Budget availability check: Partial releases

Hi Experts
I have configured budget availability check with Overall+Released.
For the project, i have planned costs using network activities (Commitments are not created yet)
These costs are updated as planned costs and assingned costs in budget overview.
1) I am unable to maintain budget less than 100% (because of assigned costs)
2) I am unable to release for lesser amounts (It is too because of assigned costs)
This way, i am unable to use the functionalties of REVALUATION and PARTIAL RELEASE.
Please suggest possible solution to make use these functions.
warm regards
ramSiva

Goto OPUV, uncheck the assigned value box for order category 20. This will make network planned cost not to be included in assigned value when the system status is CRTD, but once you release the project, the network planned cost will be included in assigned value irrespective of this setting.
Edited by: Ahmed Rifaee on Jan 8, 2010 10:25 AM

Similar Messages

  • Cost Center Budget - Availability check

    Hi !
    Can you tell me what is the procedure to get  * Cost Center Budget - Availability check *
    Regards,
    Ben
    Moderator: Please, search before posting

    Hi,
    Budget and Availability control is available for Internal Orders.
    For cost centers, i dont think this is available.
    Thanks,
    Ravi

  • Budget availability check

    Hi experts,
    i'd like to know if there are some ways to have, inside customizing SRM 4.0 or 5.0, a Budget availability check. Now we work with a replication of SC in request of Purchasing on R3, in this way SAP works with its standard functions for checking Budget availability.
    Thanks
    AB

    Hi AB,
    the budget availibility check in SRM is a commitment posting simulation. Once you set up all the connection mechanisms in your SRM, you will check the budget, i.e. you will simulate a commitment posting into ERP or R3.
    This happens from the Form routine PROCDOC_CROSS_CHECKS in BBP_PD function group. You may deactivate the budget check completely -- just look for the right BADI BBP_BUDGET_CHECK on SE18. If you want to alter something in the 'correct behaviour' -- look up FM BBP_PD_COMMITMENT_FILL_ITAB.
    Just be careful - when you activate the iDoc BBPCO01 - you'll get commitments posted; here a budget check occurs as well, i.e. once there's no budget available, you'll get an error in transfer.
    For more details 520717 Budget check in EBP.
    Btw - I don't expect that much changes in SRM6.0 at that point.
    BR,
    Richard

  • Control availability check during release of production order

    friends,
    Can you guys help me find the user exit/BADI which will allow me to control the release of production order after the availability check is complete.
    In detail, the scenario is that : based on a flag on material master, I should be able to ignore this product's availability during release. I cannot change the availability check to "KP" ( No check) as this product can be sold seperately. So what I thought was that if I get to control the availability check during production order release I would be able to ignore this product before check or may be after check and before the status change.
    I found PPCO0021 exit and function module EXIT_SAPLCOZR_003 which is actually intended for release control for automatic batch determination. I am not sure if I can use this.
    Please let me know if you guys have any idea.
    Thanks
    Prod_Planner

    Let me rephrase the scenario :
    I have a production order for a product P1 which consumes raw materials R1 and R2. R1 is supplied by a nearby vendor every 1 hour to my plant so I do not need to worry about the availability of it when releasing the order but R2 availability should be taken into consideration. So, function 1 or 2 in OPJK will not work (as release need to be stopped if R2 not available) hence I will be using 3. If I use 3, R1 availability is also considered hence the whole order is not released. I will maintain a flag on material master so if R1 has flag, I need to ignore R1's availability but still considering R2.
    As mentioned, I found PPCO---21 which could help me but need your help to understand if there is any other way.
    Thanks
    Prod_Planner

  • Auto Material & Capacity Availability check when releasing Production Order

    Dear Experts,
    Is there any configuration in Production Planning that will automatically check material availability and capacity availability automatically when a Production Order is released?
    Meaning to say, users will not need to manually click on the Check Material Availability and Check Capacity Availability button.
    Please advise.
    Thanks in advance.

