PRT Availability check quantity information in production order

Hi
Material PRT availability check is carried out in Production Order. This gives me the information like PRT is available or PRT is missing. It does not show how much is available or how much is missing like it shows for Material availability.
I understand that there may be the reason behind this.
But i want to know is it possible to get the quantity information also in the availability check of PRT in Production Order.

HI
As per my knowledge Its not possible to check the quantity of PRT at the time of Production order....You will have to seperately check the same.
Regards,
Anand.

Similar Messages

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • PRT availability check

    Hi all,
    In the PRT availability check, my user wants the inventory to be checked for some specific storage locations alone.
    Is there any settings available to restrict for some specific storage locations alone in PRT Check.

    dear,
    In spro (OPJJ) check which checling rule has the following setting
    storage location check - No storage loc check box is not active?
    that combination of checking rule and checking group should be used for PRT.
    See the more information as below
    Availability checking in SAP
    Ave checking is done in SD/PP/MM....hence it is made of two parts
    Checking rule and checking group
    Checking rule(CR) is decided by the function. like for SD it is A, for PP module it is PP...
    Checking group(CG) is the value you enter in MRP3 view for a material in the plant level
    Hence combination of CR and CG will control how the material is to be checked for availability, in we define in Customizing what are the elements to be considered. like Stock, receipts like PO, issues like reservation from production order...
    in OPJJ you can see the details of whether storage location stock to be considered or plant level stock to be considered.
    if you activate the check no storage loc insp then stock is considered as plant level, if you uncheck it stock will be considered for ATP @ stocrage loc level mainatined in the transaction during ATP check.

  • GR quantity more than production order quantity triggering cost difference

    Hi Gurus,
    We have observed a scenario where the cost(price) dfference account getting hit whenever the GR quantity is greater than the production order total quantity. The dollars posted to this acount are directly propotional to the difference between the GR quantity and the production order quantity.
    The total quantity specified in production order is 1 M2U and GR quantity is 1,000 M2U.Material price is $195.65.
    Accounting Document;
    Inventory account           - 195.65
    Offset account                - 200.00
    Cost difference account  -    4.35
    If we do GR for less than or same quantity as in the production order, this account is not getting triggered.
    Any idea what is causing this scenario? I really appreciate if you can share with any SAP note related to this.
    Thanks,
    Mano.

    Hello Gurus,
    One  more observation is,
    The palnned costs and actual costs are always different when dealing huge quantities. But the cost difference account is only getting triggered if the actual quantity is  more than the palnned quantity.
    And,
    when the difference between atual quantity and palnned quantity is huge then
    Planned costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Significant cost variance is booked to the cost variance account.
    When the difference between actual quantity is less than/equal to planned quantity is not so huge then
    Actual costs are booked to the inventory account
    Actual costs are booked to the prodcution cost account.
    Is this a standard behaviour?
    Thanks,
    Mano.

  • Quantity mismatching in production order

    Hi PP experts,
    The delivered quantity for a production order in CO03 is 53 while Goods receipt has been done for 59 materials. You can refer the below screen shots.

    Hello
    Please implement and run the report ZPCON_076D, from the following note, in order to correct such inconsistent orders:
    1352231 - Correction: Goods receipt quantity and value in order
    This repor sum the posted goods movement quantity and updates the delivered quantity on the order.
    BR
    Caetano

  • Availability check of material against sales order

    Dear All,
               Please let me know how to check the material availability against a sales order during despatch stage. We are following make-to-order scenario & do create order bom based on Customer requirement. in such case how to generate the list of material available against the sales order line item by entering the following parameters:
    1. plant
    2. sales order no.
    3. line item no.
    4. material group
    Please help me!!!
    Regards,
    Anil
    Edited by: anil pawar on Jul 30, 2010 11:40 AM

