Source inspection- partially accept

Dear all,
How to partially accept the source inspection lot.  For example: my source inspection lot size 10 kg I want to accept only 5 kg.
Otherwise how to give the link to GR.(like  5 KG accepted qty)
Thanks and Regards,
Vairavan

Hi Vairavan,
Please make a note that Source inspection is non stock relevant. It has no control over the stock posting. Moreover you'll do the inspection at Vendor premises.
Rather what you can do is accept only 5 kg out of 10 kg in the results recording screen and take UD (like accepted partially) and at the same time change the PO quantity to 5 kg, which will satify your requirement.
Regards,
Keerthi.

Similar Messages

  • Source Inspection Partial Qty GR

    Hi Experts,
    In Source Inspection Scenario there is a requirement, before GR quality wants to accept partial qty.
    Ex: I st case: As per PO qty 10 PCs after inspection 6 accepted and 4 rejected during GR system should allow accepted qty only.
    IInd case: As per PO qty 10pcs he will inspect and accept 2 qty and system should allow only for 2 qty not for all 10 qty.
    How it is possible kindly explain me
    Inadvance Thanx
    Shiva Patil

    Hi
    Its not possible to have partial Qty GR for the source inspection as there is no stock posting screen in the souce inspection.
    Either you have to accpet all or reject all
    Regards
    Sujit

  • Inwarsd Inspection - Partial Acceptance

    Hi all,
    We are doing the Inwards Inspection at MIGO level with 103 movement. At UD I am accpeting only a Partial Quantity by 105 movement. Remaining is returned to Vendor by 124 movement. Both 105 and 124 happens at QA32 UD level. (Automatic).
    My client is asking for the Excise Invoice that has to be sent to Vendor so that Vendor will get the Credit for the taxes he paid for the returned qty. ( He would have paid the taxes for the complete quantity and as we have returned partial qty, they should get back the credit from Gov).
    To ensure that Vendor receives the Credit back, what are all the documents need to be sent and How?.
    Note: As I am doing Inspection at 103 level, no stock is updated with the procurement qty. So in this case, I am returning the goods as if I haven't receive them.
    Experts please guide me.
    Best Regards
    Sam

    Thnx Mr.Neeraj.
    I have few doubts in the same context. Why Account document should be generated and why Inventory should get updated before the Quality Inspection is over.
    Why the reversal of Accounting Entries and reversal of Inventory and all other reversal should takes place unnecessarily, if we could reject the materials at Quality Inspection (103) itself.
    Will this not simplify all the process that I have mentioned above.
    Regards
    Sam

  • Scenario with reference to source inspection and MIGO

    Hi all,
    My scenario as follows:
    1.Source Inspection lot should get generated as per the lead time given in Q-Info while creating PO.
    2.MIGO should not be allowed when source inspection lot is open(Means UD is not taken).
    3.Inspection lot should be generated while doing GR in MIGO when source inspection lot is accepted.
    These all three points are with reference to one raw material.
    Kindly throw some light on the above said scenarios.
    Thanks in advance
    Sudhar

    Dear Sudhar
    1) For generating inspection lot automaticaly please use QA51. here you can shedule the program as in Qi07 and can be sheduled in a defined frequency
    2) You may have to go for user exit if you need to stop GR when the source inspection is open. You may use MB_CF001. Please check the exact exits as there is no option in standard for the same
    3) just check - in config maintain GR for Rejection -  GR not allowed and in quality info record maintain No GR inspection for source inspection
    Please let me know the issues
    Regards
    Gajesh

  • Incoming inspection through source inspection

    Hello,
    I want to do incoming inspection for few raw materials on lot basis (each trucks is one lot). But quality department  do the inspection for certain characteristics and truck will allowed inside only if QA dept accepts the lot.
    Then gross weight is taken and material is unloaded in yard. Again empty truck wt is taken through weigh bridge. Then Good receipt for that lot is done based on formula GRN qty= GROSS - Tare wt.
    So I think option for me for incoming inspection is Source inspection. But quality needs data and Usage decision done to be based on lot wise. Is it possible for me to do source inspection based on lot wise for one open purchase order.
    Concluding:- I need incoming inspn before Goods Receipt for each lots I receive. I may have one PO, but my vendor may give 5 trucks on that PO. Each truck I need to maintain as a lot for inspection.
    Whats the best way...Assured rewards for best solution

