Lot size data

I have a maximum lot size for my procurement parts. If my requirements for a day are higher than this quantity I want to have a supply with my maximum quantity for this date and the other quantity on the next days. Not at the same day.
The system creates splitted deliveries for the same day.
Which settings are necessary?
Thank you for suggestions.

Hi,
Use Lot size EX - Lot for lot order qty and assign max lot size in MRP1 view.
In MRP 2 view assign TAKT time 1 day.
So when MRP run system will generate procurement proposal for the required qty if it is less than max lot size.
If the requirement qty is more than max lot size system will split the qty & generate one more procurement proposal for the next day.
Regards,
Dharma

Similar Messages

  • How to make lot size dependent in Material master?

    Hello Experts,
                   I created a Material master for a Finished product in Pharma industry and in work scheduling screen, under the section "In house production time in days", I see that "lot size independent". What change(s) in my settings in the Material Master can change it to "lot size dependent"?
    Does any changes in the  "Lot size data" section in the view "MRP1" have any effect on this field?
    Also one more question:
    Where is the Usage for BOM first specified? Is it in material Master or when creating a BOM?
    Thank you.
    Message was edited by: Visu Venkat

    Hi Visu
    No,Lot size data in MRP1 view will not have any effect in inhouse production time in work scheduling view.
    You need to maintain the base qty in work scheduling in order to get the scheduling time for lot size dependant.
    BOM useage is first specified only during BOM creation.
    Suppose if u maintain the BOM useage in material master before creation of BOM, then still u can create a BOM with different useage. During these case, there will be always inconsistencies.
    Hence Useage is always specified first during BOM creation.
    Hope u r clear now.
    Regards
    Vijay

  • How to perform Data Collection on single SFC with QTY = 1 with material lot size 1?

    Dear experts,
    We are working with SFC qty>1 on a relaxed routing. At a given operation we want to collect the data on single quantity; i.e. SFC qty on that operation, where the collection will happen, will be 1.The corresponding material lot size is for ex 10. The operator must be able to collect data on SFC with qty=1 multiple times until the quantities will be consumed. He must be also able to collect other values on the remaining quantities on the same operation with the same DC group or other DC groups. How many times the data must be collected is dependent on the shop order build quantity. The data may be collected several time but not more than the build qty. In other words some specific data will be collected on a qty of a product while others will be collected against remaining quantity. The data collection must be also done in a serialized manner.
    Here's what we have set up so far:
    1) 3 DC groups, each DC group has 3 data fields.
    2) Each data field has the following restrictions:  Required Data Entries = 0 and Optional Data Entries = 1
    3) All DC groups are attached on the same combination of operation\material\routing
    4) we are using relaxed routing
    Process description:
    The operator must be able to collect any data field on single product. For that he will enter the operation where the data collect are attached, he will enter the SFC with qty=1 then he will run the data collection after selecting the appropriate DC Group and entering the needed information. The operator will complete the SFC with qty=1.
    The operator will pick the next product, select the same SFC and enter qty 1 and collect other value against this product.
    Problem is:
    Once the first collection is done on a given SFC with entered qty=1, the system is not allowing the operator to do further collects on the same SFC with qty=1 or any other quantity. He cannot select any DC group from the DC group list. We tried also with the table selection menu on the DC Group list but nothing can be selected.
    So we tried to play around with the DC group definitions as follows:
    A) we set Required Data Entries = 0 and Optional Data Entries = 10. Still the operator was not able to select any DC group after collecting data the first time. We tried to reopen the pod and list again. But we get the same blocking behavior.
    B) we set Required Data Entries = 10 and Optional Data Entries = 1. The operator was able to select the DC group after collecting data the first time. BUT operator must enter the data fields 10 times on one SFC quantity, which is not what we want. Besides again he cannot collect other information on remaining quantities on the same operation.
    C) There's an option to serialize the SFC before reaching the operation where the collection is happening, then merging ofter complete. Automation is needed here; hence customization. We are highly avoiding customization now, since we expect the data collect to work well on single quantities even when the main SFC has qty>1
    Questions:
    1) Are we missing any kind of further configuration\setup?
    2) Or the current system design does not allow collecting data on single quantities of an SFC which main quantity is greater than 1?
    3) Looking at this link Approaches to Collection of Data - SAP Manufacturing Execution (SAP ME) - SAP Library, there's nothing mentioned about same SFC number with multiple quantities!!!
    We are using SAP ME 15.0.3.0.
    Thanks in advance for your help
    Ali

