Scheduling problem in planned order.

Hi all,
I have a problem in scheduling of planned orders.
I had mentioned the following parameters.
1. Available capacity in the work center as 06:00:00 to 12:00:00
2.Set up time is 10mins in the routing.
3. The planned order qty is 100 nos.
While doing manual scheduling in planned order, the system proposes the start time as 11:50am and finish time as 12:00am. But as per calculation, for 100nos x 10 mins = 1000 min = 17 hrs.
But the system calculated 10 mins for 100 nos.
Is there anything i am missing , due to which the system is doing wrong scheduling.
With regards,
Afzal

dear afzal ,
system is taking setup time only for first piece you are machining and for rest other 99 piece its not considering the setup time.
Check in the formula you are using if its defined as only to consider one time the setup activity or its taking piece wise/quantity  wise.
Check and change it , it will solve your problem.
Hope it helps you.
regards
Ritesh

Similar Messages

  • Time scheduling by the Plan order (MD02)

    Hi,
    Does the the scheduling margin time be considered by (start and finish date) for plan order after MD02.
    If yes how can I customize the system
    Is the Time scheduling important for the plan order or only for the production order?
    I've set in the Material master for my Material 4 days by the scheduling margin.
    When I execute MD02. The system doesn't consider the 4 days by (start and finish date)  from the plan order.
    It only consider the Goods receipt processing time.
    Is the Goods receipt processing time relevant only for the plan order and the scheduling margin time for the production order?
    Thanks.

    Dear ,
    Did you miaintain the Scheuling Margin Key in OPPR , Material Master -MRP2 and routing ??
    Generally , to define the order float  we need the scheduling margin key in OPPQ .The scheduling margin key is copied from the material master -MRP2 view . The float before production or float after production and the release period are defined in the scheduling margin key
    For Customizing you need to go in OPPR or in   Shop Floor Control, by choosing Operations --> Scheduling --> Define Scheduling Margin Key . This key gets  transferred when the production order is created from planned order or direct production order  These values can be changed in the production ordr only .
    While running MRP , it will not cosider the SMK  for scheuling purpose  because MRP does not carry our detail scehduling based on Work Centre available capacity  where as it takes the routing operation time and perfomr the scheuling to gerenrate the Planned Order Dates .
    refer  this expert comments : Scheduling Dates for Planned Order and Production orders
    Regards,
    JH

  • Dedicated scheduling of a planned order having a fixed activity

    Hi Gurus,
    We're using PP/DS Optimizer with Total Delay Costs objective function, following a Backwards Scheduling strategy in order to Reduce Premature Scheduling. Order activities are then scheduled as close as possible from the requirement dates. However we would wish to apply a forward scheduling strategy to the orders having a fixed activity, but starting from the existing order planned start date instead from the system date, i.e:
    Requirement X due on 18.01.2012
    Output firmed planned order Y with 3 activities (A1, A2, A3), A2 beeing fixed
    Optimization result with a Backward scheduling strategy:
    A1 09.11.2011
    A2 18.11.2011
    A3 17.01.2012
    Optimization result when Backward scheduling setting is unchecked
    A1 NOW
    A2 18.11.2011
    A3 17.01.2012
    The business requirement we d'like to achieve
    A1 09.11.2011
    A2 18.11.2011
    A3 19.12.2011
    It is not foreseen to fix A1 to bypass the problem, above example is only a basic example whereas there're multiple activities in between A1 & A2 in our real material PDS. Is there any way (even with another optimization run, or using in combination a Production Planning Run...) to achieve such a scheduling strategy?
    BR,
    Pascal.

