Rework quantity confirmation

hi
the rework control key for the intermediate opration is assigned, the trigger pt. with reference oeration set is also assigned.
when going to confirm the rewrk qty, the system shows the msg.,
"Total confirmation quantity not equal to planned confirmation quantity"
the operation quantity in prd. ord is 0.

Hi Vijay,
Normally GR will not be done for rework order.To get stock for reworked material Do the GR for orginal order & settle the both order .
With Reference operation set with a operation that needs to be reworked on and with the control key of a Rework type. Assign this to the trigger point in the parameters. Assign this Trigger point to the last operation as u wanted in the standard routing you created for that product.
If you create the trigger point as to be triggered at the partail confirmation of the order, then at the confirmation of the order, enter the rework quantity in that field with partial confirmation selected and save the confirmation. while saving, this will create a rework order.
While assigning the parameters to the trigger point, make sure that the order type also is a rework order type.
If helpful or if any further doubts, please reply back
Regards
R.Brahmankar
Edited by: R Brahmankar on Jul 23, 2008 5:30 PM

Similar Messages

  • In CORR where we can enter the rework quantity

    Hi ,
    In CORR collective confirmation , where i can give the rework quantity , How the rework quantity maintain in the Corr transaction.
    Second question  :-   is there any reservation number for rework order ?
    Regards
    satish

    Hi
    In CORR, when you use the confirmation type final for the process order and you mentioned the quantity less than the full order quantity in the yield field at the particular operation /phase .
    and if you maintained the tigger point with the condition (if confirm qty < order qty for the final confimation, system trigger for the rework for remaining quantity)
      so system consider remaining pieces as rework

  • Rework quantity,URGENT

    Hi all,
    I am facing a problem while creating the rework order.The rework order is created but the actual rework quantities are not updated in the rework order,and i am getting quantity as1 no.How to get the actual quantities in a rewok order?
    requesting experts to focus on this issue.
    Thanks in advance
    TV.KUMAR
    I think I haven't explained my problem properly,let me elaborate,
    Assume the main production order is created for 100 components to be manufactured.I have assigned trigger point to the last operation .When i partially confirm the main order for 75 components i am getting the rewok order but it is not showing the remaining 25 components to be reworked,instead the rework quntity i am getting is 1no.in the rework order,Where i commited the mistake?Asking experts to guide me.
    thanks in advance
    KUMAR.TV
    Message was edited by:TV.KUMAR
            TVKumar

    Dear Kumar,
    You need to enter the rework quantity in the rework field
    yeild qty = 75 to
    rework qty = 25 to
    then only it will take this qty into rework order
    rajesha vittal

  • Processing the Rework quantity

    Hello,
    In my discrete manufacturing scenario, in routing out of 10 operation 8 are subcontracting operations. After completing the production order i want to process the rework quantity. This rework quantity i want to send the subcontractor & again get back and want to do the confirmation for that quantity. Same case for how to do the rework process in case of inhouse operation?
    Plz give me solution for that.
    Thanks in advance.
    regards,
    Prafulla

    Dear Neheta
    Cofiguration Settings For Rework order
    1) just copy std re-work order type & give new name as u required in OPJH
    2) in OPL8, copy existing rework order type & give ur re-work order type & plant & save
    Master data for rework order
    1) CA11 - Creating reference operation set
    1) after Executing CA11, just enter without giving data in initial screen
    2) usage - 1, status - 4. from lot -1, then click on operations
    3) then give work center & descrption
    4) Double click on Description, then give timings for setup, machine & labour & save
    Rework order Creation
    1) Normally rework order is created by t-code CO07
    2) while doing confirmation of header material in CO11N or CO15, we give re-work quantity
    3) then creat re-work order in CO07
    4) in CO07, give plant then order type (rework order type) then enter
    5) materail description, quantity to be reworked then date enter
    6) system will ask u refernece opeartion set (it should be created before only in CA11)
    7) then give the reference operation set Number then system will take u to settelment Rule
    8) here for CAT give as ord, then in settelment receiver give ur header order number then percentage as 100 %
    9) then clcik on component overview icon, then give ur BOm componets (which to re-worked & assign an opeartion to it)
    10) then save the order
    11) then do the confirmation to re-work order
    12) then do GR to header order & settelment will take place to header order only not to re-work order
    Note : for rework work, GR will not take place
    Regards
    Kumar

  • How can I avoid automatical quantity confirmation of the items?