    Hi,
    I've solved the problem. Just maintain the config in transaction OPJK.
    Thanks

  • Documents on FICA and Budget Availability

    Hello All Members,
    I have written documents in "Document Section" on Budget Availability Check and SAP FICA Overview.
    Please go through , I hope this will be very helpful for all our SDN Community Members.
    Any suggestions, improvement comments are always welcome !
    Links as follows :
    SAP FICA Overview :
    http://scn.sap.com/docs/DOC-54076
    Budget Check Availability
    http://scn.sap.com/docs/DOC-54055
    Thank you.
    Regards,
    Pankaj Bhalerao.

    High availability:High Availability is required if any error occurs in the inteface when support tean is unavailable
    You have some misconception about the High Availability concept. In simple terms it is about availability of XI system even in case one of the server node is down so that the overall business flow does not stop. Raising an alert or notifying the support team could not be found exactly in High Availability documents. Instead check for CCMS guide on SDN for alert setup for systems.
    Disaster recovery related documents are provided by many software vendors like Oracle or check the one below
    https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/40b25684-863f-2b10-af9d-b9ff4790540a
    I require this ASAP.
    You shouldnt use the words like ASAP in your query. Please read Rules of Engagement.
    Regards,
    Prateek

  • Exempt labour cost in IMG but still include in the Budget Availability Chec

    Dear expert,
    I am confusing in setting which is under SPRO->Project Systems->Cost->Budget->Specify Exempt Cost Elements.  I have set the labour cost element in the table, but when I do a budget availability check, it will include the labour cost. 
    Does anyone know how to make this setting working?
    Thanks in advance.
    regards,
    FLL

    Hi,
    Thanks to Praveen Raghavendra and Ahmed Rifaee for your valuable replies.
    I just solved the problem, it was causing by the setting has been changed in OPTK without performing CJEN and CJBN.  The setting is working after I have done CJEN and CJBN.
    Thank you for your contribution.
    regards,
    FLL

  • BPC - Budget Availability Control

    Dear Experts,
    I am interested in knowing whether Budget Availability Check functionality is available in BPC. If not, then does it mean that when both SAP ECC and BO-BPC co-exist, the Budget Availability Control configurations are required to be maintained in SAP ECC through modules such as Funds Management, Internal Order or Project System.
    Thanks,
    Sudhakar Shetty

    hELLO,
    Can anyone provide a specific answer on the possibility of having Budget Availability Check in BO-BPC. I understand that data has to be transferred from an operational system like SAP ECC to BPC. And, so a real-time Budget Availability Check may not be possible in BPC. But, wanted to know whether there is a solution to this.
    Thanks and Regards,
    Sudhakar Shetty

  • Material Availability Check Upon Confirmation

    Hello Everyone,
    I had a question regarding Material Availability check.
    Here My raw material and Semifinished Goods are Backflushed during confirmation. My client wants to check material availability check upon confirmation of production order. System should not allow Confirmation if no stock is available. Is there any way how I can do this?
    I know we can perform material availability check upon release and prevent the same, but user does not accept this since change in production order is possible even after release.
    Any suggestion would be greatly appreciated.
    Sincerely,
    Aji Kurian Mani

    Hi,
          you can configure this in the confirmation parametres --OPK4.In General individual entry tab Error handling/logs tabmake a tick for the Goods movements --Termination for the Incorrect Goods Movts.
    Termination of Confirmation if Incorrect Goods Movements Controls if the confirmation is terminated in the event of incorrect goods movements
    If these incorrect goods movements are determined by inventory management, then the option of correcting these errors is offered in the error handling
    If the correction is not successful, the confirmation is terminated
    Thanks,
    Rajanikanth

