ORRQ Status Process Order
Hi Everybody:
I've a issue with this orders status, I need to active the Deletion flag into my Process Order, but I can't get this, cause i'm receiving this error message:
System status ORRQ is active (ORD 12000020)
Message no. BS013
Diagnosis
Object ORD 12000020 has system status ORRQ (Order record required). According to this status, transaction 'Mark for deletion' is not allowed.
I couldn't find out the settings for this status in my customizing.
Please anyone can help me about?
Thanks in advance.
Omar Perea
Hi Omar,
Option 1
Go to BS22
Select the id I0278 - LVMS
Change the selection option to allowed from disallowed
You can set the deletion flag.
Option 2
Change the status to ORAC from ORRQ, by using t-code COAA or COPA. Order record will be archived during this process. But you can not re-print once you done this. Again re-printing can be controlled using BS22 by making the change in the relevant business transaction.
Hope the above helps.
Regards,
Vivek
Similar Messages
-
PP - PI Process order - Technical complete problem
Hi Gurus,
I have created process order and generate Cont.recepie. Then I tecnical complete my PI sheet after report data. when i set technical complete in my process order. system says "It cannot be technical completed because status "CRCR" Contrl recepie created". How i can set status technical complete to my proc.order.
kindly help
MajidHi,
Inorder to TECO or close your order first you have to close the Control Recipe. To do so follow the steps:
1. TCode: CO57
Proc.Message Cat: PI_CRST (Message on control recipe status)
Process Order Number
Control Recipe Number
Control Recipe Status: 00005 or 00004 or 00007
After these entries save the Process Message.
2. TCode C054
Here send the Process message that was created in the above step.
If the message is successful, the status in the order changes from CRCR to either CRAB (if control recipe discarded), CRFI.
Then you can close your order.
Regards
Vinod -
Set Deletion Flag for Process Order is not possible due to status ORRQ
Hi Guys,
I need to mark some process orders for deletion, but the status ORRQ (order record required) is blocking me. I've read some SAP Documentations and SAP Notes and it's recommending run tcode COPA to store the order records. A
Although the Process Order is appearing there to be stored, we I execute store process it gives me a message that "Zero Orders were stored".
So, can you help me on this?
Thanks.
Pérsio KojimaHi Pérsio,
Check In Customizing whether the order type has been set up for storing in T code COR4 (order type-dependent parameters, Master data tab page, Order record required indicator).
IF the option is selected, the system will not delete the record directly. The order record must be archieved and then deleted.
based on this either you can de activate the option or archive before deletion.
Hope this answers your question.
regards,
Pradeep. -
Read Master Data for Process order status change (REL to CRTD)
I am unable to read master data and thus change the status of process order from REL to CRTD. (COR2)
The reason it says, error in BOM reading, Transport Requirement (TR) already generated.
Even after deleting the TR (LB02), the issue still exists.
Is there another way of changing the status or some more steps are needed for the TR deletion?
Thnx!
Abhi.Order header Status-
REL Released
MSPT Material shortage
PRT Printed
PRC Pre-costed
BASC Batch assignment complete
BCRQ Order to be handled in batches
SETC Settlement rule create.
In the error log it gives-
Diagnosis
Transfer requirements have already been generated, so therefore the bill of material cannot be read.
System Response
The system does not execute the action.
Then I deleted the TR (LB02), but still I cannot reread the master data.
The MSPT was for only 2 materials out of 6 and there is no GMPS status.
There is prod supply area and control cycle used.
and the TR generated at order release. -
Hi all,
In the SAP i´m working when i enter the process order the beginning status is MANC (one of them), when i do the availability check this status change to MACN.
Now:
In which point of the SPRO is this set-up ??
Is it posible to avoid the release of the order until status MANC is set ?? (i want the user to always chaeck availability)
Is there a similar SPRO for checking capacity ??
Thanks !
DPrasobh,
The biz need is like this. First of all we need to check availability and capacity (and if any of them is not ok, you can not release). To solve this, as you tell me, you have to set OPJK, business transaction 2.
The other point is to introduce a "Freeze" status. From where you are not allow any more to change data from the master recipe, this status also before the release.
This point is the one i am trying to figure it out.
Thanks,
Dalmiro -
Table for process order &Selection profile status details -reg
Hi ,
From which tabel we can get the link between the process order and selection status profile (like SAP001 etc..
When we input the process orders we should get the selection status profiel linked to it
Regards,
Madhu KiranHi,
The tables JEST and JSTO are related to status profile .
What i need is of Selection Profile
You can see this field in COOIS or COOISPI just above the Sys Status field
We need this urgently
Can any one help ?
Madhu Kiran -
Get Process Order List Based on Date Range and Order Status
Hi all,
Iam using BAPI_PROCORD_GET_LIST to get the entire list of Process Orders based on selection criteria as plant. However I have noticed that there's no selection option to get records between start and finish times neither does any option exists to get only the released or open orders.
