CM07 Capacity Integration

Hi Guys,
I wonder if anyone can help me; we have implemented plant  maintenance and have configured such that the capacity generated via PM is picked up against the work centre. However to view overall capacity we use CM07 and at the moment this report is just picking up the capacity generated by the capcity category 001 Machine - i have configured it so that it also picks up category 002 Person and indeed when i now run CM07 i can see both categories showing. However these are seperate entries in CM07 and as i result i cannot see a cumulative total of both the PP and PM capacity generated.
My question is that is it possible to see total capacity for both PP and PM generated orders in CM07? I can see this in transactions CM50 and CM55 but these do not provide the felxibility that CM07 does.
Many thanks
Nisar

Capacity load situation is always shown in SAP for each category separately.  You can never combine in standard SAP transaction.  Alternatively  you can see whether you can combine the category in work center itself.
cheers
Rav

Similar Messages

  • Pp and pm integration for capacity planning

    Dear ALL,
    Just now i started integration testing between pp and pm.
    As we know PM equipment is work centre for PP.Suppose there is 1 machine MAC-1 for which i created maint. order  also i ticked Sys. condition in MO and by using  the same  machine , Prd.dept is created Prod. Order.
    But as per std. scenario , SAP should show that this  capacity is not available for pp but in our case it is not happening and capacity is available  here.
    I would like to know is there any thing  missing from my side.
    Awaiting for your valuable suggesation.

    In Equiment Bom, enter PP workcenter. When you make MO it will not give you an alert. But while your leveling your capacity MO will appears that Work Centre will be on Maintenance from --- to date.
    If it helps, kindly give points.
    Regards,
    RM

  • Capacity planning integration with ERP based on activity types

        Hello Friends,
    Please help me in understanding the integration of capacity planning with activity types.
    I have done the configuration but i am getting all the values double and giving the wrong roll up.
    Please help me how this integration works and how to configure it so that i can get the actual efforts from the SAP ERP.
    Regards,
    Lohith

    You can split operation and assign operation ticket to more than one Person (i.e. HR person number) even if they are not linked to one work center.
    I don't have system in front of me, but I think it's in Operation details. You can also check individual capacity in table or graph. It was available in ECC 6.0
    Hope this helps-

  • Configuring profiles in CAPACITY PLANNING (CM07)

    We need to configure a profile in CM07 which should be similar to CM01 but only should pick up released orders (PM orders) and instead of 9 weeks we need data for 11 weeks. These are the major two differences that we need. Can you please let me know the steps to do it.
    Your help would be really helpful and appreciated.

    Hi,
    Regarding selection of data of 11 Weeks than 9 Weeks you can do the same using Option Profile using T.Code: OPA3 in customisation where in you can mention Start and End Date.
    Path SPRO - Production - Capacity Requirements Planning - Evaluvation - Profiles - Define options profile.
    You need to assign the new Option Profile in Overall Profile (OPA6).
    Regarding selection of only released orders I will check and confirm.
    With best regards
    Shankar.

  • Capacity Planning - CM07

    Dear PP Gurus,
    I am using CM07 to view the work center for the capacity planning. My requirements load for  12 months.
    How come the planned order on July onwards is schedule all to June?
    It is supposed to load according to the month for the orders, but is not and the earlier months capacity is not fully utilised?
    Need you expertise on this.
    Appreciate the assistance
    Thanks & Regards
    Pooja

    Hi Abhijeet,
    You can use profile SAPPISAFRU - IS Confirmation and then after double clicking the particluar line item you can chose confirmed quantity in the field display.
    Otherwise you can use the transaction CN41 for actual work done or CN48n for confirmation line item display.

  • Planned capacity not integrated to Bucket

    Hi Experts,
    We are working with PPM 5.0 and facing the following scenario:
    We have defined an scenario where the item gets the planned capacity from the role demand in the project management system (item process = Integration) and the bucket should roll up that information (bucket process = roll up).
    We are getting the integrated information in the item correclty, but when we go to the bucket capacity management, the planned capacity appears as 0. If we include subobjects we can see the correct demand assigned to the item.
    For the integration we are running program /RPM/CAP_PLAN_INT
    If instead of the integrated value we look at the forecasted which is manual at item level and rolled up at bucket level, the roll up is executed correctly.
    Has any of you faced that issue? Are we missing any step to get the rolled up information? Is there any SAP note on this?
    Thanks in advance.
    Best regards,
    Neil

