BAPI_QUALNOT_CREATE with Reference to Inspection Lot

When using this BAPI to create the q-note I am entering the reference object information as REFOBJECTT=BUS2045, REFOBJECTKEY=70000050424 (inspection lot number) and REFR=REFZ.  I am also populating SENDER and KEY_RELATIONSHIP fields with same data.  Q-Note is being created but the inspection lot information is not being populated into the Q-note.  I have verified the notification type. Is there some other setting I need to populate to transfer this information? We wish this process to be completed through remote RFC/BAPI only - receiving data from MES system to create q-note. Thank you!

Hello Melanie,
BAPI_QUALNOT_CREATE can be used to create certain fields for the
notification header. However, please read below for some alternatives:
If you need to fill these fields during the notification creation with the bapi can you please check if the enhancement QQMA0014 and user exit EXIT_SAPMIWO0_020 helps?
When saving notifications, this customer exit allows you to carry out inspections and to supplement missing values like the fields you mentioned.
Whenever you call the Save function in the notification transaction, a subroutine is run. The customer exit is called up from this subroutine. The call up takes place after the mandatory partner check and before the number assignment, the update of the logistics information system and the start of subsequent functions for tasks.
If either of these suggestions dont help then the last option would be to copy the bapi to your own Z module and appended these fields to meet your requirement .
Please also check if the bapi BAPI_ALM_NOTIF_CREATE also meets your requirement for populating these fields .
Edited by: Babatunde Daniel Aloba on Dec 2, 2011 5:46 PM

Similar Messages

  • QM with HUM- HU linked inspection lots

    Dear All,
    Here is the issue I am facing.
    I am using QM with WM and HUM. My handling unit has multiple batches. Thus, system creates as many inspection lots as there are batches.
    My questions are:
    1) Is it possible to create one inspection lot for one handling unit? I think not.
    2) Is it possible to record results for all HU linked inspection lots in one screen?
    3) Is it possible to make a usage decision for complete HU with all linked inspection lots in one screen?

    Hi,
    Not possible to do result recording based on HU, but you can check with QE72 for result recording and UD for all inspection lots at a stretch.
    Regards,
    Naveen.

  • Cancel 101 movement with Inspection lot of closed financial period

    Hi experts,
    we are having the following problem.
    We have a 101 movement with creation of Inspection lot, which was done in a finance period which is already closed.
    Now I have to cancel this movement, but I get the error M7021 with VOR, which means that I am not allowed to cancel it, because of the period is already closed.
    But we also can not open the period.
    Which possibilities do I have?
    Maybe MI10 movement?
    Kind regards

    Hello Jürgen,
    thank you for your help.
    I am confused now.
    Becasue normally I am logged on in german and now I did check the english one.
    Deficit of BA St. in QI prev. 127 M2 : "material number" 0001 "sloc" "batch"
    But here I get QI prev, but in the F1 help there is no QI or prev.
    In german I get VOR and there in the F1 help it is written, that VOR is previous period (so I think equal to PR in english).
    Now I am a bit confused.
    But anyway, the thing is that we have to empty the stock.
    Kind regards for every help, I think there is no possibility to cancel that booking as the period is closed.
    @ Biju K, to be honest your way would really be the only correct way, but at the current situation it is a bit special.
    I will do a MI10 booking.

  • Stock relevant inspection lot with return from customer

    Dear Gurus,
    What settings should I make so that when I make a sales order return from customer, I get a stock relevant inspection lot. What is available for me now is these 2 options:
    1. To activate insp. type 06, and upon return, the stock will fall in the returns logic in the storage location, and an inspection lot will be created, but it is not stock relevant.
    2. To activate insp. type 05, the stock will fall in the returns logic in the storage location, after that transfer from return to quality using mvt type 457, upon this transfer a stock relevant inp. lot is created.
    Both solutions are not suitable for me because for the first option I do not have a stock relevant inp. lot, and for the second option, I loose the refernce to which customer this lot is relevant, and this information is very important for the process.
    Regards,
    MaX

    Hi MaX,
    Well I would suggest to with 1st method as this is standard practice.
    No doubt you can have option to inward the material for customer returns directly in to quality inspection also. Follow the following steps.
    1.     Assign inspection type 05 in material master
    2.     Deactivate inspection type 06
    3.     Go To transaction VOV6
    4.     Double click on appropriate schedule line category that you are using for your return process
    5.     Change movement type there to 655. i.e. returns to quality inspection stock
    6.     Run a cycle. As a result of this stock will be posted to QI with stock relevant  inspection lot
    7.     You can record results and post stock with UD as in normal case of GR.
    8.     Do not forget to check the effect of accounting and controlling document for this movement with your FI consultant.
    Regards,
    Anand Rao

