Wrongly Price Picking in Shipment Cost

Hi Guru’s,
I am maintaining the condition records for freight cost in Tk11, choose the condition type I have configured for freight and maintain those records for freight basis the truck type and the transporter rate is scale wise. Example- 100km – 3/- & 200km-4/-
I am creating the shipment in VT01N & selected the two delivers & Route, Route Km is 100. I have created the shipment cost in VI01, system picking the KM is 100 but price picking 4/- instead of 3/-.
Can anybody give the advice? Why it is pickup wrong price? Is any setting or configuration required?
Useful answers duly rewarded
Regards,
Devendra

Hi,
Thanks for reply,
I have maintained the Scale type in “To scale" but same problem is there.  My client is requirement the fright calculation – KM x Rate x MT(Qty) & rate is scale basis.  I have maintained the condition type as below
Scale
Scale basis – R – (Distance)
Check value -   (None)
Scale type    -  (To-scale)
After maintained the condition, I am creating the shipment cost & go to condition. I have checked the header conditions details; system doubles the KM in Scale base val. 200 km instead of 100 km.
Pl. give the advice
Regards,
Devendra
Pl. help
Edited by: Devendra on Mar 11, 2008 11:36 AM
Edited by: Devendra on Mar 17, 2008 6:44 AM

Similar Messages

  • Picking deleted shipment cost documents

    Hello,
    if I delete a shipment costs document (transaction VI02) there will be no flag at document, the document will be deleted completely from the table. How can find any information of deleted documents, the best with any information about values?
    Regards
    Norbert

    Hi,
    If change log is activated, you can get the deletion log in CDHDR & CDPOS tables. You can use function module CHANGEDOCUMENT_READ to get change document information.
    Regards
    Vinod

  • Wrong price picked in purchase order created with reference to RFQ.

    Hi Experts,
    We are encountering an error when we adopt a service RFQ. We maintained 3 RFQs at different prices for 3 different vendors. When we try to adopt the RFQs in the PO, the system picks up the price of the last RFQ maintained. The system gives the same price for whatever RFQ number that we use (for the same item). This goes for service items only (whether with service master record or none). I do not know if this is a customizing setting or a program error.
    Will give points to helpful answers. I would appreciate any input. Thanks!
    Regards,
    M khan

    Hi,
    I have checked in MEKA for all the condition there are no price available for the service.
    I am facing this problem in Services not in material.
    Thanks and regards,
    Munna.

  • Billing the Shipment Costs to the Customer

    Hi,
    In my scenario, I had created shipment document & shipment cost document, now what ever be the cost in that I want to charge to customer in addition of material price.
    I had created condition type say KF00 in shipment & made it statistical. same condition is in my pricing procedure in SD.
    In front of procing procedure I had made tick mark i.e. Transaction speciefic price procedure
    In copy controll LF to F2, at item level I selected price source as shipment cost.
    But still cost is not flowing in the billing document.
    Please suggest what to do
    Thanks,
    kapil

    Hi,
    Refer this [http://help.sap.com/saphelp_erp60_sp/helpdata/en/d5/2285347860ea35e10000009b38f83b/frameset.htm]
    and [Re: sap sd Transportation;
    please check the copy control for Billing in the SAP Hep link
    Regards,

  • Define upper/lower limits for shipment cost condition

    Hi people, help please!
    How can I define upper/lower limit for shipment cost conditions?.
    The transaction TK11 has the functionality for upper/lower limits, but I can't find how to define it in customizing.
    I follow the path Logistic Execution>Transportation>Pricing>Pricing Control>Define Condition Types, but is not like the transaction for pricing elements in condition types for sales.
    How can I do it?
    Regards.

