Budget for parent

Hello
We have made a Project say P/ 0919 this is at parent level
agains this pareent level we have 4 childs levels
P/0919 - Project  Parent
P/09191/1 - Child 1
P/0919/2- Child 2
P/0919/3 -Child 3
P/0919/4 -Child 4
Budgets were allocated to childs 20 lacs each So total budget is 80 lacs
Howeve during procurement we have given the Parent WBS as element means P/0919 was used
Os were released ,Goods were received  ok
But during the QC release of stocks system shows no budget availabe for P/0919
the issues is Parent does not has any independent Budget , it is at child level
Is some confrigation setting required to stop this check, if child level budgets are available system should not stop the transactions
Can i reallocate the budget by Reducing the Child budget and keeping some allocated at parent level
Please help its urgent

Hi Bhavesh,
System is behaving as designed. There is no budget defined at the parent level hence this issue. Please refer SAP Help once and go through the topic Budget or search the forum to understand the budget functionality in PS.
Most of your doubts will be cleared once you do this.
Regards,
Gokul

Similar Messages

  • Error while mantain budget  for project

    Hi,
    I maintained budget for project CJ30 in IDES as follows:
    1. Sellect all Item --> copy view --> choose planned total
    2. Entry: Percentage = 100%, Overwrite option
    2. All values is copied from Column Planned Total  to column Budget
    3. Save
    4. Error message:
    Item WBS element A-60000 budget exceeded
    Message no. BP604
    Diagnosis
    In document item WBS element A-60000, budget  for fiscal year 2008 was exceeded by 2.763,26 EUR.
    can anybody help me to solve the problem?
    Thank you
    Long

    Hai Long,
    For getting BCWS , you should maintain Progress version. DO following in config settings..
    1) Project Sys -
    Progress -
    Progress analysis -
    Maintain Progress version.
    2) Select Progress version 100 and copy the same and give new name.
    3) Go to details.
    4) Select option 3 ( if basis for Progress is Budget) 4 ( If it is planned cost) for Earned Value Basis.
    5) Select option 2 ( if basis for Progress is Budget) 7 ( If it is planned cost) for POC weighting.
    6) Save it.
    7) In your project select Progress tab in detail screen of WBSE and Activity and select above Progress version, select select cost propotional ( Or as suitable for ur requirement) plan and actual ( it is adviseable to have plan and actual same always to have clarity in results)
    8) Schedule and see report in CN41N.
    Please post your observations
    Thanks
    Saikishore Ganga.

  • Missing Functionality -where do I set a budget for a Project?

    Budgeting for Projects is non - existent
    Budget for Profit and Loss for a particular project , How is it done ?
    Does not work , No facility to put in Budget for a project ?
    The report I am trying to run is:
    REPORTS>FINANCIAL>BUDGET REPORTS>Profit and Loss Statement Budget Report.Then go to Expanded and choose a PROJECT, say MailOrder.
    The result is that it will show the MailOrder project for the ACTUAL but it will show the whole company Turnover against the BUDGET column.
    This is because there is no place to set a budget for MailOrder Project in the first place. So the question is where do I set a budget for a Project?
    1 Budget setup screen - this has no facility to setup a budget for a PROJECT
    2.Budget Profit and Loss - this has the facility to run a PROJECT budget but the figures for the Budget cannot be right because they were not setup in the first place.
    PS MailOrder project is just an example.
    Version: SAP BUSINESS ONE 2007 A Patch Level 41
    Description of requirements: As above
    (Valid as of: (Date that this legal requirement is applicable) N/A
    Business needs: Customer cannot set the budget for a project and this effects their accounting.
    Examples: (Please describe a typical example, how the functionality should work.)
    Current Workaround: None.
    Proposed solution: Create a Project and then be able to set a Budget for it
    Edited by: Darpal Thiarha on May 14, 2008 10:34 AM