    Hi,
    To add further and to more precise, the issue is:
    In CM01[or in any capacity evaluation tcode], In a particular maonths load[Period] the opeartion from different month is showing up.
    For example: if Period[month] 06 is veiwed of a Workcenter load, a line[load appears], whose earliest date is in 7th month[01.07.2014].
    I expected to see, only Workcenters scheduled in 6th month to show up in the load evaluation.
    Please look at the screen shot.
    Regards,
    Avinash

  • MF50 problem with planned order

    Hello
    We use MF50 to production planning and convert quantities in production order.
    But if we doing any mistake and, without save, we need to doing "undo" how can we doing this?
    Thanks

    JN,
    In MF50 when you are manually entering quantity, system creates a simulated planned order and when you use the Quantity Change>Convert Quantities>In production order  system just has this detail in the structure for updating the database with these details.
    Till the time you save in MF50 transaction this planned order or production order is not updated in system database, so if you dont want the production order to get created as you made some mistake just comeout of MF50 transaction without saving.
    Regards,
    Prasobh

  • Scheduling Problem in Productoin order

    Greetings .....
                     i have on emtaerila whih has one opeartion which take 3 min for one number
    this opeartion is performed on a work center which available 1224 min per day ....
    now theroticaly ..
                      1   nos                takes     3        min  
    so           3600 nos           wil take       10800  min
    Now acording my available capacity
                    1224 min             1  day
                   10800 min           8.5 day 
    so toatl time to produce 3600 wil be 8.5 Day ...
    Now while certing production order of 3600 nos in opeartion  Oveview screen
    i m getting result as
    Start date  11.02.2009
    End date   26.10.2009  ( 8 months)
    Procesing Time  108000 min
    Now processing time is correct as per theroticall but Start date & end date is very strange ??
    How to resrict or  correct this kind of scheduling ..............
    expecting positive reply..
    thanks

    Hi,
    nos takes 3 min
    so 3600 nos wil take 10800 min
    Now acording my available capacity
    1224 min 1 day
    10800 min 8.5 day
    while in Order you have written it is
    Procesing Time 108000 min
    Is it correct , or is it 10800 only?
    Regards,
    Dhaval

  • Rounding value problem in planned order

    Hi,
           if we have demand for X material is 1.500 qty. & under this 2 material having usage probablity is 50-50% also single material having qty is 1 nos. But if i am taking run for X material having demand of 1.500 qty. then it will give rounding value as 1  qty not 0.75  qty for each material.
    my problem is about rounding value. we are using strategy 40 & Lot Size is EX & Procurement type is E.
    i also check in OMI4 for lot isze,pls reply me
    Best Regards,
    Dev

    Hi Dev,
    For rounding  value you need to check the below two fileds in Material Master  MRP 1 view :
    1. Rounding Profile
    2. Rounding Value
    If the rounding value is 1 then system will round off to 1 for any decimal requirement like 0.1,0.2,0.3...... etc.
    regards
    radhak mk

  • BAPI or FM for scheduling a planned order (like MD11 or MD12)

    Hi guys.
    We are working with a group of materials and planned orders, in order to modify and create new planned orders depending on the stock per each material. So we use MD12 to 1) modify the quantity in the order, and MD11 to create new planned orders for the rest of stock for this material.
    For process of creation we don't have problems (BAPI_PLANNEDORDER_CREATE makes its work well ), but when we want to schedule the new planned order created before via FM or BAPI, we cannot see any results in MD12.
    I mean, when a planned order is scheduled via menu button, a new tabstrip appears in the transaction with dates. So this similar action we've tried using CX_PLANNED_ORDER_SCHEDULE or CX_CRP_PLANNED_ORDER_SCHEDULE but there was no change.  If we execute the Schedule button action, in table PLAF (master of planned orders) apears a new number in field PLAF-BEDID related to MRP.
    So guys, could you please help us how to get this issue? As last option is BDC, but BDC's and me are not good friends because its performance. So please, any suggestions?
    Thanks in advance!
    Raul Romero

