Test Equipment for calibration

Dear Experts,
Is it necessary to create Calibration Orders against Test Equipments only ?? or we can do the same against Machines also??
As in some cases there is preventive & calibration plan against same equipment then if we create Test equipment,, there is going to be doubling of equipment??
Plz guide
rgrds
DM

Dear DM,
           For the same Equipment U can distinguish one is M - Machine     , and Q- Test Equipment  categories.
So u can do  preventive maintenance and caliberations plan also
If u not clear pls come back
Regards
SMC

Similar Messages

  • Sending equipment for calibration

    Dear all,
    what is the process to send test equipment for calibration.
    ours is external calibration:
    as per QM they are running the scheduling for calibration so system automatically creating one purchase requisition .
    so then how to send that equipment through MM .
    please give step by step
    regards,
    prasad

    Hi,
    Generally, Repair of Materials are handled via concept of Gate Pass (Returnable & Non-Returnable). But, SAP doesn't provide any option for creating Gate Pass (Returnable & Non-Returnable) in standard.
    Try the below suggested procedure as a work around process;
    Repair Process via Returnable Gate Pass: -
    1. MM01 - Create Material Master for every Spare Part / Machinery to be sent to Vendor for Repair as Non-Valuated (Material Type "UNBW") (Do not extend Accounting and Costing views since you don't require postings of Stock value and consumption values, you only want to track the Service/Repair Charges)
    It's not necessary to have materials as Non-Valuated always, it depends on your requirement.
    2. MIGO - Goods Receipt > Others (Receive the quantities of these materials using Movement Type 501 / 511) - Only if Stock of Material is not available.
    3. ME21N - Create Subcontracting PO (Here Main Material and Component will be same material)
    4. MB1B - Transfer Posting w.r.t. Subcon PO (Mvmt Type - 541, Spare Part stock will get posted to Vendor Stock)
    5. MB90 - Take Print out of this Material Doc as Returnable Gate Pass (U need to configure Message Determination of Inventory Mgmt)
    6. MIGO - GR against Subcon PO (101 - Receive Spare Part, 543 O - Consumption of Spare Part form Vendor Stock)
    7. MIRO - LIV for Service Charges w.r.t. Subcon PO
    Note: - If PM Module is implemented then use PM Order as origin of the Repair Process. If it is not then follow the above process.
    Else if you don't want to track the material stock then follow the Service Process Cycle
    1. ME21N - Create Service PO (With Item Category D and Account Assignment Category K )
    2. ML81N - Create Service Entry Sheet w.r.t. Service PO
    3. MIRO - LIV for Service Charges w.r.t. Service PO or Service Entry Sheet
    For Service Process, refer following link;
    [SAP External Service Management|http://www.sap123.com/showthread.php?t=52]

  • Sending Gauges / Equipment for Calibration

    I want to send the Gauges / Equipment for Calibration to Outside party (Vendor). Would you please tell me how to map this process in SAP.
    The process is:
    1. Gauges / Equipments are sent for Calibration to vendor.
    2. Vendor Calibrates and those are verified for the usage.
    Your valuable inputs will be helpful, points will be awarded accordingly.
    Thnkx and Regards,
    Rashmi

    hi rashmi
    while planning the calibration order , create  a task list with a control key for external operation, and maintain the requiured outline agreement or services.while scheduling a PR will be generated then you can process further. you can also look in to the web site for better understanding "http://help.sap.com/saphelp_46c/helpdata/en/fe/67fbcc9d6f11d189b60000e829fbbd/frameset.htm"
    regards
    thyagarajan

  • Test Equipment for Power Supply

    Hi ,
    I want to develop a test software for power supply using LabVIEW which we can use for our mass production.
    We are currently using the following for the development stage.
    1. Digital Multimeter(Topward 1330)
    2.Oscilloscope(Agilent DSO 6054A)
    3.Programmable AC Source(Chroma 6430)
    4. DC electronic Load (Chroma 63030)
    We are using GPIB as the programming interface.We also use NI-VISA, NI-488.2 from LabVIEW to communicate.
    Since I am new to this domain, I need an expert help in programming this software.
    Thanks

    Dennis_Knutson wrote:
    And for follow up questions, please don't post to this board. You have nothing related to NI's pxi chassis/boards.
    p.s. And after the test specification is complete, perform the tests manually. You can't understand a programmatic approach if you don't understand the instruments and their capabilities.
    "You can't automate what you can't do manually" is one of my favorite maxims. 
    Now is the right time to use %^<%Y-%m-%dT%H:%M:%S%3uZ>T
    If you don't hate time zones, you're not a real programmer.
    "You are what you don't automate"
    Inplaceness is synonymous with insidiousness

  • Process for sending equipment during calibration

    Hi Experts,
    when i send an equipment( ex: vernier) for a third party vendor for calibration, in purchase order, there is no material displayed since the item category is " D"(service).  Now i have one doubt.
    How to send the equipment for calibration and at the same time in sap, there should be some transaction/document so as to send/receive the equipment for calibration. Any suggestions .

