System Status Change for Project Definition

Hi,
I am working on a requirement to notify the Project Manager when the Project Status changes to REL.
I couldn't find any user exits where I can add the code to send an e-mail notification at the time of status change of the Project Definition or the WBS elements within the Project.
I checked for events in Business Objects BUS2054(WBS) and BUS2001(ProjectDefinition) which might get triggered at the time of status change. I couldn't find any events relevant to Status Change.
Any ideas how to handle this requirement ?
Regards
Bhooma

I found a solution to this issue.
Regards
Bhoooma

Similar Messages

  • Project definition system status change details

    Dear PS experts,
    Request, kindly let me know which report is available to show the system status change from
    crtd to rel
    rel to teco
    teco to clsd
    we would like to analyse which date or period the system status changed thru edit-status
    from crtd to rel
            rel to teco
            teco to clsd
    we don't use any user status.
    i have checked cn60 & all reports from cn41 to cn47, but i don't get any report states about the change details of system status.
    pl help
    srihari

    thanx,
    can u pl tell me about cn60 std report, does this use for system status change or any other purpose, pl let me what purpose this report is available for us.
    i wanted to know only the changes taken place in project definition with regard to crtd to rel or rel to teco or teco clsd, there should some report which will give this data without touching the tables.
    pl help
    regards
    Srihari

  • Project system : system status changes log?

    Dear PS experts,
    Kindly let me know where i can see the Project Definition ; system status changes done by users as & when required.
    CRTD to REL
    REL to TECO
    TECO to REL (cancel)
    so on
    I wud like when the project status - system status changed by user thru any log report?
    regards
    srihari

    Hi...
    why don't you try the following:
    in project builder CJ20N (project definition) use the I (informaton button) where the System/User status ism and then in the next screen use the menu Extras->Changed Documents ->All.
    Next screen press button history...
    (or even CN60 transaction)
    i hope it helps
    pan

  • Exit for CJ20N where system status changes can be captured

    Hi Experts,
    I need exit for CJ20N where system status changes can be captured
    for both the below cases
    1) When WBS Element is having Networks inside it
    2) when WBS Element is having no networks inside it
    EXIT_SAPLCOBT_001  --->>>   ZXCO1U01  , will work for 1) , but not for 2)
    i want an exit where status change gets captured for both cases 1 and 2 and
    will do further processing according to client needs based on status change
    Need to trigger IDOC on status change of  WBS element.
    If WBS is having network inside it  , then network status changes also with WBS status change
    and IDOC should trigger for WBS also.
    I just want suitable exit  / place for coding . Rest i can do.
    if no suitable exit / BADI , then what is the best possible place where i can go for Implicit Enhancement
    Best Regards,
    Gaurav
    Edited by: TheGaurav on Oct 25, 2011 7:08 AM
    Edited by: TheGaurav on Oct 25, 2011 7:12 AM

    I am kind of stuck in a similar issue. I need to perform custom validations on standard fields which cannot be done through OPSI or OPUC transactions. 0007 or 0002 User exits seem to assist on custom field creations/validations. However, I do see people posting the following BADIs which may be useful.
    CO_SRULE_CHECK
    PROJECTDEF_UPDATE
    WORKBREAKDOWN_UPDATE (which you already tried)
    WBS_FIELDS_FOR_ASSET
    CO_SRULE_CDOC
    Let me know if any of these worked out...
    AN

  • How to find next number range for project definition in tcode CJ20N

    Hai Experts,
          Please help me 'How to find next number range for project definition in tcode "CJ20N". I was trying in function module NUMBER_GET_NEXT. Is it right function module? If its right what input i need to give for this tcode and for the field project definition?
    Note: I searched in forum before posting, but couldn't find the solution.
    Thanks
    Regards,
    Prabu S.