  • Want to do mass processing for inspection lots with status SPRQ

    Hello,
    My company using early lot creation for 04 inspection type. We have thousands of inspection lots with status "UD   ICCO SPRQ PRII PRSI STUP". Now due to SPRQ status, system is not closing process orders associated with thousands of inspection lots.
    Is there any transaction where I can do mass processing of inspection lots to change the status "SPCO" from "SPRQ"?
    Thanks
    Bhavesh

    Dear Bhavesh
    You may have to modify the standard program to do so. Modify this program RQEVAI30.
    This can help you
    Regards
    gajesh

  • Creation of one inspection lot for more than 1physical sample

    hello SAP,
    we have one common question.I have created 3 physical sample 20000006,2000007,2000008 and now i want to create one inspection lot for these 3 physical sample through QPR5 Transaction but system is generating each inspection lot for each physical sample which is wrong process. this is common scenario for most of the industry.SO please clarify and provide the solution

    Hi,
    I hope this solution gives some way out for you to solve your problem . I assume the sample is for  the same material , phy. sample type and category
    Create a new physical-sample drawing with refernce to :
    Using this function, you can create a new physical-sample drawing (with one or more physical samples) that references:
    An inspection lot
    A production order or process order
    A production version
    You use this function to create physical samples that have not been planned in a sample-drawing procedure and which you can draw from a production process according to your specific needs. In an inspection during production, for example, you can draw physical samples from the process on the basis of time or quantity (for example, a physical sample every three hours or for every 1000 liters of material produced). You can freely specify the inspection-relevant operations in which you want to inspect the physical samples for the new physical-sample drawing.
    please do let us know wether you were able to create one inspection lot .Or else please ellaborate the question step wise t-code and functions Will try to find a solution .
    cheers
    kp
    source of information : SAP

  • Transfer of Results from IDOC to Inspection Lot

    Hello experts,
    Following scenario:
    Inbound IDOC (QCERT) from vendor with inspection results is supposed to populate the inspection lot, which is being created at GR for PO.
    QM in procurement is active and QM control key and ceritificate type populated in material master record. We also activated workflow, which is supposed to execute the transfer from IDOC to the inspection lot automatically as soon as inspection lot gets status CROK.
    This works only under certain circumstances in the following order:
    1. Inbound IDOC received
    2. Q-certificate created automatically from IDOC with intial status "2 - Certificate received"
    2. GR posting for PO
    3. Manual setting of status "5 - Certificate filed and inspected"
    4. Inspection lots receives status CROK and the results are being transferred to the inspection lot
    This is okay as a start, but not ideal. We would like to have the following behaviour:
    1. Automatic setting of status "CROK" for inspection lot in order to transfer the results as soon as certificate and inspection lot are available.
    2. If the IDOC is being received after GR for PO, there is no connection in the Q-certificate to the inspection lot, i.e. the transfer of results will never take place, but it should.
    Can anybody help and knows, if this is feasible in SAP standard?
    Many thanks!
    Martin

    With IDOC Type Quality01 there is no reference to inspection lot, but in IDOC type Quality02 there is
    a inspection lot reference in segment E1EDLIN-E1CCI01, you will have to find out the logic to auto
    populate the lot # , please consult developer if its possible
    Thanks
    DD

  • Automatic WM transfer order during inspection lot posting to non-WM-sloc

    Hi All,
    I have a question in regards of automatic creation of WM-transfer orders during QM-inspection lot posting from a WM-storage location to a non-WM-storage location:
    - MIGO IM-posting: goods receipt with reference to purchase order to a WM-storage location
    => inspection lot automatically created
    => WM-stock is located on 902 GR area external rcpts / stock category Q
    - Inspection lot: enter result and usage decision with posting of inspection lot stock to a non-WM storage location into the blocked stock
    A transfer requirement (movement type 311 / destination u201C921 Transferu201D) is created after the inspection lot posting (QA11) but the auto-creation functionality is not possible since the u201CSystem cannot find source storage binu201D.
    How can this auto-creation of a transfer order be realized since it is possible to create the transfer order manually via LB11 (entering source u201C902u201D / storage bin u201CPurchase Order no.u201D)?
    The system cannot find the storage bin automatically.
    Thank you in advance!