To filter records based on Start Date/Finish date or get records with specific status, we need to get the entire list of records that exists for a plant and then use repeater/condition action to filter the same. Fetching the complete list and then filtering is an overhead. Does anyone know a solution to this or does anyone have been in this situation ? Is there any other BAPI that supports the filter criteria to get open/released orders from SAP. Do we need to modify the BAPI to include Process Order start date and end date or System status as selection options ?
Appreciate your help !
Regards,
GilmourHi Gilmour
I would say you have 2 options here..
1. Create a new RFC with the search params as you want them. Write the logic accordingly.
2. Use the Enterprise services for Production Order where you can say you want Process Orders. The Service that has Planned Start Date and End Date along with Status is ProductionOrderSimpleByElementsQuery_sync. See Link [here|http://esworkplace.sap.com/socoview(bD1lbiZjPTAwMSZkPW1pbg==)/render.asp?id=D507C16176BE11DA36BB000F20DAC9EF&fragID=&packageid=DE0426DD9B0249F19515001A64D3F462&iv=]
This service is available from ECC 600 onwards.
You can call the Enterprise Services using the Web Service Action block.
Regards
Partha -
Process order status while settlement
Dear all Guru's,
Which status required for the process order settlement.Dear Mahajan,
Go to transaction BS22 and in REL status set KABK (Settlement account assignment) to forbiddin. Then you will not be able to settle the order in REL status. in TECO it is allowed by default. Hope it will be helpful
Regards,
Ibne Khalil -
Stop Process order settlement (CO88/KO88) for DLV status orders
Hello gurus,
My business requirement is to prevent process orders with status DLV (Delivery completed). In standard SAP orders with DLV/TECO are being settled to settlement receiver. ANy help would be richly rewarded.
Thanks
RGDear Ajay,
Thanks.
I am able to change the profile. But after that when I try to exit from the screen system throws the following error/message :
1 Receiver categ. MAT is not allowed by settlement prof. 000090 for this sender
2. Maximum number of 0 rules reached
3. Rules exist, but set. prof. 000090 states no settmt of act.costs/cost of sales
First two are Errors and last one is message with yellow mark.
Thanks and Regards,
Nirav -
User Status change problem in Process Order
Hi,
We are in process of upgrading our system from 4.6C to ECC 6.0. I have a problem with User status change for process Orders.
In 4.6C we are using the profile x with settings:
10 ZNEW Created process order 10 90 1 1 ZSTA
20 ZLCK Locked process order 20 90 1 1 ZREV
30 ZOPN Reopened process order 20 90 1 1 ZOPN
40 ZMST MES order started 20 90 1 1 ZMST
50 ZMCL MES order closed 20 90 1 1 ZMCL
90 ZTEC Technically completed 20 90 1 1 ZTEC
In ECC 6.0 we also use the same profile settings as above.
The problem is in ECC 6.0 when I do a goods receipt the User status changes to ZTEC . The process followed is ..Create process order, Release Order, Goods issue, Phase partuial confirmations, Goods receipt and then Finla confirmations of phases. Now in 4.6C if i do the above process the User status remains at ZMST and it only changes to ZTEC when i technically complete the order but in ECC 6.0 when I do a goods recipt from above steps the User status changes to ZTEC. THis should not happen.
Any pointers will be very helpful.Hi,
The log for production order preliminiary costing is not saved. Therefore, once the order is saved, there is no log available anymore (this is by the way a question of PP; none of the logs is saved).
Hope that helps...
Regards,
Declan -
In Process Order status "SETT" Settled
Hi
After settlement of Process Order, system status (SETT - Settled) of Process Order is not updating atomically.
After settlement of Process Order, Process Order allow only in Display mode & there is no posting allow against settled Process Order.
Please suggest me what are the setting required.
Regards
ARKARK,
In your order type dependent parameters in transaction COR4, for you plant order type combination for Process documentation "Order record" radio button is active, that's why system is not allowing you to set deletion flag.
Are you working on a client system or a training system where you are just trying to test different scenarios?
If you are working in training system then in COR4 transaction for the plant order type combination you can activate the radio button for "No process documentation required". Now if you check the order it would allow you to set deletion flag.
If you are working on a project and client system, you need to ask the user to execute transaction COPA to store the order records, once this is done you would be able to set the deletion flag. (Please note: Before you execute transaction COPA necessary basis setting for storing has to be in place.)
Regards,
Prasobh -
Function to read status in process order
Hello.
Iu2019m using the function STATUS_TEXT_EDIT to read the status of a process order and I need read the statu in whole phases. Someone know a function to read the status of each phase in a process order?