    Missing the execution of program /RPM/BUCKET_ROLLUP

  • Planning Capacity using CM01 and CM07 transaction

    Hi,
    there are two kinds of sales order in our company: the "confirmed" order sales and the "not confirmed" order sales. The both we need to plan in PS and need use the factory capacity. But when we need to analyze the capacity planning of these projects, it's interesting if we can separates both types of projects, the "confirmed" and the "not confirmed project". And we have to change the projects from "not confirmed" to "confirmed" when a costumers really confirmed a sale. The input in CM07 transaction that I use is the work center.
    I think this case is very common in the companies since there are situations that it's necessary to use the factory forces even a order sales is not confirmed but probably is going to. Than we need to change this project to "confirmed" and is going to show us in CM07 as a confirmed project.
    Thanks,
    Tiago

    Try this function module,
    CLOI_WC_CAPACITY_READ  Similarly
    Please search in SE37 using f4 by giving the capacity in the description field and search.
    there are many function modules are listed for capacity related one , then try  giving your input value and find the output you are expecting...
    Thanks.

  • PP-PM Integration-capacity block due to maintenance order

    Hi guys,
    I have an work center under which i have grouped 3 similar machines which has both machine & labour category
    Now with respect to notification(that one of the m/c in that wrok center got break down) from production if a maintenance order is planned then in CM 27 screen iam able to see the capacity getting blocked
    The problem is capacity is getting blocked for the whole work center,iam not able to dispatch for the other two m/c,my requirement is that i should be able to dispatch the operations in other 2 machines,so what should be done to address this issue?

    Hi Naven,
    In work center capacity tab select Capacity header details and give "No of Individual Capacities " 3.
    Hope this is useful
    thanks and regards
    Murugesan

  • PP-PM integration : CM50 (capacity evaluation)

    Hi experts,
    I have an equipment with a PP work center filled (in "work center" field, in location tab).
    I have created a PM order with "system condition" set to 0 (=out of order) and a work duration of 8HR
    The PM work center has the following capacity information :
    Start                06:00:00
    Finish               18:00:00          Capacity utilization 100
    Length of breaks     01:00:00          No. of indiv. cap.   4
    Operating time       11.00             Capacity             44.00        HR
    Overload     0%
    The PP work center has the following capacity information :
    Start                06:00:00
    Finish               06:00:00          Capacity utilization 80
    Length of breaks     01:30:00          No. of indiv. cap.   2
    Operating time       18.00             Capacity             36.00        HR
    Overload     0%
    When I run CM50 for the PP work center , I get the below information for the related period/day :
    Requirements     Avail.cap.      
    20.864 HR          57.375 HR
    Can someone explain to me how the system get those values??
    Thanks,
    P.

    Hi,
    1. Check the work center capacity whether you maintain capacity interval or not. With capacity interval, it will change the capacity header data.
    => intervals are maintained and for the related period :
    Day SNo   Day  Shift Start    Finish   Breaks   Cap. No. Oper. Capacity     Un
    1   1                06:00:00 14:00:00 00:30:00 85   3   6.38  19.13        HR
    1   2                14:00:00 22:00:00 00:30:00 85   3   6.38  19.13        HR
    1   3                22:00:00 06:00:00 00:30:00 85   3   6.38  19.13        HR
    I guess the above explains why capacity available in CM50 is 57.375(=3x19.125). Because (8-0.5)x0.85x3=19.125
    2. Do you maintain shift sequence in Grouping field? If so check the configuration of shift sequence.
    => Grouping field not maintained.
    3. Please note that the PM Order will not reduce the available capacity, instead it will increase the requirement.
    => could you give more details about your statement.
    4. Please ensure that the system condition is set to reserved capacity to PM in configuration.
    => for 'system condition = 0 (out of order)' , 'reservation by PM' indicator is selected
    Also you need to enter the PP work center in PM orders (or in equipment master) in location tab.
    => PP work center maintained in location tab in PM order
    5. Also the work duration in PM order is not used. Instead it will use operation. start date/time and operation fin date/time. For example, the operation start date start from 08:00 to 12:00 on the same day, the capacity requirement is calculated at 4 hours.
    => in PM order, the operation start date/time and finish date/time are : Erl. start 20.06.2011 06:00:00        Earl. fin. 20.06.2011 14:43:38
    6. Hope that you didn't change the configuration in extended capacity evaluation. If so, check your configuration too.
    => do you know that configuration path in IMG?
    Do you have an idea how CM50 gets a requirement of 20.864HR?
    Thanks for your time.
    P.