    Have you tried using inspection points for this?  Each truck can be a new inspection point.  But you can't make the UD until the end of the day or the next day which could be a problem.  I think you'll have to have the material go right to unrestricted inventory, (turn off post to inspection stock in the inspection type setup for the 01.)
    As you do each receipt, the qty of the truck will increment the inspection lot posting qty as well as unrestricted inventory.  If an inspection point fails, the tech/mgr. would post that qty in the returns stock line.  This would move the qty from unrestricted back to the vendor.
    The final UD would be on the qty of all five trucks received for the day minus any that were rejected.  You may need to work with the invoicing folks as to how this all impacts the invoice.  But I beleive they'll see a shortage of material if any trucks were rejected.
    Craig

  • Schedule delivery qty issue in source inspection process

    Hi,
    Issue : System is blocking GR if any one of the schedule delivery qty is rejected against same PO.
    System been used : Source inspection process.
    Issue in details:
    We create PO for 3000 kg with delivery schedule as 1000kg on 12th sept, 1000 kg on 13th sept and 1000 kg on 14th sept and save it.
    Then we go to QI07 and create three inspection lots against this PO. So during user decision if we reject any one of the inspection lot then whole PO get block for GR, system should allow to do GR of 2000kg but it is not allowing, it say material is blocked for quality.
    Kindly resolve my issue
    Regards,

    Hello,
    I doubt whether you can do this using source inspection. Now let me give you another option which will be manual in nature.
    1. Checking should happen before GR. - Make use of manual inspection(89 type)
    2.  System should restrict the GR if the material is rejected. - Do not release the quantity in quality info record if the material is rejected.
    3.System should allow GR for partial approved material and restrict GR for partial rejected material against same PO - Release the required quantity in quality info record so that the GR can be done only for those quantities. A normal 01 inspection type lot will be created.
    4. Rejected quantity material PO should get open to take GR for replacement of rejcted material of same PO - You can make use of 122 movement type in the lot so that GR can be done for the rejected quantity as well.
    Regards
    Gajesh

  • Stock posting in block stock after grn for source inspection

    Hi All,
    I have following scenario
    I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
    i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
    Now when i am doing GRN for same PO it is giving me the following message  stage
    <b>A category ZC01(user sp. category) inspected certificate is required</b>
    Message no. QA312
    Diagnosis
    An inspected certificate must exist at the first goods receipt for a purchase order item.
    Procedure
    Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
    If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
    If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
    after doing the GRN stock is being posted to block stock
    if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
    plz suggest soultion
    It's urgent
    Regards
    Ashutosh Shende
    9860681314

    Hello Ashutosh,
    In the material master you have defined certificate type with the customizing setting indicator for  'Enhanced Certificate Processing' active.
    If you set this indicator, extended certificate processing is active for
    this certificate type. You can then manage the inbox for quality        
    certificates independent of the goods receipt.                          
    The electronic inbox of certificates for the purchase order is only     
    possible if this indicator is set.                                                                               
    This means you have to create a certificate in QM (Transaction QC51),   
    before you can update your PO with cert. enclosed.  
    If you do not want the enhanced certificate processing you have change  
    the indicator into inactive.    
    Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.                                        
    I hope that this resolves the described issue.
    Regards,
    Isabelle

  • Source inspection before 365 days of delivery date of purchase order

    Hi Experts,
    Business wants to create source inspection lot well in advance before 365 days of delivery date of purchase order. this lot is required to record results.
    In SAP, transaction code QA51 allows only two digit characters for 'number of days for opening period' so system is not creating inspection lot for more than 99 days delivery date from current date.
    Please advise.