    Ali
    to collect data for the same SFC multiple times, your system rule "Allow Multiple Data Collection" needs to be set to true for the site.
    Stuart

  • Master Data on Lot Size Tab

    Hello Guru,
    I need your help with regards to the master data set-up we have in APO. In tab Lot Size, the Procedure of our products is BY PERIOD, period type is W (weekly).
    We are now having issues in the quantity recomended to received, as you can see we have 23 days as safety time, but the system is calculating to have around 100 days of coverage (days of supply)
    if we compare inventory target in items on a weekly view, we should have around 150m items, and the system is calculating to have around 500m items
    Does this set-up in master data is a factor? hope for your help.
    FYI.
    We check other code in the location that is ok, we see that in its master data Procedure = Lot by lot. And the other ok one is its Procedure = BY PERIOD, Period Type = D (daily)

    It would be helpful if you explained which engine/heuristic you are using.
    If you use lot for lot is the quantities exactly matching the demand?

  • Lot Size different to master data

    Dear Gurus,
    In master recipe, when I am trying to save the following error message is appearing.
    Lot size different to master data
    Can anyone help me on this issue.
    Thanks in advance,
    Arul.

    Dear,
    Please check,
    When a master recipe is scheduled, the lot size can be proposed in two different units of measure
    If a base quantity is maintained in the material master (view Work scheduling), the lot size is entered in the base quantity of the material master. If no base quantity is maintained, it is entered in the unit of measure of the recipe header (header unit).
    That is, the unit of measure of the lot size is predefined by the system and you cannot choose it.
    If the lot size is entered in base unit of measure for scheduling, up to now, no conversion between base unit of measure and header unit occurs. The lot size (in base unit of measure) is converted into the operation quantity directly via the conversion factors of the operation. The scheduling result is incorrect. and system display the message   Lot Size different to master data.
    Regards,
    R.Brahmankar

  • MRP Type P1 & Lot size PK

    Dear All,
    This is REM scenario,
    Client is going scheduling agreements
    material master Settings
    MRP Type - P1
    Planning time fence - 10
    Lot Size - PK
    Procurement type - F
    GR Processing time - 2 days, No plad delevery time maintained.
    in planning calendar we are going with only one day as Friday
    and we made previous day is working day if friday is holiday.
    After MRP system is proposing dates for schedule lines as
    16/06/2010 ( wednesday ) Rescheduling date as 07/06/2010 ( Monday ) ( Rescheduling in i.e 10 )
    How system is proposing this dates
    Please share your views or if required more info then revert back
    i cannot upload Docs as my company policy is not allowing
    Regards
    Madhu

    Hi ,
    Bring process forward (reschedule in)
    Within this rescheduling horizon, the net requirements calculation checks whether, after a requirement, a firmed receipt exists, which can be used to cover this requirement. Then the system displays a rescheduling date as well as the exception message Bring process forward for this receipt. The net requirements calculation then uses this receipt and the system will only create another procurement proposal if the receipt quantity is not sufficient to cover the complete requirement. Several firmed receipts can be used to cover one requirement.
    It does not take in to account the GR processing time and it is purely based on the stock requirement date , parameters in Procurement and Scheduling in the Material Master
    So it will consume the requirement  backward scheduling and bring the Process forward.
    Kumar which  strategy are you using ?  scheduling agreement is of weekly , daily or monthly bucket ?
    How many days SA bring to Production and How many days SA for forecast you are doing ?
    Are you using any Program to convert these SA in to PIR and upload ( using any program ) .
    Regards,
    Jayavimal
    Edited by: jaya vimal on Jun 16, 2010 1:33 PM

