Production Scheduler Issues
After running collections and the launch, when downloading the PS plan from EBS, we are getting an error that says "Failed to load the input file: 'C:\scp\data_store\1\EbiPSModel.opz'. See log file for details. The log file is empty. The job that ran in EBS has a normal successful completion. Has anyone see this? Please help.
Guru's,
I am getting below error while launching PS plan, can some one help me to reslove the issue.
Advanced Supply Chain Planning: Version : 11.5.0
Copyright (c) 1979, 1999, Oracle Corporation. All rights reserved.
MSCSCPPS module: Launch PS Plan
Current system time is 27-JUN-2011 17:41:44
java.lang.ClassNotFoundException: oracle.apps.msc.ebi.cp.concurrentprogram.LaunchPsPlan
at java.net.URLClassLoader$1.run(URLClassLoader.java:200)
at java.security.AccessController.doPrivileged(Native Method)
at java.net.URLClassLoader.findClass(URLClassLoader.java:188)
at java.lang.ClassLoader.loadClass(ClassLoader.java:306)
at sun.misc.Launcher$AppClassLoader.loadClass(Launcher.java:268)
at java.lang.ClassLoader.loadClass(ClassLoader.java:251)
at java.lang.ClassLoader.loadClassInternal(ClassLoader.java:319)
at java.lang.Class.forName0(Native Method)
at java.lang.Class.forName(Class.java:164)
at oracle.apps.fnd.cp.request.Run.main(Run.java:157)
Start of log messages from FND_FILE
End of log messages from FND_FILE
Executing request completion options...
Thanks,
Edited by: user604737 on Jun 27, 2011 11:16 AM
Similar Messages
-
Dear Experts,
Can i have multiple scheduling profile ?
Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
Please help me to solve the issue.
AmitHi,
I am unable to figure out from your query what you exactly need.
But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
So hope the above clarifies, if it does not, then please explain with an example, it would be better.
Regards,
Vivek -
Customer-specific production schedules
We have contractual obligations with a major customer that require us to complete production of materials they order a set period of time before their requested ship date. For example, they order material with a requested ship date of 3/1/12 and the contract requires that we complete that material and have it in stock 4 weeks prior to that date.
The same material can be ordered by other customers that do not hold us to that "early completion" arrangement. What options are available in PP-PI that will let us model and automate this circumstance, where production schedules and completion dates can vary by customer?
Any assistance would be greatly appreciated.B,
I hope you are getting a premium price for having signed that contract.
Generally, MRP will try to schedule the Finish Date of a planned or production order to match the Material Availability date of a Sales order. You would like the MAD of the Sales order to be 4 weeks earlier than the planned Goods Issue Date of the sales order; and you would like it only for specified customers.
In SD, you can use Transportation and Delivery scheduling'. This functionality determines which timing durations are relevant for your sales orders and the associated deliveries. The data items that affect the duration between planned GI date and planned MAD are 'Loading Time' and 'Pick/Pack' processing time.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm
Loading time and Pick Pack processing time are entered in configuration of the Shipping point that is used in your Sales order. Shipping point in the Sales order is in turn determined a few ways; but one of them is by Shipping condition. You can enter the Shipping condition in the Customer master.
http://help.sap.com/saphelp_erp60_sp/helpdata/en/dd/5607cd545a11d1a7020000e829fd11/frameset.htm
So, conceptually:
1. Create a Shipping point where the combination of Pick/Pack and loading time is 4 weeks.
2. Create new Shipping condition. Assign it to your customer.
3. Create Shipping Point determination where the combination of the new shipping condition, the loading group, and the plant will determine the New shipping point.
4. Ensure that you are using an ATP check, so that other customers don't 'steal' the stock that has been placed into stock for your '4 week customer'.
Speak to your local SD expert, he should be able to set this up for you with no difficulty.
Best Regards,
DB49 -
Work order operation number in Production Scheduling
Hi,
We are using production scheduling for scheduling the discrete jobs. In production pegging view, the work order operation is shown in number "xx:xx:xx:xx:xx" not the name of the operation. Is there any setup required to display operation name? Any patch required?
Thanks,
Anitha.Hi,
I have face similar issue in deleting PO line items.
Even though I delete items, system check budget for deleted qty with the currency conversion + value & gives budget exceed error.
In some cases we have asked user to deactivated AVAC asked to do the transaction, which is not recommended.