    Hi Darpal/Kerstin
    Please ignore my previous replies because I have now worked out why this idea will not work:
    Kerstins' idea is based on setting up new Nominal Codes for every Project and for Every Nominal Code in the Profit and Loss structure. Apart from the fact that this will create a messy Nominal Structure with hundreds of Nominal Codes, the main issue here is the way the Cost Of Goods Sold is structured. The logic of our Nominal Structure for Sales and Cost of Goods is based on Item/Item Groups and the Nature of these Items. In our case we sell Skin Care products under 3 Brands. Say Brand A, B and C
    So Brand A is summarised into one item Group and the ITEM GROUP is coded to Sales Nominal 20000 and the Cost of this group is coded to Nominal 30000. In Kertins suggestion, I would need to raise a Nominal Code 20001 for say Project Mail Order and 30001 for the Cost of Goods for Mail Order but this the Mail Order project is selling ALL our brands (A,B,C) - so you can see the problem here. You cannot use Nominal Codes for two different purposes and make it work. So the problem here is that my BRAND A summary will contain a Nominal with a Project Mail Order, that has SALES of Brand A,B,C. The Net effect will be that we will not be able to summarise anything in SALES and Cost of SALES in a logical way (Neither by Brand or By Project) and the Nominal Structure will be a mess.
    My conclusion is that SAP b1 Sales and Cost of Goods section demands certain logic when building the Nominal Codes, and this is based on the NATURE OF THE STOCK ITEM and trying to superimpose the PROJECT issue into this, will never work. In my view, the PROJECT issue needs to be sorted without involving New Nominal codes and the starting point would be in sorting out the SALES and COST of SALES and the project Budget for this.
    Please let me know if you need further illustration of the problem.

  • Item 000 RN1D25 /4105140000 / commitment budget for year 2011 exceeded (

    Dear All,
    Iam using FR32 for Budget Uploading in ( Funds Management ) at the time of uploading it is giving like this message
    Item 000 RN1D25 /4105140000 / commitment budget for year 2011 exceeded
    In document item 000 RN1D25 /4105140000 /, commitment budget for fiscal year 2011was exceeded by 1,650.00 INR.
    Pls give me the solution as soon as possible.
    Thanks & Regards
    Vijay

    Dear Mr/Ms,
    Thank you very much, i have cleared the issue.
    Vijay

  • Budget control - Assigned funds are less than payment budget for fiscal year in document item

    Dear Experts,
    We are using Former budgeting, when ever we run the transaction FMBV getting the following message to a particular user.
    Budgeting
    Assigned funds are xxxx BHD less than payment budget for fiscal year
    2014 in document item XXXX /XXXXX .
    And also when purchasing creates the PO getting similar message to a particular user.
    Purchase order 450000XXXX
    Assigned funds are XXXX BHD less than the commitment budget for
    fiscal year 2014 in document item 010 XXXX /XXXXX .
    How to know where these users were maintained.
    Thanks for the help

    Hello Itai,
    Sorry for my late reply. Have you been able to find a solution for this?
    If not, please update, otherwise please make this thread as answered.
    Sorry for the delay...
    Kind regards, Mar.

  • Activate carryforward of budget for commitments

    Hello Gurus,
    When we execute carryforward for a purch order or purch requisition,
    eventhough we activated the carryforward of budget for commitments, the
    system is updating only table FMBDT.
    So the amount of the carryforward item does not affect the avaliability
    control (table FMAVCT) so we end up having more commitment on the next
    year but without the avaliability of the document carried forward.
    When we sum the record type '1 Plan' minus '0 Actual' we realize that wehave less avaliable budget than before.
    In table FMBDT the system creates a record for process 'CORV Carry For.
    Recv' for record type 1 Plan.
    We reestructure avaliability control tx FMAVCREINIT and it does nothing.
    Regards,
    Adriana.

