Preventing additional component consumption after final confirm in PM Order

Hi,
I am trying to block the consumption of additional components after the final confirmation in a PM order, this is causing erroneous component consp. especially in orders with multiple operations.
The user may choose a confirmed operation while recording a component, system gives an error but it does not prevent the recording of that component, I want the users to get an error and stop there in such a case.
I hope I made myself clear, thanks in advance
IW32 Screen: https://picasaweb.google.com/koray.tulumen/Paylasacaklarim#5707123654338971234

OK once more I thought I should add screens to better tell what I was trying to ask, I could not do that with the old forum layout. Anyways, could I get that result (in the screens) thru customization. There have been other comments relying on Orders' user statuses but with multiple operations they are not usable, every operation is confirmed individually and order status does either let or deny material movements thru the whole order (all operations)
Here are the screens, thanks again.

Similar Messages

  • Production order status was not changed to 'CNF' after final confirmation.

    Hi guru.
    I experienced very special case that production order status was not changed to CNF after final confirmation.
    I did final confirmation and canceled confirmation. (CNF -> REL)
    And I did final confirmation again because of fixing activity quantity.
    the strange thing is that production order status wasn't changed from REL to CNF.
    I did  confirmation again with 0 activity, thereby  I solved this problem
    BUT i don't know why this case happened.
    Please, explain the reason.
    Thanks.

    Hi,
    As per my observation, their is not any change in the status of the order REL with confirmation CNF, instead of this, it has change from CRTD & then to TECO.
       Sequence of the status of the order as below
    1) CRTD MANC NMAT SETC
    2) REL  NMAT SETC - Changes from CRTD to REL after releasing of the order
    3) REL  CNF  PRC  CSER ERTR OPGN SETC -  After confirmation, it updated after the order REL status.
    Rgd,
    Chetan

  • Maint order should get TECO automatically after final Confirmation

    Hi Gurus,
    My customer requirement is that, Maint order should get TECO automatically after final Confirmation (in IW41) of last operation. Is it possible? If yes, plz let me know the steps which I need to do.
    Thanks in Advanceu2026
    Amol.

    Hi,
    This functionality is not available in std. SAP. You may go for enhancement. please check the following user exits for achieving your requirement. 
    CONFPM05 PM/SM order conf.: Cust. specific enhancements when saving
    IWO10009 PM Order: Customer Check for 'Save' Event
    Praveen

  • WBS Forecast dates disappears during scheduling after final confirmation

    Hi dear Experts.I faced a problem with WBS dates.
    The system overwrites forecast and basic dates on WBS after final confirmation of attached activities. And start to schedule wbs dates from dates of activities with no confirmation. Is there any way to solve this prolem?
    In other words i need my WBS to take into scheduling ALL the operations forecast date. Moreover how the system can overwrite the forecast dates wich were entered manually by user?
    Green - actual dates
    Yellow (orange) - forecast dates
    Bue - Basic dates
    Please help.

    Hi Kirill,
    Please check the control parameters for WBS Scheduling. Check if the scheduling method over here is WBS Determines Dates. If this is the case, irrespective of the scheduling that was carried out at the activity level, the system overwrites the basic and forecast dates present at the WBS level. May be in your case the scheduling method that had been used was "Network determines dates".
    . Please change this and let me know if this helps.
    Regards
    Varun

  • Goods Receipt after Completion Confirmation for Service Order

    Hi,
    We have a scenario in which a Notification is used to create a Sales Order & a Service Order using the action button.
    The Sales Order has a old/used product as a line item which we will consume along with some other new parts(added in the components tab in Service Order) to make a remanufactured product which we will obtain after using IW42 for Completion Confirmation. (The Service order is to carry the cost of refabrication/refurburishment & additional parts as well)
    We need to do Goods receipt of this remanufactured product to bring it into stock so that we can deliver the same using the same sales order.
    Is this possible? We have tried using Refurbishment order both CS/PM but have not been successful in inwarding the remanufactured product using IW8W.
    Kindly do suggest possibility of using a Service Order(created through a notification) with a GR feature for the above process of inwarding. Any alternate suggestions would also be very helpful.
    If this functionality can be achieved with some enhancement(custom exit, BADI etc) & some amongst you have worked on something similar , please do share your valuable inputs
    Thanks & Best Wishes
    Vishal

    Hi
    I dont think you will be able to do Goods receipt against prodcution order using inbound delivery VL31N. Inbound deliveries are normally created for Purchase orders and then GR can be posted wrt to the inbound delivery.
    Prod order is normally within warehouse only so you can use MB31 and post GR directly against Prod order.
    If you can explain more about your scenario hope we may help
    Please let us know
    thanks

