PM/QM Integration for Calibration of Equipment /Measurement Instrument QC
Dear Friends,
I want to have inspection lot for calibration of Lab equipment
what i understand is
Creating the Maintenance Plan
Assigning and Displaying the Task List
Scheduling the Maintenance Plan
Displaying the Calibration Order and Inspection Lot
Entering Characteristic Values
Entering the Usage Decision
but just want to know what are the basic setting to activate inspection type 14 , do i need to treat Equipment as material master or is there any place to activate inspection type 14 in Equipment
Thanks & Regards
Raj
Dear Ram
The 14 inspection type is to be activated in the config
1) SPRO>QM>Quality inspection> inspection lot creation> inspection in plant maintenace> maintain 14 against the order type you are going to use. Normaly PM05 is used.
Things to be noted
1) Inspection lot is created when order is released and saved
2) in task list you have to have a sampling procedure which has a tick in plant maintenance ( QDV1)
Check and revert back
Regards
gajesh
Similar Messages
-
PP and PM integration for PRT equipment
Hi,
i got integration issue when implementing PP and PM.
i used PRT equipment with counter, PP confimation will update the counter.
If it reach some value it is overhaul and maintenance order created.
1, if it is overhaul, can i automatically set the PRT so it is not available (status)
2. can PP people know this and the they reschedule the PP order and it schedule automatically considering the maintenance order for the PRT equipment they use.
after PRT equipment i will user work center as equipment too and then we will have botj issue as above
is it really possible for pp and pm integration like this.
please kindly help.
best regards,
Freddy Hahi
In the normal process once your production order is confirmed ,your maintenance order from plan will be triggered ,but your PRT status is in release only which will not be updated as LOCK automatically .it can be locked manually in the Master data.
check with abaper whether it is possible to update the status using measurement document ,for say once it reaches 2000 pc
Once the status is locked it cannot be used for maintenance or production order
for Workcenter as equipment then you can process with System condition as Not in operation which will show the maintenance order while checking the production order planning table
regards
thyagarajan -
Measuring point in equi[ment for calibration cycle.
Hi All,
Can any body tell me how to use Measuring point and measuring document in calibration - in Equipment.
Its urgent for me
Thanks
Siddheshhi siddesh
iam not having any doc. please follow the link in that a model company has performed all the operation in PM
<b>http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.htm</b>
regards
thyagarajan -
Sending Gauges / Equipment for Calibration
I want to send the Gauges / Equipment for Calibration to Outside party (Vendor). Would you please tell me how to map this process in SAP.
The process is:
1. Gauges / Equipments are sent for Calibration to vendor.
2. Vendor Calibrates and those are verified for the usage.
Your valuable inputs will be helpful, points will be awarded accordingly.
Thnkx and Regards,
Rashmihi rashmi
while planning the calibration order , create a task list with a control key for external operation, and maintain the requiured outline agreement or services.while scheduling a PR will be generated then you can process further. you can also look in to the web site for better understanding "http://help.sap.com/saphelp_46c/helpdata/en/fe/67fbcc9d6f11d189b60000e829fbbd/frameset.htm"
regards
thyagarajan -
Test Equipment for calibration
Dear Experts,
Is it necessary to create Calibration Orders against Test Equipments only ?? or we can do the same against Machines also??
As in some cases there is preventive & calibration plan against same equipment then if we create Test equipment,, there is going to be doubling of equipment??
Plz guide
rgrds
DMDear DM,
For the same Equipment U can distinguish one is M - Machine , and Q- Test Equipment categories.
So u can do preventive maintenance and caliberations plan also
If u not clear pls come back
Regards
SMC -
Sending equipment for calibration
Dear all,
what is the process to send test equipment for calibration.
ours is external calibration:
as per QM they are running the scheduling for calibration so system automatically creating one purchase requisition .
so then how to send that equipment through MM .
please give step by step
regards,
prasadHi,
Generally, Repair of Materials are handled via concept of Gate Pass (Returnable & Non-Returnable). But, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
Try the below suggested procedure as a work around process;
Repair Process via Returnable Gate Pass: -
1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
It's not necessary to have materials as Non-Valuated always, it depends on your requirement.
