have not assigned the correct Schedule Line Category to the replacement item category. I assigned the correct Scheduled Line Category as IA. Now the system allowed me to create outbound delivery without any issue.
    In the outbound delivery I mention from which storage location this replacement item should be picked from.
    6. After the outbound delivery of the Replacement Item - now I see the correct figures in the Repair Scheme.
    From now I can proceed with the other steps successfully.
    So to summarize - these are the steps which needs to be checked for Replacement Item Delivery
    A. The Replacement Item Category should have the Scheduled Line Category IA assigned.
    B. Adding the Replacement Step should be done before the Returns Delivery (with the repair procedure settings which I had).
    I could sort out the issue now with the above two settings. I hope this could be helpful for others who are trying to sort out the same issue.
    Thanks,
    Siraj

  • Debit and credit entry of items in repair order after DP90

    Dear All,
    From the repair order we create a service order, followed by operations and components in service order. We do a DP90 after completing the service order and see that there are entries for in repair order. Once again we go back to service order and delete one of the material not required, do a DP90 and what we see is, we have a negative entry for the item that is deleted.
    I am not from CS background so request for lill explanation, why is system behaving in such a manner, to remove these entried from repair order what is the correct method. I can delete it directly but i am sure that is not the right way.
    Please suggest in detail if possible.
    Thanks
    Deepak

    Hi Pete,
    I've been reading some of your posts and feel you might be able to help me with an issue regarding the "debit memo" indicator issue during DP90 processing for a repair order.
    In our company we do just the standard repair: create repair request, return the material, generate service order then do RRB billing through DP90. DP90 adds sub items to repair order, which is fine. The problem is if I go to the repair overview screen from the main item, I don't see lines with "debit memo" indicator there for the sub items added by DP90 transaction - meaning if the sub items are added through DP90, there is no entry in the repair overview table with "debit memo" checkbox. Then if I look into COPA, I don't see planned revenue on the main item - the prices on those sub items don't get picked up as planned revenue. After I do billing, the actual revenue does go up to the main item and seen in COPA. Thus I have a "negative order backlog" caused by zero planned revenue.
    I did some testing manually adding items with "debit memo" checked in the repair overview screen. Then sub items were added to repair order and I saw planned revenue on my main item. This made me wonder why items generated by DP90 don't have corresponding "debit memo" entry under repair overview screen.
    We need to have the planned revenue picked up so we don't have negative backlog value after actual revenue is billed. I want to find out if the issue is caused by the missing "debit" entry in the repair overview screen or some other reason. If that's the reason, how to get the debit memo entry generated under repair overview screen?
    Hope I have explained my problem clearly. Could you please shed some light on this?
    thanks in advance!
    Meng

  • Return Delivery for In-House Repair Order

    When I create an In-House Repair order in CRM and replicate it to ECC, the return delivery does contain the special stock indicator "E", hence the stock is posted to unrestricted.  This only happens with replicated orders.
    Any ideas?

    Hello Peter,
    Regarding Posting of Goods Issue for Spare Parts in SAP R/3 Materials Management,
    The data posted depends on the logistics scenario(s) that you use. The system therefore first determines the logistics scenario defined for the combination of transaction type, item category, service organization, and other relevant information required for the scenario (for example, movement type or special stock indicator in SAP R/3).
    Availability information informs you whether the service parts are currently in stock. Each service part item generates a reservation in the back end system, which can be used to trigger an early procurement process.
    To know more about the same refer the below link:
    http://help.sap.com/search/highlightContent.jsp
    http://help.sap.com/saphelp_crm50/helpdata/en/cb/f876d513c56e4e864c15517ff67e92/frameset.htm
    Hope this helps!
    Thanks and Best Regards,
    Shanthala Kudva.

  • Problem in creating Invoice for Repair Order.

    Hi,
    We have a repair order on the production system, which has 3 line items. The statuses of the first two line times are completed and the repair invoice is generated for both items.
    The problem is with the third item. The system status of the third item shows as <b>PARTIALLY REPAIRED (Business decision made / Partially repaired)</b>.on analyzing further we found that service order is generated for this repair item and the system status in the service order is <b>CLSD PCNF MANC PRC  RET  SETC.</b>
    The invoice is not getting generated for the above mentioned item. The error message says <i><b>“Billing is not possible because repair is not complete”.</b></i>
    Can anybodytell how we can rectify this and generate the invoice.
    Regards...
    Imran

    Cant you change the status to repair complete in the change mode (IW52)?
    that should solve your issue.
    reward points if it helps
    regards
    Biju

  • CS Repair order Return and Loan Item - SWAP

    Dear Experts
    I have a question on Repair  order
    I had configured all proper setting for repair order
    I can able to return repair item, send load item, return back repaired item and
    system can able to create automatically a service order , can able to do issue and confirm
    but i have a scenario
    1) Bring back the repair item from customer location
    2) as a replacement i need to send a new item
    3) Repair the item which we brought early and keep in service ware house
    for this what is the step to be followed
    Regards
    Raj

    Dear Mahesh,
    Sorry to confuse you
    case 1
    normal process ,
    1)Bring back , to be repaired item from customer
    2)Send replacement/Loan item to customer
    3)repair the item from step 1 and return back the item
    4)bring  back again replacement/loan item from customer  its fine for me
    perfect working
    case 2
    1)Bring back , to be repaired item from customer
    2)send a replacement item which is nothing but swap item
    3) Repair the iten from step 1 and move to warehouse
    for case one is that any special configuration needed
    or just do  only steps and do billing , does billing will be correct
    Regards
    Raj

  • Unable to provide repair order information?

