Hi,
Planned order  creation via MRP depends, If we change Delivery date in Stock transfer Order.
I created STO with delivery date as 31.1.2012 and when i checked MD04, i can see Planned order created on 27.2.2012 with the same above STO quantity .
Now when i changed the delivery date as 30.1.2012 and runned MD03, and then checkd MD04, planned order disappeared.
Why Planned order got created when STO delivery date was 31.1.2012 and when I changed the delivery date in PO, planned order disappeared.
MRP profile details :
Plnd delivery time   1
GR processing time   1
Planning time fence  38
Tot. repl. lead time 38
Can you please let me know why system is beaving in this manner?
Regards
Utsav

Hi,
Normally , MRP runs based upon the requirements.If your STO is created for a date , system checks through the availabiloty check wheather there exists any stock for that date to get deliverred in the supply plant .If there exists for that date the stock , planned order will not be created.If no stock available then a planned order will be created in MRP.
cHECK the availability check parameters assigned to material master in supply plant.
Regards,

Similar Messages

  • Type of planned order created by MRP run

    hello,
    I have one concern regarding planned order creation through MRP run..
    our MRP creates  automatically order type LA
    I wanted that for some materials,  the MRP creates  planned order type PR ( with account assignment Q ->  WBS element, coming from sales order)
    what is the customizing point to make this ?

    Hi,
    I think that this happens automically when the requirement is created in the WBS SEGMENT, AND cOLLECTIVE INDICATOR IS NOT SET TO 2

  • Automatic Planned order creation-Strategy 50

    Hi all,
    I am using strategy 50 and first two levels of the finished material are make to order. Whenever i create sales order a planned order is automatically created for the finished material but for the material one level below no planned order is create, although this material is also make-to-order (ind/Col indicator is empty). Please guide me how can i achieve automatic planned order creation for the materials which are one level below the finished material (Note: Assembly is also of make-to-order strategy)
    Best Regards,
    Shah

    HI ,
    You are using planning stg as 50 " Planning without final assembly ", and this stg you need assgin only TOP level code i.e salable code , and down level codes no need to maintain .
    Once you enter sales order in TOP level code system will generate planned order  and from next level onwards you need to run MRP manually / Scheduled  ( single level / multilevel).
    System will not generate MRP for two level automatically i.e TOP level and next level when you enter SO.
    I hope this will clear to you
    Thanks
    Sekhar

  • Conversion of Planned order to PR and Dependent Requirements

    Hello Everyone,
    I had two issues to be dealt with..
    1. When i run my MRP run for a specific plant i do not want the system to automatically convert planned orders to Purchase requisitions for specific material in specific plant. How do i Configure the same?
    2. I use planning strategy 40 for the header material. During MRP run dependent requirements are automatically  raised for lower level components. But how does the user know which planned order is generated for which higher level order?
    Moreover, since the same raw material is used in multiple  finished  materials, a single planned order is raised for the same raw material. This makes it all the more complex.
    I think Individual/ Collective requirement does not help in this case because i am using stategy group 40 which is a MTS strategy.
    Any help in both these cases would be greatly appreciated..
    Sincerely,
    Aji
    Edited by: Aji Kurian Mani on Nov 28, 2009 2:51 PM
    Edited by: Aji Kurian Mani on Nov 28, 2009 2:51 PM

    1) Select the indicator "3"- Planned Orders in the MRP Screen or in a Variant you use to schedule the MRP
    2) Under a make to stock scenario, requirements are summarized in a planned order (or many, according to the lot size key). But in general as the stock is generic and not customer-specific, there is no assignment of planned order to a given customer.
    Regards

  • Automatic Plan Order Creation on Sales Order save

    Hi friends,
    We are having an requirement where Automatic Plan Order should be created on Sales Order saving.
    We have Material A in Plant 1000 & Plant 5000.
    Plant 5000 in plant where Manufacturing is carried out & Plant 1000 is service Plant.
    We are using Special Procurement key for Material A in 1000 Plant which triggers procurement from Plant 5000.
    When Sales Order is entered in Service Plant 1000, after saving Order Plan Order should be created in both Service Plant 1000 & Manufacturing Plant 5000 along with Sales order reference.
    I have tried using Strategy Type 81 but Plan Order is created while saving Order only in Service plant (1000), but with Procurement Type (E - In-house Production) & No Plan Order created in Plant 5000.
    Can you please guide me how to meet requirement?
    Thanks in advance.

