Hi Folks,
My  BW Production Server was down for few weeks and we could able to fix the problem, Now we want to load the data that was not loaded since the production server was down (about 2 weeks of data should be loaded on the production server).
Please advice a proper plan to upload the 2 weeks data.
Thank you,
Jay

Hi Jay,
it's not the right forum for this question. Data warehousing would be right.
Anyway, your question can not be answered fully. There are many possible dependencies. Check note <a href="http://service.sap.com/~iron/fm/011000358700000431401997/0731682">731682</a> and related notes.
Regards
Marc
SAP NetWeaver RIG

Similar Messages

  • PLANNED ORDER & PRODUCTION ORDER DATES.

    Dear All,
    How to come Dates in Planned order and then Production order.
    in Discrete Mfg. through MRP Run.
    I want details
    How to calculates production dates
    MANOJ

    Hi,
    MRP does not calculate dates for production orders. For planned orders, refer to SAP help link below:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/f4/7d290944af11d182b40000e829fbfe/content.htm
    Regards,
    Vivek

  • Production server data read

    Hi Experts
          Can we read data from developement client to production client and its database table.
    I used the following query,
    SELECT ebeln
           aedat
           lifnr
           zterm
           FROM ekko CLIENT SPECIFIED INTO table itab
    WHERE MANDT = '394'.
    But its not working, but it works fine between developement client and the sandbox client.
           Can't we read production database tables data.
    Suggest me
    Regards
    Rajaram

    hi,
    devolopment and sandbox r 2 clients in same server.
    but it is different server for quality and production.
    u can compare table entries between diff clients using this fm.
    RFC_GET_TABLE_ENTRIES

  • [URGENT] Hide Calc Script in Planning a Production Server

    <p>Hello,</p><p> </p><p>How can i hide for users the essbase calculation scripts in anHyperion Planning application using Shared services mode.</p><p> </p><p>Thinks for help.</p>

    Hi,
    You dont need DI installed in your production system (EPP) You can use DI of developement box.
    Regarding SLD there are several scenarios for it
    1. you can have a central SLD for all your system (most common scenario)
    2. Seperate SLD for DEV/QA and for production (used to safegaurd the production system)
    3. Separate SLD for NWDI (NWDI makes use of SLD as name server during design time)
    Please check the SLD planning guide under http:
    service.sap.com\SLD
    Also
    http://help.sap.com/saphelp_nw70/helpdata/en/31/f0ff69551e4f259fdad799a229363e/frameset.htm
    For DI related info check
    http://help.sap.com/saphelp_nw70/helpdata/en/03/f6bc3d42f46c33e10000000a11405a/frameset.htm
    Best Regards,
    Anamika
    Reward points if helpful.

  • Production finish date differs from basic finish date in backward schedulin

    Hi, experts.
    When i do scheduling the planned order,
    production finish date differs from basic finish date in backward scheduling as below.
    Scheduling: Backward
    Basic finish date : 2010.01.22
    Basic start date : 2010.01.21
    Production finish date : 2010.01.23  09:00:00
    Production start date ; 2010.01.22 03:57:09
    *GR time : 0.
    *Scheduling Margin key : 0.
    I don't know why production finish date set in 2010.01.23 09:00. ( Basic finish date +1 day)
    Please reply me.
    Thanks.

    Dear Jong,
    1) what is the parameter used in MRP run, Basic scheduling or lead time scheduling
    2) you must find a exception Mssg for that plan order in MD04
    3) basic scheduling take the time from material master & lead time scheduling will take time
    from Routing
    Regards
    Madhu

  • Request in Production server for Master data

    Hi,
    In Production server when we try to hire an employee through PA40, it is giving an error saying that "Client XXX has status 'not modifiable", Choose 'Display object' or 'Cancel'.
    I think it is asking for a request, because of settings in SCC4,is not modifiable. Since it is PRD server the standard SAP suggests to have the setting as above hence we cant change the settings also.
    What could be the solution for this?
    Regards
    Prasad

    Hi Prasad,
    It doesnt make any differnce, just click on display object , it will save th data in the respective tables.....
    Regards,
    Sushil Soni

  • How to take data dump(export) with given language set on oracle 9i database(production server) ?