    Hello,
    I do not understand your scenario , u are saying are posting inspection lot to non WM storage location and again saying system can not find bin automatically.
    "A transfer requirement (movement type 311 / destination u201C921 Transferu201D) is created after the inspection lot posting (QA11) but the auto-creation functionality is not possible since the u201CSystem cannot find source storage binu201D.
    How can this auto-creation of a transfer order be realized since it is possible to create the transfer order manually via LB11 (entering source u201C902u201D / storage bin u201CPurchase Order no.u201D)?
    The system cannot find the storage bin automatically.
    Thank you in advance!"
    Please let me know are u using quality interim storage area. If you clear material from quality and want material to go to bin then it should be warehouse managed storage location. 
    Regards,
    Prashant

  • Inspection lot creation for inspection type 05

    Hi Gurus,
    We have finished material FERT & semifinished material HALB.We have assigned insp. type 02 & 05 in material master of matl. HALB.When we create production order for FERT & confirm the order , inspection lot is generated for matl.HALB of inspection type 02.
    Now we are reversing the goods issue by movement type mb1a, movement 262.In customizing for movement 262 inspection lot origin 05 is assigned.
    My problem is that when i reverse the goods issue with mvmt.262, inspection lot is not created for insp. type 05. What should be the reason behind this? or are any changes to be done to above setting?
    Regards
    Ram

    Hi Ram,
    Just check the SPRO setting SPRO---> Quality Management ->Quality Inspection->inspection lot creation--->inspection for goods movement --->deactivate quality inspection for a movt type.
    Here against movt type 262 uncheck the QM not active tick.
    It will solve your problem.
    Cheers,
    Tushar

  • Archiving Inspection lots

    Hi,
    i am usging Archiving Object QM_CONTROL.
    i want to Archive selected Inspection lots like 140000000001 to 140000001000.
    in my maintain variant
    i am giving input
    Plant : 1000
    Selection Profile : SAPQL01
    Inspection Lots  : 140000000001 to 140000001000
    its not reading any Inspection lots, Usage decision records and selected inspection lots.
    can any one give the process to Archive the Selected Inspection lots using Archiving Object QM_CONTROL.
    Regards,
    murali

    Hi Murali,
    Check note 1002056 whether it helps.
    Have you tried archiving with just the inspection lot range without the selection profile? also have you maintained proper residence times for inspection lots and performed the pre-processing run before running the archive run?
    Thanks,
    Naveen

  • Result recording to be done after UD with long term inspection

    Dear All
    I have activated two MIC's for long term inspection. Inspection lot is created and UD is provided after Result recording. i have run QA12 and go to EDIT/RESET/INSPECTION COMPLETION.  status of UD changed to LTIN and then in Qe51 / qe51n i selected long term inspection but error message is coming '' NO CHARACTERISTICS WERE FOUND". Plz help , how to do result recording after UD.

    Dear Even if the char is long terms & if you have forcefully completed the chars then even if char has LTIN status it will not allow you.
    But check this in your sandbox and revert.
    1. In the MIC set the 'Optional Characteristic' and 'Long tem inspection ' in the control indiactors.
    2. Attach MIC in inspection Plan
    3. Do results recording and comlpete UD. all short term charactericts are closed.
    4. QA12Change UD with history for Inspection Lot ,
    Menu-> Reset inspection completion -> Status changes to LTIN
    5. Goto QA02 --> you woudl see " do you wnat to compete Long term inspections" --> yes
    6. Then Long term inspection characterictic is open for results recording.
    7. Change and complete results --> Make UD
    Check and Revert.
    Cheers
    KK

  • Post GR (from production) + Create inspection lot through an interface

    Dear All<BR><BR>
    We would like to set up an interface which posts a GR (production - mvt type 101) and also creates an inspection lot for the produced batch. When you post this GR online (MB31), it is possible to have the inspection lot created automatically (some memory ID has to be flagged), which actually first triggers a SAP standard popup asking for the inspection plan.<BR><BR>
    I have tried setting this up with a test program, first calling BAPI_GOODSMVT_CREATE to post the GR and then calling a combination of functions, the main one being QPL1_INSPECTION_LOT_CREATE, to have the inspection lot created. I am however having troubles with the generated inspection lot, e.g. when I click the button "Mat. Documents", it says "no material documents fonud".<BR><BR>
    Does anybody have any suggestions? Our system is 4.6 C. If I appear reluctant to answer any of your replies, that's because I'm out for holidays the upcoming 20 days)<BR><BR>
    Thank you and krgs<BR>
    Tom<BR><BR>
    Edited by: Tom Van Oevelen on Aug 26, 2009 3:53 PM
    Edited by: Tom Van Oevelen on Aug 26, 2009 4:00 PM
    Edited by: Tom Van Oevelen on Sep 22, 2009 5:15 PM

    Hi Lammie,
    I am really confuses actually what you want, but can give you a brief idea about in process inspection.
    There are 2  of inspection types related to it-03 and 04.  03 type will create lot but that will use routing as task list. 04 will use inspection plan as task list. So, when processing production order, 1st 03 type will generate a lot, there you can check hows the quality going.This lot is not stock relevant. After confirmation, 04 type will create another lot for final result confirmation and this lot is stock relevant.