    Hi Jiaul,
    Thanx for reply.
    I have already assigned the Special Procurement Key to Material A in Plant 1000.
    In Plant 1000 procurement type is F (External procurement)
    But when Plan Order is created after saving Sales Order it is created with Procurement type E (In house production).
    If I delete Firm Plan Order generated & run MRP for Sales Order / Item. It gives me required output generating Plan Order in both Plants.
    Regards,
    Rameshvar

  • Planned order creation IDOC

    Hi Experts,
    i've a requirement where i need to develop a custom IDOC for Planned order creation. is there any standard IDOC for Planned order creation and if it is there then provide me the complete details like IDOC name, message type name, posting and selection program names etc.
    if i need to create a custom idoc then wht is the procedure for it.
    Regards
    Faisal

    Hi Abdul,
    You can use the below details for achieving the below requirement:-
    Message Type :- LOIPLO
    Basic Type      :- LOIPLO01
    You need not create any custom IDOC type as we are having a standard IDOC type available within SAP, but you need to write a custom function module to read the data from the IDOC segments and then call the below BAPI to post the Planned Order.
    Check the input parameters of BAPI and gothrough the documentation of the Basic Type in WE60 transactions, whether all the necessary input parameters of the BAPI are covered in the standard IDOC type, if not then we need to customize the standard basic type to meet the requirements.
    Bapi which needs to be used is BAPI_PLANNEDORDER_CREATE.
    I think all these inputs will solve your purpose.
    Thanks,
    Mahesh.

  • How can I set a fixed scrap qty on planned orders created by MRP?

    During production of some specific subassemblies, destructive testing is done that requires us to scrap two pieces per production order.  I know I can set an assembly scrap percent, but what I need instead is a way to set a fixed assembly scrap quantity that will get loaded onto every planned order created by MRP for these subassemblies.  If we can't do this, we can't plan the correct order quantity and eventually end up being short of parts.  I know we can set a safety stock or safety time, but I'd rather just plan the right quantities if possible.
    Is there a user exit, configuration option, or master data setting that will allow me to do this?
    Thanks,
    Randy

    Hi Randy
    This can be solved by one solution. _You can try this._
    You define the same item in BOM again with qty 2 nos. Double click on the item no. Then it will take you to item detail. There in Basic data tab page at quantity data  ( Tick the fixed quantity. ).
    When ever BOM explodes for the header material automatically The item will be exploded 2 nos extra.
    Ex
    The header is Mat X and items is Mat Y. While creating BOM for X give item Mat Y in item no 10. give the quantity as per the requirement.
    And again give item Mat Y in items no 20. give quantity 2 nos and activate the fixed quantity tick as instructed above.
    When ever requirement for Mat X is 100 nos. The plan order for Y will be 102 nos .
    Hope this will clear.
    Regards
      J .Saravan

  • Prevent Planned orders creation in Sourcing Org

    Hi,
    We have a customer requirement as below:
    Supply Chain : Org1 <-- Org2 <--Org3
    Item Name: X
    Item X has demand in Org1 procured from Org 2 by Sourcing "Transfer From"
    Item X in Org2 has planned order demand which triggeres a Planned Order in Org2 and to be procured from Org 3 by sourcing type "Transfer From" and it will create a Planned Order in Org3 which has sourcing "Buy from" External supplier.
    Org1 : Sales Order -->Planned Order1 for Item X
    Org2: Planned Order Demand2 -->Planned Order2
    Org3: Planned ORder deamand3-->Planned Order3
    Planners are different for Org2 and Org3 wan to do releases indivudually on their own schedules.
    Planner in Org2 want to ensure Planned order3 in org3 not to be released earlier than ISO creation in Org2 for item X.
    How to prevent planned order creation in Org3 having transfer planned order from Org2 to org3 for ISO creation.
    Need your valuable inputs.
    Regards,
    Kumar Kancherla