    Hi guys...
    Sorry for the long time without an answer, which I'm sharing you now:
    1. In order to perform the proccess of scheduling, you have to record the steps from menu bar in your batch input. I mean: (1) set values into fields CRHARBPL-LOW () and CRHWERKS-LOW
      PERFORM set_batch USING: 'X' 'RCCRY000' '1000',
                                      space 'BDC_CURSOR' 'CRHARBPL-LOW',
                                      space 'BDC_OKCODE' '=PLNG',
                                      space 'CRHARBPL-LOW' p_arbpl,
                                      space 'CRHWERKS-LOW' 'PR01'.
    (2) After you ordered your list of planned orders or production orders, loop your internal table and per each order record these commands (these simulates the popup option to select the order you want for scheduling and mark it in the dynpro you are processing):
      LOOP AT gtd_tabofplan INTO gvc_tabofplan.
        PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                                        space 'BDC_OKCODE' '=Z021'.
        PERFORM completa_bi_campos USING: 'X' 'SAPLCY19' '0120',
                                space 'BDC_CURSOR' 'CYMARK-VALUE(02)',
                                space 'BDC_OKCODE' '=BACK',
                                space 'CYMARK-VALUE(02)' gvc_tabofplan,
                                space 'CYMARK-MARK(01)' space,
                                space 'CYMARK-MARK(02)' 'X'.
        PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                                space 'BDC_OKCODE' '=SL25'.
      ENDLOOP.
    (3) Set the SAVE operation.
      PERFORM completa_bi_campos USING: 'X' 'SAPLPLAT' '4000',
                              space 'BDC_OKCODE' '=SAVE'.
    Hope you' ve succeeded in this task, let me know if you've another questions.

  • Collective Planned orders Scheduling for lower level orders with reference to the Superior order

    Hi All,
    Collective planned order scheduling.
    I have been trying to reschedule the superior planned order and i was expecting the lower level planned orders to reschedule based on the superior planned order.
    My problem is
    when i try to reschedule the superior planned order the system is not rescheduling the lower level planned orders.
    For example if i change the basic finish date of superior planned order as 30/09/2014 and reschedule the planned order it is only scheduling the header planned order and the lower level planned order is not scheduling.
    Could some one tell me why this is not happenning at planned order level.
    As the rescheduling of collective order will work at production order level but for some reason it is not happening at planned order level(as there is no option available to do so).
    Please give your thoughts on this asap.
    Mahee.

    Hello Mahee
    Please observe that your system is working as designed. Planned orders are scheduled independently, even when they are part of a network/collective order. Note 152319 explains the planned order scheduling in detail and it provides the following information:
    * No scheduling of overall networks is executed although a directly manufactured component is assigned.
    Note that no scheduling of the overall network is executed for planned orders. For the components requirements dates are determined. In order to cover them, planned orders are created in the next MRP run. Since the requirements are not managed using the exact time, the results of the planned order scheduling and of a scheduling of the overall network of the converted collective order can differ.
    BR
    Caetano

  • Planned order scheduling in mrp

    hi
    iam trying to run MRP at my client place
    facing problem in planned order dates
    i choosen  tequirement type BSF and strategy group as 11
      in md 61 pir was given in a month of june2008(monthly)
    after mrp run at modo4 iam getting planned order with
    execption message 64 called order date in past
    means iam getting planned order START DATE AND END DATE IN THE MONTH OF JUNE
    where as i need to  my planned order satar date in MAY MONTH and
    end date must be 1st of june
    means i given PIR which is my start of my june month
    checked scheduling parameters which  says backword scheduling, and i choosed planning mode 3 and leddtime scheduling
    plz suggest which setting effects the planned order start and end dates??
    regards
    sasikanth

    hi
    i selected schedule margine key with 0 flots (key000)
    and chossed *LEED TIME SCHEDULING (in mrp controll parameters :-scheduling 2 at MD02 )
    how the reduction strategy helps in this case ,casue i am doing lead time scheduling system has to consider only routing time ??? right ??
    plz suggest how to  arrest message 64
    regards
    sasikanth 
    message 64 diagnosis enclosed
    64: Production finish after order finish                                                                  (P4)
    Message no. MD427
    Diagnosis
    The production finish date calculated using the routing lies after the order finish date that was calculated using the in-house processing time in the material master record.
    As the system uses the order finish date in the planning run, this situation may lead to material shortages if production is not finished until the production finish date calculated by the system.
    System Response
    This exception is displayed in the MRP list and in the current stock/requirements list.
    Procedure
    Check the times in the material master record and in the routing.
    Check whether the order has to be rescheduled in.

