Dear Experts
I am a beginner in SAP PM. I have one PM scenario. How to implement in SAP.
I want to dismantle one temperature gauge from one equipment for repaired, first I have to dismantle the gauge from equipment and after repairing I have to reinstall the gauge on equipment. How to proceed for that?
My temperature gauge is maintained in BOM for that equipment. How can I dismantle material from equipment BOM and reinstall that?
Thanks

Hi Iqbal
    In IQ01 for the 'material' Temp gauge I created one serial no and equipment. I installed that equipment(temp gauge) on pump as sub equipment. Then before repairing, in IE02 itself I selected dismantle and dismantled. Is it the way you were mentioning?
Alternatively when I use the t-code IE4N it gives the following error massage: -
"Missing Customizing settings for software component ECC-DIMP
Message no. IEN126"
Can you please tell me the path details for IE4N. And is there any customising settings reqd for this T-code.
Thanks

Similar Messages

  • Multiple Material Selection linked to Equip BOM

    Dear Experts,
    We have Equipment BOMs.
    Now there is a requirement during Material selections in From To fields, that if I select the option 'Material by Equipment BOM' the list of materials under that particular Equip BOM should appear. (Exactly the way 'Material by Material Group' etc do) for this I need to have the above option in the Menu. i.e. Material by Equipment BOM.  How do I achieve this?
    Kindly help.
    Regards
    Jogeswara Rao

    Hi ,
    It might be not possible
    but you can try   copy from equipment bom
    Regards
    Jitender

  • To pick up semi-finished material from BOM

    Hi friends,
    How do i pick up only the semi-finished material from the BOM against the finished material???? Plz help me with the code.
    For EX: 5000-00001 is the finished material for which der i a BOM.
    it hs the components 4000-00001,
                                    4000-00002 &
                                    3000-00001.
    I want to pick up only the semi-finished material i.e
    4000-00001 & 4000-00002. Material Group for semi-finished is '4-1'.
    plz help me with code.
    Its very urgent
    Thanks & Regards,
    Purva.

    Hi Hemant,
    Check this post
    To find the semi finished goods used in a finished good
    You can get the list of Semi finished materials for a finished material from the Bill Of Material.
    Use this function module CSAP_MAT_BOM_READ to read the BOM.
    Regards,
    Satish

  • Purchasing Group in equipment BOM ( Item level)

    At the time of creating equipment BOM , purchasing group in equipment BOM (item level ) will be in sync with material master purchasing data.
    When we change purchasing data (Purchasing group) in material master at that time system will not change purchasing group in old equipment BOM's at item level. Is there any standard method to maintain purchasing group in old equipment BOM in sync with purchasing group in material master data (System ECC 6.0 ehp5)
    Thanks and Regards,
    Pankaj

    Thanks for reply Peter ,
    Because of this issue wrong information is flowing to PR (when component selected from equipment BOM in work order).
    Is there any negative impact if I will remove purchasing group at BOM item level ?
    I did analysis for this and found no negative impact on PR , still looking for expert advice as client is not looking for any core modification.
    Thanks and Regards,
    Pankaj

  • Material Reservation Through Bom

    Hi Gurus,
    I have a requirement that when am going to create a order i need to take material from E-BOM only and some of oil and greese i have to select from componets tab,  from components tab i dont want to select any other material, so please hlip me how to enhance this task.
    please help me on this it ld be very helpful for me.
    Regards,
    Rahul

    Hi,
    am using this user exit, when we are entering material in component tab other than E-BOM material, when we are saving it throughs an error it is not in BOM list when am going to delete it from component tab the system doesnt allow me to save the order.
    >> i want check list when am entering material in component tab other than E BOM, system thoughs an error that it is not in E BOM,
    Eg:
    In components Tab: System should Check here only
    Material No>>Enter>>It is in BOM
    Material No>>Enter>>It is NOT in BOM
    Regards,
    Rahul

  • Reservation and requisition for material in MO from the equipment BOM only

    Dear all,
    i want to create material reservation and requisition from the equipment BOM only which is maintain against that equipment ( in the 'list' tab of component).and which material is not in that BOM, system should not allow to create material reservation and requisition of that material in maintenance order.