    Hi Nandi,
                   Being from the business side I would suggest that rather then considering this process as the Calibration Process, please consider it as a Simple Sub-Contracting Process.
    in which the material that you are sending, will be coming back to you, That is the Re-Work Material.
    You can issue the Serialized Material(With Equipment) to the vendor via 541 Mvt Type and do simple GR with 101 Mvt type and pay the vendor for the services.
    You can generate the Sub-Contracting PR from the Maintenance order Only, and then create the PO for the PR.
    Hope it helps you.
    Rgeards,
    yawar Khan

  • Test equipment design & Development

    Dear Candidates,
    We are having an excellent opening for Design and Development of "Test Equipment" for hardware with one of the Leading MNC company in Bangalore. Experience of 2-4 years experience. If interested please send us your updated profile of call us on 9880957399
    Srihari
    9880957399

    Hi,
               Glad to see the relevant opening here. Unfortunately, the provided number is not working for me. Could you provide me your Email address, so that I could send my CV.
    Thank you .

  • Equipment sent out for calibration

    I have a scenario where for calibration i am sending the equipment to vendor for calibration.
    i am creating equipment as material and sending it out with help of sub contracting P.O -so that returnable gate pass can be created .
    Now my quetion is how can i track this cost in my order for sub contracting P.O.

    hi
    please try this below, you can get the actual costs in the order upon service entry sheet confirmation.
    >Create calibration order
    >Create P.O with account assignment category F.
    >Enter the calibration order number in the account assignment field
    >Create entry sheet and confirm
    >actual costs can be captured in the calibration order.
    Regards
    Seenu

  • Error during usage decision for Test Equipment

    Hi,
    I have completed results recording  for Test Equipment using QE51N (results closed and confirmation completed). When I tried to make usage decision (QA11) for the lot the pop-up message shows as "Not all equipment is valuated! Do you want to force inspection completion. I also noticed that in equipment tab of qa11 code valuation column shows as Not  Valuated.
    I request you to help me to solve this problem.
    Thanks & Regards
    V.Devaraj

    HI,
    You may try changing the valuation mode in IA06. In the inspection characteristic overivew, click on details -> operation, scroll down, you will find Quality management inspection points  -> maintain automatic valuation based on inspection points.
    The changes if made will be effective only for the next inspeciton lots.
    Regards,
    M.M

  • PM/QM Integration for Calibration of Equipment /Measurement Instrument QC

    Dear Friends,
    I want to have inspection lot for calibration of Lab equipment
    what i understand is
    Creating the Maintenance Plan
    Assigning and Displaying the Task List 
    Scheduling the Maintenance Plan  
    Displaying the Calibration Order and Inspection Lot
    Entering Characteristic Values 
    Entering the Usage Decision 
    but just want to know what are the basic setting to activate inspection type 14 , do i need to treat Equipment as material master or is there any place to activate inspection type 14 in   Equipment
    Thanks & Regards
    Raj

    Dear Ram
    The 14 inspection type is to be activated in the config
    1) SPRO>QM>Quality inspection> inspection lot creation> inspection in plant maintenace> maintain 14 against the order type you are going to use. Normaly PM05 is used.
    Things to be noted
    1) Inspection lot is created when order is released and saved
    2) in task list you have to have a sampling procedure which has a tick in plant maintenance ( QDV1)
    Check and revert back
    Regards
    gajesh

  • Process in QM for Calibration of guage & destructive material testing

    hello all,
    can somebody help for sequence of process and setting required in QM  to
    - send the Gauges for Calibration to out sidevendor and receive back.
    - To send the material outside for (destructive)testing and receive the material back and book it on scrap account.

    Hi,
    Refer the link below for calibration process thro PM in SAP.
    http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.htm
    Depends upon your requirement ,  you need to decide the extent of calibration data to be stored in the SAP system.
    Sequence of process will be depends upon your business requirement.
    Regards
    K.M.Arun

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • Is it possible for the test equip. to tell me the measured data is ready?

    When programming to read from a test equipment (e.g. ocsilloscope)
    connected to PC/GPIB, many times I have to set a delay before reading
    the value, otherwise the return value will be some invalid numbers
    (e.g., 0). To achieve valid test results and testing time reduction, I
    used trial-and-error to get a "minimum" delay time. But even this
    delay time which works for one equipment may not work for another.
    It's such a headache!!!
    Is it possible to poll/inquire the status of the test equipment in the
    program if the measured data is ready? If yes, how?
    Thanks a lot for your answer!