    Hi Patel, I really got interested on this particular issue because we have been using source inspection in our company for a while. After some investigation on ABAP code of report I will share with you my fact findings:
    1) System calculates the start date of source inspection (delivery date from PO - Leadtime from q-info record). For example, in my test case it was 14.08.2015 - 0 days. So field g_datum below will be 14.08.2015:
    2) System then checks if you are running the report in background (highlighted in yellow above). If so then it will check if the start date of inspection (g_datum) falls on opening horizon (g_datum_eroff). The opening horizon is calculated as per formula below (system login date + opening period). As an example: 14.08.2014 + 30 days = 13.09.2014.
    Default opening period (p_eroff) is 30 days:
    3) So all-in-all, when you are running QI07 online you´ll get a yellow traffic light on the long leadtime PO but you will be able to process it (on-line). However if you run the report in background (job scheduling) system will only create inspection lot to the relevant POs if the PO's delivery date falls on the 30 days window based upon the current date.

  • Source inspection - STOP Purchase Order GR

    Hi,
    We have a requirement in quality management in procurement process:
    Requirement:  System should perform inspection before goods receipt is made to the purchase order. Pre-receipt inspection should have three MIC to be inspected. When all the inspection characteristics are OK then system should receive the material to unrestricted. If MIC are not ok system should not let doing GR of purchase order.
    Possible solution: I tried leveraging source inspection functionality to meet above requirement. I created QIR and selected Source inspection = 0101 and check box for Source insp u2013 no GR active.
    Material master is assigned with inspection type 0101 and selected control key with GR for rejection = Goods receipt not allowed, GR control/Batch = u2018Do not create new ILu2019
    When purchase order is created system is letting GR for the purchase order without error. I used QI07 and created an inspection lot for the purchasing document, however before I do UD for the inspection lot system is letting to do GR for purchase order  Or before I create IL for the purchasing document system is allowing to do GR for the purchase order. Which I believe is incorrect.
    Is there a way I can stop doing GR of purchase order if source inspection UD is not Ok. If source inspection UD is rejected then system should not let doing GR of purchase order.
    Please advice...
    Thanks
    Regards
    S

    Just want to check if any recommendations for below issue ?
    Thanks
    S

  • SeeBurger Message Splitter State accepted or partially accepted

    Hi,
    The requirement is that if we receive an EDI interchange with multiple transaction sets and if some of them are rejected due to EDI data errors, only those transaction sets in error should be ignored for processing and the ones without errors should successfully come to the integration engine.  I suppose this can be achieved by having all our inbound Seeburger splitter configurations in u201CPartially acceptedu201D status. 
    currently we have set our configurations in accepted state.
    Could you please confirm if we change state to partially accepted it wil solve our purpose?
    Best Regards,
    Harleen Kaur Chadha

    Hi.
    Create both partial and partial accepted.

  • Source inspection - inspection lot skip for certified vendor

    Hii,
    I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
    1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
    2. In Material Master-
        - Activated QM Proc- QM control Key -Delivery release
        - Target QM system
        - Inspection type for source inspection activated in inspection set up
    3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
        - Maintained the existing QM system & validity
        - Selected 'No Inspection' in Insp. control
        In Vendor source inspection tab maintained the inspection type & lead time.
    Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
    Please suggest as to which setting I might be missing.
    Thanks!!!
    Regards,
    SV

    Hi,,
    You have to go T code QI07
    where give input Vendor ,Material plant,
    Delivery dateopening peroid
    Then execute the transaction .
    Select line item click oninsp lot & save.
    Where you have trigger lot for the same then only lot will get genarated.
    Regards
    SANIL
    This confugaration required if you have option if lots get rejected.
    Quality management-QM logistics-QM procurement -Control key
    Define control key;
    GR/Source inspection control;
    GR for rejection; three option is available
    1.source inspection has no effect on goods receipt
    2.Creation of new inspection  lot
    3.Goods receipt not allowed
    Regards
    SANIL
    Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM

  • Source Inspection

    Hi
    Qm Gurus
    Can Anybody Tell me the cycle of Source Inspection
    As Per My Knowledge we can decide Source Inspection In QInfo Record
    Here We Gave lead time Days
    Then In QI07 we trigger it Manually & generate Inspection Lot .
    My Quesion is how it trigger Automatically.This inspection lot is not Stock Relevant? why
    Regards
    Sanjay

