Varaince settlement and costing sheet in REM and Production order

for REM, repetetive manufacturing, what's the difference between REM and production order in terms of variance settlement and settlement profile design? what's the difference between process order and production order in terms of variance settlement and settlement profile design?
for actual overhead(fixed and variable), can it be calculated automatically by costing sheet? user is very angry to input actual overhead by jounal entry. also how about plan scrap, how to define it in configuration? besides order confirmation, where can I input actual scrap?

For variances, there is no difference between the 3 diferrent orders. The settlement profile can also be the same.  The real difference from a CO perspective concerns the calculation of WIP and the settlement rule.  Process orders and production orders normally use a full settlement rule (though periodic settlement is also possible) and WIP is calculated based on actual cost.  Repetitive orders only use periodic settlement and WIP is valued at target cost.
From an overhead perspective, there is no difference between the 3 types of orders.  Overhead sheets are assigned through the costing variant and costs are applied through period-end process. 
Plan scrap is maintained in master data, either in material master, routing (receipe for process orders), or bill of material.  Acttual scrap usually happens based on the quantity of components issued to the order during confirmation or by the amount of scrap reported during confirmation.  If you are backflushing components, as you normally would do for repetitive, then you can adjusted the consumed quantities by doing an additional goods issue to the order (movement type 261).
thanks,

Similar Messages

  • Document attachment to BOM and has to be viewed in Production Order too.

    HI! Friends
    Can any body give the detailed procedure for attachment of Drawing Doc to BOM and it should be viewed
    in Production Order, the idea is before production it should be viewed.
    Thanks & Regards
    MDSFR

    Dear MDSFR,
    I'm not sure whether the system will disply the document directly in the production order,but you can check the list of
    documents in the production order in the document overview and assuming the documents are created with a proper document
    type and attached in the BOM of the product(production order header material) as document items with category "D".
    Check these links,
    Re: How to attach document to production order?
    Attaching documents in BOM item list in production orders
    Regards
    Mangalraj.S

  • Contents of new costing variant, valuation variant and costing sheet not getting transported

    In our development client,I have created a new costing variant, a new valuation variant and a new costing sheet in separate transports.
    When I release the transports to move into the Test client, the contents of the configuration are not getting transported at all.
    I tried to do them again manually using  Table view - Transport , but again, if I view the transports in SE10,they don't show the table contents, etc.
    Any help on this will be highly appreciated.

    Ajay,
    Let me make sure I understand.
    Create a new TR using SE01
    Go to transaction OKKN (costing variant)
    Select the costing variant and then choose Table view - transport
    Provide the transport number
    At what point to I say 'include in request'
    If I try to use the menu option Edit-Transport-Include in request in the beginning itself, the 'Include in request' is greyed out.
    This is where I'm stuck

  • My dictionary icon has disappeared and in its place is an icon of paper and pencils                sheets of paper and pencils that do nothing

    My dictionary icon is gone and in its place is an icon with two sheets of paper and pencils.  It does nothing.  When I look at the apps on my computer it's also gone and the paper and pencils icon is there also and does nothing.

    Long shot: The only icon I know of that resembles what you are describing is the App Store icon. I see you're on 10.5.x Did you recently update to 10.6.6 or 7? Of course, this doesn't explain why you don't find Dictionary in Applications or why it's missing in the Dock. And, doesn't explain "two sheets of paper."
    Otherwise, no idea what that icon is or what it's doing there.
    If you open About this Mac from the Apple menu>Applications, do you find it there? What you may have to do is use Pacifist to reinstall just that app. Read this on using:
    https://discussions.apple.com/message/12278861?messageID=12278861#12278861

  • Not able to see material and operation overview as tab in production order

    Hello Friends,
    While creating the production order by T.C CO01, after giving the material code , production plant and order type, system took me inside it.There i am not able to see component overview, operation overview as tab.Whereas in menu option Goto - overview - component , i can see there.But i want this things as tab in screen where we give qty and dates.
    So guys do you know where to do configuration for it.
    Thanking you guys in ad

    Dear Jitendra,
    In Production Order you will find Component and Operation screen under two different icons (not tab) production Header screen.
    - For Component Overview it is something like Balance or on pressing F6 you will branch to Component overview Screen.You will find it just after Hat icon
    - And for Operation over view it looks like ladder or on pressing F5 you will branch directly to operation screen.you will find this icon just after Component overview Icon.