  • Empty file picked although file have lot of data in file adapter SAP PI

    Hello All,
    We are facing the weired behaviour of SAP PI file adapter channel.
    In without mapping Scenario of 7.31
    At some time whole file is archived properly in archive folder but in SAP PI log we can see the file size 0 bytes.
    And at received side empty file will be sent.
    But in actual there is lot of data in the file.
    The same file triggered next time then it working fine.archived and sent as it is.
    So can anybody help me for this ?what is the issue why sometime file with no data is  picked by PI?
    If file is pick up by PI before it is written completely by third party then is it possible that archived file will have all data as it although processed empty ?
    Thanks in advance,
    Anant

    Hi,
    Thanks for reply.
    I know this is common issue of file picking before completing the process of file writting and also i can use Msec to wait before modification check for avoiding this but
    my question is how the archived folder have the file with all data that sender is sending.
    So is it possible that empty file (before compete writting )is picked up by sap pi and then after completing the picking process it will archive the file that is completely written by third party in source folder.
    In other way file picking & File archiving is separate process means file that is picked is not archived but once pi processed the file then it will again check the source folder and archive and delete the same file.
    Thanks
    Anant

  • How to know if a MRP run element is using Quota Arrangement and lot size?

    Hi all,
    Two questions:
    A) How to determine if a source is actually pulled from Quota Arrangement?
    I am wondering if there is anyway from ABAP table or from Transaction (i.e. Purchasing Order) in which the source is pulled from a Quota Arrangement?
    We use scheduling agreement, PIR and source list, and as well as Quota Arrangement for our purchasing.
    I just want to know how, from system (table and transaction), to find out the source is from quota, not from PIR or others.
    B) Quota Arrangement still can work properly if lot-size procedure's splitting quota indicator not Checked?
    If my the lot-size procedure which I am using for a material does not activate the splitting quota indicator, it means split quota will not work during MRP run.
    But does this also mean that quota arrangement will not be working for this particular material even if I have create a a quota arrangement object (via MEQ1) for this material?
    Thanks
    Daniel

    Tomek,
    If I want to use the split quota, it seems there is some pre-requisite.
    If you go to MEQ1 and press F1's on the "Minimum qty split" column, and you will notice the following message.
    Allocation by quota using splitting quotas is only carried out via a requirement planning run, subject to the following preconditions:
    Through the appropriate entry in the field Quota arrangement usage (on the MRP data screen 2 or Purchasing screen) it must have been specified that a quota arrangement is to be applied in the planning run.
    The indicator for the splitting quota must be set for the the lot-sizing procedure used for materials planning purposes in Customizing.
    Hence, the quota arrangmeent still workable even if the lot-size does not have the spliting quota box checked?
    Indicator: Splitting quota in short-term horizon
    The indicator for splitting is used to determine that in the case of the selected lot size, the quota arrangement is to be applied using the splitting logic.
    Use
    If this indicator has been set, the lot is split up in the planning run according to the following formula:
                                quota for source X
    Quantity for source  X = --------------------- * requirement
                               sum of all quotas

  • Lot size dependent / independent

    Hi, please advise when the system uses this lot size times data in mrp4 view? Where we need to specify that whether lot size dependent or independent need to select? When the system uses this data and when the system uses the planned delivery days and in-house production days which is in mrp2? Pls advise.

    Dear,
    Planned Delivery Time use for  external procurement Like raw materials.
    In-house production time use for in house manufacture materials like HELB and FERT.
    In-house production time is independent of the order quantity.
    Lot size depnendent timing calculate from the routing.  It is calculated byadding the lead times of all operations, the float before production, and the float after production.
    You schedule the routing for a base qty The in the scheduling results screen click the button" scheduling results"
    You will get the results screen in days.
    In that screen at the botton there is abutton update material master.
    After this go to CA96 There update the material master.
    Please refer this link,
    Re: set up time dependant and independant of order qty
    Regards,
    R.Brahmankar