    Hi Sanjay,
    Here are the steps and settings for Source inspection:
    In Q-infor record, select source inspection. Activate 01 insp type for material master in the QM view.
    ME21N-CREATE PURCHASE ORDER
    QI07-WORKLIST OF SOURCE INSPECTION -Select Create insp. lot and save.
    QA32-INSPECTION WORKLIST
    QA11-UD FOR SOURCE INSPECTION
    MIGO-GR
    QF11-DEFECT RECORDING
    QA11-UD FOR GR
    QA12-INCASE TO CHANGE QUALITY SCORE
    QA13-TO CHECK HISTORY CHANGES
    Reward if cleared or get back with queries
    Keerthi

  • Vendor rating on source inspection

    Hi,
    I am doing source inspection for some materials ; now my requirement is I want to consider these usage decision scores given for these inspection lots in vendor evaluation rating,so how to do that.
    Thanks
    Vinay

    Dear Vinay
    In standard SAP vendor evaluation is based on GR inspection only. So it will not be possible to add source inspection to that. What you can do is add source inspection as subcriteria
    1) You can maintain this manualy by
    SPRO> MM> Purchasing> vendor evaluation > Define Criterial > quality > maintain subcriteria as Source inspection> maintain scoring rate as No automatic determination
    2) try using the user exit and try to automize
    SPRO> MM> Purchasing> vendor evaluation > Define Criterial > quality > maintain subcriteria as Source inspection> User exit  MM06L001
    Search for this user exit in the forum you will get lot of response.
    hope this helps
    Regards
    gajesh

  • Supplier relationship status for Source inspection

    Is it not possible to intiate supplier relationship status in quality info record for source inspected material???, please advice..
    I already assigned no GR inspection in Quality info..

    Hi,
    Please go through the below links.
    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e0c680d3-0706-2e10-4a9a-a5c67d6c4321?QuickLink=index&overridelayout=true
    http://help.sap.com/saphelp_46c/helpdata/en/2d/351149448c11d189420000e829fbbd/content.htm
    Regards
    Hari

  • Source inspection configuration

    dear all,
    what is source inspection and vendor evaluation, please give me details of configuration steps for it.
    thanks in advance