Thanks in advancesHello Vivek,
My requirement is much simlar to this this is Status profile below maintain in the System
1 INPR In Process 1 10 1 1
2 UNCA Unsigned - CA Approved 2 10 1 1
3 UNFA Unsigned - FA Approved 3 10 1 1 ZFAAPPR RELE
4 SIGN Signed 4 10 1 1
5 SICA Signed - CA Approved 5 10 1 1
6 SIFA Signed - FA Approved 6 10 1 1 ZFAAPPR RELE
7 TBCL To Be Closed 1 10 1 1
8 CLOS Closed 1 10 1 1 ZNOAUTH
9 TBCN To Be Cancelled 1 10 1 1
10 CANC Cancelled 10 10 1 1 ZNOAUTH CANC
11 COMP Completed 1 11 1 1 ZNOAUTH
My Requirement is when the status is Close we can set the status to any of the Ten mentioned status as it was maintained in Highest and lowest vlalues here i dnt need alll the status i only need filtered Statues for the Close Status like
In Proces,Unsigned - CA Approved,Signed,Signed - CA Approved,To Be Closed these Status should be active when the Header Status is Close.Can you help me steps involved to achive this
Edited by: posanapalli kiran on Feb 11, 2010 10:08 AM -
DLV status not updated in Process order
Hi guys,
I did GR and got goods receipt documents but system is not updating DLV status in process order.
Actually i have by-product and co-products as components in order. I did posting of by-product from Confirmation screen COR6N and for co-products i did MB31 and goods movement doc. get generated. Qty. is also updated in order but NOT the dlv status.
Pl.suggestDear,
This is System status and you cannnot maintain it manually once that Business Transaction(FULL Delivery) happens System will automatically sets that status.
DLV status updated once Del completed tick is activated in order header, This tick will get uodated once you do GR for complete qty.
You need to Final confirm (CNF) the Order to get the DLV Status.
Or if the Delivery completed indicator is set in the Process Order, then also th System status will be DLV.
If you want to make it manually then goto co02, enter the order, goto goods receipt tab page and activate delivery completed tick and save...DLV is activated in the head as status.
Please check in BS22-I0012
Regards,
R.Brahmankar -
Auto batch detmn for components in Process Order selects batch in Q status.
Hi Gurus,
We have the following issue with automatic batch determination for component batches for a Process Order:
Say for a Process Order it requires components A,B, and C.
The issue is with component C. if the PO requires 100 Qty of C. the system is picking batch X having 80 qty and picking 20 from another batch Y which is still in u201CQu201D status (due to some defects it is not cleared . for which inspection should have completed 3 days before Process Order is released).
Also there are only these two batches for this component in MMBE.
What I understand is system adds GR date + GR processing days ( for inspection) and release component for production after that (ie., moves to Un restricted stock). Therefore system selects this batch as per the availability check (by calculating the GR+ GR processing date) even thoe it is not cleared yet.
Also, I want to know If this is correct procedure, how can we make system to not to include batch with Q stock (batch which is having some defects).
Thanks,
N.Hi
Use separate Checking Group(Availability Check) in MRP-3 view for comp C with the settings in OPJJ(Availability Check+Checking rule combination) with untick incl.quality insp stock. Idea is to select the un-restricted batch stock qty during Auto Batch determination for Components
Regards
Brahmaji -
System status for capacity availability in Process order
Hi,
I have activated the capacity availability check in SPRO to have a capacity check while process order creation.
But system doesnt provide any status in the process order for this. No status is appearing even if I do a manual capacity check in process order.
Is there any system status for capacity is available?.
Thanks in advance
PrathibHi Prathib
System will be give any status if capcity is available, but it will give a status MSCP if there is Capacity shortage.
Rgds
UK
Maybe you are looking for
-
Using bind variables (in & out) with dynamic sql
I got a table that holds pl/sql code snippets to do validations on a set of data. what the code basically does is receiving a ID and returning a number of errors found. To execute the code I use dynamic sql with two bind variables. When the codes con
-
Repository Creation Utility Download
Hi All, As a part of Oracle Fusion Middleware installation, I am unable to find the download for Oracle Repository Creation Utiliity. Could you guide me to the right link? Regards, Balaji A
-
CC desktop will not install...
I am doing a clean install having just joined CC (previously disk based CS5.5)...the Adobe installer for desktop app will download but not install. It stals at about 10% status bar and gives error 'server not responding'... 'error code 207'. PC win 7
-
Getting End of file communication Error
Hi, I am having a query , which has to return the rows satisfying both the conditions in a single column. I got the output if i am using self join with 2 aliases concept in that query. But actually the table is a partition table containing some milli
-
Sending LINKS to sites does not work on friend's computers
What is the problem? There are two choices to send a site to someone....Mail contents of this page, or Mail link to this page... I keep getting replies saying there's no attachment or no link to click.... what is the problem???????????????????