    Shahanawaz,
    You could try making the material and material text fields display-only via field selection.
    Otherwise, try user-exit CNEX0026 (general inspection of material) via TCode SMOD.
    PeteA

  • How do i get a Base code (Material) from a description through BOM?

    Hi,
    the right base code(material) for the production order '68647' is 100827 descriotion 'PIPE BASIC' .
    my requirement is i have an production order and relevent plant, how do i get a basecode ?
    from my previous finding i read that All BOMs will have are associated with the description.
    Targeting this description will always return the right base code for the order.
    but i did not get any idea out of it.
    Please tell me how do i get a Base code (Material) from a description through BOM?
    Thanks in advance.
    Edited by: gulab zehra on Sep 22, 2009 9:17 AM

    Hi Keven,
    I had a look at the example "programmaticbuild2.vi" that you can find at this link:
    in this application the error that eventually comes out from the "BuildTargetBuildSpecification.vi" is written in the error_log.txt through a case structure.
    You can change the code inside the Error case if you want to handle the error in a different way. For example you could connect the error wire to a General Error Handler, that displays a message if an error occurs, or you could light up a led that inform you the error has occurred.
    Best regards,
    Serena M.

  • PM - Equipment BOM VS Maintenance Bills of Material

    Hi,
    In Materials planning,  Using maintenance bills of material have  advantage , know that there's Equipment BOMs
    & Functional location BOMs.
    When & How to use the Functional Location BOM ?
    When & How to use Equipment BO?
    Can we use normal production BOM (CS01) replace all this equipment BOM / FL BOM?
    TQ.

    Hi,
    Production BOM will have the Materials in Header as well as in Item level. Even BOM usage will be defined as Production.
    In Equipment / FL BOM, BOM will be created against the Technical Objects. These BOMs will be used in Maintenance Orders. In these BOMs, components of the Equipments (For example, equipment will be motor. Components may be capacitor, rotor, casing, etc.,) will be mentioned with the qty.
    Based on the type of motor, components can be different type. So BOMs will be maintained by the MDM people. Maintenance Planner will create the Maintenance Order & BOM will enable him to select the right component (There may be different type of rotors in Material Master, but based on Motor type, rotor should be selected in Maintenance Order).
    As Maintenance Planner will not aware of the type of component, BOM will help him to select the right component.
    Regards,
    Maheswaran.

  • Equipment BOM

    Hi,all,
    I m maintaining equipment BOM for spare parts planning ,where all item category has been mentioned as "L",now from maintenance order I want to generate Purchase Requisition by changing the item category as "N" after selecting the specfic item from that equipment BOM .But  item category field of the maintenance order is coming greyed mode ?how can I change the item category from "L" to "N" to trigger PR??
    Also is it possible to create Purchase Requisition from t-code ME51N with reference to an equiment for which I have maintained BOM .Is there any field to enter equipment no from where I can retrieve the spare parts list ?Please give ur valuable suggestion how to proceed.
    thanks in advance.
    rgds
    rajib

    Hi,
    BOM item should be maintain with item category u2018Nu2019 or while assigning component to order instead of double clicking on item (BOM item) ,  Just copy the material (ctrl+c) and assign category :u2018Nu2019 and quantity manually.
    In case of second issue: You cannot create a PR with reference to Equipment and there is no field in PR to assign Equipment.  If you are having cost centers assigned to equipment in 1:1 ratio, you can assign cost center in account assignment of PR item.
    Or else you can go for a standing order that is one standing order is to be assigned to each equipment and same can be used for account assignment for procurement.
    In case of capitalization of expense you can go for asset as account assignment.
    If you are not looking for account assignment and just want to retrieve the PRs connected to Equipment then you can think of tracking no field.
    Raju

  • LSMW for equipment bom kde

    Can someone please specify the steps required to create an equipment bom lsmw

    hi Alagasen
    why don't you use standard object "create material BOM",change the transaction code from CS01 to IB01
    and do the mapping and upload
    regards
    Seenu

  • Equipment BOM & Function Location BOM

    Dear All,
    We  are created functional location BOM and we are  created Functional location order.In that order i found the  Equipment BOM which are linked with functional location.I assigned functional location BOM as well as Equipment BOM items for that order.It will take the items.In Functional location order Equipment BOM items should not take.
    Pls.Help me.

