Hai gurus,
My requirement is as follows:
1) My fert material consist of 5 ROH
2) The stock of all the ROH is to be maintained for minimum two days production qty.( 2 days inventory stock)
How to maintain this minimum stock of ROH  and control under SAP
waiting for the positive reply.
Regards
sekar chand

Hai Bhramankar,
Thanks for your rpely.
In my case the material required for next three months is planned and procured by MM guys
after MRP run .
So the procurement is done and material is stored in central warehouse, and  raw material required
for the next two days  production is issued to production ROH   stores and maintained as stock to avoid
any shortage for final production.
If it so how can we bring this scenario into SAP and keep track of total stock at central warehouse and two
days dynamic stock by the shop floor people
waiting for your detail reply.
Regards,
sekar chand

Similar Messages

  • Re : Reserved stock of raw material in MMBE

    HI
        While doing make-to-stock production the raw material purchasing from vendor is updated in both unrestricted use and reserved use. after finishing production the unrestricted stock is removed but the reserved stock is not removed.
    How to solve this.
    Thanls
    Mani

    Dear,
    Reserved stock which is showing in Stock overview or any other stock reports is not the physical stocks. These stocks are created with respect to reservation.
    You can't transfer the stock from reserved stock to Unrestricted stock. These reserved stock is just the information availble in Stock overview for the User that this much stock is pending for transfer with respect to reservation. So when you post the stock with respect to reservation then this reserved stock will automatically decreased with that posted stock for the material. You can't transfer that to unrestricted.MB1C will help you in this case with 261 movement.
    if set TECO status for your first production order, system will release the reserved stock, it comes to unrestricted stock.
    If it is not take place then to run the correction program Go to SE38 give RM06C020 and execute.
    Regards,
    R.Brahmankar

  • Raw material Stock not reducing when cancelling Subcontracting MIGO

    Dear All,
    We are facing problem in subcontracting process. Suppose we have a HALB material X which is made up of material a and b.
    When we are receiving material X stock of material a and b is reducing at vendor end. but when we are cancelling MIGO or doing return delivery stock of material a and b is not increasing at vendor end.
    Due to this we are unable to get exact raw material stock lying at vendor end.
    It means when we are cancelling subcontracting MIGO stock of raw material is not increasing at vendor end instead of it HALB material stock is increasing at vendor end.
    Please suggest.
    rgds
    Awnindra Dutt Tiwary

    k

  • Raw material stock to be consider against sales order in md50(i.e mrp run)

    when i run MD50 against particular sales order, it is not considering stock of raw material. it is creating planned order for raw material which is already in stock. my problem is that when i run mrp it should consider my raw material stock.
    manish.

    Hi Manish,
    Correctly said by all our Experts (Mr.Brahmankar , Mr.Dharma)
    Now all you have to decide whether you want to go for this individual or Collective requirment type.Because on one hand
    - If you select individual requirement then system will not consider available stock and generate Proposals for every single requirments.
    Also you will find PR and Plan order with account assignment of Sales order (in case of MD50)
    - If you select collective requirement then system will not generate planing proposals through MD50.In that case you have to go for individual MRP (MD02 / MD03 / MD41 / MD42).
    Regards,
    Dhaval

  • Diff stock GL account for raw material

    Hi,
    We have raw material under 2 different location, one is under raw material warehouse, another one is under staging area which belongs to production. From time to time, we will issue stock from RM warehouse to staging area.
    The stock GL account (either debit or credit) for the raw material is RM Stock (140001) when we do any movement.
    But we do not want like this. We want that when there is any movement from raw material warehouse location, it will charge to GL account 140001 (RM Stock). And when the movement is from starging area location, it will charge to another GL account (140002 - production stock).
    We want to seperate out the GL account for the raw material if they are under different storage location.
    Can this be done?
    Kindly please advise. Thank you.