    *What is Source Inspection* 
    What is source inspection and what are the setup required to do in system to implement successfully?
    A source inspection is a quality inspection in which Buyer required the quality check before the material received. So that he performed the quality inspection at the vendoru2019s Location.
    To setup source inspection, you should define inspection type (01 and 0101) in material master QM View. (MM01)
    When requesting source inspection, include the following information:
    a)  Purchase order number
    b)  Item number
    c)  Part number
    d)  Quantity of parts to be inspected
    e)  Date source inspection is required
    f)   Types of inspection  required
         - In Process
         - Final
         - Interim
         - First Article Inspection (FAI)
    g)  Contact name and phone number
    Go to transaction QI07 and give the material code, vendor, plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform Source Inspection and choose Create Inspection Lot. These inspection lot triggers for inspection type 0101. Against this inspection Lot perform result recording QE01 & QA11.
    When finally you received Goods at your premises, then inspection lot will triggered automatically (01) and perform result recording QE01 & QA11 
            How to do Source Inspection in QM
    Can any one guide how to do Source Inspection in QM. What are the settings required to be done and can the lot for source inspection be trigerred manually or automatically. 
    The Q-Info Record is used to trigger a source inspection lot for a material/vendor and plant. Under the tab key Inspection Control in Q-Info Record, you would find vendor source Inspection and under that select the inspection type desired for source inspection (say 01,0101) and give the lead time required to perform the  inspection in days (say 10 days).  If you do not want to trigger an inspection lot @ GR for a source Inspection lot then check the box (Source Insp. No Gr).
    Ensure that the inspection type selected @ source inspection is activated in the Material Master Record for the chosen material in the Quality Management View.
    To trigger the lot manually you need to have some open purchase orders for the material/plant/vendor. Go to transaction QI07 and give the material code,vendor,plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform S.I and choose Create Inspection Lot. 
    This would trigger the lot and then it is QE01 & QA11.
    Vendor Evaluation for Purchasing
    Define the weighting keys in SM30 - V_T147J.
    Weighting keys 01 and 02 are defined in the standard system. You combine the following
    weighting shares for the standard main criteria:
    Main criterion     Key 01 Key 02
    Price                   1      5
    Quality                 1      5
    Delivery                1      2
    Gen. service/support    1      1
    Ext. service provision  1      2
    Define the criteria in SM30 - V_T147G - Double click on the line items
    In this step, you define the criteria by which the system computes scores for vendors and
    specify whether the scores for the subcriteria are computed manually, semi-automatically, or
    automatically.
    You can also store your own methods of computation for the scores for subcriteria in the
    form of user exits. The enhancement MM06L001 is available for this purpose.
    Define the scope of list in SM30 - V_T147M - Double click on the line items
    Define Purchasing Organization data for vendor evaluations in transaction OMGL.
    An example :-
    How the system calculates the score for the automatic subcriteria
    "On-Time Delivery Performance"?
    The system uses the statistics-relevant delivery date in the purchase order
    (Items -> Delivery Schedule) and the goods receipt date to calculate date variances.
    You use the statistics-relevant delivery date, for example, if you know that the vendor
    will not deliver the material as scheduled on September 15 but on September 30. Enter the
    delivery date as September 30, but enter the statistics-relevant delivery date as
    September 15.
    In calculating the score for on-time delivery performance, the system will then not use
    the actual delivery date, but the statistics-relevant delivery date. This has a negative
    effect on the score for this goods receipt.
    However, materials planning and control uses the realistic delivery date (September 30)
    which the vendor will actually adhere to.
    The system considers only goods receipts against purchase orders and scheduling agreements
    into stores and the release of GR blocked stock into stores. In the standard system, these
    are the movement types 101 and 105.
    Minimum Delivery Percentage - OMGL in the On-time delivery section
    If you do not want a vendor to receive a very good score if he delivered the goods on time,
    but did not deliver the required quantity, you can maintain a minimum delivery percentage
    in Customizing.
    Assume you set the Min. del. perc. parameter to 60% and the vendor delivers the goods on
    time, but only 55% of the ordered quantity. Although the goods receipt is punctual, it is
    not included in the calculation of the vendoru2019s score for on-time delivery performance. So
    that the non-scoring of the on-time delivery performance criterion in this case does not
    bring an unfair advantage in comparison with a poor score, the vendor is awarded a low score
    for quantity reliability. On-time delivery performance is thus always to be seen in
    conjunction with quantity reliability.
    Standardizing Delivery Date Variance  - OMGL in the On-time delivery section
    To rate delivery date variances in days, maintain the Std.del.time var. parameter.
    If you assign a lower standard value, this means that relatively low date variances produce
    high percentage variances. If you set a higher standard value, this results in a relatively
    low percentage variance:
    The Std.del.time var. parameter has the value 20. The goods receipt took place on Nov. 27;
    the statistical delivery date was Nov. 15. There is thus a difference of 12 days.
    The system calculates the percentage variance as follows:
    12 / 20 x 100 = 60
    If the Std.del.time var. parameter had the value 60, the variance would be 20%
    (12 / 60 x 100 = 20).
    If you do not maintain this parameter, the system calculates the delivery time variance via
    the firm zone in the case of scheduling agreements, and via the order date and the
    statistics-relevant delivery date in the case of purchase orders.

Maybe you are looking for

  • Audio Problems in Adobe Presenter: Help Needed Urgently!!

    I am using trial versions of Adobe Presenter 7 and Adobe Connect 8. I created a presentation in in Powerpoint 2002 and published through Adobe Presenter to Adobe Connect Pro. This presentation has voice over recorded through the Adobe Presenter "reco

  • Using CS3 on Windows 7 64 bit – possible?

    Hello. I'm using Creative Suite 3 Design Standard. Can I install and use it on Dell PC with Windows 7 64 bit? Thanks for your help Kuba

  • Keep DB Connection Open

    I have an Oracle stored procedure that I need to call for a list of records in Crystal. What I have done is created a UFL to make the call and provide the return results. I call the Custom Function for each record returned however, it's taking a long

  • Setting a import job in oracle

    Can you tell me where i can find a good documentation that shows how to create a job in orcle. I would like to schedule a task which will run insert scripts everyday...

  • Unable to link shapes to track paths

    I had designed a shape then I had established the track (both manually or analizyng the movement) but ...... puttig the track number in the right box to make my shape moving .... the shape stand still !! Where I am wrong ???? Thanks Luca.