    Hi all,
    Ok so here's my story, for the past week and a half I've been keeping up to date on my repair order which is resulting in HP having me send my laptop into them and them sending me a different one. The problem is, my case manager can't provide me with ANY information on the order. I don't have an order number, expected date, tracking number, etc. She says that she contacted the order department on Monday and they haven't sent anything back, HOW is this possible?! Is the communication that bad in HP that they can't even get a simple order number sent between departments? She mentioned that they've updated their order process or something like that and have had a few problems, I'm just wondering if anybody else has had this problem?

    Thank you for visiting the HP Support Forum. This is a peer to peer community for customers to connect and share solutions on their HP consumer products. If you have direct feedback for HP about their products or services, please use the link below.
    http://welcome.hp.com/country/us/en/wwcontact_us.html
    If you have other questions and concerns, please feel free to send me a private message.
    MrMatthew - HP Support Forums Moderator
    Click the Kudos star as a way to say "thank you" for helpful posts.
    Be sure to come back and click the 'Accept as Solution' button on the post that solved your issue - it may help someone else.

  • Handling Status of Servicable Material on Repair order Manually

    Dear All
    Is it possible to change the status of servicable material from Under repair>repaired>for delivery  manually without using service order for the reapir order.
    My scenario is that i am using Notification for the purpose of generating repair order and service order.
    I create repair order  for the purpose of tranfer of posting to different location and manage the status while creating service order revenue based directly from Notification as i need to create quatation for it and generate sale order and billing for the service order.
    thank you
    Nomi

    Dear PeteA
    I am using reapir order for moving my servicable meterial to different processes of return and repair processing.I am not using service order from the reapir order as what i think is that service order generating from repair order is only used for non revenue bearning,Am i correct?
    Sir my other question is  I create quatation > standard sales order>delivery--> Billing for the component which i sell for my service order.Issue is that When  billing document is generated system post material in debit & sales value in credit on service order. Resultantly order total value shown in negative and negative value cannot be settled told by CO consultant.
    raw mat Cr
    Customer Dr
      Sales cr on (service order)
    Thank you,
    Nomi

  • Repair Order - swap scenario

    Hi I am working on 2 scenario, pls help.
    Scenario 1 - SWAP (where a new product is issued to customer if the product which has come cant be repaired)
    Item received >reapair started>product cant be repaired>service order should send back message to repaire order as "scrap 1>Repair order should offer scrap of received product (which is currently in the status of "under repair">once scrap>not returnable replacement of new product should be allowed>repair order will be closed.
    FInal status in repair tab should be
    return 1
    scrap 1
    delivered 1
    Scenario 2 - Loaner ( where product can be repaired but will take time, so for the same temporary product is provided to customer.
    Pls reply ASAP
    Thanks !!

    Hello Bharat,
    Std return & repair process needs configuartion in SD module for SD order dcument type. We need to configure service order type in one SD module.Based on return order using Tcode VRRE, the repair order can be generated. With using user status you can set the status beyond repair.Scrap the material using std Materialscrapping process. Using User exit for ervice order create a soles of order with FOD( free delivery) condition record & deliver new material to customer..
    Guess this helps.
    Thanks
    Vinay

  • Error in Depot Repair when creating repair order for SR

    Hi,
    I am getting the following error in Depot repair when creating a repair order for a Service Request :
    "The Service Request Customer (GEJ Service Provider) does not own this item instance (&ITEM_INSTANCE). Please choose another instance. (IB_INSTANCE=21777)"
    An Item Instance was created for customer A (Owner), then party relationship was created in IB with another customer (GEJ Service Provider).
    Now a SR is created with customer as GEJ Service Provider and this item instance is selected.
    The error is coming up when trying to create repair order for this SR.
    Any idea how to resolve this issue?
    Regards,
    Mohammed

    Mohammed
    Please refer to this in Metalink note that says Deport Repair 11.5.10 enhancements and search for this ER number.
    ER: 4723163
    Service Request and Repair Order blocks of Depot repair do not allow ability to change Installed Base ownership of an item or creation of TCA relationships between existing TCA parties before creating a service request or repair order.
    Ability to automatically change ownership for an install base tracked item when returned for repair.
    ER 4723163
    Patch 4910836
    Look like you have applied this patch.
    Coming to the issue you cannot achieve what you are trying. The only option is to add this subfunction Depot: Allow Change of IB Ownership to your menu of the resp you are trying to use and the message will be different:
    This allows you change the ownership and create a repair order.
    Unfortunately customer relationship is not going to help at this time. YOu may want to log an SR and see if that is intended in the future. I checked R12.06 but the same behavior is exhibited there as well.
    Good luck!
    Thanks
    Nagamohan

Maybe you are looking for