    Hi,
    I am taken data dump on oracle 9i machine and ported (imported ) oracle 10g (production machine) ,But it will showing error : language set error,
    Could you tell me how to take data dump with language set.
    Regards,
    Suva

    Hi PaulM,
         Please follows the details, 
    Development server  ,It is 9i machine (I am export in this machine) and Imported on Production Server ( It is Oracle 10 g).
        When import on production server error is coming, Tis error log adding below.
    Production Databse (Language details)
    NLS_LANGUAGE AMERICAN
    NLS_TERRITORY AMERICA
    NLS_CURRENCY $
    NLS_ISO_CURRENCY AMERICA
    NLS_NUMERIC_CHARACTERS .,
    NLS_CHARACTERSET UTF8
    NLS_CALENDAR GREGORIAN
    NLS_DATE_FORMAT DD-MON-RR
    NLS_DATE_LANGUAGE AMERICAN
    NLS_SORT BINARY
    NLS_TIME_FORMAT HH.MI.SSXFF AM
    NLS_TIMESTAMP_FORMAT DD-MON-RR HH.MI.SSXFF AM
    NLS_TIME_TZ_FORMAT HH.MI.SSXFF AM TZR
    NLS_TIMESTAMP_TZ_FORMAT DD-MON-RR HH.MI.SSXFF AM TZR
    NLS_DUAL_CURRENCY $
    NLS_COMP BINARY
    NLS_LENGTH_SEMANTICS BYTE
    NLS_NCHAR_CONV_EXCP FALSE
    NLS_NCHAR_CHARACTERSET UTF8
    NLS_RDBMS_VERSION 10.2.0.1.0
    Development Database  Language details Details.
    NLS_LANGUAGE AMERICAN
    NLS_TERRITORY AMERICA
    NLS_CURRENCY $
    NLS_ISO_CURRENCY AMERICA
    NLS_NUMERIC_CHARACTERS .,
    NLS_CHARACTERSET UTF8
    NLS_CALENDAR GREGORIAN
    NLS_DATE_FORMAT DD-MON-RR
    NLS_DATE_LANGUAGE AMERICAN
    NLS_SORT BINARY
    NLS_TIME_FORMAT HH.MI.SSXFF AM
    NLS_TIMESTAMP_FORMAT DD-MON-RR HH.MI.SSXFF AM
    NLS_TIME_TZ_FORMAT HH.MI.SSXFF AM TZR
    NLS_TIMESTAMP_TZ_FORMAT DD-MON-RR HH.MI.SSXFF AM TZR
    NLS_DUAL_CURRENCY $
    NLS_COMP BINARY
    NLS_LENGTH_SEMANTICS BYTE
    NLS_NCHAR_CONV_EXCP FALSE
    NLS_NCHAR_CHARACTERSET UTF8
    NLS_RDBMS_VERSION 10.2.0.1.0
    Log file
    Connected to: Oracle Database 10g Release 10.2.0.1.0 - Production
    Export file created by EXPORT:V09.02.00 via conventional path
    import done in WE8MSWIN1252 character set and UTF8 NCHAR character set
    import server uses UTF8 character set (possible charset conversion)
    export server uses AL16UTF16 NCHAR character set (possible ncharset conversion)
    . importing JW_OR's objects into JW_OR
    . importing JW_OS's objects into JW_OS
    . importing JW_ADMIN's objects into JW_ADMIN
    . importing JW_OR's objects into JW_OR
    . . importing table                      "ACCRXNS"     234671 rows imported
    . . importing table                  "AUTHORLINKS"     790450 rows imported
    . . importing table                      "AUTHORS"      79500 rows imported
    . . importing table                       "CATSOL"      25505 rows imported
    . . importing table               "CATSOLSYNONYMS"      80045 rows imported
    . . importing table                "CHAPTERTITLES"        133 rows imported
    . . importing table                "COMPOUNDLINKS"     601785 rows imported
    . . importing table                   "CONDITIONS"     207445 rows imported
    . . importing table                     "JOURNALS"       2327 rows imported
    . . importing table                     "LANGUAGE"          0 rows imported
    . . importing table                     "MAINDATA"     234659 rows imported
    . . importing table                      "MOLDATA"     721174 rows imported
    . . importing table                   "PLAN_TABLE"          1 rows imported
    . . importing table                   "REFERENCES"     276783 rows imported
    . . importing table                        "ROLES"          2 rows imported
    . . importing table                  "RXNKEYLINKS"    1724404 rows imported
    . . importing table                  "RXNKEYWORDS"        848 rows imported
    . . importing table                  "TABLETITLES"       2400 rows imported
    . . importing table                   "TEMP_TABLE"     165728 rows imported
    . . importing table          "TEMP_WILEY_MAINDATA"     155728 rows imported
    . . importing table           "TEMP_WILEY_PDF_MAP"      16672 rows imported
    . . importing table      "TEMP_WILEY_YEAR_VOL_MAP"         42 rows imported
    . . importing table                  "WEX_ACCRXNS"       3465 rows imported
    . . importing table              "WEX_AUTHORLINKS"      14183 rows imported
    . . importing table                  "WEX_AUTHORS"      79500 rows imported
    . . importing table            "WEX_CHAPTERTITLES"        133 rows imported
    . . importing table            "WEX_COMPOUNDLINKS"      10925 rows imported
    . . importing table               "WEX_CONDITIONS"       5297 rows imported
    . . importing table                 "WEX_JOURNALS"       2327 rows imported