    Hi Sim
    Valuation of Stock is done at Plant level and not Storage Location Level. Within a Plant, you can differentiate the G/L accounts based on the Valuation Class assigned in the Accounting view in Material Master.
    The above settings enable automatic account determination at the time of GR. If you want different G/L accounts for different areas, there are 2 options:
    1. Configure and Activate Split Valuation. This will enable you to give different Valuation Classes for different Storage Locations in Matl Master.
    2. The better option is to make the 2 locations as 2 different plants and extend the materials to both these plants.
    However, pls mention your purpose of differentiating the G/L accounts. If it is only to view the stocks in the 2 areas, there are many reports like MB52, etc.
    Hope this clarifies.
    Thanks

  • How MRP Run exclude QI Stock Type of a Raw Material SLOC?

    Dear all
    Fact:
    All of our raw materials must be subject to quarantinee upon GR. We have Storage Location of Raw Material: RMSL
    In Material Master of that Raw Material
    We are using the "SLOC of EP" (MRP View 2) to put the defaulted GR SLOC. And we also make use of the "Post to QI Stock" in View: Purchasing.
    Upon GR:
    During GR, the Raw Mat SLOC (RMSL) will be copied from "SLOC of EP" of the material master data, and it will be posted to the stock type "QI STOCK".
    Problem:
    However, when the MRP Controller run MRP, it will take the QI Stock Type of Raw Material SLOC into account.
    Is there anyway we can exclude the QI Stock Type of Raw Material SLOC from MRP Run?
    I have read from some threads to suggest to post it to the Quarantinee SLOC. We prefer not to create another Quarantinee SLOC (QISL) which will be filled in SLOC of EP and then after passing QC, we perform Transfer Posting from SLOC: QISL to SLOC: RMSL. We have a few Raw Material SLOCS and we do not want the Warehouse guy to get confused which Raw MAterial SLOC to choose upon GR. Rather, we prefer it to be defaulted in the "SLOC of EP" in the material master.
    Please advise.
    Edited by: Daimos on Jul 13, 2009 1:16 PM

    Hi,
    Generally MRP consider stock from all the storage location when run the MRP for Plant level for material.
    However we can exclude the particular storage location from MRP Run, for those following settings to be done.
    Go to MRP-2 View of material master and select the storage location to be excluded from MRP. (Press Shift +f1 ex .sloc2) As per your case it should be RMSL
    In that MRP view go to Storage location MRP Tab.
    And assign u201CSLoc MRP indicator = 1 (Storage location stock excluded from MRP)u201Dand save.
    Now run the MRP, stock from sloc2 will not be considered to create-planned order.
    Please try this and revert back.
    Cheers,
    Kumar.S

  • Raw material available in stock. Want to avoid Pur Req for sales ord stock

    Dear Experts,
    After MRP Run, we want to avoid creation of purchase requisitions (procurement) for for project stock/sales order stock for raw materials whoose unrestricted-use stock is available. Later on we will do transfer posting of available stock to project/sales order stock.
    Kindly suggest.
    Shiva

    Shiva,
    I dont think you would have got new PR's created after changing the Individual collective indicator in the material master - MRP4 view of the raw material.
    I would suggest you to run MRP in "3"- Delete and Recreate Mode or Delete the already created PR's and then try running MRP.
    Regards,
    Prasobh

  • Move the stock from the raw material storage type to production storage typ

    Hi
    How to move the stock from the raw material storage type to production storage type.
    note that both stoare type be in same storage location only.
    pls reply me

    Hi Raj,
    I WM process, issue or transfer to Production process results in picking of material from the RM storge location / storage type.
    If you mean your production stoarge location is same as that of the RM stoage location, it is just a tranfer within a warehous.
    which you could do with posting change document. This doesnt reduce your WM stock.
    If the production stoarge location is differnt from RM stiage location, then it is picking process from WM and goods issue.
    this reduces your WM stock.
    hope it helps.
    Regards
    Harish

  • How to enter / Post Goods receipt of Raw Material from subcontractor

    Dear Experts,
    As standard subcontracting procedure, Raw Material Transfer posting is made to Subcontracting Vendor
    and the Semi finished material [Assembly] is received from the subcontractor.
    If in case extra or by any reason, raw material stock is with subcontractor, he want to return the raw material stock.
    How to receive raw material stock from subcontracting vendor and how to handle subcontracting challan transactions in SAP ?
    Thanks in Advance !