  • Planned Order Scheduling - No Valid Routing Selected

    Hi Friends,
    I am trying to create planned order and then trigger lead time scheduling for it.
    I have maintained BOM, Routing, Production Version, and Scheduling Parameters for Planned Order as Detailed Scheduling with Scheduling Horizon as 50 days, and gactivated scheduling anf enerate capacity requirements in OPU5.
    My Production Version is valid through 12/31/9999 and also validity in terms of order qty is correct.
    I face problem of routing not being selected beyond the 70 days horizon.
    I could not understand why the scheduling horizon considered is 70 days tough i have maintained 50 as scheduling horizon in OPU5.
    Waiting for your valuable help and pointers
    Regards,
    Mayur

    Dear Maulik and Dhaval,
    Good morning, Hope you remember me.
    In my material master I have 28 days as inhouse production time but even aftre changing it to 0 there is not change in the leadtime scheduling result. I still get the message that no valid routing found.
    Dhaval,
    For the selection ID routing status matches. My problem is, If my Planned Order has a basic start date on or before 30-Apr-2009 when I try to schedule order it successfully fetches routing but when i give basic start date as 1-May-2009 it results in message no valid routing found.
    I though it might be because i have maintained detailed scheduling horizon as 50 days but 30-Apr-2009 is 70 days from now, so I am confused where to check for. My material even do not use production shceduling profile.
    Thanks for replying.
    Looking to see some clue
    Mayur...

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

  • Need Automatic Lead-time scheduling in Planned Order using MD11

    All,
    Our users have a requirement that when they create a planned order using MD11, they would like system to do automatic lead-time scheduling based on the "basic finish date" entered by the user. Currently the system is taking 3 days from the in-house time maintained in material master to calculate the basic start date. But users want to use the 100 days that have been maintained in the routing.
    Currently users have to click on "manual scheduling" on the planned order for system to pick up 100 days from routing which is an additional step for the users. Hence users want an automatic way in which system would do lead-time schedule when they enter the basic finish date.
    Thanks,
    Swapnil

    Dear Swapnil,
    In my understanding it is the standard SAP behaviour even if you have made the necessary settings in OPU5 for the planned
    order type.
    If my understanding is correct, then as per this setting the MRP behaves for the particular plant and order type combination.
    Whenever you create a planned order manually you have to do a detailed scheduling and then you get the production dates
    for the planned order.(This might be because generally when a planned order is converted into production order the system
    carries out a lead time scheduling.- Check the same and correct me if I'm wrong)
    Even if you update the material master through CA97,you will not get the detailed scheduling done along with the production
    dates.So you have to perform this manual activity during MD11.
    What is the reason of setting the in-house production time as 3 days,if the exact production time is going to be more?
    Check and revert
    Regards
    S Mangalraj

  • PPDS Planned orders with setup driving requirements in R/3

    Hi Gurus -
    We plan Finished Goods and Semi-FG in APO and send the planned and process orders over to R/3. We use the change-over matrix(set-up)matrix to create the set-up times for the finished good planned orders.
    For a material I have 24 hours change-over time. Lets say material runs on tuesday 3 PM, the setup time is 24 hours before that.
    Setup time: Monday 3 PM to Tuesday 3 PM
    Run Time: Tuesday 3PM onwards.
    Unfortunately the Packaging requirements are being shown on Monday itself. While I have setup or change-over time, I don't really need the packaging materials on monday. So what can we do to avoid this?
    Basically as soon as the APO planned order hits R/3, the BOM in R/3 is being exploded based on the order start date/time and not based of actual runtime of the order.
    For MRP folks, its misleading since the packaging items are not really needed on monday.
    Any help on this will be greatly appreciated.
    Regards
    Rajesh