    . . importing table                 "WEX_LANGUAGE"          0 rows imported
    . . importing table                 "WEX_MAINDATA"       3465 rows imported
    . . importing table                  "WEX_MOLDATA"      10358 rows imported
    . . importing table               "WEX_REFERENCES"       3795 rows imported
    . . importing table              "WEX_RXNKEYLINKS"      34540 rows imported
    . . importing table              "WEX_RXNKEYWORDS"        848 rows imported
    . . importing table              "WEX_TABLETITLES"       2400 rows imported
    . . importing table           "WEX_WILEY_HTML_MAP"      17316 rows imported
    . . importing table           "WEX_WILEY_MAINDATA"       3465 rows imported
    . . importing table            "WEX_WILEY_PDF_MAP"      23925 rows imported
    . . importing table       "WEX_WILEY_YEAR_VOL_MAP"         58 rows imported
    . . importing table               "WILEY_HTML_MAP"      17316 rows imported
    . . importing table               "WILEY_MAINDATA"     234659 rows imported
    . . importing table                "WILEY_PDF_MAP"      23925 rows imported
    . . importing table           "WILEY_YEAR_VOL_MAP"         58 rows imported
    . importing JW_OS's objects into JW_OS
    . . importing table                      "ACCRXNS"       7116 rows imported
    . . importing table                   "ATMOSPHERE"         47 rows imported
    . . importing table                  "AUTHORLINKS"      33276 rows imported
    . . importing table                      "AUTHORS"       6555 rows imported
    . . importing table                       "CATSOL"       1463 rows imported
    . . importing table               "CATSOLSYNONYMS"       9370 rows imported
    . . importing table                    "CHEMICALS"      78197 rows imported
    . . importing table                "COMPOUNDLINKS"      20799 rows imported
    . . importing table                       "EXPDET"          1 rows imported
    . . importing table                    "FOOTNOTES"      77825 rows imported
    . . importing table                     "JOURNALS"          2 rows imported
    . . importing table                     "LANGUAGE"          2 rows imported
    . . importing table                     "MAINDATA"       7116 rows imported
    . . importing table                     "PATHSTEP"       7199 rows imported
    . . importing table               "PROCEDURENOTES"      77293 rows imported
    . . importing table                        "ROLES"          2 rows imported
    . . importing table                  "RXNKEYLINKS"      23096 rows imported
    . . importing table                  "RXNKEYWORDS"       1272 rows imported
    . . importing table                  "WEX_ACCRXNS"        135 rows imported
    . . importing table               "WEX_ATMOSPHERE"         47 rows imported
    . . importing table              "WEX_AUTHORLINKS"        613 rows imported
    . . importing table                  "WEX_AUTHORS"       6555 rows imported
    . . importing table                "WEX_CHEMICALS"          0 rows imported
    . . importing table            "WEX_COMPOUNDLINKS"        497 rows imported
    . . importing table                   "WEX_EXPDET"          1 rows imported
    . . importing table                "WEX_FOOTNOTES"       2184 rows imported
    . . importing table                 "WEX_JOURNALS"          2 rows imported
    . . importing table                 "WEX_LANGUAGE"          2 rows imported
    . . importing table                 "WEX_MAINDATA"        135 rows imported
    . . importing table                 "WEX_PATHSTEP"        135 rows imported
    . . importing table           "WEX_PROCEDURENOTES"       2253 rows imported
    . . importing table              "WEX_RXNKEYLINKS"        695 rows imported
    . . importing table              "WEX_RXNKEYWORDS"       1272 rows imported
    . importing JW_ADMIN's objects into JW_ADMIN
    . . importing table                     "APP_USER"         76 rows imported
    . . importing table                       "AUTHOR"      61874 rows imported
    . . importing table                     "CITATION"
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 10794
    Column 2 77
    Column 3 1
    Column 4 24
    Column 5
    Column 6 Science of Synthesis
    Column 7 Negishi, E.-i.; Takahashi, T. Science of Synthesis...
    Column 8 681–848
    Column 9 2
    Column 10
    Column 11 2002
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 10879
    Column 2 77
    Column 3 1
    Column 4 110
    Column 5
    Column 6 Comprehensive Organic Synthesis
    Column 7 Hiemstra, H.; Speckamp, W. N.; Trost, B. M.; Flemi...