    The problem is on the class condition import limits.
    I can’t customize upper and lower prices for the shipment cost class condition and i cant find how define it or what else can I do.
    The customizing transaction for shipment cost lass condition is not like sales price class condition, please look this:
    For the shipment cost class condition follow the path SPRO>Logistic Execution>Transportation>Shipment Cost>Pricing>Pricing Control>Define Condition Types.
    For the sales price class condition follow the path SPRO>Sales and Distribution>Basic Function>Pricing>Pricing Control>Define Condition Types, and take a look in Define upper/lower limits for conditions.
    So then, when I go to functional transaction VK11 for the sales price condition y can’t assign an import out of the limits defined. I need the same for shipment cost condition, transaction TK11, but I can’t find where define the limits, as result, user can load any import without limits.
    I hope the explanation is useful.

  • Automatic picked up purchase order during shipment cost cal

    Hi,
    We have one issue system picked up automatically Purchase order which having account assignment category "U".We have config new account assignment category "I" for some specific reason.Now we want that during shipment cost calculation (VI01) system automatically picked up purchase order with having account assignment category "I" intead of u.
    Please guide.
    Regards'
    Kumar

    Dear Arif,
    Please check the shipment document is there any error log exists
    Check the shipment cost having the value and Transporter(Vendor) and it is getting transfer to FI.
    After checking the transfer chek sytem will create the PO while saving the shipment cost document.
    I hope it will help you,
    Regards,
    Murali.

  • Shipment cost - fixed prices

    Hello SAP experts,
    I have created a new condition type to calculate shipment costs for which:
    - calculation type = quantity
    - scale basis = quantity
    I know there is a way to enter the prices per quantity unit (e.g. PC), like this:
    - if quantity = 1 PC , price is A per PC
    - if quantity = 2 PC, price is B per PC ==> total price for 2 PC will be 2*B
    - if quantity = 3 PC, price is C per PC ==> total price for 3 PC will be 3*B
    I would like to be able to enter fixed prices, depending on the calculated quantity:
    - if quantity = 1, price is X
    - if quantity = 2, price is Y
    - if quantity = 3, price is Z
    Does anyone know if and how you can enter the prices this way?
    Thanks a lot for any recommendations or help!
    Kind Regards,
    Alexander

    Used Multi-dimensional condition with scale.

  • Shipment Cost price per trip

    How can we set -up the condition type as per trip or per shipment document?
    Or maybe, set-up pricing per shipment route (and not per delivery).. What should be the calculation base of the condition type?
    I can't find "per shipment' but only per delivery.. what if there are several deliveries in the shipment?

    Hi,
    if you want to combine several shipments, the calculation base is "shipment costs item".
    Best regards
    Juergen

  • Wrong shipment costs posting during good receipt

    We are having a problem when we post a good receipt for an inbound delivery in the transaction MIGO. We have created some account keys in order to classify and post shipment costs -specified in a shipment cost document- on specific balance accounts. The balance accounts determined by the OBYC transaction are right but posted values during good receipt do not match to registered values in the shipment cost document.
    The documents flow for this process is as follow:
    1. It is created a purchase order (ME21N).
    2. It is created an inbound delivery based on the purchase order (VL31N).
    3. It is created a shipment document based on the inbound delivery (VT01N).
    4. It is created a shipment costs document (VI01) for the shipment document where shipment costs are specified in its calculation schema
    5. It is created a good receipt for the inbound delivery of the step 2. The balance accounts are determined correctly but values do not match to registered values in the shipment cost document.
    Best Regards
    Guillermo

    Hi,
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/93/74413b546011d1a7020000e829fd11/frameset.htm
    Kapil