    At our case, production is done on sales sales order for some of the materials. When all of the materials at the order are producedi I want to triger the availability check but availability check triggered autpmatically when for the first time the order is created. I don't want the system to make the confirmation automatically. How can I avoid automatical quantity confirmation of the items?
    Thanks in advance for the answers....

    Hi Yasar
    This can be done 2  ways
    1.if you want individual material stocks to be checked for avialbility and deliver them independently then check whether you are using requirement type KSV.
    2. If you want to send the group of materials together and do not want to send a material which is part of group individually ,you can use delivery group with Sales Bill of material  concept . the header material may be a fantom assembly .
    The delivery group is set at the item  category level ,so u can set it for the item categories u want to go together.
    for example  all text package inserts ,extra spares and a material must go together, they  will be part of delivery group.
    I hope this helps
    Regards
    Mandar

  • Copy quantity confirmation from Qt to SO

    Hi
    While i copy Quotation confirmation for SO creation , system again go for availability check automatically , after that i observed that it confirm other quantity instead to quantity blocked by Quotation.
    So its like double quantity confirmation for same order .
    Can anyone help me how do i get back SO confirmation quantity of Quotation only ??
    Thanks
    Nitesh

    Hi guang,
    The system response is correct only.  Because the system do the availability check at both Quotation and sales order levels.  This is because the availability check settings at schedule line category (VOV6)of both levels.
    So, first check have u activated the setting at both BP &CP.
    Also qty difference is arised due to the document probability. Since the quotation have document probability of 70% only, so only 70% of the item qty have been transferred to MRP. But in sales order, the probability is 100%. that is why the difference in quantity is arising during availbility check.
    Hope it is useful..
    Reward points if useful....

  • Header mat. in line item showing in zero quantity confirmation...

    Header mat. in line item showing in zero quantity confirmation. How to rectified it??

    What is the transaction code and where the qty is ZERO
    Explain me in detail.
    Regards,
    Deepak GS

  • Quantity confirmed in sales order change mode not in display mode !!!

    Dear All !!
    We have a problem in sales order .
    In sales order the line item 580 quantity confirmed 15 pc in change mode VA02 if I open the sales order in display mode VA03 the quantity confirmed “0”
    More details refer the attachment .
    Kindly advise why the system behaving like this and suggest how to control.
    Thanks in advance.
    Best Regards,
    Rampe

    Dear All !!
    The issue has been sort it out .
    Reason for cause : The Problem happened due to wrong material master data defined in material master.
    The material has been changed and marked "as configurable material" in material view "Basic Data 2".Even though the material is not configurable. So we have  forced correct value in material master and open the  sales order with VA02 and then saved in order to redetermine correct master data. Then the problem got resolved.
    Thanks for your Help.
    Best Regards
    Rampe

  • No auto GR duirng zero quantity confirmation

    When put yield quantity greater than zero, then Auto GR has done. But when put zero quantity in yield, then auto GR of header material is not showing in line item. Where as in other material for same cases it showing in a line item for zero quantity confirmation. Plz give me solution.

    But when put zero quantity in yield, then auto GR of header material is not showing in line item.
    Auto Gr is trigger based on Control key maintained for final operation,  If the quantity is maintained as 0 in confirmation, system won't trigger auto GR functionality. this is standard behaviour
    Where as in other material for same cases it showing in a line item for zero quantity confirmation. Plz give me solution.
    Other goods movement such as 261 531 is based on backflush setting , system will show the material in goods movement screen and explode the quantity based on confirmation, that's the reason system is showing 0 for those material in goods movement

  • Quantity Confirmation

    Hi
    I need to create a user exit for VA01(sales order). In which I need to check some conditions for the line item. Based on the conditions, I need to confirm the quantity for schedule line items. How I can do that. Can I do it giving the value of confirmed quantity to the BMENG field of VBEP table?
    Please help me out in this.
    Thanking you in advance.
    Regards,
    Eswar

    Eswar,
    I have worked on the same requirement.All u need to do is put ur code in the Form: USEREXIT_SAVE_DOCUMENT. This form gets triggered before saving the Sales order.
    You need to put in the code relating to the checking of the quantity of the line items from table VBAP and getting the scheduled line quantity from VBEP table.
    Thus u can guide the user by poping out Error-Messages.
    Thanks..