    Hi Kumar
    If I understand your question, the requirement is not truely about Planned Order Creation but releasing a planned order in Org3 before ISO is recieved in Org2 from Org1?
    This is more of a business process issue than planning since plan will provide a replenishment suggestion when there is a requirement based on sourcing rule. I'm assuming that these 3 orgs are planned in single ASCP Plan.
    One way to enforce this business process is by using "Auto-Release within Time Fence". Since lead times for Item X will be longer in Org1 vs. Org2 and Org3, planned order in Org1 will be released first triggering Internal Req/ ISO between Org1 & Org2 first and then between Org2 & Org3. While this may be OK if you plan to implement all suggestions from ASCP without manual intervention, it may not be acceptable to some planners who may want to control the release process manually.
    You may try it out with a limited set of items initially before rolling it out for all item/ orgs.
    I re-iterate that this issue is more of a discipline that planners need to use their discretion and due diligence to collaborate with other planners to ensure that lower level supplies are released only after a firm demand is released from higher level.
    Please feel free to let me know of any further concerns in this respect.
    Thanks
    Navneet

  • Optmizer Planned Orders Creation

    Dear SAP Experts ,
    I am facing some problems with Planned Orders creation. I am executing discret optimization but it is creating planned order without taking into account minimum lot size.
    For i.e
    For one product with forecast 500 pc and minimum lot size 150 .
    Optmizer should create 4 orders with 150 pc taking into account minimum lot size but it is creating 3 orders with 150 and 1 order with 50 pc to fullfil demand .
    Some one can help me ?
    Nice Regards
    Mauricio Filho

    Hi,
    What is PPM/PDS max lot size? it seems due PPM max lot size you are getting these results.
    SNP Optimizer can't respect max lot size defined in product master.
    it can respect only min lot size and rounding value from product-location master for that
    in optimizer profile must be discrete and on discrete consraints tab define Mini PPM/PDS lot size and Integral PPMs/PDS horizon.
    If data view has weekly as well as month buckets, define 12 Months (don't define 52W) in discrete constraints tab if you want to respect these constraints for one year.
    Regards,
    Vipul

  • Change Delivery date in Sales Order

    Hi all
    I want to change Request Delivery Date in Sales Order. But when I changed Request Delivery Date system appear" The default date is not copied into existing schedule lines"
    And Delivery Date didn't change.Could you tell me how to change Delivery Date ?
    I setup Request Delivery Date - September 21th but Availability Date is September 19th. Could you tell me how to setup loading time, picking time, packing time ?
    Thank and Best regards,
    Thang

    Hi,
    When you change the Request Delivery Date, it automatically changes the schedule line date of all the materials, but by default does not change the schedule line date of the ordered material.
    So just check the ordered material schedule line date and change it manually in the order.
    Similarly maintain the same date in all the resp fieldsi in the delivery, wherever you see the date.
    Regards,
    Siddharth.

  • MRP run but no planned order creation

    Hi ,
    I use MD61 to create PIR , i can saw PIR in MD04 sceen.
    Then i run MRP via MD02 there is no planned order be created.
    But if i run MRP via MD43 , the planned order appear .
    Could anybody can help on the topic ? Thanks !

    Dear Denny Sheng 
    i think you are asking about two different things:
    1) you have enter PIR in md61and those are reflected in md04,but when you take MRP Run( md02) planned order are not created.This is because there must be stock of material available
    2) The planned order are created when you run md43.This means you have selected MRP Type MPS.please check .
    Regards
    Prashant

  • Planned order creation with sale order assingment at the run time of MRP

    some material item not planed with sale order stock in MRP run time. all setting in material master are corrected as i knowing.having some mistake in setting other configuration.