You can try running CJBN & CJBV in sequence for affected WBS.
Thanks & reg,
Sam -
Issue inMaintenace scheduling issue in Two plants with similar data set up
Hi PM Gurus
Scenario: A) We Have two maintenance Plants which have got Factory calendar assignment as per Table Data. We need to change Non Working days of factory Calenders (D1 and T2) for work centres working and do Maintenace scheduling
Issue A) Plant PL0B has got factory Calender T2 set up at work centre (WCT2) .We get Maintenace schedule Calls as per Calender set up ie No Maintenace Call (Planned call and Call date) on (Non Working Days). Here we change public holidays to working days and this throw schedule calls accordingly (thatu2019s Maintence Calls on working days only).
B) We have similar requirement to change public holidays for Calender D1 which is assigned to Work centre WCD1, then we must get maintenance calls for working days. But we find that for Plant PL0A, Maintenace Calls are generating even on non working days. Only difference between Plant PL0A and PL0B is for Work centre set up as per screen shots for Capacity data.
C) We have changed work centre data of WCD1 as per WCT2 ,but still PL0A is giving maintenance Calls on Non Working days (Not Controlled by Calender data of Work Centre )
D) Info: Scheduling indicator in Maintenace plans of both plants is TIME
Plant Factory Calender (plant Factory Calender
(Work Centre) Non Working Days Work Centre (PL0A)
PL0A U1 D1 3-Public holidays WCD1
PL0B T1 T2 Sat ,Sun and 10 Public holidays WCT2
Thanks
UpinderGreetings Upinder,
You should set the Scheduling indicator to "Time - factory calendar" and select a Factory Calendar if you want the Maintenance plan to be scheduled according to one of the calendars you set up.
The work centre capacity scheduling doesn't come into place here, yet - it'll allow for rescheduling once the orders are called. -
Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.
Hi All,
I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
All help greatly appreciated,will award points to all useful answers.
PAPJ1.
Edited by: PAPJ1 on May 20, 2011 11:01 AMHello,
You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to Production Scheduller and Cost Center.
Hope it helps.
Regards
Alok -
Production schedule report/Standard v/s actual report
Dear experts,
Need two standard report for
1) Production schedule report- production during the perion and their cost component and items break up
2) Standard v/s actual report - Standard defined for material and actually consumed in term of qty and Cost for material and production order.
regards
RRHi ajay,
Thanks for your valuable advice,
I did all the changes mentioned in thread.
Cost component wise production target cost and actual cost is coming.
Same way i did it for qty.but my actual qty of production order is not coming but input qty is coming.
Option selected for output qty and same is not coming in report
key figure-output qty
value type-4actual
version-770IVERS
Option selected for input qty and qty is coming in reports also
key figure-input qty
value type-5target
target cost version-790SVERS
Need to ask one more question,Shall i create separate cost component for FG cogm a/c?.my fg cogm and settlement a/c is same.
and also how to extract all data(cost component wise) in excel for all orderwise/material wise
reards
RR -
When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
How to check whether production scheduling profile is maintained for relevant order type 10.
To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
Also, pls explain about “Order Type 10” and how it is linked with material and order execution.
Looking for a detailed explanation with screen shots , since i am new to SAP.
Thanks With Regards,
Dinesh Kumar V.Hello Dinesh,
Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
Production order have Order category as 10 Process Order 40 in standard SAP you can check this in OPJH.
Best Regards,
R.Brahmankar -
Printing setting in Production Scheduling Profile
Hello Guys,
In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
I used this setting.
But I could not print the production again.
I want to re-print the production order.
How do I enable re-printing the production order?
Thanks
George KingHi George,
the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
Did you get any error? Are you able to print when you push the print button manually?
Settings in OPK8 are correct ?
Regards,
Sabine -
Same material with diff. Production scheduler profiles
Hi,
I am working on PP-PI, where the same material is being manufactured using separate order types.
To be more specific, one order type for the regular manufacturing & another with Re-work order type. The requirement is such that the Order type dependent parameters & production scheduler profile are different in both the cases. Since my master has the prod. scheduler for regular manufacturing on the material master, even if i select the Re-work order type the system is considering the Settings of the regular manufacturing order.
I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
master due to various reasons. At the same time system should consider the settings for Re-work order only when the specific order type is manually selected during order creation.