  • Partial quantity confirmation not happening in BAPI_SALESORDER_CREATEFROMDA

    Hi,
        I am using bapi BAPI_SALESORDER_CREATEFROMDAT2 to create sales order.
    1)Suppose my order quantity is 5 and my ATP quantity is 3 , The partial confirmation is not happening.
    2)However if my order quantity is 3 and my ATP quantity is 3 , Confirmation is happening.
    However when i manually create sales order for scenario 1 confirmation is happening for 3 quantity out of 5.
    Pls let me know if i am missing any setting.
    With Regards
    Tausif Shaikh

    Hello,
          ORDER_ITEMS_IN-PLANT      = TAB-PLANT.
          ORDER_ITEMS_IN-STORE_LOC  = TAB-STORE_LOC.
          ORDER_ITEMS_IN-TARGET_QTY = TAB-TARGET_QTY.
          APPEND ORDER_ITEMS_IN.
          ORDER_SCHEDULES_IN-ITM_NUMBER = TAB-ITM_NUMBER.
          ORDER_SCHEDULES_IN-REQ_QTY = TAB-TARGET_QTY.
          APPEND ORDER_SCHEDULES_IN.
    Regards
    Waza

  • Scheduling agreement va31, open quantity , confirmed quantity

    hi SD experts,
    could anyone tell the relationship between  order qty, Cumulative released quantity,
    open qty and confirmed qty for one schedule line in SA?
    thanks in advance,
    gj

    Hi,
    Order Qty:
    Required Qty in a schedule Line.
    Cumulative released quantity:
    This cumulative quantity is made up of the cumulative quantity received by the customer and the schedule line quantities.                     
    Target Qty:
    A target quantity represents the total quantity of an item that the customer has agreed to buy during the validity period of the agreement.
    Open qty:
      The confirmed schedule line quantity that is still to be delivered.  
    Regards

  • Production quantity Confirmation by Quality

    Hi All,
    With inspection point processing and partial lot, we can confirm the production quantity in in-process inspection.But that should not affect the incentive given to the production employees.How that is possible? and also tell me if quality people want to confirm the quantity only when the lot is rejected otherwise production people should confirm it.How this is possible?
    With regards,
    Venkat

    Hii venkat,
    There are two possible ways which I can understood by your scenario. I guess you are talkin pcs rate wages for your employees. If that so, you can do like this-
    1) Define SVK in production as pcs.
    2) I havent gone thru with HR module, may b this report can lie with them, else write a z report for the same.
    And for your last question, It is logicaly not feasible....lets c if you get this answer. I will be checking this post.
    cheers!!!!
    kapil

  • Insp.lot after rework order confirmation

    Dear all,
    My client requirement:
    they want insp.lot when they confirm rework order.I can activate inspection to 531 mvt.type.but they are using 531 for other purposes also.so can i do any setting in Rework order type so that it should create inspection lot.
    it is urgent plz reply soon
    thx&regds
    prasad

    Hi,
    It is possible to generate inspection lot of inspection lot origin 03 if you configure in OPL8 transaction. It is used for inprocess inspection and its not stock relevant.
    As you want to generate inspection lot for By porduct ( 531 Mtype) above config setting will not work for you. I suggested new movemet type as you mentioned that 531 mtype is used for some other purpose.
    You also mention the if user forget to enter the custom movement type . As they need to confirm the by product they need to user 531 or custom movement type. you can remove the authorization for 531 movement type so that they can not use this.
    Regards
    Sanjay

  • Quantity confirmed

    Hi friends,
    They confirmed less qty in last operation (i.e 1897),but they GR more qty (i.e. 1950).
    How to give the solution for this,
    Thanks
    venkat

    Dear Kumar,
    Assuming that manual GR was done through MIGO/MB31 for 101 against a production order and further no movements has
    been performed using the stock of this particular material,you can either cancel the entire goods movements posting and post a
    new GR for the correct quantity or else post 102 movement against the order for 53 quantity alone(from the same storage
    location to which it has been posted).
    Check and revert
    Regards
    Mangalraj.S