    Hi Varun,
    Have you mapped setup and run as two activities in same resource or seperate operations all together.
    If compoenents are assigned to run then are dates getting calculated correct ly in APO and only getting chaged in ECC?
    In ECC there is configuration for production/process order   under scheduling parameters for production order where you can decide whether component should be assigned to run activity or set up activity but unfortunately this config is not available planned order.
    If you have defined set up and run as seperate operation then there shold not be problem check config in ECC
    Define scheduling parameters for planned order- adjust dates- adjust schduling should be adjust basic date and dependent requirement to operation date.
    Regards,
    Santosh

  • Planned order created after mrp run instead of purchase req

    Hi All,
    I am facing a strange problem about planned order being created after mrp run jobs runs in background instead of purchase req. This is happening randomly. In the material master MRP view 2 procurement type is F and in the varient for the MRP job the in Purchase requisition control parmater 1 is marked that is purchase requisition. Also planning file is having the entry once there is shortage and hence MRP run is there always if there is shortage of material.
    With Regards
    Tarun

    Hi Tarun,
    Please maintain the control parameters as
    Processing Key                                       NETCH
    Create Purchase Requisition                          1
    Sched. Agreement Schedule Line                   3
    Create MRP List                                            1
    Planning Mode                                               1
    Scheduling                                                     1
    Please let me know the results.
    Regards,
    satyajit

  • Can't dispatch planned order (LA), but can dispatch production order

    Hello,
       I'm new to capacity planning and all of the related configuration screens.  I'm probably missing something simple.  We've configured our work centers and routings.  We've configured our production order types (tcode OPU3, type US01) and planned order types (tcode OPU5, type LA) so that all create capacity requirements and are relevant to 'detailed scheduling'.  Requirements are being generated for production orders and planned orders.  We can see correct setup and production times in the graphical planning table CM21.
       Here's the problem: When we try to dispatch a planned order, nothing happens.  There is no error, but the order is not dispatched.  If we convert the planned order into a production order, accepting all SAP proposed defaults, and then try to dispatch the production order, it works fine.
       What configuration are we missing?  My first thought was to look in OPU5 for order type LA.  In the detailed scheduling section, scheduling horizon is zero (is this Ok?), SelID: Detailed is 01, 'scheduled' and 'generate capacity reqs' are checked.
    Thanks,
    Randy

    Randy ,
    Please analyse the below note related to your issue.Hope this will help you to sort out the problem.I have cheked the configuration area.I hope u are correct .In fact , it may related to your production version if you do automatic dipatch.Please reade the note and come back.
    If an error arises when automatically dispatching planned orders (for example, a capacity overload at a work center) then the system schedules the affected planned orders to another production line.This function is available in both types of planning table. It is of interest for all areas that use planned orders, for example in repetitive manufacturing or in MRP/MPS. It can also be used in production control when later converting planned orders to production orders.
    this function the following conditions must be met:
    The dispatching function Change production version on error must be set in the strategy profile.
    The original work center
    must be entered in the production version of the material as the production line (not necessarily in the current production version).
    can only be assigned to one operation in the routing for this production version
    The alternative work center can only be assigned to one operation in the routing for the alternative production version
    If an error arises the system copies the production version with the version key that is next alphanumerically into the planned order. The planned order is rescheduled with this production version. However, it is not dispatched to the new production line but remains in the pool. In this way you can dispatch the rescheduled planned orders together with other planned orders in the pool to the new production line.
    To give you a better overview and to improve handling you should choose a sort key with which the planned orders in the pool are sorted according to work center and, for example, latest start date. All orders that are to be dispatched to a production line are then placed next to one another in the pool. If an error arises during automatic dispatching to the new line every planned order affected is rescheduled with the next production version
    . If the conditions are not met then the following occurs depending on your settings in the strategy profile:
    Dispatching is terminated
    Dispatching to the same work center is continued and error messages are written to the planning log
    You can only dispatch main operations with this function, but not sub-operations. Operations are always dispatched with the full quantity to the new work center
    Reward point if useful
    Regards
    Jia