Appropriate solution would be of great help, thanks in advanceHi,
Try using user exit. change the production scheduler profile during order save based on the order type.
check with your technical team.
hope this helps.
regards
CSN -
XI/PI ANSI/ISA-95 Content For Production Schedule; Production Performance
Hello experts,
Can you please let me know what the correct name of the package is on SAP Market Place for the pre-defined ANSI/ISA-95 Content (for Production Schedules; Production Performance; Maintenance Requests;Maintenance Workorders etc. for SAP MII scenarios) .
Thanks and regards,
BrendonHi Brendon,
If you are trying to find out packages for MII, the best link is this: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/webcontent/uuid/90537bfe-fd6b-2910-fda3-b04f1177c51e. [original link is broken] The specific link for standard MII templates (version 12.1) is: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e090ef23-dbc5-2a10-0994-b589d869cd92. NOTE: It requires a S user and also SDN user to download.
I tried to find out what ANSI/ISA-95 refers and I guess what you need is into PP templates into the link above. It doesnu2019t make sense u201CXI contentu201D if you need MII content, my advice is trying to download and install into your MII this templatesu2026
Regards,
Marcelo Cabrera -
Details about Master production Scheduling & Variant configuration
1) What are the steps for Master Production Scheduling (MPS)?
2) What are the steps for Variant Configuration?Hi,
MPS:
With in your planning time fence (maintained in mat master ) , you will get firmed planned orders because your MRP Type P1 - P4 has firming type.
And the firmed planned orders will not change after next MRP run.
You have to set MRP Type p1 - p4. acc to firming type. in ur mat master.
Then run MPS .It is generally for important products and it is run single level.Because it will not change your procurement proposals as it has firming type.So you get effective planning for your imp products.
Variant configuration:
Go to mm01 create a material and in bd2 view mark the check box material is configurable and then save the material and go to ct04 create chara.
Go to cl01 and create class with class type 300 and assign the charac. to it
Go to tcode cu41 create the profile using material code and assign the class to it
then got tcode mm02 and assign the profile there
Variant configuration material type is KMAT (SAP std), u can use this material type alternately u can mark the indicator in basic data 2 view ->client specific configuration->Material is configurable tick.
For further reference, check the link below
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf -
HOW TO CREATE PRODUCTION SCHEDULING PROFILE
PLEASE
TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
EXPLAIN IN STEPS
THANKSHi,
Check the below link and the screen shot:
http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
Hope it will help you.
Regards,
Alok Tiwari -
Post production support Issues
Gurus,
Can anyone provide me with PA/OM production support issues with the solutions..will be obliged
Regards
ElizHi Eliz,
For the post production issues like,
1. create new employee sub groups,
2. create new payroll area
3. create new wage type( transport allowance) in infotype15
4. delimit the wagetypes which may allowances will not pay future.
5. payslip error
6. employee getting double pay
7. configure of new nationality
8. configure of addtional dependents
9. create new infotypes for schools, dependent visa's etc.
Hope you cleared
Vijay -
CAn anyone send me documents related to key production support issues
CAn anyone send me documents related to key production support issues in SD and MM
thanks ®ards
amanHi Priya,
Please find the below link to have a very good stuff on Foreign Trade;
http://help.sap.com/bp_bblibrary/500/html/G09_ForgTrade_EN_IN.htm
Please Reward If Really Helpful,
Thanks and Regards,
Sateesh.Kandula
Maybe you are looking for
-
Problem with Speaker and Headset in Windows Vista
Hi, I just got my Macbook Pro 13" and having problem with speaker and headset when working with Windows Vista (I have installed the driver from bootcamp). The sound very weak if I play music from Itunes or youtube even the volume already full and if
-
As long as I have been in the job and we have been using IE as our browser, we have controlled the proxy settings with an automatic configuration file. Recently, with IE8 on WinXP and Win7, we have had situations with the user getting various connect
-
HT5361 My Mail window will not open.
My mail window is not opening. The bar at the top pops open, but nothing else comes up and I have to restart my laptop to close it.
-
Why can not I use third-party True-Type fonts in my firefox application?
I want to use a third-party fonts inf my application. How can I make it?
-
Premiere Pro CS4 won't boot - keeps crashing when trying to load VST plug-ins
This problem has been a thorn in my side for ages - after a recent software update to some of my VST plug-ins, Premiere Pro will no longer boot. I have to re-name the VSTPlugins folder to a different name. It used to be that it would scan the VSTPl