    Hi Srinu,
    Your query is not clear.
    Normally when your creating the maintenance order for Functional location. if this FL is having the BOM you will get the this BOM during the material planning in that order.
    if your creating the maintenance order for Equipment. if this Equipment is having the BOM you will get the this BOM during the material planning in that order.
    If there is no BOM you can plan the Material from the list also.
    Regards
    Venkat

  • Equipment BOM query

    Dear All,
    After maintaining equipment BOM , i think we are only
    able to issue (BOM Maintained)material against the
    Maintenance Order but its not happening.?? ? i think i
    am missing some customization, is it?.
    Plz guide, n do tell me main benefits of maintaining
    Equipment BOM.
    Thanks a ton

    Deepak,
    A BOM is used in PM to assign spares for a technical object. BOM provides you  an overview of all components that make up an Equipment . The BOM is also used for material planning, and you can perform material planning when creating a maintenance task list or Work Order.
    When you create a work order with an Equipment as reference object, you can access its BOM from the order component screen and assign an item to the order. The system generated material reservation/ PR based on the item category.
    If you can elaborate your problem a bit more in detail I may be able to provide more specific answer.
    Hope it helps.
    Thanks,
    PJ

  • IB01 Load equipment Bom

    Does anyone know if there is a standar program to load equipment bill of material, i tried using a recording but when executing the batch record the screen changes from the one where i created the recording so is not working. I will appreciate if you can help me out with this. I even tried with a standar object 0030 but is asking me for a logical file that i can not assing.

    try with below LSMW IDOC method
    Message Type         /ISDFPS/BOMEQU              BOMs: Equipment BOM
    Basic Type           /ISDFPS/BOMEQU01            Equipment BOM
    Enhancement

  • Error while creating equipment BOM (IB01)

    hi guys,
    while creating equipment BOM (IB01) i am getting this error, while adding components.
    'Material type NLAG cannot be used with item category (plant 1000)'.
    regards
    chinta

    HI Chinta,
                                   I understood ur problem IB01-give the equipment number which is generated by the system and give plant name in which you have created the equipment and bom usage as 4 (plant maintenance) and press enter.
    Then you will get the components list give the description,quantity and item category as:
               as you gave it as L it is throwing an error give it as N(Non stock item), then you wont get the error.while selecting the item cat. you will get differnet components and you select the appropriate one based on you equipment.Hope you issue is resolved.
    Regards,
    Bharat

  • Costing run with values for material from info record.

    Hi All
    there is requirement with my client, that when i run my costing run the values of the components in BOM should be from the latest purchase order.
    For this i am maintined valuation criteria as price from info record and sub strategy as gross price from PO.
    When i am create a PO the info record is created automatically in background. So when i run costing run the value is picked correctly.
    Now when i create a PO with same material from diff vendor the info record is generated, but on costing run it picks the value from the info record of earlier vendor. For this i go and check the conditions tab in info record, ensure its balnk and save it. Again generate new PO and then run a costing run. This time the system reads the latest info record.
    My problem is that i want to ensure that during the costing run, system should read the latest info record w/o manual intervention. System behaviour is not consistent when there is multiple vendor and same material info records. Sometimes it pick up the value and sometimes it refers the old info record.
    Can any one help me out in resolving this issue. Its critical.
    Regards
    Rakesh

    Hi!
    Generally first info records will be created with vendor, then PO will be created, based on info records price, price will be updated in PO.
    If you have more than one vendor for same material, you have to create info records for each vendor. then you need to maintain source list, where you can fix the vendor. If there is no fix vendor, then you can do schedule agreement with vendors, where you have to give proportionate percentages again each vendor.
    Now for costing run :
    1. if you have only one info record, the price will take from that info record.
    2. if you have more than one info record, you need to mantain source list, where you can tick the fixed vendor, then system will take price from that vendor info record.
    3. if there is no fixed vendor and you have maintained scehduel agreement with weightage to vendor, then higher percentage vendor info record price will be picked up.
    4. if you have more info reocrds, not maintianed source list or schedule agreement, price will be picked up from first info record ( based on info record creation date).
    5. if you have a schedule agreement, but you have given equal weightage for example 50% and 50%, then also system will pick up from first info record.
    i think it is clear now.
    regs,
    ramesh b