2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511) - Only if Stock of Material is not available.
3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
7. MIRO - LIV for Service Charges w.r.t. Subcon PO
Note: - If PM Module is implemented then use PM Order as origin of the Repair Process. If it is not then follow the above process.
Else if you don't want to track the material stock then follow the Service Process Cycle
1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
2. ML81N - Create Service Entry Sheet w.r.t. Service PO
3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
For Service Process, refer following link;
[SAP External Service Management|http://www.sap123.com/showthread.php?t=52] -
Equipment sent out for calibration
I have a scenario where for calibration i am sending the equipment to vendor for calibration.
i am creating equipment as material and sending it out with help of sub contracting P.O -so that returnable gate pass can be created .
Now my quetion is how can i track this cost in my order for sub contracting P.O.hi
please try this below, you can get the actual costs in the order upon service entry sheet confirmation.
>Create calibration order
>Create P.O with account assignment category F.
>Enter the calibration order number in the account assignment field
>Create entry sheet and confirm
>actual costs can be captured in the calibration order.
Regards
Seenu -
What is the proces flow for calibration equipement management
Hello,
Please can some explain the Process flow for the equipment management?
We want to schdule the order for the calibration equipement.
GauravPlease follow the following prcoess flow
IA05- Create General Task list(Enter inspection point :300,operation,inspection charactertics to the operation,usage)
IP01-Create plan( Use maintenace startegy of plant,enter equipment, select general task list for plan the equipment,enter call horizon,planning cycle schduling period)
IP42-Schedule the plan Schedule the plan for the quantity with frequency defined in the plan.Which schdule the according to the schdule date.Schedule date generates pm order for the plan on due date.
IW33-Display order.
QE51-Calibration result recording for equipment- Gives status for result i.e ok or not ok.
QA11-Lot usage decision
IW41-Confirmation for the order.
You can refer the sap librabary for detailed process.
Regards,
Sunil Patil -
Background Scheduling of Maintenance order for Calibration.
Dear Experts,
I want to scheule my calibration order in QM for calibration of Test Equipment in background.
I have created my maintenance order for calibration of Gauges / Instruments (which are defined as Equipments). The dates for the calibration have been calculated based on time. When I go to the transaction of scheduling the order & save, the inspection lot for calibration is generated & the equipment task list is assigned to the lot.
I want this to automatically happen in background. This is because I have thousands of equipments, for which I can not schedule the calibration manually.
Regards,
PrashantHi,
Please check below link if this can help it.
http://help.sap.com/saphelp_scm2007/helpdata/en/c3/9e443cfb06e532e10000000a114084/content.htm
Regards,
Anil -
Digital signatures for calibration inspection (inspection type 14)
Hi,
I want to use digital signatures for results recording and usage decision (ud) when performing a calibration (inspection type 14). Normally you'd set-up the material authorization for digital signatures. But this can't be added to maintenance plans or equipment. Is there any way to set-up digital signatures for calibrations?
Regards,
MaartenExplore SAP Note 576307
It may help u. -
Measuring Instrument Needs to be added in inspection plan for each part
Hi
How to assign the Measuring Instrument in the quality inspection plan for all the materials.
Whether i need to assign as material assignment or as PRT.
how to use prt to assign to the operation in the quality plan (task list)
Thanks
VRAJHi,
when i try to assign the Equipment for first Inspection Characteristics.
the system thru the ERROR as,
Production resource/tool is not intended for this type of task list
Message no. CF230
Diagnosis
You want to use the production resource/tool in a task list or work order with task list type Q. However, according to usage 004 of the PRT, this task list type does not exist.