    Hi,
    >>Receive the RM using MB1B / 542
    >> Reconcile using J1ifq
    >> Complete challan using J1if13
    Thanks,
    Rajoo

  • In time Consumption of Raw material in case of Subcontracting

    HI Gurus
    Please look into the following issue.
    Presently we are sending Raw material to subcontracting vendor  through 541 mvt type  along with excis challan.Then subcontractor intimates raw material consumption details time to time through mail/fax.Now as per client requirement raw material consumption should be done in time i.e. when they are receiving raw material consumption details. They don't want book the raw material consumtion at the the time of receipt of finish goods.
    Please guide me to book in time consumption of raw material.
    Redards
    Kumar

    Thnks for your reply.
    I want to do the manual consumption from subcontracting stock. Client don't want to book the consumption at the the time of raw material transfer to subcontractor. Also there will be problem in subcontracting challan reconcillation.
    We can't do the manual consumption through 543 mvt type .Is there any workarround for this ?

  • Process to split production order based on the raw material batches

    Hi All, below is a business situation which needs some some SAP process to help overcoming this issue.
    We are working on process industry, where the core fabric (SFG) are produced from different machines and which are used as raw material in the subsequent process (Coating).  Business wants SAP to generate individual planned orders for Coating when it uses this materials
    e.g
    Current situation.
    SFG1  is the component of SFG2
    SFG2 is  the component of FG.
    When the demand for FG is 100, you get 2 planned orders  SFG1- 100 yd and  SFG2- 100 yds
    During production, the Planned order for SFG1 is split for 2 production order  each producing 50 yds each.
    Now I have SFG1 - 50 yds ( Batch A001), and SFG1- 50 yds ( Batch A002).
    Now Business wants  SAP to automatically propose 2 order for SFG2, However based on MRP it will  only show 1 planned order of 100 yds required for SFG2 since the demand of FG is 100.
    We want to split the planned orders of the higher level to look at lower level stock.
    Any ideas or thought process.
    Regards
    Sarvan

    Sarvan,
    You can have MRP propose two lots of SFG2 based upon lot sizing.  For instance, if you always will want SFG2 to have orders of 50 each, then one way to achieve this would be to set the 'maximum lot size' to 50.  MRP1 Tab of the material master.
    There are other lotsizing methodologies that may be better suited to your business requirements as well.
    Lot-Size Calculation - Consumption-Based Planning (MM-CBP) - SAP Library
    Best Regards,
    DB49

  • Manual Correction to Raw material/ Inventory a/c

    Guys,
    When we did  our  initial stock load at the time of implementing sap ECC6.0 .That load went into dummy profit center and  now thousnads of entries with material assignment sitting in dummy.and offset is in initial stock upload a/c , Now we wanted to remove these entries.
    I tried to do a JE on the accounting side by opening up the Raw material a/c and removing  the  indicator "post automatically
    ". when I do it in FB01, system gives me message  NO item category is  assigned so posting  is not possible,as doc.splitting is active in GL.Is there any way to do it on the accounting side, or it has to be  thru movement type, 561,562 on the  logistic side.
    Regards
    SHAUN

    HI,
    You need to assign item category to the GL account in the below path:-
    SPRO > Financial Accounting (New) > General Ledger Accounting (New) > Business Transactions > Document Splitting > Classify G/L Accounts for Document Splitting
    Regards,
    SDNer

  • Availability check of raw material during sale order processing

    Dear experts,
                           When i am entering the finished good in sale order processing,system should check the raw material availabilty.Is it possible in STD sap
    Regards,
    murali.R

    thanks to you all for your reply,
    My customer is bright bar manufacturer,They just buy the steel bar & process it & sell it to the customer.So there is only one RAW MATERIAL.
    Their all the activities are mainly based on raw material.So customer wants.....when we enter the finished good system should check the RM stock,based on RM STOCK,sytem should do the availability check...& confirm the delivery date
    I have mapped customer requirement,after modifying item category & assignment......
    Sales BOM explosion & delivery group is maintained for header material.availability check is on at component level & header level.So now system consider the raw material stock & it conform the dates when  i do availability check combinely.
    I would like to know how it will affet the MRP incase of alternative BOM....FURTHER PROCESSING
    Is it the right practise.....Please reply...............