    Hello,
    Maybe some quick check can help you trouble shoot the problem:
    1. Identify the Budget Type for Carry-forward receiver:
    Spro > Public sector management > Funds management government > Closing operations > Closing operations for BCS > Define budget entry documents for commitment carryforward; look for Settings for receiver lines and get the Budget Type.
    2. Check whether the above Budget Type is included in the AVC Ledger:
    Spro > Public sector management > Funds management government > BCS > Availarbility control > Settings for availability control leger > Define filter settings for budget values > Define the consumable budget; select ledger 9H and check whether the budget type identified in 1 is included.
    Regards,
    Ming

  • Hi,When I submit the budget for approval, it is approved and base lined when we submit it for approval. It does not go in approval hierarchy. We want it to flow through approval hierarchy.

    Hi,When I submit the budget for approval, it is approved and base lined when we submit it for approval. It does not go in approval hierarchy. We want it to flow through approval hierarchy.

    Hi Amit,
    if I understand correctly, you just need for a particular object a tooltip to be showed.
    There is no such functionality hence you used the trick of using a hyperlink, which if clicked generates undesired behavior.
    Hyperlinks don't allow themselves to be disabled, therefore if you are using that workaround you must cope with that.
    I would suggest to create an Idea at [https://ideas.sap.com] for having in the properties of an object a tooltip, then post the link to the idea here and other users will vote if they like the idea.
    Thanks and regards,
    Simone

  • Diferent font format for Parent/Child

    Hello,With Excel Add-In, we can format the letter font differently for parent and child, using the Essbase Option (Style -> Members -> Parent -> Format).How can we do, the same thing, using Analyzer.Any help is appreciated.SL

    Hi,Unfortunately there are no advanced formatting options in the current release of Analyzer (6.2.1). You can either format the data or the metadata (headers). I believe in the next release there are plans to incorporate more formatting options.Hope this helps.Paul ArmitageAnalitica Ltdwww.analitica.co.uk

  • How to assign ALV for parent node and child node that uses supply method.?

    HI Dear friends,
        I need to display header details ( VBAK ) and Item details ( VBAP ). I have created two node like HEADER_NODE inside this i have created ITEM_NODE for this item node i use supply function 'GET_ITEMS'  any way it is working only when crete two separate table and binding but when i come to work with ALV i am totally confused .. i have created two 'View Controller UI Elements'   when i try to map HEADER_NODE  it mapped properly but for ITEM_NODE it shows mapping already defined. return status message as 'Action Cancelled' . In result both ViewContainer shows only HEADER_NODE data only.
    How to achive ALV for  Parent, child node that uses supply function ? ?
    Thank you

    Delete Mapping is not enabled, that means there is no mapping done yet.
    I just tried what you are saying and the application works and i am able to map the header table and item table and also again i could map the tables any number of times.. i didn't get any such message, sorry i couldn't recreate the scenario. might be there is something wrong in the context.
    i just did it like this.
    Please also move this to Web DynPro Discussion, Hope that would be helpful.
    Message was edited by: Syed Ghulam Ali

  • Budget for the vendor Vs actual amount spend on vendor

    Hi all,
    how to find the budget for the vendor and the actual amount spend on one vendor.
    What are the table names and where can we find this data.
    Thank you.

    Hi,
    What do you meand by 'budget for a vendor'? The tables for the items can be found in BSIK/BSAK tables (uncleared/cleared items).
    Regards,
    Eli

  • Budgeting for balance sheet accounts

    Hi Expert,
    I have activated the profit center accounting for my company. Now the users can use the PCA functions. They are planning to do budget process in SAP. There is no problem to enter budget for P&L accts. But they want to enter budget for balance sheet acct as well.
    how to set the configurations to allow entering of budget for balance sheet accts ? Please advise the stepo by step procedure. After done with the configurations, any additional month end closing steps to be performed ? Do I stuill need to create cost element accts for the balance sheet GL accts, like the cost element for P&L accts ?
    Thanks.
    Angel.

