Shipping point , route and GR

Hello Gurus,
Consider the following sentence :
"Shipping point and route are determined with the GR."
My understanding is shipping point is determined by shipping condition, delivery plant, loading group.
and
route is departure zone, transportation related and shipping condition.
So, I not sure why the above statement is referring to GR. Only with the 2 information determined can the goods be received.
regards
M Russo

Hi ,
The shipping point is determined once the item is processed in the order . First it determines delivering plant thru a search from master data . and from the delivering plant the shipping point . Same with route first from ship to party, ship conditions and after the item is processed the route.
What the sentence can imply is that once you GR is done in your respective plant  you can then only decide your shipping point and then the route. My suggestion dont ponder over it.
Regards
Deepak

Similar Messages

  • Lead Time - Customizatiou0131n steps: Shipping point, route, and loading group

    It says about delivery scheduling that "The lead time considers the shipping point, route, and loading group". Can anybody explain me briefly the customization menu steps about this sentence?
    Thanks in advance.

    Please go through this document it will help you
    1) Maintain transportation planning point through Menu as follows:
    IMG Maintain Logistic Execution  Definition Enterprise Structure  transportation planning point.
    Create your own like BP01 enter the general data¡¯s required
    2) Defining modes of transport:
    IMG RoutesBasic Transportation Functions  Transportation Logistic Execution Define modes of transportDefine routes
    Use the standard like:
    Shipping type: 01
    Description: Road
    3) Define shipping types :
    Basic Transportation Transportation Logistic ExecutionIMG Define shipping types Route Functions
    Or through T-code: SM30
    PT: 01
    Description: Truck
    Mdtr: 01
    STPG: 0001
    4) Define transportation connecting point :
    LogisticIMG DefineRoutes  Basic Transportation Functions  Transportation Execution Define transportation connection pointsroutes
    Copy the std point and make it FB01 as departure zone and FB02 as destination zone
    5) Define routes and stages.
     Logistic Execution IMG Define Define routes Routes  Basic Transportation Functions Transportation routes and stages
    Use the standard route and copy it as FB0001 and enter the departure zone and destination as what we created.
    6) Defining Transportation Zone:
    Basic Transportation Logistic Execution IMG Define transportation Router determination  Route Transportation Functions zones
    Use the standard transportation zone depending on the route so as for the example use 0000000003 - Southern Region
    7) Maintain country or transportation zone for shipping points
     Logistic Execution IMG  Route determination  Route  Basic Transportation Functions Transportation Maintain country and transportation zone for shipping point
    Shipping point be ASH1 and route as 0000000003 which is assigned to country India
    8) Maintain route determination:
    Logistic ExecutionIMG Route determination Route  Basic Transportation Functions  Transportation  Maintain route determination
    Country of departure: India
    Departure Zone: 0000000003
    Country of destination: India
    Destination Zone: 0000000003
    And enter the data’s needed like shipping condition 01, etc.
    Maintain Transportation relevance for shipping point, sales document type and delivery types.
    9) Now create shipping types
    IMG Define shipment Shipments  Transportation Logistic Execution types
    Copy the standard 0001 and make it to AFIL
    10) Define and assign traffic zones through T-Code: T_76 (or) thru menu as follows
    IMG Define Basic functions  Shipments cost  Transportation Logistic Execution and assign tariff zones
    Copy the standard and make it to FABTARIFF and assign our transportation planning point as ATP1, ATP2 assign tariff zone to every particular transportation planning point
    11) Define and assign pricing procedures
    Shipments Transportation  Logistic Execution IMG define and assign pricing Price control  Pricing cost procedures
    Copy the standard shipping cost pricing procedure SDFC00 to FBSC01
    12) Assign purchasing data:
     Logistic Execution IMG Assign purchasing data Settlement  Shipments cost Transportation
    13) Assign transportation planning point to shipping condition, purchase organization, purchasing group and to plants.
    14) Define Automatic G/L account determination:
     Transportation  Logistics Execution IMG Automatic G/L Account Determination Settlement Shipment Costs
    Or through T-code: OMWB
    Use G/L account 614000 as used in standard
    15) Automatic determination of CO assignments:
    IMG Automatic Settlement  Shipment Costs  Transportation Logistics Execution Determination of CO Assignments
    Or T-code: OKB9
    16) Maintain shipping point address.
     Logistics Execution  Definition Enterprise Structure Define, copy, delete, check shipping point
    17) Creating G/L account centrally.
    Financial AccountingAccounting  Master Records  General Ledger 
    Individual Processing Centrally
    Or through T-Code: FS00
    18) Enter the G/L account 614000 to the company code AFIL
    19) Create transportation condition records:
     Shipment cost  Transportation  Master data Logistic Execution createPrices