  • Product Gap To Accommodate the Shipment Cost in R/3 Procurement process- MM

    Hi,
    We are in to IT distribution business; in our nature of business we donu2019t know shipment cost at Purchase Order, we can have various options
    As per Our business requirement we want to take the MAP cost as basis of our Sales Price considering very low profit margin, so  for every shipment( partial GR) the freight cost  are not on proportionate basis, it will vary widely depending on the facts like
    A.     Mode of transport(Air / Ship /Road )
    B.     Size of Truck load/ Ship Container
    C.     Number of Partial Shipment
    D.     Shipment for Multiple Purchase order.
    Further we want the freight cost  to be automated based on above variations.
    Problem:
    We need to incorporate both the partial delivery cost (Elucidated below) at Goods receipt point for each and every shipment (Partial Delivery).
    We want automated price component should flow to Good receipt on partial delivery basis considering both components mentioned below.
    For understanding kindly refer to the below mentioned example.
    Case 1:
    We placed one Purchase Order Qty 1000 to Vendor HP on Inco term Ex Works Taiwan,
    This Quantity of Material will be shipped partially to Our Plant at Dubai; We will out sourced Freight forwarder for picking the material from HP factory to Dubai Sea Port
    We have different components as below
    Fixed      $  115.00      Per Bill of Lading / Shipment
    Variable 1 and/or      $  235.00      Per 30 CBM / 20" FT Container
    Variable 2 and/or      $  200.00      Per 60 CBM / 40" FT Container
    Variable 3      $  200.00      Per 70 CBM / 40" FT HC Container
    Again the Shipment will be transferred from Sea Port to Our Plant through road, this may be a
    Variable     From 1 to 8 CBM --> $ 19     3 Tonn
         More than 8 CBM --> 19 CBM --> $38     7 Tonn
         More than 19 CBM --> 43 CBM --> $52     40" Trailer
    Any concept or solution will be acknowledged..
    Thanks & Regards
    Sudhansu
    Edited by: sudhansu satapathy on Jan 27, 2011 9:50 AM
    Edited by: sudhansu satapathy on Jan 27, 2011 2:02 PM

    Hi,
    Quick answer will be
    As you do not know delivery cost at the time of PO creation , you can post delivery cost in MIRO with a option to a particular G/L account & need to active in following path:
    SPRO > Materials Management > Logistics Invoice Verification > Incoming Invoice > Activate Direct Posting to G/L Accounts and Material Accounts > Here Activate "Dir.posting to G/L acct = active" and save. 
    OR
    Try for rebate / subsequent settlement.
    Regards,
    Biju K

  • Delivery - Shipment - Shipment cost docs

    Hi experts,
    Hi,
    I created delivery and completed invoicing , when I tried to create shipment doc with VT01N , Its asking for tranportation planing point and shipment type. FYI I have configured routes , legs(Direct leg) and shipment doc types.My question is , is there any way to link delivery document to shipment docu and dhipment cost document?
    Is there any field in delivery type to link with shipment doc ?
    Is there anything to do with copying controls for this?
    what is the T.code to maintain condition records(header and item) for shipment cost document?
    when I created the sales doc , system is automatically picking the route. so is there any other area to configure?
    can anyone help me on these questions
    Thanks,
    Kanna.

    1. Assign delivery to shipment
    You should assign the delivery before GI to the shipment in VT01N. (generally you create the sales invoice after PGI)... However, if you use "C" in total goods movement status field of selection screen when assigning deliveries to the shipment you should be able to do it. So, check your selection criteria.
    2, Transportation relevance
    SPRO > LE > Transportation > Shipments > Transportation Relevance - here you can define for route, delivery type, delivery item the shipment relevance.
    In your delivery you can define blocking reaso for transport (LIKP-TRSPG), please aslo check this.
    3. Delivery type - shipment type
    As I know there's no direct connection between delivery type and shipment type. Please check SPRO before asking.
    4. Copy control
    Why do you ask for copy control? Did you find anything like this in the menu in SPRO? Please first check menu in SPRO before asking.
    5. Condition record for shipment cost document
    Please check SAP easy access menu
    Logistics > LE > Master Data > Transportation > Shipment Cost > Prices (TK11, TK14)
    Regards,
    Csaba

  • Shipment Cost and Plant Abroad Config Doc

    Can anybody provide me with the Step by step
    1.Shipment cost configuration Doc.
    2.Plants abroad configuration doc.