    Column 8 1047–108
    Column 9 2
    Column 10
    Column 11
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 10880
    Column 2 77
    Column 3 1
    Column 4 111
    Column 5
    Column 6 Houben-Weyl Methods of Organic Chemistry
    Column 7 De Koning, H.; Speckamp, W. N.; Helmchen, G.; Hoff...
    Column 8 1953–200
    Column 9 E21b
    Column 10
    Column 11 1995
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 10904
    Column 2 77
    Column 3 1
    Column 4 135
    Column 5
    Column 6 Houben-Weyl Methods of Organic Chemistry
    Column 7 Ryu, I.; Murai, S.; de Meijere, A., Ed. Houben-Wey...
    Column 8 1985–204
    Column 9 E17c
    Column 10
    Column 11 1997
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 10905
    Column 2 77
    Column 3 1
    Column 4 136
    Column 5
    Column 6 The Chemistry of the Cyclopropyl Group
    Column 7 Tsuji, T.; Nishida, S.; Patai, S.; Rappoport, Z., ...
    Column 8 307–373
    Column 9
    Column 10
    Column 11 1987
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 10906
    Column 2 77
    Column 3 1
    Column 4 137
    Column 5
    Column 6 The Chemistry of the Cyclopropyl Group
    Column 7 Vilsmaier, E.; Patai, S.; Rappoport, Z., Eds. The ...
    Column 8 1341–145
    Column 9
    Column 10
    Column 11 1987
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 10952
    Column 2 77
    Column 3 1
    Column 4 183
    Column 5
    Column 6 Cyclopropane-Derived Reactive Intermediates
    Column 7 Boche, G.; Walborsky, H. M. Cyclopropane-Derived R...
    Column 8 117–173
    Column 9
    Column 10
    Column 11 1990
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 10958
    Column 2 77
    Column 3 1
    Column 4 189
    Column 5
    Column 6 Houben-Weyl Methods of Organic Chemistry
    Column 7 Klunder, A. J. H.; Zwanenburg, B. Houben-Weyl Meth...
    Column 8 2419–243
    Column 9 E17c
    Column 10
    Column 11 1997
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 10995
    Column 2 77
    Column 3 1
    Column 4 226
    Column 5
    Column 6 Science of Synthesis
    Column 7 Cha, J. K. Science of Synthesis 2005, 325–338.
    Column 8 325–338
    Column 9
    Column 10
    Column 11 2005
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 10, maximum: 8)
    Column 1 17123
    Column 2 82
    Column 3 1
    Column 4 13
    Column 5
    Column 6 Comprehensive Organometallic Chemistry II
    Column 7 Dushin, R. G.; Edward, W. A.; Stone, F. G. A.; Wil...
    Column 8 1071–109
    Column 9 12
    Column 10
    Column 11 1995
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 17124
    Column 2 82
    Column 3 1
    Column 4 14
    Column 5
    Column 6 Modern Carbonyl Olefination
    Column 7 Ephritikhine, M.; Villiers, C.; Takeda, T. Ed. Mod...
    Column 8 223–285
    Column 9
    Column 10
    Column 11 2004
    IMP-00019: row rejected due to ORACLE error 12899
    IMP-00003: ORACLE error 12899 encountered
    ORA-12899: value too large for column "JW_ADMIN"."CITATION"."PAGE" (actual: 9, maximum: 8)
    Column 1 17126
    Column 2 82
    Column 3 1
    Column 4 16
    Column 5
    Column 6 Transition Metals for Organic Synthesis (2nd Editi...
    Column 7 Furstner, A.; Beller, M.; Bolm, C. Eds. Transition...
    Column 8 449–468
    Column 9
    Column 10
    Column 11 2004      17712 rows imported
    . . importing table                     "FOOTNOTE"         38 rows imported
    . . importing table              "GT_STATS_REPORT"          0 rows imported
    . . importing table         "GT_VALIDATION_REPORT"          0 rows imported
    . . importing table                     "OR_USERS"          1 rows imported
    . . importing table                     "OS_USERS"          1 rows imported
    . . importing table                "PROCEDURENOTE"         70 rows imported
    . . importing table                  "QC_TRACKING"     539881 rows imported
    . . importing table                         "ROLE"          5 rows imported
    . . importing table                       "SCHEMA"          3 rows imported
    . . importing table              "TASK_ALLOCATION"     159370 rows imported
    . . importing table                     "USER_LOG"     174488 rows imported
    . . importing table                      "VERSION"          3 rows imported
    About to enable constraints...
    IMP-00017: following statement failed with ORACLE error 2298:
    "ALTER TABLE "AUTHOR" ENABLE CONSTRAINT "FK_AUTHOR_CITATIONID""
    IMP-00003: ORACLE error 2298 encountered
    ORA-02298: cannot validate (JW_ADMIN.FK_AUTHOR_CITATIONID) - parent keys not found
    Import terminated successfully with warnings.
    Regards,
    Subash