    Planning strategy is Make to order individual collective as individual but still come as make to stock plan orders
    Incase of Header material- Plan order is creating in MTS
    Check the sale order procurement tab, Is The requiremnt type is relevant to your Stratergy?, if not chnage it to correct requiremnt type and rerun MRP again
    Incase of component material- Plan order is creating in MTS
    Check for the component material MRP 4 View, individual/Coll.req- as 1. If not set as 1 and rerun the MRP again

  • Planned Order Creation after Sale Order MRP MD50

    In a BOM of FERT material, one HALB material is present at different BOM levels. When we run sale order MRP (MD50), system will create one planned order for complete quantity (total qty of HALB material at all  levels put together). Is there any way, so that system will create different planned orders for the same material present at different levels ?

    Hi,
    MD50 is T code for running MRP w.r.t sales sales, During MRP run system will explode the BOM and plan the requirements for all the levels( i.e, multiple levels)
    with regards,
    P.P.Anand

  • Planned order creation with PDS valid on only order start date and not finish date

    Hi All,
    We have requirement to allow creation of planned order manually if production version is valid on order start date and not finish date.  This is because lead time of order is longer. I refered OSS notes 385602. I could find out solution for this is implementation of OSS note 694140 to change validity mode at activity level to consider start date of first produce activity  in validity interval. Problem is even If I create order in APO by implementiong this note planned order is not transfered to ECC and it gets stuck with error production version not valid.
    Is there any way in ECC to control this? Any config or customization?
    Regards,
    Santosh

    Nilesh,
    I think there is a simple procedural skip happening in your business process. You are right when a planned order is created after MRP it would default assign it to the first available production version. 2options available for us,
    1. First use transaction MF50 and do the line loading and assign the quantites to the production versions/Production lines, so that the actual capacity planning is getting completed. This way you can have planned orders with both the production versions and matching to your actual line capacity.
    2. Use Quota arrangement concept, to automatically split the Planned orders during MRP for a percentage based on individual production versions.
    Now when backflush is performed S225 table is updated and Planned order qty also gets reduced.
    Hope this helps....
    Regards,
    Prasobh

  • Manually Planned order creation

    Hi Gurus,
    When i am creating planned order manually in MD11, some times ( not allways) it is asking for components although it has a Bill of material. But if we create pland order through MRP it woudn't asking for any components. Can u please tell me when it will ask for components if it has a BOM maintained?
    Regards
    Rajib Pathak

    Hi,
    I am using same order type for both manual creation and automatic creation......also i am using a valid BOM. Furthermore some time it is not asking for components. My question is in which condition it wil ask for components whereas there is a valid BOM.
    Edited by: Rajib Pathak on Oct 27, 2009 12:14 PM

Maybe you are looking for

  • Cost center is not getting determined for free of charge delivery

    Dear Experts, We have configured a new division, as part of the project, from the SD poing of view all requried config done, from the FI-CO side they created a new profit center and which is assigned to the materials ( of new division). Alos complete

  • Squiggly wrong word red line position not fix to center of text

    Hi, when use sguiggly spell checker in richtextEditor's richtext area which have a fix size and set in canvas and set spell checker on this then i get red line position on end of text and when i write and enter so scroll is enable and text height is

  • Document Templates in MS Word - how to cut the leading zeroes in number

    Hello CRM gurus ! We use document templates in MS Word but have the document number printed with the leading zeroes. example we have now: 0005000681 example we want to have: 5000681 Question - how to do that? Is that in standard? The document number

  • NSAPI plug-in for Weblogic 5.1

    Has anyone come across any problems with using the weblogic plug-in for Iplanet 4.1 SP9 running on Solaris 8. If so please can you let me know. Thanks

  • Table with LOV's verry slow

    Hi All, I have a tabel with 6 lov's on a row. I now have 15 rows and loading the table is verry slow! Why is that? Are there executed 6*15= 90 query's when the table is loaded? How Can I improve performance? Because now it is not workable. Thanks in