I have a Work Center defined with 3 shifts (24 hours) and a standard capacity from 8 - 4 pm which is displayed outside (start - end time, etc..)
I created a production order with BACKWARD scheduling and I've noticed the scheduling is calculated on the standard capacity (8 - 4) and not the 24H intervals/shifts defined.
1) why is that?
2) how can I correct the settings

Ok, I've done that.
However, if I have the 3 shifts and each has a break of 1 hour. Should I also put in the standard available capacity 3 hours?
Now I'm creating a production order and it's not getting the exact break time while scheduling, it's dividing the 3 hours break on the 21 hours working time. Each 1 hour operation it schedules for 1 hour and 7 minutes.
How can I make it schedule the right break times?
I went to OPU3 (Scheduling Parameters) and checked "Scheduling With Breaks) but doesn't work.

Similar Messages

  • Creating/Copying a Work Centre,also a Production Scheduler and Cost Centre.

    Hi All,
    I am trying to create a new work centre based on the settings of a previous one? First of all,how I can do this?
    Secondly,after I have created the new work centre (having copied being copied from another),I need to create a new production Scheduler and Cost Centre? How I will be able to do so,also?Will the Production Scheduller and Cost Centre assignments fom the old work centre be copied,too,or I will need to create/copy these from scratch?
    All help greatly appreciated,will award points to all useful answers.
    PAPJ1.
    Edited by: PAPJ1 on May 20, 2011 11:01 AM

    Hello,
    You can create a new work center by copying an existing work center. in the cr01 screen in the copy from column put the plant name and Ref. work center name and put enter. all the existing data will be copied to the newly created work center. no need to create new assignment to  Production Scheduller and Cost Center.
    Hope it helps.
    Regards
    Alok

  • Production schedule report/Standard v/s actual report

    Dear experts,
    Need two standard report for
    1) Production schedule report- production during the perion and their cost component and items break up
    2) Standard v/s actual report - Standard defined for material  and actually consumed in term of qty and Cost for material and production order.
    regards
    RR

    Hi ajay,
    Thanks for your valuable advice,
    I did all the changes mentioned in thread.
    Cost component wise production target cost and actual cost is coming.
    Same way i did it for qty.but my actual qty of production order is not coming but input qty is coming.
    Option selected for output qty and same is not coming in report
    key figure-output qty
    value type-4actual
    version-770IVERS
    Option selected for input qty and qty is coming in reports also
    key figure-input qty
    value type-5target
    target cost version-790SVERS
    Need to ask one more question,Shall i create separate cost component for FG cogm a/c?.my fg cogm and settlement a/c is same.
    and also how to extract all data(cost component wise) in excel for all orderwise/material wise
    reards
    RR

  • Production scheduling profile for production order type 10 does not exist – SAP Message No.10085

    When i tried to make confirmation for Production Order through CO15 transaction , i receive the following error message “ Production scheduling profile for production order type 10 does not exist – SAP Message No.10085 “
    In Work Scheduling view, Production Scheduling Profile is maintained as per OPKP only.
    How to check whether production scheduling profile is maintained for relevant order type 10.
    To do this , i went to OPKP & KOT2_OPA transactions but i don’t know how to check. I guide me through with a screen shot.
    Also, pls explain about  “Order Type 10” and how it is linked with material and order execution.
    Looking for a detailed explanation with screen shots , since i am new to SAP.
    Thanks With Regards,
    Dinesh Kumar V.

    Hello Dinesh,
    Please check the order type dependent parameter in OPL8 here you will get the Substitute Scheduler
    Then go to OPCH and check valid production scheduling profile assign here as per OPKP to your production scheduler for your plant.
    Production order have Order category as 10  Process Order  40 in standard SAP you can check this in OPJH.
    Best Regards,
    R.Brahmankar

  • Printing setting in Production Scheduling Profile

    Hello Guys,
    In Production Scheduling Profile (OPKP) there is a config setting "On Release" Execute Printing.
    I used this setting.
    But I could not print the production again.
    I want to re-print the production order.
    How do I enable re-printing the production order?
    Thanks
    George King