  • How to find the date when object is moved from quality to production server

    Hi Experts,
    I am working with BADI ZMM_PUR_REQ_PROC_001-Method Check and BADI ZME_PROCESS_PO_CUST-Method Check.
    I need to add a check that a particular logic should be implemented only after this object is moved to the production server.
    How can i check the date when an object (in my case this BADI) is moved to the production server?
    <Removed by moderator>
    Thanks in advance.
    Edited by: Vinod Kumar on Aug 1, 2011 10:55 AM

    Hi Sakshi,
    So your reqt is that the documents created after your Transport implementation date should pass the check and others (old ones) should ignore.
    I will recommend, if at all possible, to make all the old documents compatible to your check by doing a separate initial loading /one time activity to avoid this kind of hardcoding.
    IF not at all possible to do so, then I think you should better hardcode your Transport req number and fetch date (AS4DATE) from E070 table and only if any entry exists, use that date as your required date. I believe this will be the date of transport imported in the target system.
    You can avoid hardcoding Transport number by picking latest transport with respect to your object (BADI) using E071 table, but that will go wrong once you send any future changes in this BADI to Prod, so better to hardcode the transport.
    BR,
    Diwakar

  • Dynamic pl/sql to fetch data from production server

    Hi,
    I need to create a dynamic pl/sql program to fetch all the packages from the production server and store them on my local machine in different files.
    Thanks in advance.