    Or thru T-code: TK11
    Enter condition type FB00 that is freight condition type, which is used as standard in the shipping cost pricing procedure.
    Enter the price and save it
    Process:
    1. The system determines the pricing procedure for the shipment cost item-using transportation planning point, service agent and shipment cost item category
    2. Calculation Basis
    3. Condition Record
    4. Access sequence.
    For the sales order, create a delivery using VL01N and pick the goods. Now create a shipment using VT01N and assign the delivery to the shipment document. Make sure to enter the carrier and other details before performing the transportation planning and execution. Save the shipment document and PGI for the delivery would be done automatically.
    A shipment represents a physical goods movement between two or more locations.
    For the system to create a shipment, shipping-relevant deliveries must exist.
    You use Transportation Planning to group pending deliveries into shipments and then to perform the shipments.
    The outbound delivery documents contain routes that the system calculates in route determination, and a transportation planning date for the delivery.
    Dynamic transportation planning is responsible for grouping together outbound deliveries into shipments that have at least the same route, visit plan type and the same transportation planning date.
    The following restrictions can be taken into account for a shipment in Dynamic Transportation Planning:
    • Weight
    • Volume
    • Variable capacity
    • Number of stops
    • Maximum duration
    • Loading units
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
    Transportation Create Single document Logistics Logistic Execution  TransportationPlanning
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Create Delivery:
    T.code: Vl01n
    Create TO:
    T.code: LT03
    Create Shipment Document
    Use
    After the status of the delivery is open for transportation planning, it is possible to create a shipment document to schedule the transportation.
     Transportation Planning  Create Single document Logistics Logistic Execution Transportation
    T.code: VT01n
    Enter your transportation planning point and shipment type. Press enter.
    Creating the shipment cost document
    Use
    After the deliveries are scheduled by shipment and the shipment is executed, now it is time to maintain and close the shipment document in order to record all relative information and ready for the shipment cost settlement.
    Single document Logistics Logistic Execution  Transportation Shipment cost Create
    T.code: VI01.
    After creation of shipment cost doc. You settle the Shipment cost.
    Go to VI02, enter shipment cost no.and press enter.
    Then go to Overview -- Fright cost items, Select the line item and double click it.
    Go as main menu: Item --> Acc. assignment, you enter G/L acc. and cost center to which the transportation cost will be posted.
    On the Standard change, details – Freight cost items screen, then check the check box “Transfer”, which means you will transfer the relative transportation cost to FI/CO, in this case, the system should determined which Purchase Order will used to settle the cost, so after you check the “Transfer” check box.
    Press save button on the current screen.
    Shipment cost settlement and documents:
    Use
    After the shipment cost settled in shipment cost document, it has the following affects:
    It creates a service entry sheet that refers to the purchase order determined.
    It posts acceptance of services performed.
    It creates an accounting document for the accruals.
    Further subsequent documents are created in FI.
    Generally process is-
    1) VL01N
    2) VT01
    3) VL02N - PGI
    4) VI01
    5) ML81N – Service Entry Sheet
    6) MIRO – Invoice Verification
    Shipping docs (VT01) are created before PGI...
    You cannot carry out transportation planning or creation of shipment after the goods issue has been executed. Once goods issue is done it means that the material has left your premises so there is no need for a transportation planning after it.
    In case you need carry out the shipment documents at the end of the day you could just create the delivery documents during the day and at end of the day create the shipment documents and the goods issue
    This link is also usseful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Hope this helps you.
    Regards
    nitin

  • Shipping Point, Route

    Hi,
       In VA21 Transaction for Type = QT, I am able to see the values for Shipping point and Route for a particular Sales organization and not able to see the values for another Sales organization.
    Any ideas?

    HI DN N,
    Shipping Point & Route are automatic determinations and get determined at the Item level of a Sales document. They get determined as eblow:
    1. Shipping Point -
    Shipping Conditions (Sales DOc type Config / Cutsomer master)
    Loadging Group ( Material Master - Sales Gen/Plant data)
    Deliveruing plant
    2. Route :
    Departure Zone of Shipping Point
    Shipping Conditions  (Sales DOc type Config / Cutsomer master)
    Transportation Group - ( Material Master - Sales Gen/Plant data)
    Transportation zone of Ship-to-party
    SO check whether the assignments are made properly in IMG and other realted places like CMIR / CM / MM
    Reward if it helps
    regards
    Srini

  • Shipping point field and associated table...