    Dear ,
    When system perform ATP  for any Sales Order , it checks the Total Replishment Lead Time-MRP3 .The total replenishment lead time is the time needed before the product is completely available again, that is, after all BOM levels have been procured or produced. It is not calculated by the system, but defined in this field as the total of the in-house production time(s) and/or the planned delivery time(s) of the longest production path.
    This time is necessary if, for materials produced in-house, the replenishment lead time is to be taken into consideration in the availability check.
    In an availability check where the system takes the replenishment lead time into consideration, it only checks whether there are sufficient incoming quantities and stocks available to cover the requirements within the replenishment lead time. Outside the replenishment lead time,the system assumes that the material is available in sufficient quantity.
    Therefore, in this situation, it is usually necessary to depict the product's total replenishment lead time with all BOM levels as the replenishment lead time.
    Now , unless the Requirement Pass through MRP , you can not have BOM explosion  at the lowest level and system will give you the result based on the MRP Net Requirement Calculation till the lowest level of BOM as dependent as well as FERT.
    At the Sales Order Stage it only checks the Availablility of FG with in RLT which can be proposed or committed but not confimred because BOM Lead Time for compoenets are differnet and it does not perform any requirement planning .
    But , you can check after MRP run , you can check the Material Availabity in MD4C , CO46 , MD04 etc where it will also give you a clear report on the Requirement Date , Committed Date , Qty to be procurede , Qty to in Stock all of them .
    Before MRP  if you want to check  the Order BOM , then you may have to go for Z-report based MARD , VBAK , MARC , STPO  etc .
    Please refer some of the beautiful threads on this topic :
    changing Availability Checks in Sales orders
    Sales Order - Availability check for components
    Hope it is clear
    Regards
    JH

  • PRT Availability Check for MRP

    Hi experts,
    Even though a PRT is assigned to operations in one order, when I create another order with the same PRT, on running the availabilty check the system shows me that "all PRT's are available"
    Does anyone know what are the relevant customizing settings to be made?
    Besides this, when we run a Production MRP we need to see the planned dates for the PRT. However the MRP only takes into account the Work Centers availibilty and not the PRTs availability.
    Has anyone had this problem before? Please mention the required settings or workaround solution.
    Best regards and thanks,
    Fernando

    We made a workaround using suboperations to simulate the PRTs because we didn't find the PRT function really useful or friendly for us.

  • Longer time for Material Availability check while creation of prd order.

    Hi guys,
    I am facing a weird problem while creating production orders thru CO01.
    I enter the component and plant and I am also using the forward scheduling option.
    for some reason, SAP is taking a long time for material availability check when I hit the release button.
    Sometimes its taking more than an hour. Its happening with few specific BOM's, and I have checked the master data but I could hardly find a problem in master data.
    Can someone suggest me some tips ??
    Thanks & Regards,
    Sashivardhan

    Hi,
    Please check the Availability check control maintained for Components it should be 01 or 02. Also check the issue storage location maintained or not. You can maintain issue storage location in BOM in Status/lng text tab in Production Storage Location.
    Hope this will help.
    Regards,
    Navin

  • Availability check on storages in sales order and delivery documents

    Hi all,
    I'm verifying if it's possible to find a standard or a custom solution for this type of problem:
    I have a scenario in which there are more storages relevant for MRP (ex. 01, 02, 03, 04), and, in if I check availability in sales order or delivery (using checking rules "A" or "B") with setting which considering storages location inspection in availability check control, system check if there's stock available on all these storages.
    I'm trying to verify if it's possible to consider only some on these storages (ex. 01 and 03 only) in sales order and delivery documents availablity check.
    I know that in sales order storage location field is normally filled only using exit, but i don't know if it's possible to do, using a user exit, check availability considering only some storages and not all. At delivery level i have tried to use stock strategy, but this functionality don't have consequences on availability check, also if it's relevant during good issue phase.
    Any suggestion will be appreciated.
    Regards
    Gianpaolo

    Hi Gianpaolo,
    We had some issues with availability check on a Customer Site.
    I don't remember right now if we had to exclude storage locations from MRP to take them out from ATP, but I guess Shiva is 100% correct.
    At the end, what was done was to always "force" a unique storage location in the sales order item, which will be the storage location used for shipping of the delivery of course.
    If you use WM in your plant, then you will have no problem in having a unique storage location, so no problem.
    Anyway you are correct in your analysis, if the Storage location is not informed in the sales order item, then all the plant stock is taken in account for ATP.
    Best Regards,
    Franck
    Freelance Logistics SAP Consultant

  • Availability Check : Confirmed Date in Sales Order.