    Hi,
    I am running this procedure and not getting anything in the- 'Report_Out2.txt file....
    Have a look..
    create or replace
    PROCEDURE extract_file IS
    vclob CLOB;
    getClob CLOB;
    vstart NUMBER := 1;
    bytelen NUMBER := 32767;
    len NUMBER;
    my_vr RAW(32767);
    x NUMBER;
    l_output utl_file.file_type;
    BEGIN
    -- define output directory
    l_output := utl_file.fopen('LOG_FILES', 'Report_Out2.txt','wb', 32767);
    vstart := 1;
    bytelen := 32767;
    -- get length of clob
    for rec in (select owner, object_name, object_type
    from all_objects
    where object_type = 'PACKAGE'
    and owner = 'ABC')
    loop
    dbms_output.put_line('data entering');
    vclob := dbms_metadata.get_ddl(rec.object_type, rec.object_name, rec.owner);
    x := dbms_lob.getlength(vclob);
    dbms_output.put_line('data exiting');
    end loop;
    -- save clob length
    len := x;
    dbms_output.put_line('value assign');
    -- if small enough for a single write
    IF len < 32767 THEN
    dbms_output.put_line('data in if');
    utl_file.putf(l_output,substr(vclob,1,100));
    dbms_output.put_line('data in file');
    --utl_file.fflush(l_output);+
    -- write in pieces
    ELSE
    dbms_output.put_line('data in else');
    vstart := 1;
    WHILE vstart < len and bytelen > 0
    LOOP
    dbms_lob.read(vclob,bytelen,vstart,my_vr);
    utl_file.put_raw(l_output,my_vr);
    --utl_file.fflush(l_output);+
    -- set the start position for the next cut
    vstart := vstart bytelen;+
    -- set the end position if less than 32000 bytes
    x := x - bytelen;
    IF x < 32767 THEN
    bytelen := x;
    END IF;
    utl_file.fclose(l_output);
    END LOOP;
    END IF;
    EXCEPTION
    WHEN no_data_found then
    dbms_output.put_line('null data');
    WHEN others then
    dbms_output.put_line('Uncaught exception');
    END extract_file;
    The proc is compiling without any errors, but when im running it gives:
    Connecting to the database XYZ
    data entering
    data exiting
    value assign
    data in if
    Uncaught exception
    Process exited.
    Disconnecting from the database XYZ
    What could be the reason for the above condition??
    Edited by: user9963922 on May 29, 2009 2:58 AM

  • Transfer data from Test to Production Server

    Dear All
    I want to know how to transfer data from test server to production server.
    Lets say we have done all the setup steps of GL, and we have also feeded chart of accounts, journal entries, recurring etc. at our test server. Now we want to shift our data from Test Server to Production Server.
    What can be the procedure?
    I shall be really thankful.
    Best Regards
    Muhammad Habib
    http://mhabib.wordpress.com

    Dear hsawwan
    Thanks for your reply. Can you send me this document via email. My email id is: [email protected]
    Secondly can you please tell me how to just transfer my Chart of Account.
    I shall be really thankful to you.
    Best Regards
    Muhammad Habib

  • Ale to transfer data for quality management in production server

    Hello Gurus ,
                            I want to transfer data from development to production server which method is easy and preferable by ale
    or by bapi .                                                                               
    Thanks And Regards
                                                                                    Shrikant Ambulkar

    i have close this thread

  • How to migrate Planning from Production to Disaster-Recovery server?