  • Notification on Receipt and Purchase documents getting fired on Production order having Items with planning method as MRP

    I have written a SP Notification to block adding of documents if block number is not provided. Notification is working fine on Purchase and Receipt documents. This notification also gets executed on Production Order where items included in Production order have planning method as MRP.
    Can anyone explain me the relationship between
    "MRP planned items"
    and
    "Purchase documents (Purchase Order; GRPO; Purchase Return; AP Invoice and Credit Memo) and Receipt of Production."
    Thanks & Regards
    Sonil Bhardwaj

    Hi Sonil,
    Can you post your SP , to look if there is any problem with SP ..
    Regards

  • Settlement of costs only & not revenues on service order

    Hi,
    I have a revenue bearing service order.
    The revenue that was posted through billing document was also posted to the cost center respobsible.
    Now I want to settle only repair costs of service order to the cost center responsible.
    But the system does not allow posting the items containing revenue on cost center.
    How can I settle only costs to the cost center & not revenues.

    Hi,
    Is there any setting by which we can select the line item costs & revenue during order settlement.
    I am using KO88 for settlement but I cannot see any way out to do selective settlement there.
    Pl guide.
    Also as you have mentioned that in cost center master record, uncheck the actual revenue posting lock, so that I can post the revenues. But in my case it is already unchecked (unlocked for revenue posting), but still system does not allow to post any revenue to this cost center.
    Am I making mistake somewhere?
    If I get solution to above two queries, my problem will get resolved.
    Thanks.

  • Storage location and Batch updation for components in Production Order.

    Hi Friends,
    After creating Production Order,need to update components with Storage Location(RESBD-LGORT) and Batch(RESBD-CHARG).
    Plese any one can help me by providing FM/BAPI for the same(Update Component level)
    Points will be rewarded.
    Thanks,
    Prb.

    Hi Prathap,
    Path - OCHA
    Condition type,access sequence, strategy type,
    Work on automatic batch determination. Assign standard search procedure to order type dependent parameter, check against manual entry.
    Make sort sequence for material by CU 70, tick ascending order, Then assign component in COB1, enter selection values and sort sequence. In finish product material master set automatic batch determination.
    System will copy the required material with batch & storage location, also check against manual entry.
    I think it will solve your problem.
    Regards,
    Suhas

  • ATP check and Check against planning for a production order

    Hi
        When I create a production order for some orders it is ATP check and for some orders it is showing 2 in type avail check is check against planning in coois screen. Because of this orders are gettign released even though BOM material is out of stock.Can I know in which situations the orders will come under the second scenario. I always want the orders should be in ATP check
    regards,
    PradeepM.

    Hi,
    If you want only ATP check, then in MRP-3 view of the mtl master change the checking group to the same value as the one which you find to be following the ATP check.
    However before making this change do consult your colleagues in other domains, as this will impact all places where Av. check is done.
    Hope it clarifies.
    Regards,
    Vivek

  • How to allocate external process cost on the units of Production order

    Hi Gurus,
    I am facing a cost allocation issue.
    The scenario is a make-to-stock scenario in discrete manufacturing industry. I am using production order (PP01) and confirming the material issued to production and operations manually. There is an electrical cost incurred by the client. The total cost of electricity is allocated on the number of units that comes out from the production. Say, total electrical cost is 1000, number of units produced using the production order is 100, then per unit is charged 10 (1000/100).
    Can anyone help me how can I perform the cost allocation? Should I go for an activity type in work center OR should I use the cost sheet. Kindly help me.
    Thanks and Regards,