    Hi,
    Can someone tell me the field and table asscoiated with shipping point ?
    Also which transaction code we use for printing smartform for Bill of Lading ?
    Thanks.
    Regards,
    Tushar.

    Hi Tushar,
    some of the related tables which i found for Shipping point are <b>VTTK & VTTP</b> tables
    For the required tables and fields download this document from
    http://www.sap-img.com/sap-download/sap-tables.zip
    and look at the SD tables tables to know the shipping details..
    Reward if it helps
    Regards,
    Santosh

  • Shipping point and plant

    Hi experts,
    In VL01N, the system pops up the message below when entering storage location, picked qty & batch. Pls help to solve. Thx.
    "Shipping from shipping point 2000 and plant 1001 is not possible.   Message no. VL027".
    Acutally, shipping point 2000 has been assigned to plant 1001 in OVXC. In shipping point determination, shipping condition 20 - loading group 1000 - plant 1001 - proposed shipping point 2000 has been maintained. Shipping condition & shipping point between the sales order & delivery match.

    Hi Cathy
    Please make sure that your plant 1001 and shipping point 2000 is assigned  properly
    Then your OVL2 shipping point determination settings
    As you are getting this error while entering the storage location
    That means your OVL3 is not maintained properly
    OVL3 is storage location determination settings
    It is determined thro
    1.Shipping point
    2.Delivering plant
    3.Storage conditions from MMR (optional)
    In t code OVL3 maintain for Shipping point 2001 and Delivering plant 1000 and storage conditions of material maintained in MMR (plant data/storage location data 1 ) or you can keep  this as blank also
    For this combination maintain your storage location the key which you are manually entering in VL01N
    Regards
    Raja

  • How to find the shipping point creation Date and time

    Hi All,
      Could you please help to solve this issue.
       Some of the users created shipping point, Now I have to find out in which date and time the shipping points were created, is there any table to find. please help me.
    Regards,
    Muralikrishna

    hi Murali,
    first define and assign shipping point in enterprise sructure in define shipping point EC07 and assign in OVXC
    goto OVL2 and assign the shipping points
    The following are used for the shipping point determination:
    1. Shipping conditions - Proposed from CMR. The entry in VOV8 for the sales document type if there overwrites the entry in the shipping conditions mainatined in the CMR.
    2. Loading group - Proposed from the material master record.
    3. Plant - proposed from CMIR - if not found then CMR - if not found then MMR.
    But you should first define and assign the shipping point in the "enterprise structure" otherwise you will not be able to do the shipping point determination.
    IMG - logistics execution - shipping - basic shipping functions - shipping point & goods receiving point determination - assign shipping points.
    Shipping point definition:
    IMG - enterprise structure - definition - logistics execution - define, copy, delete, check shipping point. You have to define the shipping point here for the particular plant.
    Shipping point assignment:
    IMG - enterprise structure - assignment - logistics execution - assign shipping point to plant. Here select your plant and assign the shipping point to the same.
    hope this helps,
    cheers,
    Hema.

  • Scenario required for sd route and mm route

    Dear Guru
    There is two process for stock transfer order one is SD route and 2nd one is mm route
    can you please explain the differnce between these rout
    and what is the scenario required for sd route and mm route
    it means in which scenario we use sd route for stock transfer and in which scenario we use mm route for stock transfer
    Thanks in advance
    Kashyap

    Kashyup,
    I am not aware of 'SD Route vs MM Route'.  They are the same Route.
    STO is basically a special kind of Purchase order.  Purchase orders are part of the MM module. In order to permit shipping goods from one plant to another, SAP has 'borrowed' some of the functionality from the SD module.
    During Configuration of Stock Transport orders, you assign a Customer (Shipto), Sales org, and Distribution channel to the receiving plant.  When creating a STO, the system uses these data to determine the Route.
    Route contains info that the system uses to plan movement of goods from one location to another location in the SD module.  The route contains duration information (how long does it take to move goods from warehouse to customer location), factory calendar, and perhaps some other data.  In the case of an SD order, the system will find the customer for the Sales doc, the default shipping conditions for the customer, and using this information together with the region of the shipping point, will determine a route.
    This same determination procedure is also used during creation of a STO.  The system will take the STO customer from STO configuration, and the default shipping conditions for that customer, and using this information together with the region of the shipping point, will determine a Route.  The same determination procedure used by SD sales orders.
    When you are setting up your master data, and you have decided what the duration of transport time should be, it is important that your planned delivery time in your info records or in your material master be consistent with your shipping duration (pick/pack/route time).  This makes the execution (creation and shipment of STOs) stay consistent with planning (creation of STO purchase reqs) as far as timing is concerned.
    If your STOs use Deliveries, then the shipping information in the STO that was determined during creation (customer, shipping point, route, etc) will be copied to the delivery during delivery creation.
    Rgds,
    DB49