  • Lot size Key without splitting Quota

    Hi,
    Can any one explain me what is the use of Lot size Key without splitting Quota.
    We had created a lot size Key - XY with following seting:-
    1) Lotsize Proceed = P
    2) Lotsize indicator -K
    3) Scheduling =2
    4) No of periods = 1
    5) Splitting Quota = Not checked(blank)
    If we had configured this lot size key, what is the benefits of the above setting, What testing need to be done to know whether this lot size key is working perfectly after configuration?.
    Thanks in advance

    Hi,
    If splitting quota indicator not set, then qouta arrangement is not used during planning wrt to selected lot size.
    Lot size procedure you selected, it is a periodic lot sizing procedure. Here the system groups several requirements within a time interval together to form a lot.
    Lot size indicator  Determines how the lot size is calculated for a certain lot-sizing procedure during material requirements planning. For your selection system creates lot size by refereing to planning calender defined in the system
    Scheduling -
    This indicator defines the time in the period the system is to create the availability date or the start date for the lot for period
    lot-sizing procedures.
    The availability date is the date on which the material, including the goods receipt processing time, is available again. In the MRP  list, the  availability date is equal to the MRP date.
    In in-house production, the start date is the order start date, in external procurement the start date is the release date.
    according to your selection - Availability date at period end
    No of periods - 1
    Run a complete MRP cycel  to check whether it is working properly or not.
    Post the results what you get.
    Regards,
    Pavan

  • Lot size in MTO

    Hi Experts,
                       I am using strategy 20, my FG batch size is 100 and i have a sale order of 120. I want the system to create 2 planned orders of 100 and 20. I tried with lot size EX and maximum lot size 20, but system made a single planned order of 120. Have i made any mistake, how can i address my requirement ? Please advise.
    Best regards
    Sm.

    Dear ,
    In MTO process , sales order qty can't not be spillited beacause , MRP system will not generate planned order detail scheduling to match the Schedule Delivery Date in Sales Order line item .
    If you maintain lot size as EX and max lot size is 100 for the quantity of 120,system will create total 2 planned orders.Out of 2 numbers 1 will be  with qty 100 and second one will be 20.In OMI4 open the details screen of the lot size which u are using
    in the details screen there is a indicator LAST LOT EXACT now if u tick this indicator then the system will create the last lot exact
    Basically , your requirement can be done through MTS which will possible .
    Hope it is clear
    Regards
    JH

  • MRP lot size?

    HI All,
    Guys i configured M.R.P Type and M.R.P Controller, but I am unable to understand the M.R.P Lot size?
    while i am creating a material in mm01 lot size is not allowing me to chose any other option except EX-Lot for Lot Order quantity.. could any one suggest why is it so..?
    Thanks and Regards,
    Chinta
    Edited by: Csaba Szommer on Feb 17, 2012 11:46 AM

    > while i am creating a material in mm01 lot size is not allowing me to chose any other option except EX-Lot for Lot Order quantity.. could any one suggest why is it so..?
    Do you mean you can see all the lot sizes but system is not allowing to select or you can see only EX? Because only "EX" lot size doesnt require further data. But if you select any other lot sizes like "FX - fixed lot", you also need to enter the fixed lot size value in fixed value. if you are dealing with CBP, below are the important lot sized to use.
    Lot-for-Lot Order Quantity
    Fixed Lot Size
    Replenishment up to Maximum Stock Level
    Check this SAP site to know more
    [Lot size|http://help.sap.com/saphelp_40b/helpdata/en/7d/c27177454011d182b40000e829fbfe/content.htm]

  • MRP Lot Size Difference

    Hi All
    In OMI4 ie. MRP lot size procedure i see several MRP lot sizes i.e. EX, WB etc....
    But only major difference i find is in terms of scheduling i.e.
    Blank (Requirement date = delivery date), 1 (period start = delivery date), & so on i.e. 2, 3, 4
    Can anyone tell how it works?????? What is its significance
    Example would be very good for me
    Please suggest
    Rgds