  • Material Availability check during work order creation and Release

    Hello All,
    We are checking material availability at creation as well as release
    Say we have Material XYZ=100 in stock MMBE
    Now XYZ =100 is say at normal storage location =75
    and scrap storage location=05 and serviceable =20
    Currently when availability check is performed it checks for 95 (It excludes scrap storage location 05 )
    but we want  Availability check to be only for normal stock =75 and not for Serviceable and Scrap location
    how to do this in configuration or via exits
    Since if the material is under Scrap location it is not counting in Availability check at work order creation this logic is working fine but I do know from where this control is put that when the material is in the stock of scrap it is not counting in Availability check for work orders.Same thing I want to extend it to Serviceable stock .
    Why not it is consider it for Scrap storage location , what is config or any MM enhancement
    So that when Availability check run it will not consider Materials at SCRAP as well as SERVISABLE storage location also.
    Please have your views on this
    Regards
    pratap

    Hello
    There are two option for your requiement
    1. Changing the status of the servisable storage location stock to restricted use stock . You can include or exclude this stock status material in OPJJ. This solution is not storage location dependent. It is stock status dependent.
    2. Please refer the enhancement for the storage location determination. I am not sure about this funtionality:
    For production orders the following enhancement is available:
    PPCO0005 enhancement for storage loc. determination/backflushing
    You can use this enhancement to change the storage location and the indicator 'backflushing' in the reservation.
    The enhancement PPCO0005 contains the following enhancement components:
    Function exit
    EXIT_SAPLCOSD_001 storage location determination/backflushing
    You can find the description in modification text of the function exit.
    You can find an example of the user exit in the function group XC01 in the include LXCO1F05.
    warm regards
    Ramakrishna

  • SAP PS Budget Profile & Availability Check

    Hi All
    We have a requirement to control  Purchase Order amount , so that it should not exceed the allocated Budget , currently the Error message is coming when we are doing FG delivery /PGI  & we are converting PR generated from PS into PO
    Please tell the complete steps (customization & Master Data Control Factors) for mapping the availability  check of Budget when we are creating purchase order & not during PGI.
    Thanks
    Cybrat24

    please check whether commitment is active for you in your CO area..
    please also check the exempt cost element whether these costs are excluded from your availability check..
    also check the transaction group maintained in the tolerance limit . better to select ++..

  • Budget by periods and availability check (AVC)?

    HI ,
    Can we have Budget by periods and with availability check (AVC)?
    for ex: for
    WBS element 1 for January -1000 USD for Feb 5000 USD. And so on...Total yearly budget is 15000USD.
    And
    WBS element2: January -1500 USD, Feb 2500 USD and so on ...total yearly budget is 25000USD.
    If the budget Exceeds for the particular WBS element for the particular period then it should give message (error/warning/).
    Can we implement this in Project system?
    Thanks for your time

    To give budget by period (Month ) is not possible in PS. Budget is annual / overall in PS. you requirement can be achieved by monthly you provide budget to WBS in the form of supplement.
    This way indirectly you can achieve the same.
    Please refer this post.
    Project Budget by Month
    Regards
    Nitin
    Edited by: Nitin  Patoliya on Feb 3, 2009 8:40 AM

  • Budget Profile & Availability Check

    Hi All
    We have a requirement to control Purchase Order amount , so that it should not exceed the allocated Budget , currently the Error message is coming when we are doing FG delivery /PGI & we are converting PR generated from PS into PO
    Please tell the complete steps (customization & Master Data Control Factors) for mapping the availability check of Budget when we are creating purchase order & not during PGI.
    Thanks
    Cybrat24

    please check whether commitment is active for you in your CO area..
    please also check the exempt cost element whether these costs are excluded from your availability check..
    also check the transaction group maintained in the tolerance limit . better to select ++..

  • Re: Availability check fpr production order after released.

    Prodsuction order is released. Materials pertainig got reserved for the order, goods issue not posted getting error saying availability check when checked the log. Kindly help me to solve my issue. Thanks in advance.

