Labour Postings into Cost Centres

This month, when our labour documents were posted into the cost centres, the exchange rate it used to exchange BRL/EUR/GBP etc to USD was different to the exchange rate showing in our SAP table.
Does anyone have any idea how this could have occured and where the exchange rate might have come from?
Many thanks,
Susan
Edited by: Susan Green on Dec 1, 2008 7:57 PM

Check the Translation Ratios.
SPRO>SAP NetWeaver>General Settings>Currencies>Define Translation Ratios for Currency Translation
Regards
Sreenivas

Similar Messages

  • Actuals postings to Cost Centre Accounting

    Hi,
    We have a Z field created in SPL and added the same in BSEG table. The same field does reflect in Cost Centre Accounting document but with incorrect values (Transaction MIRO).
    Any pointers towards any standard SAP user exit / program would be useful.
    Regards,
    Amar

    Hi,
    Use check table while defining the Z field or check the update field.
    if not solved, explain in detail.
    Thanks,
    Sujai

  • Labour time to be allocated to Cost centres

    Hi Gurus,
    We have fixed labour hour per hour is 100.84/hr.Now we have 5 work centre.We have configured it accordingly.In future two new cost centre will come.
    Pl advise how we can allocate same 100.84 to total seven work centre.
    Pl advise.
    Regards,
    Samar

    Would it be possible to manually calculate what the rate should be and enter it into the Activity Type/Price?

  • Posting to a cost centre from a sales order

    Hi all.  We are currently in the process of replacing a third party system which deals with publicity mailing and taking the process onto our SAP system.
    At the moment a report is run on the third party system at month end which details the months costs (freight and handling) which is then uploaded into SAP by JV in order to make the postings to the correct cost centres.
    However, the current method of raising orders via email will be replaced with raising sales orders on SAP.  The sales order will obviously allow postings to a profit centre via the material, but how do I then get the costs into a cost centre for reporting and budgetary control?
    I originally thought of using OKB9, however the relationship is not a simple one profit centre to one cost centre, and the costs have to be split across multiple costs centres.
    Any ideas would be extremely welcome.
    If you need any further info just let me know.
    Many thanks

    There are a couple of options depending on how the data comes in and how you want to disburse it. You could use a substitution rule and you could also do CO allocations as well. This is because you have one profit center and many cost centers. One to one is a an easy flow match.

  • Activity Types and Cost Centres

    Our PP is not yet live now.
    While going through the system settings, it is found that many activities (approx. 15 for indirect expenses also) are planned in the Production Cost Centres.
    However, these activities are not included in the master data of the Work Centre. Only one activity type is mentioned there for machining.
    Then, what is the purpose of other activity types planned if they are not mentioned in the Work Centre ?
    Is there any other way these activity costs will appear in the Cost report ?

    Hi,
    You are almost on the right line, activity quantities will be triggered in the  cost center report based on the routing master and through  the confirmation from the production orders.
    For the creation of the  work center - Activity Planning KP26 is required. Cost center/Activity
    where we can plan the activity quantities.
    Prior to that KP06 is required to plan the  primary cost combination of (Cost Element/Cost center/Activity Type) where we can plan the cost.
    Based on the above information we can calculate the plan price - KSPI
    Based on the confirmation from the production orders activity quantities will be updated in the center report. cost will be updated with actual postings in the cost center.
    So that you can calculate the actual activity price.
    Please look into the blog for better understanding:
    Expenses Analysis and Its splitting  - Part 1
    Regards,
    Pavan Kumar Arvapally

  • Revenue & expense posting- use cost centre OR wbs

    Hi All,
    Could you please suggest me if we are making posting for expense then whether to use cost centre or WBS.
    and if we are making posting for revenue then which one to use.
    I want to know where we should use cost centre & where we should use WBS.
    Regards
    Deepak

    Hi Deepak
    Cost Centers are org units in Controlling area which are used to posts periodic costs which are later absorped onto the products using product costing. In the end, you wish to have minimal or zero Over/Under absorption at the cost center level for periods under consideration.
    WBS are task oriented objects and are to be created for specific purpose only (logn term projects, Asset Accounting etc)
    For costs, you can use both cost center and WBS, depending on the nature of the expenditure. eg: Electricity, labour would normally be posted to cost center whereas expenses for specific purpose (training, Asset etc) would be charged off against WBS initially and later settled to respective receivers as maintained in the settlement rule.
    For Revenue, Cost centers receive only statistical postings, whereas real posting can be to IO, WBS, PSG etc.
    In case of WBS, real posting can be made to WBS.
    Hope above information is helpful. Let me know if you need any further inputs
    Regards
    Mustafa

  • Cost centre settings

    Hi experts,
      Can somebody pls tell me the cost centre settings in ISU?is it necessary to create a dummy profit centre in FICA?