    Hi,
    I assume by referring to Budgeting, you require Availabiility control as well.
    Budgeting and availability control for Balance sheet and P&L accounts is available in Funds Management  under Public sector Management functionality.
    Njoy
    Siva

  • Budget for orders

    Hi,
    while creating the budget for overall plan for 2007, 2008 yrs, we are getting the error message that In document item Order 15555, budget  for fiscal year 2006 was exceeded by 50000 INR
    That amount is the actual postings in the 2006 year for that order.
    how we can rectify the error message.
    Regards,
    Suresh.

    Hi,
    Even though i am getting the same error message for that order.
    And one more i am not able get the Budget profile field in the active mode for the process orders and maintenace order to assign the budget profile.
    Actually i need to give a buget of funds for the stores and consumption and repair and maintenace expences to get the control on those expences while raising the purchase requisitions.  But these orders are catageoried under maintenance order.
    Whether the Budget of the funds are staisfying the customer need or not? if not what way i have to approch.
    Pl. help me.
    Regards,
    Suresh.

  • Cal Total Available budget for a particular Object No (Fund No)

    Hi All,
    Can anyone tell me how to cal Total Available budget for a particular Object No (Fund No)
    Thanks

    Hi,
    Issue resolved on my own
    Thanks

  • Budgeting for CO production order

    From KOT2 we can see budget profile exists for CO production order type CP01 and CP02.
    But it is not allowed to use KO22 to enter budget amount.
    Can anybody tell me how to set budget for CO production order?
    Thanks~

    Hi Ajay.
    The reason why we want to control cost of production order is because there are too many subcontract items.
    Sometimes works can be done within a plant are contracted outside. 
    Because there is no BOM or routing for a particular product,
    we have to use CO production order instead of PP production order.
    Planning on the order is also not possible.
    That's why we want to set a budget to limit the use of subcontracting and also control production costs.
    If Project System is activated, budgeting can be used on CO production order.
    Since we are not using PS, we have to use internal order to collect subcontract related costs.
    Best regards,
    Sharon

  • Close budget for previous years

    Hi,
    The system Iu2019m working on has commitments management active, so when I create a purchase requisition or purchase order, the budget is affected. Iu2019ve noticed that the field that determines the year relevant for budget availability is the delivery date (EEIND).
    So if I make a purchase requisition today, with a delivery date of 2007, for instance, it will affect the budget from 2007 year. I donu2019t want this to happen. Is there any way to u201Ccloseu201D the year budget and donu2019t allow any more values to affect the budget for previous years?
    Thanks for any help.

    Hello,
    Please check the budget profile.
    In budget profile, you will have how many previous years or future years you can budgeted. Try to reduce one year for previous years.
    Regards,
    Ravi

Maybe you are looking for

  • Slow Browsing and Streaming

    Since last Monday ive had extremely sluggish browsing speeds and buffering video even on low settings, my speed tests come back around 44mb (My ip profile was 63mb and is now lowered 47mb) and on applications like Steam I am getting those speeds, but

  • Mfg. Date in Batch Derivation

    Hi Friends,I have configured Batch derivation. I have maintained condition records for sender and reciever material types. When I am issuing material having different batches for sender materials, Sytem is taking first lineitems mfg date in that line

  • WhileCopying from an existing document to change parameter value settings

    Hello, is there any option in sap while creating a purhase requisition by copying from an existing Prequisition and change the value?.

  • Creating Authorization for multiple plants

    Hi, I have one requirement that, Creating Authorization for multiple plants SELECT-OPTIONS:    s_werks FOR mseg-werks.     AUTHORITY-CHECK OBJECT 'M_MSEG_WMB'             ID 'ACTVT' FIELD '03'            ID 'WERKS' FIELD s_werks. 1. If have no of pla

  • App updates are not removed after installing in update screen of iPhone and iPad