  • Plant Maintenance: Capacity planning CM01/ CM07

    Hi
    In capacity planning CM01, the standard sap shows all the maintenance orders which have system status created. But we would like to look at onlly the released pm order in the standard overview list and detailed capacity list. Please let me know if there is way we can configure it.
    Thanks

    Hi Nayan202,
    You could configure desired "selection set" T.code "CSM1" and then assign this to appropriate "Selection Profile" under initial set.
    Hope this helps.
    Shahnawaz

  • Capacity Utilization by network activity for each period

    Hi all,
    How do i find out the capacity utilization at the network activity level. My requirement is to findout the remaining requirement/capacity of a workcenter for each period, which will be the cumulative value of the non utilized resources/hours for the previous months, based on distribution key.
    The same functionality is there in CM07, but what is the exact functionality and how it can be reimplemented in a report?

    Hi,
    Check if table KAKO helps. You may have to calculate the remaining capacity from available and utilised.
    Regards

  • PS and PP integration

    Dear Experts,
    Good Morning....
    Please suggest me PS and PP integration customization steps.
    Regards
    Lallan

    PP is not a major player in PS as far as integration is concerned. It is through Material Management that Production Planning is informed of Production Orders using special settings in the Material Master.
    One another area, the PP and PM modules share Work Centers with Project System.
    The Work Center is needed for Capacity Planning and Planning costs. If we integrate this Work Center with HR module, we will be able to select only the people who have been assigned to the Work Center. We can specify the amount of work the individual will contribute. This forms the basis for capacity planning.
    Hope u must have understand.
    PS - Process
    After creating the project next step is u want to do cost, Revenue & Budget Planning for the project
    in the t-codes CJ42, CJ30 & CJ40 respectively. Next step is creating the Sale order in va01 T-code.
    But I have internal project scenario, example: Overhauling of DG set. Assigned work enter & Workforce & also material to network. So shall I do costing? As explained! Is it necessary to create of Sales Order?
    CMP2 - Assign workforce to activities
    CAT2 - Transfer actual time to CATS. In CAT2 we have record the actual timing correct for an activity, on day basis & with personal number.
    MD51 - Run Project MRP to create Planned orders.
    MD04, ME21N, MIGO - Convert planned orders to purchase requisitions and P.O, and goods receipt.
    MB1A - once the goods are brought is project stock; the same needs to be consumed by mb1a -281 Q on the project.
    CJ20n - Attach milestones as per the payment terms.
    VA02 - Copy billing plan to sales order.
    VF01 - Billing
    CJ20n - Project tech complete and closure.
    Hope this will help you,
    Regards,
    ANSAR

  • Doubt in creation of capacity

    Hi All
    I have a doubt as what effect the "Active version" field has in the creation of capacity.I have created a capacity with 20 number of individual capacities within it and maintained all details pertainng to individual capacity correctly.Now when look for CM07 I am not getting the cumulation of 20 capacities as Available capacity whereas getting only one capacity value.In the creation of the capacity (in the header screen) I have not amended any value against the active version field.
    Might this be the reason for the above.Please advice

    Hi.Thanks for the reply.I have not proceeded upto routing.On checking only one capacity value i have stopped proceeding further.
    Another unusuall thing is SAP help says if you have not enter anything against Active version field then the system will take the 'standard available capacity' for capacity planning.Hence i have the doubt as the standard available capacity viewed in cr13 is cumulative of the 20 capacities,but still in cm07 i am getting only one capacity value as available capacity.
    Please advice.
    thanks in advance

  • Setting needed for Capacity Planning.

    Hi PP Gurus,
    I want to know what setting we have to do for capacity planning.
    what I know is:
    1. W/C should be set for finite scheduling.
    2. In scheduling parameters for process order tick "Generate capacity Requirement".
    This both setting are made in my scenario, but it is'nt loading the work center fot that week.
    Any other setting nedded?
    Thanks, in advance.