    Hello Gurus,
    I have an issue with the availability check.
    Scenario :
    Customer has created an order for quantity 800 on 26th of Feb and accordingly when created the order go confirmed for 17th of March.
    The specific quanity(batch) of 800 was released from Quality to unrestricted on 27th of Feb.
    And Now that the stock is in unrestrictd the customer wants to deliver this material before 29th of Feb as against the 17th of March confirmed date.
    When we try to re run the availability check, since there are other open orders and deliveries against the material system proposes a new confirmed date alltogether which is still further ahead of 17th.
    Can some body advice me as to how do i ensure that the particular quantity can be sold before 29th.
    I have also tried running Backorder processing and Rescheduling which failed, It might also be because i might have not run them properly as i am new to the concept of backorder processing and rescheduling.
    Please guide me to correct this step wise.
    Thanks.

    please try as below:
    Back order processing is a functionality in SAP where you can change the committments and over-ride the blockage of stocks marked against sales documents/deliveries. For e.g. you receive an order from a very important customer for material "A" but the entire quantity of A is committed to another customer "B" via earlier sales orders and this is where BACK ORDER processing helps you to change the committment and shift stock due for B to A. This is the benefit of this funtionality.
    OMIH - Checking rule for updating backorders
    OPJL - Define new checking rule
    OPJJ - Define scope of check
    V_RA - Backorder Processing
    Data selection:-
    Sold-to-party Customer code Mandatory
    Sales Organization Mandatory
    Distribution Channel Mandatory
    Division Mandatory
    Changed confirmed quantity :-
    Tick the material you want to changed and click the Back order button Confirmed quantity that still can be changed are highlighted.
    V.15 - Backorder List
    Sales Organization Mandatory
    Distribution Channel Mandatory
    Division Mandatory

  • Availability check with Purchase Requisition / Production Or

    Hi,
    I want to configure the availability check in such a way that, system should first check the stock available. If there is no stock system should generate the Purchase requisition or Production order.
    Can you tell me the solution on the same.
    Regards
    Rahul

    Hi,
    We have the similar requirement & achieved through development.
    Eg: M1- stock = 55 ea
    order qtty M1- 100
    system confirms for 55 ea & remaining qtty, seperate line item will be created with TAB item category i.e. 45 ea.
    Used FM: AVAILABILITY_CHECK ( MV45AFZZ) & BAPI_MATERIAL_AVAILABILITY  to find the ATP stock in Include:MV45AFZB
    Regards,
    Reazuddin MD

  • Quantity error in Production order.

    Dear all,
    While creating production order i have given the quantity 2500 EA,after confirmation i checked in material documents the following bill of material(totally 23 bom) had consumed same time as quantity 3 EA only
    Kindly find below screen shots
    I checked in BOM level regarding the base quantity everything was fine,but i dont know why the quantity is consuming like this
    Regards
    Rajasekaran

    Dear Kumar,
    For all the material back flush is maintained
    Kindly find the screen shots of base quantity

  • Checks in userexits of production order confirmations from PDC in CO16N

    Hi,
    we are using PDC interface for production order confirmations. This is done by Idoc type PPCC2PRETTICKET01 (time ticket) based on BAPI BAPI_PRODORDCONF_PDC_UPLOAD_TT. Standard confirmations are working well. In case of SAP detected errors the confirmations are registered for error handling in CO16N.
    So far so good but we have some own check logic implemented in confirmation user exit CONFPP04 and BADI WORKORDER_CONFIRM. These checks are working fine whith online confirmations in CO11N but not in background PDC Idoc processing. I checked the function module EXIT_SAPLCORF_104 for exit CONFPP04 but it has got no exception. The call in SAP processing is like this:
          CALL CUSTOMER-FUNCTION '104'
               EXPORTING
                    CAUFVD_IMP    = I_CAUFVD
                    AFVGD_IMP     = I_AFVGD
                    AFRUD_IMP     = E_AFRUD
               IMPORTING
                    AFRUD_EXP     = LS_AFRUD
               EXCEPTIONS
                    ERROR_MESSAGE = 01
                    OTHERS        = 02.
      CASE SY-SUBRC.
        WHEN 0.
        WHEN 1.
          MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO WITH
                  SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4
                  RAISING CONF_DATA_FALSE.
        WHEN 2.
          MESSAGE E174 RAISING CONF_DATA_FALSE.
    How can I throw the exception when there is no exception defined in the function module interface without modification?
    As 2. option I wonder if it is better to implement the check logic in the BADI WORKORDER_CONFIRM Method AT_SAVE. This has got an exception ERROR_WITH_MESSAGE. But I don't know if this will lead to CO16N registration of the confirmation.
    Any hint how I can solve the problem to apply the online checks in CO11N also to PDC interface confirmations with CO16N in error case?