    Hi George,
    the setting simply define that the production order is printed when the order is released. This setting should not have any effect to reprint.
    Did you get any error? Are you able to print when you push the print button manually?
    Settings in OPK8 are correct ?
    Regards,
    Sabine

  • Same material with diff. Production scheduler profiles

    Hi,
    I am working on PP-PI, where the same material is being manufactured using separate order types.
    To be  more specific, one order type for the  regular manufacturing & another  with Re-work order type. The  requirement is  such that the  Order type  dependent parameters & production scheduler profile are different in  both the cases. Since my master  has the prod. scheduler for  regular manufacturing on the material master, even if i select the  Re-work order type the system is considering the Settings of the  regular manufacturing order.
    I need to keep the production scheduler profile of the regular manufacturing order as a default in the material
    master due to various  reasons. At the same  time system should consider the  settings for Re-work order only when the specific order type is  manually selected during order creation.
    Appropriate solution would be of great  help, thanks in advance

    Hi,
    Try using user exit. change the production scheduler profile during order save  based on  the order type.
    check with your technical team.
    hope this helps.
    regards
    CSN

  • Production scheduling profile

    Dear Experts,
    Can i have multiple scheduling profile ?
    Issue is that i have defined Production scheduler A and production scheduling profile A1 in material master which refer to order type A2
    Now i want to create production order of same material with order type B2 with Scheduling profle B1 how can i do that without changing the master data in matrial master.
    I tried to give order type B2 in Co01 but it is refering Sch. Profile A1 only.
    Please help me to solve the issue.
    Amit

    Hi,
    I am unable to figure out from your query what you exactly need.
    But for a given material even though you have a prod. sched. profile maintained with a certain order type, you can create an order with different order type.
    If you're converting planned order to prod. order via co40 or co41, then system will propose the order type from the prod. sched. profile, this can be overwritten.
    However if you're manually creating via co01, then you can choose the order type you want, system will not prevent you from doing so, unless there is some enhancement in-place.
    So hope the above clarifies, if it does not, then please explain with an example, it would be better.
    Regards,
    Vivek

  • XI/PI ANSI/ISA-95 Content For Production Schedule; Production Performance

    Hello experts,
    Can you please let me know what the correct name of the package is on SAP Market Place for the pre-defined ANSI/ISA-95 Content (for Production Schedules; Production Performance; Maintenance Requests;Maintenance Workorders etc. for SAP MII scenarios) .
    Thanks and regards,
    Brendon

    Hi Brendon,
    If you are trying to find out packages for MII, the best link is this: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/webcontent/uuid/90537bfe-fd6b-2910-fda3-b04f1177c51e. [original link is broken] The specific link for standard MII templates (version 12.1) is: http://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/e090ef23-dbc5-2a10-0994-b589d869cd92. NOTE: It requires a S user and also SDN user to download.
    I tried to find out what ANSI/ISA-95 refers and I guess what you need is into PP templates into the link above. It doesnu2019t make sense u201CXI contentu201D if you need MII content, my advice is trying to download and install into your MII this templatesu2026
    Regards,
    Marcelo Cabrera

  • Details about Master production Scheduling & Variant configuration

    1)  What are the steps for Master Production Scheduling (MPS)?
    2) What are the steps for Variant Configuration?

    Hi,
    MPS:
    With in your planning time fence (maintained in mat master ) , you will get firmed planned orders because your MRP Type P1 - P4 has firming type.
    And the firmed planned orders will not change after next MRP run.
    You have to set MRP Type p1 - p4. acc to firming type. in ur mat master.
    Then run MPS .It is generally for important products and it is run single level.Because it will not change your procurement proposals as it has firming type.So you get effective planning for your imp products.
    Variant configuration:
    Go to mm01 create a material and in bd2 view mark the check box material is configurable and then save the material and go to ct04 create chara.
    Go to cl01 and create class with class type 300 and assign the charac. to it
    Go to tcode cu41 create the profile using material code and assign the class to it
    then got tcode mm02 and assign the profile there
    Variant configuration material type is KMAT (SAP std), u can use this material type alternately u can mark the indicator in basic data 2 view ->client specific configuration->Material is configurable tick.
    For further reference, check the link below
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf

  • HOW TO CREATE PRODUCTION SCHEDULING PROFILE

    PLEASE
    TELL ME HOW TO CREATE PRODUCTION SCHEDULING PROFILE
    EXPLAIN IN STEPS
    THANKS

    Hi,
    Check the below link and the screen shot:
    http://wiki.sdn.sap.com/wiki/display/ERPLO/Production+Order+Type+Selection
    Hope it will help you.
    Regards,
    Alok Tiwari

  • Production scheduler & profile configuration

    Dear SAPper,
    When i create production order, the production scheduler is automatically flled (ex.101) and then
    the production scheduler profiles is automaticalled filled too.
    I don;t maintain production scheduler & production scheduler profile in work scheduling in material master?
    where did system pic thatt value??
    Best regards,
    Freddy Ha

    Hi,
    For your order type,
    Please check if in OPL8 "Assignment" area - "substitute scheduler" field is defined.
    This scheduler is picked up as default if not defined in material master.
    If a PSP is attached to this defualt scheduler in OPJ9, then that will also be picked up in the order.
    Hope this helps.
    Regards,
    Ashok

  • Production Schedule Profile & shop floor paper printing.....

    Hi there ,
                   If we set the Execute Printing checkbox in the T-code <b>CORY</b>for a production scehedule profile....... then when we will release the order along with the other shop floor paper do the Transfer Order will also get printed if the material is warehouse managed.........
    Please enlighten me .....
    Thanks & Regards
    Kaushik

    Hi there ,
                   Thanks for your reply...... I am aware of the fact that the shop floor paper will be printed once the order is relased & the relevant config is done in the Production schedule Profile.........
    But in case of the material which are warehouse managed the Transfer requirement will be created & the further the Transfer Order........... I wan tto know that these will also Print the Transfer Order doucment for the warehouse managed material .......
    Thanks & Regards
    Kaushik

  • Production Scheduling

    We are currently creating process orders and scheduling them to a date.  We then take the order numbers and schedule dates and put them in an Excel sheet to create our weekly schedule.
    My question: Is there a way to create a production schedule in SAP 710 with either a summary report or log that is date defined.  If there is, were do I find it?  What section?
    Thank you in advance for your help,
    TC

    You can use R12 instance, but if latest rollup patch not applied then PS will not work.

  • Production Scheduling 11i

    We are planing to use Production Scheduling module iin 11i our EBS environment,i got metalink note Production Scheduling (PS) Installation [ID 454651.1]
    document says apply the patch 5899674,Patch readme.txt is little bit confusing me, readme says apply patches in source side/destination side,what does it mean,we have multi node EBS(dbtier/mtier) please clarify me.

    Thank you very much, so i don't need to apply patches( Planning instance as the destination) target mentioned in patch right..?

  • Production Scheduling tool

    Can anyone let me know, which is the best production scheduling tool (bolt-on/in built) which can be integrated with 11.5.10 ver.
    Thanks,

    Can someone help me on this

Maybe you are looking for

  • Bilingual title frame in forms 6i

    I want title frame in french when the user speak french and title frame in english when the user speak english. I can have bilingual label for item and windows without problem, I use the set property. For the frame I don't find any set property comma

  • AttributeError: what is wrong?

    Hi , I am getting the below error - wls:/bifoundation_domain/serverConfig> atnr=cmo.getSecurityConfiguration().getDefaultRealm().lookupAuthenticationProvider("csLDAP") wls:/bifoundation_domain/serverConfig> atnr.createUser('test','','test') Traceback

  • Window 2003 upgrade to window 2008 R2 for Moss 2007

    I am currently running Moss 2007 on window 2003 32 bit. I need to move it to 2008 r2 64bit.  currently 1sql, 1webapp i plan to add  64bit webapp(running window 2008 r2 64bit) to the farm, then remove the 32 bit webapp. here are my question is that an

  • Does Lightroom Support EPS File Format?

    We are thinking about switching over to Lightroom, but 95% of our 60,000 images are EPS files. I recently used a trial version and it didn't seem to recognize my EPS files. Is there a way for Lightroom to acknowledge these files? Is there a plugin to

  • HT1212 how do i go on my ipad if i do not remember the password

    i forgot my password to get into the actual ipad itself and i can not get in it at all. What do I do?