    Hi Vicky,
    Requirement date = delivery date
    Planning or procurement proposal will create on req date
    Period start = Delivery date
    Planning or procurement proposal will create on period start.
    ie, if you use period lot size WB,MB.
    WB means weekly lot size ie, on Monday cumulated requirement will create for that week. Same for MB, month end planning proposal will create.
    Period End = Delivery date
    ie, if you use period lot size WB,MB.
    On Saturday cumulated requirement will create for that week if you use WB. Same for MB.
    This concept will not work if you use planning time fence.
    Regards,
    Dharma
    Regards,
    Dharma

  • Maximum lot size - create order manually

    Hi Experts,
    we are in the implementation phase of the project (PPDS) and need your help.
    For the products we have the data of Maximum Lot Size, that is a constrain for the process. But when we execute manual adjustments/creation of the planned orders, this maximum lot size is not respected, because for the manual orders is used the heuristic SAP_PP_001 Change Order Manually.
    We need to consider the maximum lot size even for manual adjustments/creation.
    Does anyone knows a way to consider the maximum lot size when create orders manually?
    Thanks in advance
    Thiago Cyrillo

    Hi Hans,
                  If as per the requirement you want the system to take into account the period of 63 days reqirement , then as my experience the lot size field should be changed from  the daily lot size .......or else the setting is quite redundant in nature........in accordance to your business requirement.
    Check for the period lot sizing for detail information..........incase you have any query then let me know ......
    Please reward points if it is helpful.........
    Thanks
    Kaushik

  • Help on Planning Calender and lot size procedure settings

    Hi Gurus,
    We have 2 different schedule at the moment for our PO Placing to our supplier :
    1. Planning Calendar D01 --> For Seafreight shipment, PO Placing on bi-weekly basis, every Monday and RDD (Request Delivery Date) is on Thursday (11 days after PO Placing)
    2. Planning Calendar D02 --> For Airfreight shipment, PO Placing on weekly basis, every Friday and RDD (Request Delivery Date) is on Wednesday (5 days after PO Placing)
    Now we have required to change the SEAFREIGHT process by having the PO Placing on weekly basis, every Monday and RDD (Request Delivery Date) is on Wednesday (9 days after PO Placing).
    Please let me know the step by step procedure to create a new Planning Calendar and Lot Size Procedure to accomodate this requirement?
    Thanks for your help.
    Regards
    Brijesh

    Dear Brijesh:
    1. I think you are planning to change the Planning calendare D01.
    2. For this go to MD26- GIVE THE plant / palnning calendar id.
    3. Then in the CAlc rule for spec peroid - change the day from wednesday to Monday.
    4. SAve this and generate periods.
    5. Now in the maeterial master- check if you have the lot size as PK and also planning calendar as d01.
    6. In the planned dleiveyr times you enter 9 days.
    Kindly check this and revert back.
    Reg
    Dsk

Maybe you are looking for

  • Why do I have to click the go button after typing a URL? Before FF6 I could just hit enter.

    I just recently updated to Firefox 6. Before the update, I was able to type a address into the URL bar and hit return. Nice and easy. Now if I do this I get no response. To direct to a web page I have to move my cursor to click the go button. It's an

  • Credit Card Reconciliation

    Where does Credit Card Reconciliation Occur, and which form it is suppose to be interfaced with? The solution will provide a function to reconcile these card-level adjustments with the associated card balances displayed on A Bank provided reports. If

  • Billing Invoice post diffferent account configuration

    Dear All, I'm new on SAP, i have to configure billing invoice so that when release to accouting it is post to account that depend on valuation class. let say it is material with vluation class A i want it is post to A revenue if MAterial with valuati

  • How do I go about getting a replacement for my earbuds at the apple store?

    I just got my iPhone 6 and when I went to listen to my music my earbuds was not working in the left ear. I tried with my macbook pro and the problem was still there. I was told once before that my earbuds will be covered by the warranty, now I want t

  • Dulpicate and rename User/Groups

    Whitin the administration it's possible to duplicate a group or user, but I also want to change the name. How can i do this? What i actually want is 25 groups with different filters on the same fields.