  • Generation of Output after Final release of Purchase Order

    Hello
    When a PO is subject to release procedure the output for the PO is only generated and sent  when the PO has been finally approved. I would like to know is this sap standard internal feature or do we need to configure it.
    If it is standard then can some throw light on what happens on background?
    If it needs customization please let me know the customization details?
    Regards
    Mohammed

    Hi,
    Out put of the PO is something to do with the Release Indicator assigned for each state of release of the document.This indicator if is blocked state of a PO it prevents from outputing the message .If the indicator has the status Released by way of releasing by the concerned user than the same can be outputed.
    If the PO is subject to a release strategy, it must normally be released before it can be transmitted to the vendor. Therefore, when a PO is created, it is assigned a release indicator that blocks it from being outputted in message form.
    This I think is a standard behaviour of the system.
    Dhruba

  • Final confirm one operation sets order status CNF

    Here is the issue I am having.
    I have PM Order with multiple operations. If I confirm any one operation with 'Final confirmation' checked then Order status changes to CNF and I am unable to do any further confirmation on the order.
    I am expecting the order status to be changed to CNF only after ALL the operations have a CNF status, but it is not behaving like that. I searched oss and could not find any relevant notes.
    Any suggestions greatly appreciated.
    Thanks,
    PJ

    Philip
    Some questions:
    - Do all operation have time
    - Do all operations have the same Operation Control Key
    - Are you using any batch programs to update the order/confirmation
    - How are the confirmations created
    - Are there any user-exits/BADIs being used on the confirmations
    PeteA

  • Production confirmations for Production order

    Hi all
    I am using ECC 6.0 and Production orders. When I do a final confirmation to the order the order is in a 'CNF' status. Now after it is in a CNF status if I try to perform another confirmation using a CO15 then it allows me to do a confirmation with a 'warning'. If I am using a CO11 or CO11N then its a hard error. Is there a way I can get a warning message on a already Final confirmed order in tcode CO11 or CO11N?
    thanks

    Hi John,
    You want the system to allow to confirm operation wise even though you have already confirmed with respect to order
    I dont think its possible,because if you see logically -once we do the confirmation for the order system will complete the confirmation for operations too ie it will book the time,cost to the respective cost center
    So logically it will not be possible to confirm the operations which are already confirmed when doing the order confirmation
    If you want to do order wise confirmation then you have to cancel the order confirmation & then you will be able to do operation wise confirmation
    Hope the above explantion is understandable
    Revert back if you have further query
    Reward points if useful
    Regards,
    SVP

  • Confirmation of PM order, what FI posting will be done in SAP

    Dear Gurus,
    On final confirmation of PM order, what FI posting will be
    done in SAP ?
    Regards

    Hi Entry Will be
    Stock of FG Accunt debit
      to COGP Account
    Mann

  • Do not want component consumption in Production order confirmation.

    How to create production order so that NO component consumption takes place during confirmation of the order. 
    A list of equipment comes from Delivery created by Project System. These equipments have to be assembled into a KIT.Then some of the equipments in the kit requires installing of software. Thus the kit goes though a couple of work centers. 
    There are no BOM but reference operation sets have been used.
    The Kit is a phantom material in the business process because what the company sells are the equipments inside the Kit, where the equipments are tracked with serial numbers ( for warranty purposes) at each customer's location.
    I create a production order for the kit to assemble all the equipment but when I confirm the production order with CO15, the equipments disappear from the stock and we do not want that to happen ( because we sell the equipments.)
    Please help. Thank you in advance for your time and effort.

    Dear
    Please remove the Backflashing reidcator if you have :
    1.In material master MRP2 view of the item ,
    2.In work Center where the routing operations are done , -Goto-Basic Data View -Back Flash Indicator
    3.In routing Componenet Alocation -Item Line -Back Flash Indicator
    4.In OPK4-un- check the setting for all components.
    Try and come back
    Regards
    JH

  • Order Component quantity gets changed after operation confirmation

    Order Component quantity gets changed after operation confirmation.
    We are using CO27 to issue the Material to the Order.
    When we do the confirmation of  operation. Component quantity attached to operation get changed.
    Any solution for this.