    We are using Planning 11.1.1.3 Oracle repository. Presently our DR Planning Application name is different than production's name, and the DR's Windows server names are different from Production's. Otherwise, all other configuration the same.
    How do we migrate Planning from Production to Disaster-Recovery server? We stopped Planning on DR server. Then we exported production planning Oracle repository and imported it to DR Planning. We restarted DR's Planning. DR planning seems to be running fine, but I am afraid to click "Refresh Planning" on DR Planning - it might update Production server. So how can I be sure DR and Production planning are disconnected ?
    Is there anything we need to do? This method seems to be faster than migrating with LCM.
    Edited by: Essbase Fan on Oct 18, 2010 10:11 AM

    You are definitely go about it the correct way, if you are migrating the whole planning application I have to agree it is a safer and quicker route.
    The connection information to essbase is stored in the planning system database/schema so as long as you have not migrated that then you should be good to refresh.
    To put your mind at rest, log into the planning application and edit the datasource associated with the application then you will see where the essbase server is it is going to refresh.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • Master data in PRODUCTION Server

    Hi,
    Can someone please share the checklist/document having the details of the Master Data that needs to be maintained in PRODUCTION server at the time of GO-LIVE from FI perspective.
    Thanks in advance.
    Sanjay

    The following FI Master Data needs to maintained in Production Server before Go-Live.
    1. GL Master Data
    2. Customer Master
    3. Vendor Master
    4. Bank Master(bank Keys)
    5. Asset master data
    6. Excise Data (J1ID - if CIN is applicable)
    7. needs to check Material Master Data (valuation classes)
    br,
    Ganesh Lokam

  • No data selected for printing in production server t.code J1INCERT

    Dear Gurusl,
    I am facing a issue to tds certificate printout through t.code J1INCERT in production server. My client has booked the invoice in the month of march 2011 & remittance, bank updation is done in the month of 30th Apr. 2011. But while taking the printing out it the error No data selected for printing 8000I. So I need some permanent solution.
    For invoice booking fiscal year is 2010 & remittance, bank updation it is 2011.
    Regards
    Sachin Patil

    Dear:
               Check whether you have selected the relevant tax types for invoice posting while posting the vendor invoice. If its correct then Vendor Master data, Section/Business Place code Address data. Check tables in SE11
    J_1IEWT_CERT_N
    J_1IEWTCALID_N
    J_1IEWTNUMGR_N
    In these tables section codes might have been maintained directly. Please check these for any discrepancies.
    Regards

  • Pre setting data of production server

    Dear Friends please explain about " What r the pre-settings before upload data in to production server "

    hi,
    check ur uploading cut over data Are perfect, because all transaction will depend on that data.

Maybe you are looking for

  • Sulky Macbook Snow Leopard Blues

    Hi all I have a problem with a Black MacBook 2.4ghz.     2.5mb ram It was running very smoothly with Leopard, but I upgraded to snow leopard, first using the generic snow leopard installer DVD and then the updater, bringing it to 10.6.8. Also then I

  • Add motion tween to my buttuns in flash??

    hi, i'm new in flash ,i make a simple buttun by these steps 1- i prepare color photo and same in black and white 2- i import my photo to stage - convert to buttun 3- in over , down  i put the black and white photo - also write text 4- when i run the

  • Using 2nd Monitor Doesn't Reset When Switching To 1 Monitor Only

    FF4 was displayed on my 2nd monitor off of my laptop. I then powered-down and removed the 2nd monitor hookup. After rebooting with only the laptop monitor, FF4 opens (twice) with only a tiny window just large-enough to display the red-yellow-green bu

  • Runtime Libraraies not accessed by Applet

    We have developed an application which we build using Ant and then deploy under J2ee/home/applications and works ok. But when I try to run same application from JDeveloper it giving me this error: java.lang.NoClassDefFoundError: rpa/offlineservices/c

  • Process Multiple Files Adding File Type as Part of Name

    I'm using the "process multiple files" command to converts folders of tiff files to jpeg. I routinely hide extension names of my files. All my files are being converted with the ".tiff" extension added as part of the name, and I can find no way to pr