    Dear ,
    You need to have following set up at basic level frist before you perfomr the capacity requirement planning  :
    1.In OPKP-Define Production Scheduling parameter -Availability check -Confirm Capacity and also Finite Scheduling chekc box ticked .
    2.In OPU3/OPU5-Define Scheduling Parametesr -you should mark the following
    1.Automatic Scheduling check box should be marked
    2.Scheduling Log check box should be marked -generate in case there is a scheduling error due to capacity over load .
    3.Scedulinga and Generate Capcity should be ticked .
    3.In OPJK Imaintain check capacity with SAPSFCG013 overall profile and set indicator -1 -Release Order -by user decision if capacity is insufficient
    4.Work Center - Define the capcity planner group,activate checkbox Relevant for Finite sceduling,on the capacity header define the shift timings,break timings and unit of measure,no of individual capaity, enter formula for scheduling in capacity view.
    5.Routing - enter the values for the standard values. Use control key with scheduling and CRP activated .
    6. OPD0 and have the following set up  : Overall profile : SFAPSFC015 --Inside the over all profile I have the following set up
    1.Selection Profile -SAPSFCS013 SFC: Order view, standard overview
    2.Control Profile : SAP___C004 : Gen Capacity Availability Check for 1.5 months
    3.Time Profile : SAP___Z006 : Gen Capacity Availability Check for 1.5 months
    4.Evalution Profile : SAPSFCA013 : Gen Capacity Availability Chek =3.0D
    5.Strategy Profile : SAPSFCVER1-Gen Capacity availability Check
    6.Period Profile : SAP___P001 -Weekly period
    7.List Profile : SAPSFCI001-Production Planing
    Check all of them in place .Then you can go ahead with Capacity Req.Planning -Evalution and Leveling -CM21/CM22/CM05/CM07  etc.
    Refere the below theread for farther reference :
    Capacity problem in production order
    capacity planning
    Hope this will be useful .
    Regards
    JH

  • Change status for 18 million messages in the Integration Engine

    Hello there!
    I have the following situation and I wonder that maybe you could help. Currently I have more than 18 million messages for the BC_XMB object in the Integration Engine for a BI System (connected to a PI system).
    The problem here is that the archiving/deletion jobs in this BI system are faulty since maybe a couple of years ago and all of these messages are marked as "Archivable":
    What I'm trying to do here is to change the status for these 18 million messages from "can be archived" to "to be deleted" since there is no way that I can archive this 18 million messages (filesystem capacity). I've been looking many option but I cannot figure out how to do it.
    Maybe, if you know an alternative way to do this, I will be very pleased to hear it.
    Thanks a lot in advance.
    Carlos

    Raghu.
    I've done the following:
    1. I've executed SE38 tx code.
    2. I've entered the "RSXMB_DELETE_MESSAGES" report as "Program"
    3. As the "RSXMB_DELETE_MESSAGES" report does not have a selection screen, it must be executed with default parameters. So, I selected "Program -> Execute -> Background".
    4. There are no available variants, so I clicked on the "Execute immed." button.
    5. The job starts. I can monitor it on the SM37 tx code.
    6. It only deleted 20 messages.
    What I get from this, is that the "RSXMB_DELETE_MESSAGES" report cannot delete the big part of the messages since them are marked as "Archivable" and not as "Archived".
    what do you think of it??
    regards
    Carlos.

Maybe you are looking for

  • Bridge CC stopped showing thumbnails, does not expand at triangles

    Hello community -- three days ago Bridge doesn't let me open all triangles at folder's tab anymore, sometimes more, sometimes less -- plus when being at a folder that cannot expand anymore and Bridge should display the thumbnails of files, it doesn't

  • GPS on N95

    Hello! How can I use the built-in GPS on my N95? Every time I start the Nokia Maps program, it connects to the internet. Can I use the GPS without having to connect to the internet? If yes, can anyone point me to some guide, because these nokia sites

  • Distorted Docking Station Problem

    Okay, I put my iPOD on the docking station and when it plays music there's this sort of distorted sound in the background! Please help, because it's really annoying!!!!!!!!

  • Does the silence switch, switch off all sound?

    I have an iPhone, and I need all sound deactivated as I bring my iPhone to high school. Does the silent switch on the side, mute everything? I don't want app notifactions and emails popping up in class. Or do I have to manually switch off the sound?

  • Save Alsa Volume Levels

    For some reason when I reboot my Arch Linux workstation, Also is always muted when I login. I always have to go into my sound preferences window (Gnome) & enable the levels and select 'headphones' which gets very annoying after some time. I don't rem