  • Output type for Delivery note missing for shipping point

    Hi all,
       I have a plant setup to email delivery note which uses shipping point SGUS.  Condition record is setup for this shipping point using Del Typ/Shipping Point /Plant.  This uses the communication stragery ZINT.
    The email works well for this shipping point.  However, when delivery cannot be email using shipping point CHAL.  I guess this plant has 2 shipping points (sgus and chal).
    When delivery is created, output type for email is missing.   I already created condition rec
    for LF/CHAL/plant 121.  Still not working.
    Can anyone pls provide any suggestions ASAP ?
    Thanks
    Joyce

    Hi MdZ,
       I looked at the analysis output.  ZD04 output is what i am after.  Don't understand the followings:
    Q1 - why the ordering in anaylsis is different than in output determination procedure. For example:
    In Analysis Output: i have:
    LDOO    -  Output not found
    MAIL     - manual output
    PLOO    - Output not found
    Z940    - Output found
    ZBOL   - Output not found
    ZD04   - OUTPUT NOT FOUND
    The Output Determination Procedure as:
    Step  Counter   CType
    10       1           LD00
    12       1           ZLFX
    13       0           LALE
    14       1           ZBOL
    20        2          MAIL
    75       1           ZD04
    90       1           PL00
    110      1          Z940
    Step 10 should be read , then step 12, and so on.  Why is the ordering in procedure different than in
    output analysis ?
    Q2. Why did it display ZD04 not found when ZD04 appear on the delivery output as green light ? When i drill down, it show 2 access sequence.  Access 10 stated Output found.  Access 20 stated Output not found.
    Thank you.
    Joyce

  • GTM - wrong shipping point determination

    Hi ,
    Currently we are implementing SAP - GTM (Global Trade Managment functionality ) for our client and I am reletively new to this functionality. While creating one transaction cyles in the SAP system I am facing following problem :
    Issue .While creating delivery document against sales contract/sales order through TEW (Traing Execution Workbench),system opens the VL01N screen and instead copying shipping point & delivery date from sales order as it is,it proposes some default shipping point 0001 and wrong delivery date.Due to this system gives error and does not execute the VL01n transaction till the correct shipping point and delivery date is enetered.I checked default value in the user->own data also ,but no value is stored against the parameter id's of these two fields.
    Looking forward for valuabel inputs on the above issue.
    regards,
    Sachin

    Hi,
    OSS note 1872977 changes the TEW, so that the shipping point is taken from the sales order, like normal SD.
    /Torben

  • Edit Shipping Point in ME2O

    Hello All,
    When we use ME2O to create deliveries to subcontractors, only the default shipping point can be used.
    We have Plants which have multiple ship points for the materials . I would like to know if there is any way to edit the shipping point field and let the user enter it manually ? OR be able to choose a ship point from the drop down?
    Please advise..

    Any one has the same experience ? Please advise.
    thanks

  • Shipping point determination & selection

    Hello!
    Through an enhancement, we have increased the manual shipping points possible from a plant to 100 and have about 50-60 defined for the plant with the correct shipping point assignment and determination. However, in the selection screen in the order at the line item level>shipping, the drop down gives a selection possible only of 12 (first 12 shipping points) - all the rest don't show up at all. However, manually, the system accepts them from the list which is configured.
    I have tried changing the restriction from 500 entries to blanking it out but the remaining shipping points still don't show up. Is there any configuration around this to allow only  a certain number to show up at the line item level? Any clues where this setting may lie?
    Many thanks.