    Hi Michael,
    First, I think that the BAPI that you are looking for is: BAPI_PRODORDCONF_CREATE_HDR
    Second,
    I don't think that in the framework of such a forum it can be explained in detail how to use BAPIs; nevertheless, here are some highlights:
    A BAPI is an executable piece of code that can be called from either an external program within SAP (Z program), or called from an external system either via RFC, or as a web service (depends on your NetWeaver  release).
    As such, it has input (import) data that you transfer when you call it, and output (export) data that you recieve when it ended processing.
    More detailed information, documentation, and a description of the import/export parameters, as well as error handling, one can find in SAP by calling transaction BAPI.
    Regards,
    Mario

  • Availability checking user exit at sales order level

    Hi ,
    Is ther any availability Check user Exit at the sales order level?
    1)I want to make Confirm quantity to zero in the sales order level
    2)The block confirmation is set to VBEP-BMENG to "0" for each item where VBEP-LIFSP =Z1
    Is ther any related USEREXIT in the sales order  to make confirm quantity to ZERO
    (VBEP-BMENG=0)
    Ragu

    may be you can try putting some logic is MV45AFZZ in USEREXIT_MOVE_FIELD_TO_VBEP
    or in the exitSDTRM001 - Reschedule schedule lines without a new ATP check. 
    Regards
    Sai

  • Phantom assembly quantity change in production order

    Hello experts,
    We are producing 1 type of goods, but for 2 different customers. each of them has their own specification for packaging. as per system it was decided to not create another finished goods partnumber with additional BOM, but instead we created 2 phantom assemblies in 1 BOM. 1 of them is the main (for customer 1), another one is alternative (for customer 2).
    Now the idea was that whenever Purchasing is maintaining materials in production orders they were supposed to switch quantity from main phantom assembly to alternative phantom assembly whenever goods were required for customer 2.
    We quickly tested the possibility of quantity change on our test server, but not entirely. the thing is, that for some reason you can change phantom assembly required quantity only if it's already has required quantity higher than 0. otherwise the item is greyed out and you can't perform any changes in it.Same happens if you simply reduce required quantity of phantom assembly item to 0. once you do so - the item becomes greyed out as well.
    So, the question is - is it some kind of settings in BOM\MMD that prevents user from changing quantities for phantom assemblies (and if it is - where exactly you can change it), or it's something else (like i dunno, maybe user authorization issue or something).
    Any help will be appreciated.
    P.S. - i know that you can still simply remove entire item from production order and put it back with quantities and etc., but that way of work has higher risk of making a mistake.
    BR
    VE

    Dear ,
    Couple of points on this issue which may help you understand the problem  : Bom Explosion With Phantom Assemblies will happen based on the following set up .
    1. You need to maintain the special procurement key-50 for the phantom Assembly
    in the MRP 2 View of the material master
    2. We can override the Phantom Assembly Setting by defining in SPRO --->
    Define Explosion Types so that MRP Creates Procurement Propasals for the
    Phantom Assembly itself.ie We can Swith off the Phantom Assembly Settings.
    This settting need to be defined in the BOM Item details screen in the Basic
    Data Tab Page under MRP Area.
    So check in your Bom whether switch off phantom assembly is defined.Make the Explosion Type-Blank
    3.Run MRP Single Item - Multi level - Transaction MD02 with Planning Mode 2 : 'Re-explode BOM and Routing'. The Phantom Item will now get exploded correctly in the Planned Order.
    4.Check the Validity of the BOM  and planning date
    5.Check the MRP4 set up in FG where you have kept the BOM/Routing selection
    6.Check wether dependent requirement  material master -MRP4 view -MRP  for Depent Requ should be blank .
    Check the above points and come back
    Regards
    JH
    Edited by: Jiaul Haque on Jun 14, 2010 2:15 PM
    Edited by: Jiaul Haque on Jun 14, 2010 2:18 PM