    Hi,
      you might not have defined the proper settings for availability check.
      following is the logic in defining the settings.
    Availability check for a material is carried out only if the material is
    1. A stock item
    2. Not a phantom item
    3. Not a bulk material.
    This can be carried out
    1. during order creation
    2. during order release
    3. when a created order is saved.
    Availability check can be triggered either manually or automatically.
    For this we need to define in checking control(opjk)
    First define a checking group(ovz2) and checking rule and this
    must be assigned to checking scope.(opjj)
    In the checking scope(opjj) we should define
    1. which Mrp elements are to be considered during check
    2. which inventory categories are to be taken into account
    3. whether Replinishment lead time is to be taken into account or not
    4. whether check is also to be carried at storage location level.
    This checking rule must be linked to checking control(opjk)in which you can say
    1.No availability check for the material
    2.Availability check when saving the order
    3.What type of check is to be carried
    whether ATP CHECK or Check against PIR quantities
    4. Whether order should be released or not if there is
    any missing parts.
    The checking group is assigned to material master MRP3 view
    Regards,
    nandha

  • Availability check and credit release

    hello, friends.
    here is the situation:
    1.  MRP type PD
    2.  availability check 01
    now i create a sales order for 100 units for a material.  due to the inventory situation, the schedule line proposes 40 units by Feb 14 and 60 units by Feb 28.  i save the order and this is blocked for credit limit (of course, confirmed quantity will be '0').
    now i release the order through VKM1.  when we go back to the sales order, the schedule line is 100 units by Feb 28.    of course, we can also redo availability check and the schedule lines will propose the earlier 2 dates.
    now, i believe that the 1 schedule line proposal after release  has something to do with time period (or horizon) and credit control.  but where do we customize settings so that the original schedule line proposals (40 units by Feb 14 and 60 by Feb 28) is  automatically copied and/or retained?
    many thanks for your valued inputs.

    Jonathan,
    Also check Av.check and TOR under IMG -SD-BAsic Functions-Av.check and TOR- Define procedure by schedule line category.
    Av. check and TOR should be checked there also check whether there is a manual schedule line block in the sales order. becasue  if this is the case, then its very effective and works immediately
    If the availability check is switched on at requirements class level, it can be switched off at schedule line level. However, you cannot switch on the availability check at schedule line level, if it is switched off at requirements class level. You can make this setting at schedule line level. But the system ignores it and the setting for the requirements class applies. Also, at schedule line level when the availability check is switched on, the transfer of requirements can be switched off. For example, this makes sense for inquiries or sales information.
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    The control elements described above for the availability check must be maintained in customizing for Sales and the relevant assignments made to the sales transactions The availability check must be switched on at requirements class level and - for the availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found. A plant must be defined. It can either be proposed from the customer or material master record or can be entered manually in the document.
    A checking group must be defined in the material master record on the Sales/plant data screen in the Availability check field
    Please check all these above settings to see if there are in order. Also check if there is any delivery block on that date, if one single delivery is enabled and also there is any product allocation active. I am very much interested to know your status. Wud appreciate your status.
    regards
    Jude

Maybe you are looking for

  • REG: Java Mapping

    Hi All,          In my scenario i have 1 source message interface and 2 target interface. I am using javamapping for transformation.After transformation i need to send input file to one of the target interface based on a condition( ie file name). Can

  • My HP w2207h monitor fades to black after startup.

    When I first turn it on, it's fine, but within a minute the screen fades to black. I'm running Windows 7 on a custom computer. All has been working fine up until now. I plugged in a spare monitor and it works perfectly, so it's not the video card. An

  • Explorer Issues with Website Adding White Background

    I am working on making simple cosmetic changes to a website I did not build. More complex job than I thought mostly because of trying to figure out the past designer's coding. I have a basic knowledge and was able to make the needed changes. Except t

  • How to run oracle forms 6i on Windows 7

    Hi guys, Is it possible to run forms 6i on windows 7 .

  • G4 Compression for TIFF file

    I am looking for a plug in to allow Photoshop to save TIFF files using G4 Compression on a Windows PC.  We have CS3, CS4 and CS5.  The TIFF files start as color and than we knock all the background out and it leaves just solid black and white in the