  • Automatics Inspection lot Creation?

    Dear SAPIENTS,
    With GRC done inspection lot is created automatically in my scenario. Can anybody let me know where this etting is applied and what more I can do so that in inspection lot autmatically.
    Regards,
    Kaushal Rai

    Yes Kaushal,
    Absolutely Correct.
    - 01: Goods Receipt Insp. for Purchase Order
    It trigger the lot while you post, Gr against Purchase Order.
    - 08: Stock transfer inspection
    It trigger the lot while you transfer stock, Material to material transfer, plant to plant transfer etc.
    - 09: Recurring inspection of batches.
    It trigger the lot while, the next inspection date reaches for the batch.
    - 04: Goods receipt inspection from production.
    It trigger the lot while, the Finish product get received from the Pro. Order.
    - 03: In-process insp. for production order.
    It trigger the lot while, the Pro. Order get released, it is for inprocess inspection.
    - 14: Inspection in Plant Maintenance,
    It trigger the lot while, the maintenance order get released.
    And all these lot are triggered automatically.
    Regards,
    Shyamal
    Etc....

  • Inspection lot 08 with reference to a process order

    Hi Dear gurus:
    I need to create a special lot class 08 (stock transfer), with reference to an order process.
    Any good idea would be apreciated.

    Hi
    As you must be aware that the process order is associate with 03 inspection type.
    This is customize setting which we maintain at order type level.
    But 08 is mainly created when you transfer the stock from one storage location to other.so 08 inspection lot origin is not attched with the process order type.
    With reference to proces order a lot of 08 can only be created if you transfer  lot from one storage loc to other.
    I hope this will add some value.
    Regards
    Sujit

  • Scenario with reference to source inspection and MIGO

    Hi all,
    My scenario as follows:
    1.Source Inspection lot should get generated as per the lead time given in Q-Info while creating PO.
    2.MIGO should not be allowed when source inspection lot is open(Means UD is not taken).
    3.Inspection lot should be generated while doing GR in MIGO when source inspection lot is accepted.
    These all three points are with reference to one raw material.
    Kindly throw some light on the above said scenarios.
    Thanks in advance
    Sudhar

    Dear Sudhar
    1) For generating inspection lot automaticaly please use QA51. here you can shedule the program as in Qi07 and can be sheduled in a defined frequency
    2) You may have to go for user exit if you need to stop GR when the source inspection is open. You may use MB_CF001. Please check the exact exits as there is no option in standard for the same
    3) just check - in config maintain GR for Rejection -  GR not allowed and in quality info record maintain No GR inspection for source inspection
    Please let me know the issues
    Regards
    Gajesh

Maybe you are looking for

  • Is it possible to make an item not have any discount at all?

    This is the situation - A customer wants to turn off the ability for all users to give any discount for certain items. Rest of the items may have discounts based upon BP discount or any other price hierarchy discount. Users can also override this dis

  • Can someone help with AS2

    Hello, I am creating a website for an artist and she complains that nothing works. Mainly the embedded links (URLs). I tested the site in MSEI7 and the links work fine (but NOT in Firefox 2). I don't have a MacBook, and the one she has she says is pr

  • Problems with iTune rentals?

    My rental download was interrupted by an error "There wa a problem downloading (movie). An unknown error occurred (-50).  Please check that the connect to the network is active and try again", but it is connected! Help please?

  • How is the e-mail body text determined when e-mail sent from PO in edit mod

    We have an e-mail that is sent to the supplier when the buyer edits the po then goes to header-output - create and send immediately.   We want to remove the SAP default Salutation Best Regards, Your Purchasing Company The problem is we cannot find wh

  • Can't publish to network drive

    We recently upgraded our network to Leopard and Flash to CS3, and since then, I can't publish to a network drive. The reason I need to do this is that we're on a network where all our project files are on the server, and we work directly from the ser