    If you are programming using VISA, the following link takes you to some examples of waiting until the instrument has data available. The example link also includes other examples of synchronizing your application with your instrument.
    Using Instrument Status Registers with Service Requests and Polling

  • Background Scheduling of Maintenance order for Calibration.

    Dear Experts,
    I want to scheule my calibration order in QM for calibration of Test Equipment in background.
    I have created my maintenance order for calibration of Gauges / Instruments (which are defined as Equipments). The dates for the calibration have been calculated based on time. When I go to the transaction of scheduling the order & save, the inspection lot for calibration is generated & the equipment task list is assigned to the lot.
    I want this to automatically happen in background. This is because I have thousands of equipments, for which I can not schedule the calibration manually.
    Regards,
    Prashant

    Hi,
    Please check below link if this can help it.
    http://help.sap.com/saphelp_scm2007/helpdata/en/c3/9e443cfb06e532e10000000a114084/content.htm
    Regards,
    Anil

  • Cfalibration of test equipment.

    Hi,
    My clinet is working on calibration scenario.Here calibration of some equipment is done by maintenance department . So I would like to know what are the different setting i have to do before creating calibration order(PM06). I konw for that i have to create master data for testing equipment (Q).
    I am facing problem in QM point of view.So it is integration of PM-QM so i would know how
    Expecting for reply.
    Regards,
    Pravin

    hi
    check the link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/e0e869af9911d29a250000e8a529f3/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/bf/b9b3341a933f50e10000009b38f83b/frameset.htm
    IE01:Equipment
    IP11: Maintainence Strategy
    IA05: Task List
    IP42: Maintainence Plan
    IP10: Scheduling Of plan
    IP30: Job Planning
    Create Measuring inspection characteristics....QS21
    Create Task list by assiging ispection point as 300 /310...IA05
    Assign MIC & Strategy to the task list....IA05
    Create PM order for calibration order which should have ...IW31 (inspection type assigned as 14 as std)
    Assign Task list to PM Order...IW32
    Release PM order....IW32
    You will get inspection lot
    Provide readings against the inspection lot...QE17/QE51
    Provide Usage decieon for the FL/ EQ...QA11
    If you aregoing for Maint plan then crete maint item...IP41
    Assign this to maint plan & scheduling paramertes
    Schedule maint plan...IP10/IP30
    Get PM Orders Release it Get Inspection lots..IW38
    -ashok

  • Message if Expiry date of Master Test Equipment is in the Past

    Hi All,
    We need system give a mesage when expiry date of master test equipment (which is assigned as a PRT in the equipment task list) is in the Past at the time of result recording of an Equipment.
    Problem Details:-
    Master test equipment is defined in equipment category "P".
    Expiry date of master test equipment is maintained in the field
    of "start up date" in General Tab
    2.Equipments is defined in equipment category "Q"
    3.A task list is created in which master test equiment is assigned as a PRT
    4.Maintenance plan is created in which equipments is assigned & task List is selected
    5.Inspection lot is generated when maintenance plan is schedule & released.
    At the time of Calibration result recording "We want the system to give a message when expiry date (entered in start up date filed on  master equipment master view) of master test equipment is in the past"
    The end date in equipment master data cannot be altered and
    Hence we have used the "start up date" field for the equipment expiry  date.
    Pl assist me for solving this issue.
    Thanks & Regards,
         SKD

    hi shiv
    Start up date is the date at  which the equipment is commisioned or the equipment starts working,it is not the expiry date
    start up date is mainly used for calculating the MTTR/MTBF of the equipment
    regards
    thyagarajan

Maybe you are looking for

  • Message V1478 - Credit memo request with reference to an invoice

    Dear all, Creating a credit memo request with reference to an invoice, I get the following message "Material in item 000060 does not exist in plant/storage location". Of course, this material exists in the plant and the storage location, as we could

  • Files not created with iTunes do not play from remote iTunes library

    I hve ripped a large part of my CD collection into music files into FLAC format. I have since converted my music files from FLAC into Apple Lossless Audio Codec (ALAC) format and imprted them into iTunes. The files play with no problem on iTunes if t

  • Arch only booting in IDE mode

    Hi, I installed archlinux on my desktop a few months ago. I did not realize that the SATA bios settings were on IDE mode when I originally set up my system. I want to make it so that I can use hot-swapping, and for this I absolutely need AHCI (not ID

  • Working with Record Types

    Hi! I need to work with a Record Type in one of my functions. I have two questions: 1) In my error handler, how do I return an empty record type and 2) In the calling procedure, how do I evaluate whether or not my record type contains values. Any hel

  • Bad Links - Download Oracle 10g

    Hi I am trying to download oracle 10g release 1 for Solaris (x86) from the link specified bellow. The problem is that I'm getting a file not found error for all the links on the page. http://www.oracle.com/technology/software/products/database/oracle