    Hi,
    For project defination internal number is assigned by system.
    When you saves's project then system allocate one number to project defination, you can view it,
    SE11 >>> table  PROJ >> Click on contents >>> execute,
    here you will get your project defination & number is assigned to project defination.
    kapil

  • Including customized fields in Field selection for Project definition

    Hi Experts,
    I have created additional zfields in Project definition,
    But those fields are not coming in customization node " Field selection for Project Definition".
    Is there any way , by which we can include those fields in the list of " Field selection for Project Definition"  in customization ,
    so that i can hide/disable for diff project Profile.
    Thanx in adv.
    Regards
    Ashis

    Hi,
    actually one can try to add customer fields to field configuration using transaction SFAW alike SAP own fields.
    It is usually possible to extend the list of the modifiable fields of the  field selection in transaction SFAW within the framework of a            
    modification (as long as the fields are relative to tables PRPS or  PROJ). The relevant module pool is SAPLCJWB.                             
    Example
    E.g. for the SAP field 'functional area' (field  PRPS-FUNC_AREA) one would proceed as follows:                                                                               
    In the transaction SFAW, Module pool SAPLCJWB, Screen group PRPS 
    -Select 'Modified fields', and choose 'Change'.                          
    -Enhance the list of the modifiable fields by the following entries :    
    PRPS-FUNC_AREA. Answer yes to the question : do you want the field to   
    be modifiable?.                                                         
    Don't forget to save and then click on the 'generate button' of the     
    transaction SFAW.                                                       
    - The relevant field for distribution profile would be PRPS-PGPRF.         
    In the same manner one can try to add the Z field.
    Please note: This procedure is considered as a modification, so please review note    
    114390 which discusses a problem which can occur during an upgrade.      
    Kind regards
    Peter

  • PS: Setting Project Profile as a mandatory field for Project Definition

    Hi,
    I would like to know how to set Project Profile as a mandatory field for Project Definition (CJ20N or CJ01).  I tried to look for controls at OPUK config but the Project Profile is not available for definition - either mandatory, optional, suppressed, etc.  Would appreciate if you can share your expertise on this.
    Thanks!
    Regards,
    Vivian

    Hi,
    I would like to know how to include some additonal fields in OPUK/OPUJ.  We have defined some .INCLUDE component / fields to SAP standard table PRPS/PROJ.  We want those fields to also appear in OPUK/OPUJ so that we could also defined their characteristics - whether input, mandatory, suppressed, etc.
    Thanks!
    Regards,
    Vivian

  • Transaction Data for Project Definition & WBS Element of Project System(PS)

    Hi all,
       We want to install the Project Systems and the requirement is to report on the following fields:
    Project Definition  (Project Definition   PROJ     PSPID)
    Project Definition  (PS Short Description PROJ     POST1)
    Project Definition  (System Status  CNJ_STAT     STTXT_INT)
    WBS Element         (Project Type       PRPS     PRART)
    WBS Element         (Short ID             PRPS     POSKI)
    WBS Element         (Person Responsible     PRPS     VERNR)
    WBS Element         (Company Code     PRPS     PBUKR)
      R/3 Table Names and Field names are in brackets.
      0PROJECT_ATTR & 0PROJECT_TEXT are DataSources of 0PROJECT Master Data.
      0WBS_ELEMT_ATTR & 0WBS_ELEMT_TEXT are DataSources of 0WBS_ELEMT Master Data.
      How can I find the transaction data for those above fields, PLEASE ?
      Thanks in advance.

    Hi
    Kindly check the following data sources:
    0PS_CLM_CST ( Costs of a Claim)
    0PS_CSH_NTW ( Network plan payments)
    0PS_CSH_NWA ( Payments on network plan process)
    0PS_CSH_WBS ( Payments on WBS element)
    0PS_DAT_NTW ( Network dates )
    0PS_DAT_NWA ( Dates network operation)
    0PS_DAT_PRJ ( Date project )
    0PS_DAT_WBS ( WBS Element Dates)
    0PS_NAE_EVA ( Progress in Network Activity Elements)
    0PS_NTW_EVA ( Progress in Networks)
    0PS_NWA_EVA ( Network Activity Earned Value)
    0PS_ORD_EVA ( Order Earned Value)
    0PS_WBS_EVA ( Earned Value WBS Element)
    hope this helps!
    best regards,
    Thangesh

  • System status blank for equipment - no changes allowed

    Hi,
    We want to dismantle an equipment as it is no longer at the customer's location.
    When I go in IE02, I get following message.
    "Change technical object" is not allowed (EQU 10051040 )
        Message no. BS002
    Diagnosis
        The transaction 'Change technical object' is not allowed for  EQU
        10051040, because no status is set to permit it.
    System Response
        You cannot carry out the transaction 'Change technical object'.
    Procedure
        You can carry out this transaction if you set a user status, which
        permits 'Change technical object'.
    I put the User Status on "Released", but still not possible to change the equipment.
    When checking the System Status, I noticed that it is blank.
    As no changes are allowed, I cannot manually change the System Status.
    Also in IQ02 I get the same message and no System Status is filled.
    Anyone an idea how to workaround so we can dismantle the equipment?
    Thanks in advance for your inputs!
    Best regards,
    Geert