    Dear
    Please Follow the Steps
    1. Go into Co02 there u do production order with qty select the Component overview u find the Materials there please check hhow much is the qty of that particular material
    EX: Production order qty for Header Material is 10 ea
    then ur Compannets Qty is 10 or 20
    depends on the Componet Qty the Operation takes place that is because u have maintatined a base qty in Routing and BOM
    With Regards
    Pushpalas

  • Final confirmation issue in project system activities

    Dear all,
                I have having problem in final confirmation.
    I created activities.Planned some scope of work , after completion of the same scope of work I marked Final confirmation as system automatically ask for.But the situation now is that, The scope of work for the same activity is re-planned, It need to be chaged as scope of work increased.
    I changed the scope of work, But while confirming from CN25 the same activity number is not getting displayed.
    Kindly suggest
    Regards
    Ashutosh Saraf

    Hi Ashutosh,
    Already Ahmed has explained it step by step. How many more steps do you want? Try what Ahmed has suggested and the revert.
    Regards,
    Gokul

  • Bapi for final confirmation serviceorder

    I'm looking for a bapi which enables me to give a final confirmation to a serviceorder.
    in the current scenario people are using cats for hourdeclaration on serviceorders. most of the time it is not known after hours are entered if the job is finished or not. when it's know after a few days the engineer has to declare 0,01 hours to make it possible to give final confirmation.
    I 'm searching for a bapi where I can set the final confirmation for the serviceorder
    the other alternative is to use IW41 to set the final confirmation only that can't be fully programmed inside cats with bdc
    if anybody has any alternatives they are also welcome
    kind regards
    arthur de smidt

    when I use the BAPI_ALM_CONF_CREATE
    bapi I can enter the data already available like
    confirmation no order . I also set the indicator for final confirmation but I get the error ARU806 not valid call ??
    solution coding in my case
            SELECT SINGLE * FROM afru INTO gs_afru
                            WHERE aufnr EQ h_raufnr
                            AND vornr EQ wa_sap_catsd-vornr.
    * Indien terugmeldingsnummer aanwezig dan eindterurmelding met nummer doen                       
            IF sy-subrc = 0.
              gs_timetickets-conf_no = gs_afru-rueck.
              gs_timetickets-orderid = gs_afru-aufnr.
              gs_timetickets-operation = gs_afru-vornr.
              gs_timetickets-fin_conf = 'X'.
              APPEND gs_timetickets TO gt_timetickets.
              CALL FUNCTION 'BAPI_ALM_CONF_CREATE'
    * EXPORTING
    *   POST_WRONG_ENTRIES       = '0'
    *   TESTRUN                  =
    * IMPORTING
    *   RETURN                   =
                TABLES
                  timetickets              = gt_timetickets
                  detail_return            = gt_return.
              CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
    * EXPORTING
    *   WAIT          =
    * IMPORTING
    *   RETURN        =
    kind regards
    arthur de smidt
    Edited by: A. de Smidt on Dec 5, 2008 1:28 PM

  • PP confirmations Goods movements ONLY allowed when final confirmation.

    Dear All,
    Transaction CO11N.
    Is there a possibility to do the goods movements of components which are on back flush only on final confirmation of the operation?
    Any help is more then welcome!
    Best regards,
    Luc Knuts

    Thanks for the quick reponse!
    I will explain the problem a little bit more in detail.
    Every operation is executed on a different work center.
    We deliver the components to the supply area which is assigned to the work center.
    For this reason it's not possible to do the component allocation on the last opereation.
    We also produce by-product which should be available on stock when the final confirmation of an operation is been done.
    To start and stop activities on an operation we are going to use a scanningsystem which is going to transfer, the hours spend on the operation, via PP-PDC to SAP R3.
    The confirmation of the goodsmovement will be done manually via a final confirmation of the operation because it's necessary to adjust the qty of the components.
    These are on backflush and the business here does not want to use transaction Migo for this process.
    I'm going to check the user exit's that you wrote down to see if I can solve the problem via these.
    User exit - CONFPP05 or CONFPP06 or BAdi - WORKORDER_CONFIRM
    Best regards,
    Luc Knuts
    SAP PP-MM-QM-SD
    Belgium
    Inxites nv

  • Planned and actual consumption for each confirmation

    Dear All,
    There is a production order. it has two operations. i have made three confirmations of each operation for that order. now i want to see the planned and actual consumption for each confirmation. how is it possible.
    However i know that on order we can see planned and actual consumption but it is for total order but i want to see planned and actual consumption for each confirmation. Actually client wants that on 2nd confirmation what is planned consumption and what they consumed on actual. thanks

    Hi,
            In standard SAP this type of report not be there, but u can make it by using BOM,Confirmation table, & material document table.
    Use AFRU to get posted document no for confirmation & detail by joining it with MSEG by mblnr & MAZHR.
    now u get plan component qty by using mast & stpo if ur bom not changed in Production order , if in order component may be change then use afko & resb table & by comparing base qty or order qty & confirmation qty get plan component qty for confirmation.
    Thanks
    Rakesh