  • Report for raw material usage

    Hi All,
    i need to take the report for the raw material that used in the finished product.
    in the finished products, how much the raw materials are used .

    Hi Raj,
    Option 1. You can get the data from MARD, MAST & STPO tables.
    From MARD you can read the unrestricted stock i.e. LABST field.
    From MAST, read the finished product i.e. MATNR & WERKS (Material & PLant)
    From STPO read the component i.e. IDNRK & MENGE (Component & Qty).
    Option 2. You can get the data from MARD, AFKO, RESB tables.
    This would give you an exact consumption feedback.
    AFKO for production order details. (PLNBEZ for header material).
    RESB for components (qty consumed) for the order - Fields MATNR (Component), BDMNG (Req. qty), ENMNG (Withdrawn qty).
    You can now build the logic with the required multiplication i guess. If any further info is required, revert back.
    If helpful award points
    Regards,
    Vivek

  • QM for raw material 103 mv. type

    Hello QM Gurus,
    Please help me in following senario,
    When I am doing GR for the raw material, I am posting the stock to blocked stock through 103 mov. type.
    In system the inspection lot is being created but it is not in released status, although inspection plan is properly defined, hence I cannot do the result recording for the lot.
    If anybody can suggest where the problem is.
    Your king suggestion are expected.
    Regards,
    Amit Shirsath.

    I'm listing out some common mistakes because of which the Lot wont be in REL status.
    First in MM03 QM view -check for the inspection type(01) and 05 for other GR to be active.This should be fine in ur case since your are saying the lot is created.Make sure the check mark Automatic assignment to be checked ,Check characs and also Insp with task list.
    Second-Make sure the inspection Plan(QP01 display) was created with the same Key date as the Insepction lot or even earlier .The key date can be checked under qa03 to display Insp lot.
    Third-make sure the Usage is the same as in the Inspection lot.The usage is the one which links the Plan to the Lot .It should be 5 for GR from PO and 53 for other GR in the insp plan. You can check the Inscpetion lot usage by going to QA03.
    Check all these, ur problem should be solved.Please let me know if there is any furthur problem.And also reward if helpful and close the thread.
    regards,
    Naik

Maybe you are looking for

  • DVD burning no longer working.

    Hi there, I am not quite sure if it is since the 10.4.9 update or the re-install I did a month ago, but DVD burning with Toast 7 or the Finder no longer work. I can burn CD's with my internal NEC DVD RW ND-3520A drive and I can play DVD's just fine t

  • Calling a function in a report

    The following query brings in the calender month in a year but i want to get the fiscal year from the table. And to get the fiscal year from the table i created a function check_trans_date and tried calling the same in the query but while compling it

  • Anchor objects on spread don't appear in pdf

    CS5 / Mac 10.6.4. Bug? I have multiple anchored objects in a long document. If the anchor reference is on the same page as the anchor object, all is fine on the pdf. If the anchor reference is on the opposite page (of a spread) then the anchored obje

  • Moving music to an external.

    Ok. so i've decided to move my entire entertainment drive to an external 500GB. i've transferred all the stuff over so right now i have 2 copies. I renamed my drives so the external is now my "vault" and when i reloaded iTunes, all of my movies and T

  • Inconsistent entries between driver_aliases and path_to_inst

    Hi, I see the following in my solaris intel box. bash-2.03# grep iprb /etc/driver_aliases iprb "pci8086,1229" iprb "pci8086,1029" bash-2.03# grep iprb /etc/path_to_inst "/pci@0,0/pci8086,100c@6" 0 "iprb" bash-2.03# 100c is the inte pro/1000 gig NIC a