    Pete,
    Yes I have run that program, but it hasnt changed anything.  There is a user status AVLB in the equipment. When i checked in the status profile, this user status is not forbidden for any transactions. The program RISTEQ03 seems to work if there no user status also. But for my case, a user status is there, but there is no system status. Since there is no system status, the equipment could not be accessed through change mode (ie02).  I need the system status AVLB in the equipment.  The equipment does not even have any other details like functional location, maint. plant, sales area data, etc. in it.
    Nazeer

  • How can i see the document change for project in CN60

    Dear all,
    i want to see the project change in the report.
    i know i can see it using cn60
    but now, the system states that there is no data.
    i have ticked document change in the project profile.
    it seems useless.
    could anyone tell me how i can see the change documents?
    is there anything else i shall config?
    thanks a lot.
    Judy

    Hiu2026.
    Regardingu2026.cn60
    Tick change documents in the project profile on the right side.
    Not in the under status management. Section.
    Run transaction CJEN for project
    And check in cn60.
    Regarding checking changes in cj20n.
    Cj20nu2026.click on the WBS/Activity(which one u want to see).
    Editmenuu2026.status.....systemstatus/userstatus.
    Go to extramenuu2026..change documentsu2026.all.
    Check in Allchangesu2026.and history.
    I hope it will reach your req.
    Experts....plz correct me if im wrong.
    Regards
    Chandra

  • Grey field for project definition and WBS element

    Dear all,
    I have created a project and WBS element in CJ01. Now I go via CJ02 to the change mode and the project ID and WBS element ID is not greyed out. But I would like that the system shows these key fields as not changeable anymore, only fields like description should be changable. Can you please tell me, which customizing step I missed to get the grey field for project ID/WBS element ID?
    FYI  I do not use a project mask to create the project.
    Thanks for your answer.
    Heidi

    Hi Heidi ,
    I don't think you can grey out the Project Definition and the WBS Element fields after the creation .
    If you want to restrict the users to change the Proj definition and WBS , a better way is through
    Authorization objects and restricting only specified users to change the WBS
    Kish

  • Issue in CJ20N tcode for project definition field

    Hi guys,
    After the project definition is created in the system, I have executed the transaction code and when I clicked on change icon(toggle button which is available in the application toolbar) the project definition field is in edit mode. This should not happen at all.
    Kindly let me know your findings on this.
    Thanks & Regards,
    Rg

    Hi,
    For project defination internal number is assigned by system.
    When you saves's project then system allocate one number to project defination, you can view it,
    SE11 >>> table  PROJ >> Click on contents >>> execute,
    here you will get your project defination & number is assigned to project defination.
    kapil

  • Status Change for Purchase order in Process Purchase order

    Hi All,
    We have implemented SRM 4.0 with Extended Classic scenario.
    SRM does provide standard status for Process Purchase order worklist (such as Ordered, Held, Error in Process etc.). Is there any BADI i can use to overright my own status message for the PO.
    To give brief background of the requirement. Client wanted status to be changed to "Cancel" For POs whose all the line items we have deleted or "Close" when Last delivery or Final Invoice check is ticked.
    I am aware that i can use BBP_DOC_SAVE_BADI as structure BBP_PDS_ITEM i can get items deletion indicator. But will i able to change the standard Status message?
    Presently even though all line items marked delete still shows PO as "Ordered" status.
    Kindly let me know if i can acheive with anyway.
    Thank you
    Ritesh

    Hi Masa,
    Thank you for your response. I have few doubts about the configuration which you have suggested.
    - Define Status schema for User status will create a status Profile in which i have to include my own status. In the document of Define Status Schema it specifies that After creating User profile you have to assign same profile to transaction types. (I.e. BUS2201 or BUS2121 etc).
    My concern is will my own status profile over-write the standard status which is coming? such as Ordered, Created, Transmission fail etc.
    If so then do i have to create status profile to include all the Standard Status message in it as well?
    - Other thing i found that Ordering PO goes through many standard status message (COMP, CRTD, CTRA, DCOM, ORDR) and always the last status in the Hearder will display on  ITS level. Is my understanding right?
    - I found that there is a standard system status message I1045 (BECN Cancel) Can i use this through BADI?
    Kindly let me know.
    Thank you once again.
    Regards
    Ritesh