    Hello,
    Use KS01/KS02/KS03 to create/modify/view cost centers
    Use KE51/KE52/KE53 to create/modify/view Profit centers.
    Do remember once you create them in CO, you have to map them in FICA @ IMG\FICA\Basic Settings\Postings & Documents\Document\Define Account assignments for automatic postings\Define CO Assignment keys.
    If you are not in ECC, you need to create Dummy profit center in CO and map them into FICA.
    Mail has bounced back to me
    Hope this helps
    Rgds
    Rajendra
    Points?

  • Origin Groups for Cost Centres?

    Hi
    I am using Origin Groups to post the credit of the overheads to a different Cost Centre depending on the raw material.
    We need to do a similar thing with our activity costs (labour).  The requirement is depending on the cost centre that posted the original labour activity cost credit a different cost centre with the overhead calculation.
    The documentation says Origin Groups are for materials.  Is there someting similar for cost centres to use when calculating overheads?
    Thanks for the help
    Regards
    Gill

    Hi
    I think you can achieve it... Give it a shot as below..
    IMG: Cost Center Accounting > Actual Postings > Period-End Closing > Overhead > Costing Sheet: Components > Define Calculation Bases Referring to Cost Center and Activity Type
    In this step, define your calculation basis as a combination of cost center and activity type, say Z01 as a combination of cost center 1000 and activity A1 and Z02 as a combination of cost center 2000 and activity A1
    Now set up your costing sheet with 2 calculation bases as Z01 in Row 10 and Z02 in Row 20
    In IMG Step "Define Quantity-Based Overhead Rates", define Y01 and Y02
    In IMG Step "Define Credits", define X01 and X02
    In row 30 of costing sheet, mention Y01 (dependant on row 10) and Credit X01 (Credit X01 posts to Cost Center 1000)
    In row 40 of costing sheet, mention Y02 (dependant on row 20) and Credit X02 (Credit X02 posts to Cost Center 2000)
    Regards
    Ajay M

  • Rel. strategy is not triggered while creation of PR with cost centr

    Hi Gurus,
    While creation of PR release strategy is not getting triggered with cost centre BCWSV870. But release strategy of PR triggered for cost centre BCWSV852 (In PR changed only cost centre as BCWSV852 instead of BCWSV870). Both cost centres are similar and the both cost centres are exist in characteristics value in CL20N for the same release strategy.
    My question is why for one cost centre triggers release strategy triggers and for other cost centre release strategy is not triggered. Can you please tell how come this and rewarded for answer this.
    With regards,
    C. Sundar Rajan

    Hi,
    In regard to problematic PR with cost center BCWSV870, was your PR maintained with only one line item? or multiple line items?.  In additions, when defining cost center as part of the release strategy structure, did you enter all cost centers with leading zeros?  Tak a further look into OSS Note 365604 for your further investigation.
    Cheers,
    HT

  • How to change validity period of cost centre or activity type

    Hi
    How to change validity period for an Activity type or Cost centre?
    Can we change the validity period once created?
    regards
    Prakash

    Please note this can be done.
    Go to Edit Cost Center
    Goto Edit, Analysis Period.
    Create a new validity period say today until 3112999
    Change the data you want and save.
    When you go into the CC again it will show two validity periods.

  • MIRO Error-Can not post to mat.account & using overhead cost centre &.

    Dear Colleagues,
    On MIRO,users have come across this error where they can not post to a particular G/L account using 2 different cost centres(219 & 220).
    We have some validations on OB28 but although one particular step menitons this message as I stated above,the prerequisite of that step seem to be referring to G/L IN VAL_Plant No_16 AND Cost Center IN VAL_Plant No_17.
    Whereabouts I need to maintain this G/L account/Cost Centre Combination?II had a look at OME9/OKB9 but couldn't get any resolution looking over there...
    All Help appreciated.
    PAPJ1.