    Hi
    activity type would be better choice...
    Ajay M

  • Settlement rule sould be SDI in MTO production order

    Hello,
    I have a problem with my MTO scenario.
    The Assignment Category of the Settlement Rule in my production order is MAT. It should be SDI.
    In OPL8 I can´t change it from PP1 to SDI.
    In OKO7 if I change the Default object type form MAT to SDI I can´t save the SO.
    In OPJH If I change the Settlement profile on Production Order type to SDI e get error.
    What should i do to solve this problem?
    Thank you all in advance
    Cátia Pereira

    Hi
    It depends on settings in Req Class (OVZG)  and Account Assignemnt Catg (AAC) in OME9
    If your AAC is E in Req Class, then your sales order is a CO object and Prod order has SDI instead of MAT
    Req Class in IMG can be checked - IMG > Contr > Prod Cost Planning > Cost Obj Contr > Prod Cost By Sales Order > Control of Req Class ....... 
    Br, Ajay M

  • How to avoid actual cost error log while confirm production order activity

    Hi
    I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm in CO11N, system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

    Hi
    Issue is resolved thru PP forum. Thanks for ur reply.
    Solution lies in Control key of routing and BOM costing relevancy.

  • How to avoid Cost error log  while confirming production order

    Hi
    I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

    Sudhar,
    You can make the operation not relevant for Costing by using a Customized Control key which is not relevant for Costing or else in the operation details you need to leave the "Costing relevancy" field blank.
    Regards,
    Prasobh

  • Actual Costs are not captured in Production Order

    Hi Experts,
    I'm not able to see the actual costs for a production order. We made the cost estimate for a material for this month. We created the production order and partial confirmation also done. In production order i'm able to see the target cost only. I'm not able to see the actual cost for the production order after confirmation.
    In routing costing relevancy tick mark is available and in work center i maintained the cost center and activity types also.
    Can you please share anything is missed for getting actual cost for a production order.
    Naren

    dear friend,
    you would finally confrim order (set CNF status) and try again.
    also chack out you master data:
    -material master (possible Acc1-2 and Cost1-2)
    -work center (say,did you set a valid Cost center there?), are activities set up? usage? validity?..
    -routing (header data and control key at item level)
    check out your control key against the 'Cnf' and 'PrtCnf' checkboxes...
    good luck!

  • Actual Cost is not updating in Production Order & WIP

    Dear All,
    I have issue in production order and Work in Process not getting Target Actual cost in costing view CO03 & KKAY.
    Is there any settings or transaction missed out? Please guide me how to sovle the issue.
    Thanks & Regards,
    Venkat.

    Dear,
    Please check,
    For Target cost
    1. Your std cost must be released before Goods Receipt
    2. There must be goods receipt posted on the prod order
    3. You must calculate variances in KKS1/2
    For Actual Cost
    1. Post Goods receipt and Goods issues
    2. See if any mat movements are pending in COGI
    3. Ensure that operation is confirmed in PP and no entry is lying in COFC
    Also in CO03GotoCost-Analysis--Here change the lay out and check it.
    Regards,
    R.Brahmankar

Maybe you are looking for

  • No phone line for nearly a month

    I can't believe how slow BT are. We moved into a house which had infinity but somehow BT didn't recognise that someone lived there who had a BT line and claimed there wasn't a phone line connected! We had a phone line at least (BT didn't seem to real

  • Installing SAP NetWeaver 2004s Trial version (JAVA & ABAP )

    Hi All. Is it possible to install both versions of SAP NetWeaver 2004s (ABAP & JAVA) in the same machine ? Is there a tutorial or step by step ? Thanks.

  • BPS Performance when reading a hierarchy

    Hi, We have created planning levels with a selection on a cost center hierarchy node (included in a variable). Under this level, planning layouts use the characteristic cost center as a lead column. When we execute one of these layouts (in the Gui wi

  • Skipped Registration form on startup

    So, I decided to factory resete my macbook air because I felt like it was getting slow, because it was bought in 2011, and when I did it, I saw the registration form. I didn't feel like doing it, and I skipped it. Is there a way to do it again? Becau

  • My note is not working I did restart but didn't solve it

    My note is not working I did restart but didn't solve it