  • Report of List of all status changes for various production orders at a tim

    Hi,
    Can I have a standard report which shows the dates of each and every status (user & system) of a production order.
    I need to have a report for a list of productio orders at a time.
    If we go to CO03, header menu, status changes option is there, but it only caters for single production order.
    Table JCDS is available to know the dates but I need a standard one rather than a Z development.
    Or you can guide me any function module.
    Thanks,
    Kumar

    Hello,
    You will get the details of status in following table.
    JEST - for object status
    JSTO - Status Profile
    TJ02T - to Decode the status Number
    as the status data you will get from JEST is in very typical form you have to use TJ02T to find the exact status
    AM

  • System status change of WBS element

    Hi everyone,
    We need to change system status of WBS element programmatically.
    So can anybody suggest me which function module can I use?
    Thanks & Regards,
    Anirban

    system stauts is set when some function is executed e.g.
    REL is set when WBS is set to REL - CJ20N edit->status-> release
    SETC ise set when settlement rule on WBS is creaed
    BUDG is set when you carry out budgeting via txn CJ30
    so it depends on what system status you want set, then execute the following business transaction manually or via program/ development.
    However for setting REL or TECO you might be able to use some function modules
    For WBS elements I would check out the following
    CNIF_STATUS_2054               Set/Read Status for BUS2054                                     
    BAPI_BUS2054_GET_STATUS        Read Status for BUS2054 (Work Breakdown Structure)              
    BAPI_BUS2054_SET_STATUS        Set/Reset Status for BUS2054 (Work Breakdown Structure)         
    CNIF_STATUS_2054_CANC_AALK                                                                     
    CNIF_STATUS_2054_CANC_CLSD                                                                     
    CNIF_STATUS_2054_CANC_DLFL                                                                     
    CNIF_STATUS_2054_CANC_LKD                                                                      
    CNIF_STATUS_2054_CANC_MDLK                                                                     
    CNIF_STATUS_2054_CANC_TECO                                                                     
    CNIF_STATUS_2054_CANC_USER                                                                     
    CNIF_STATUS_2054_SET_AALK                                                                      
    CNIF_STATUS_2054_SET_CLSD                                                                      
    CNIF_STATUS_2054_SET_DLFL                                                                      
    CNIF_STATUS_2054_SET_LKD                                                                       
    CNIF_STATUS_2054_SET_MDLK                                                                      
    CNIF_STATUS_2054_SET_REL                                                                       
    CNIF_STATUS_2054_SET_TECO                                                                      
    CNIF_STATUS_2054_SET_USER

Maybe you are looking for

  • Implementation Of Badi ME_GUI_PO_CUST for adding fields in Purchase Order

    Hi All    I am implementing BADI ME_GUI_PO_CUST / ME_PROCESS_PO_CUST to add additional fields in Purchase Order. The implementation of the BADI ie the Subscreen of the fields to be added appears in  transaction ME23N but it does not appear in the tra

  • Handling Special characters in call to apex_util.download_print_document

    I am developing some custom reports that I need as PDFs. My client does not have BI Publisher so I am doing some custom xsl to generate the reports. I test as I develop by using a simple web page that POSTs to the apex_fop.jsp. Then I also test by sa

  • Error when running program ZM0ISH02

    The program runs every two weeks and pick up the sales order for that period and is giving the demand location of the plants.why is that the output of the programis getting only one demand location.thank you in advance.

  • Hi all,  script

    hi i have modified zscript only and not driver prog in dev server. 1.  do i have to transport all includes that are existing in the system or only the one which i have added?? 2.  how to transport style from dev server to quality server.?? 3. is ther

  • Move Data Between 2 xfaForms

    Assume I have process with 2 xfaForm variables, Form A (a PDF) and Form B (a PDF). A user fills out Form A. I want to populate values in Form B with the data from Form A. When I try to assign a value (using SetValue) directly from form A to form B, i