Procedure
Change the usage of the PRT in the master record or select a PRT which can be used in this task list type.
How to resolve this issue. -
Order processing for defective measuring instrument
HI experts,
i want to know how to handle order processing for a defective measuring instrument.Hi Nandi,
In addition to what Mr Maheshwaran has said, you can maintain the PRT's also.
as the PRT Equipment will allow you to do the Maintenance activities on them.
Hope it helps you Further.
Regards,
Yawar Khan -
No inspection lot for calibration
Hi all,
I am facing one problem in equipment calibration.The problem is that no inspection lot is generated for calibration
I have maintaimed following seeting
1)Equipment cration(IE01)
2)Created eqipment task list ( IA01)
3)Created maintenance plan (IP41) wherein order category is maintenance order and order type as calibration order.
4) And sheduled the plan ( IP10)
Inspection type is already active against the order type
Please guide what i am missing is the orde category correct?
thanks
ASDHi,
Also please check the following settings in SPRO
SPRO --> plant maintenance --> maintenance and service processing --> maintenance and service order --> assign inspection type to maintenance/service order type
here u have to assign inspection type 14 to your respective order type for calibration secenario
please check and revert back.
Regards,
Vinay -
AS03 : How to hide 'Integration of assets and equipement' from Allocations
Hi,
In Allocations' table (Asset master data AS03) I want to hide fields relating to 'Integration of assets and equipement'
Please advise
Regards.Hi,
First identify the screen layout assigned to the Asset Class under which Asset has been created and you want to change the status of the field for....then use below path to get that done...
Financial Accounting ® Asset Accounting ® Master Data ®Screen Layout ® Define Screen Layout for Asset Master Data
Select Define Screen Layout for Asset Master Data
Regards,
Chintan Joshi -
SAP Business one 8.8 Integration for SAP Netweaver
hi all,
Where to download SAP Business one 8.8 Integration for SAP Net weaver Components(Installation Packages for 32 bit). I installed one B1iSN but its only Integration for SAP Business One Not for SAP Business one 8.8 Integration for SAP Net weaver.
Please send me the link. Its urgent
Thanks & Regards
B.Lakshmi NarayananHi
[https://websmp104.sap-ag.de/sbo-swcenter]
Software Distribution Center >SAP Business One Products > Updates
SAP Business One 8.8 >>> SAP B1 8.8 INTEGRATION FOR NW >>>Comprised Software Component Versions
B1 8.8 INTEGRATION CONTENT
B1 8.8 INTEGRATION SIM
B1 8.8 INTEGRATION TECHNOLOGY
Hope you find.
Thanks
Kevin
Maybe you are looking for
-
I have an IPad 2 and an Iphone4, but as it suggests that I can click a photo on my iPhone and the image will also reflect simultaneously on my IPad does not happen, though I have activated cloud on my iPhone. What could be the problem.??? Also in my
-
Satellite L455D-S597​6: Disk system part deleted
Hi!!!! Configuration: TOSHIBA Satellite L455D-S5976 AMD Sempron SI-42 2GB DDR2 RAM, 250 GB HDD I have trouble with my Hard disk. The disk configuration was like this: Part C: System about 300 Mb Part D: second part about 120 Gb Part F: third part ab
-
Rotation doesn't preview in CC
Hi All, I cant seem to get the rotate CSS transform to preview in DreamWeaver. It shows in IE11 but not many browsers seem to support rotate yet. cheers Roen
-
Hi, We want to migrate from 11i to 12i from a 2 servers configuration (db, apps) to another 2 servers configuration (always Linux) and I want to have some precision on directory structure : db Tier --> apps_st --> data_top --> tech_st --> db_top -->
-
When to scale up and/or scale out?
When do you guys scale up/out, and how do you justify it? We have a small farm with a number of new projects we expect to have in production this year. I've been tasked with assessing our current environment, providing recommendations, and performing