    >I have tried changing the restriction from 500 entries to blanking it out but the remaining shipping points still don't show up
    Not a solution, just an explanation of what you are seing:
    You removed the default limit for searching records using a look-up or search help. Unfortunately, as you have discovered, this did not work in your case. That is becausde the SAP settings (without your user exit) has a limit of 12 Shipping Points for every Plant/Loading group combination. You are seeing all the values in the Shipping Point Determination table in the drop down, but the user exits permits you to enter other shipping points.

  • Express shipping point

    Hello Gurus,
          there is paragraph about shipping point:
    "As each delivery is created via a shipping point, and each run of the
    delivery due list is made with reference to a particular shipping point, you
    may want to have an express shipping point. This way, you can run the due
    list every half an hour for one shipping point only to create deliveries for
    that particular plant. Likewise in the sales order, the user knows that if he
    manually enters a specific express shipping point, he will have the delivery
    created within half an hour. The remainder of the deliveries may be created
    via the delivery due list in the normal processing run."
    I want to know what is the express shipping point ? and how to make delivery run every half an hour for this express shipping point?  thanks very much!

    Hi
    It is like a normal shipping point in all aspects but only dedicated for cash sales/rush orders. Since these orders determine this special Shipping point, periodically deliveries can be created, without making any delay in deliveries.
    Thanks,
    Ravi

  • Shipping point storage loc determination

    If same material master record is sold as finished good and sample material and if there are 2 shipping points and 2 storage locations for this material, (Sample storage loc and shipping point and finished good storage loc and shipping point. ) and we are creating different types of sales orders with different type of item categories. What would be the solution to detemrine the correct shipping point and storage location for this material ?

    If you have separate Plant also then as per the Plant ,maintain Loading Group in Material Master in Sales : General / Plant.Now in OVL2 ,assign the combination of Shipping Conditions , Plant & Loading Group with Shipping point for both Finished & Sample Material.
    In such case , while creating the Sales Order , system will pick the Shipping Point as per the combination maintained by you.
    Best Regards,
    Ankur

  • Route Determination and Shipping Point

    Hi,
    In what way Route Determination and Shipping Point are connected.
    advise please.
    thanks

    Simon,
    The country and transportation zone of the Shipping point is also considered for determination of Route in sales order and also for redetermining it in delivery.
    The system can automatically determine a route for each item during order entry. If visit lists/plans underlie order entry the system uses the routes from the visit lists/plans. If no visit lists/plans exist, the system performs standard route determination. The following criteria affect route determination in an order:
    ·        Country and transportation zone of the shipping point (departure zone)
    ·        Shipping condition
    ·        Transportation group of the material
    ·        Country and transportation zone of the ship-to party
    the system is to perform standard route determination in the delivery again, it also takes into account the weight group (weight of entire delivery). The system saves the delivery route in the delivery header. As it is saved in the document header the route applies to the whole delivery
    Regards

  • Route vs shipping point calendar

    Hi,
    Can some explain what happens when you don't specify a calendar in a route. How is the overall time for for delivery calculated if it is route dependent?
    What happens if you have a shipping point calendar but the pick/pack time and load time are route dependent?
    what takes precedence over the other?

    Thanks for the answer. Actually I was unable to find out that in the shipping point detail, there is no calendar assignment.
    Can u please elaborate on the second part of the answer.
    Thanks in advance.
    Regards,
    Sachin

Maybe you are looking for

  • Problem for PCs recieving attached SWF files from Mac Mail 2.1.3

    Hi All, When I send this file from my mac mail 2.1.3 (753.1) with a SWF (flash animation) attachment the file wont open on the PC client mail. Instead when I force the unknown attachment to open it says the below with a string of letters. --Apple-Mai

  • Firefox 18 no longer works with Mac OSX v10.8.2 Mountain Lion

    I have been running FireFox v17 with Mountain Lion (OSX 10.8.2) without any issues. The auto updater from Mozilla requested that I upgrade to FireFox v18, but since installing Mozilla FireFox crashes immediately. The browser opens but then does nothi

  • How to delete a whole line in cmd prompt in Linux

    Hi all, How to delete a whole line in cmd prompt in Linux using short key? ex: [oracle@host1 ~]$ cd /u01/app/oracle/product/11.2.0/dbhome_1/ Thanks

  • Update file data into xk02

    Hi All, I need to update file data into vendor master general data,company code data ,purchase org data in xk02 . Is there any BAPI for xk02 to update all the vendor master data into general data,company code, purchase org data. Please any one share

  • Firefox wont load

    displays missing profile or inaccessable,i have spent hours trying to correct this without success, any help greatly appreciated,thanks Terry