    I had to tweak the types  of error messages on OB28 temporarily,to allow for these postings to go through and it worked!.
    PAPJ1

  • Third party gratis order and cost centre allocation

    Hi all
    I have a problem with third party sales. When the sales order is gratis, the cost centre allocation is determined by our gratis order reason. This particular cost centre is locked for invoice receipt posting (as it is gratis), and so we cannot complete the 3rd party process.
    Is there any way around this - I can see in the IMG that you can create requirement classes for costing but I cannot see where you assign these requirements to items.
    Also, I am not sure about the implications of removing the lock on invoice receipt postings.
    Any help would be appreciated.
    Thanks
    Jon

    Please chck with FICO  team wether the cost center is loocked for same ?
    Points if helpfull
    Rg Ajit

  • Cost centre and Profit centre in one query - Authorisations not working!

    Hiya,
    I have another problem related to Analysis Authorisations.
    I have created an AA with Cost Centre and Profit centre access restricted to a certain node of a hierarchy (type 1 - this node and below). For example, the User can only run a query at Cost Centres level of Country Belgium - the query works fine. Now, the user wants to drill down by the relevant Profit centres. According to the log, the system checks for Profit centres like * and says the user is not authorised. All this, despite the fact that all Profit centres belong to country Belgium and user has been given access to see these profit centres.
    What do I need to do to enable drilldown by Profit centre? I can't make a "*" access to Profit centre as the user will be able to run other queries at global level, which is not what I can allow.
    Any suggestions?

    Hello,
    I don't know if it is relevant, but I had a similar problem when I had two characteristic each with hierarchy restrictions in one authorization object.
    I "solved" it by separting each characteristic into its own authorization object.
    BR
    Ondrej

  • How to bring Alternative a/c number (ALTKT) into costing reports

    Hi,
    We are using Country chart of accounts, as a result we are using Alternative account number in GL master data. I could able to access alternative a/c field in GL line item report (FBL3N) by activating special fields in that report itself.
    Now I would like to bring this field into controlling reports such as KSB1 - Actual Cost Centre Items; KOB1 - Actual Internal Order line items. I'm not quite sure how this can be achieved. Any help in this regard is much appreciated guys.
    Thanks,
    Harika.

    hi
    you have to copy and create your own custom developed report only

  • Cost centre in the accounting document

    Hi all,
        Can any one please let ms know, how the cost centre in the accounting document for a physical inventory adjustment is being retreived. In my scenario, the busines want to post the gain / loss from the physical inventory adjustment to different cost centre on the basis of valuation class and plant.
        My understanding is that the cost centre will be retrieved from the OKB9 entry, where the cost centre will be assigned to a cost element. The same cost element will be assigned in OBYC configuration in the combination of the transaction key, val grp, account modifier and Val class. Can you please confirm my understanding and let me know the std account modifier that will be triggered for phsical inventory differences.
    thanks & regards
    Chaitanya Rayaprolu

    Hi
    As far as my understanding, cost centre will not be attached to inventory gain/ loss account. We assign GL account for physical inventory differences in GBB - INV in OBYC which do not require a cost centre. Scrapping process requires a cost centre as it is a process loss but PI differences do not require cost centre assignment. We assign GL accounts (which are set up as cost elements) in OBYC settings for some postings like VNG, VBR etc which requires CO object assignment.
    Thanks

Maybe you are looking for

  • Can't get internet to work w/windows: DSL- Graphite

    I am trying to get this home network to function, here is the problem. The home network consists of the following: DSL Airport Graphite Ibook G4 Win 2K PC The G4 works fine, but i can't get internet on the Win2K machine. It even gets as far as having

  • Once latest Firefox 24 version uploaded, some sites visited get pop up that Adobe Flash Player 11.8 r800 has stopped working

    Once latest Firefox 24 version uploaded, some sites visited get pop up that Adobe Flash Player 11.8 r800 has stopped working. Have tried following and none work: - reinstalled latest Shockwave Flash software, uninstalled and reinstalled with clean wi

  • Nokia E72 IMAP mail problems

    Cross posted from here: http://discussion.forum.nokia.com/forum/showthread.php?p=680673#post680673 Yeah, E72 e-mail client needs real work if it wants to be a competitor with iPhone 3GS (two of which I own) and Blackberry. So far, I found these probl

  • 5th Generation iPod Design Flaw?

    My 5th generation 60 gig. iPod crashes often, locks up, doing various weird things. Sometimes its little hard drive also whirring and tapping. Restoring may or may not work. Software up to date. Sometimes a gentle tap on desktop will get it working a

  • Wierd error , plz help me .

    this is my test class , very simple: package catagorized_services_system; import catagorized_services_system.bridge.*; public class TestClass {   IndexSystem is = new IndexSystem();   TestClass() {}   public static void main(String[] args) {     Test