    Hi
    Please Follow below steps.<b>Shipment cost</b>
    1)Create the transportation planning point for the company codes.
    2) Maintain transp. relevance for the dly doc. type, item cat and routes
    3) Define the shipment types
    4) Define the shipment cost types
    5) Define shipment cost item categories and assign
    6) Define shipment cost relevance
    7) Maintain pricing
    8) Assign purchasing data
    9) OBYC
    10) OKB9
    AND Please check the below:
    Step1: T.Code: VL01N: Just Create Delivery Note here. Do not do the Picking and Packing.
    (This is Client Specific)
    Step 2: T.Code: VT01N: Create Shipment.
    Here mention your Transportation Point and Shipment Type you Configured for this and Click on deliveries ICON.
    GO to W.ref to
    Outbound Delivery : Give your Delivery Number that you created earlier for this shipment and F8( Excute)
    Then Select the Delivery and Click on OverView
    Here Click on Planning then automatically Route( If route determination is done) and Vendor Number get generated and Save the Data.
    Step.3: T.Code: VL02N: Change Delivery.Here give the Delivery no and
    Do picking, Packing (If necessary) and PGI.
    <b>Plants abroad:</b> Sales-specific settings
    Description
    If plants exist abroad for a company, i.e. in the same company code, (within the EU), the tax postings and the trade statistics for the goods flow between these plants are required for (INTRASTAT) internal EU trades statistics. In SD, this applies to replenishment and consignment.
    You can meet these requirements by carrying out billing with special settings in pricing for the relevant transactions:
    Because the INTRASTAT declarations were created using billing documents and the tax postings were created using financial accounting documents, billing documents are created for consignment fill-ups or pick-ups and replenishment deliveries although they are not relevant for billing. However, because there are no amounts the billing document has a total value of 0, obtained using a special pricing procedure (see below). INTRASTAT declarations and tax postings (the billing document is forwarded to FI) are created based on the resulting billing documents.
    Do not make these settings if the plant abroad is not in the EU. All that is required is a pro-forma invoice.
    Change system parameters in customizing
    You can find Customizing for 'Plants abroad' in the IMG via 'Sales and Distribution/Basic functions/Taxes/Plants abroad "Plants abroad".)
    A special pricing procedure (RVWIA1) is assigned to the new billing document (billing type WIA) defined for replenishment deliveries and consignments between EU countries. This pricing procedure has the following structure:
          1. Pricing condition (PR00)
          2. Input tax in destination country (based on pricing condition)
          3. Output tax in country of departure (that is, 0% on deliveries within the EU)
          4. 100% discount R100 (based on pricing condition)
          5. Output tax in destination country (based on the 100% discount)
    This causes the total value of the billing document to be 0. The discount annulls the price. Input and output tax have the same percentage rate so that the total of the tax posting is zero and the total billing document has value 0.
    Changes to the interface
    Stock transfer
    Replenishment deliveries between different EU countries are relevant for billing. The billing status is A.
    The origin of the VAT registration number (billing header) has a new value: J
    Consignment fill-up / pickup
    Consignment fill-ups / pickups between different EU countries are relevant for billing. The billing status is A.
    The origin of the VAT registration number (billing header) has a new value: J
    During consignment fill-up, the coutry of the ship-to party is now used as the departure country country for tax determination.
    Changes in procedure
    Deliveries that occur as a result of a stock transfer order, can be billed if the delivering and receiving plants are in different EU countries and belong to the same company code.
    Consignment fill-ups and pickups can be billed if the delivering plant is in an EU country and the consignment stores are in a different EU country. The consignment fill-up is then no longer relevant for the INTRASTAT declaration.
    Condition records must be created for tax conditions WIA1, WIA2, and WIA3.
          1. WIA1: Input tax in country of destination.
          The tax code for the tax determination procedure of departure country must agree with the tax code of the country of the company code. This is because the tax code is accessed via the company code country during forwarding to FI. The field 'reporting country' (that is - country of destination) must be maintained in the characteristics of the tax code.
          2. WIA2: Output tax in the country of departure (0 % for EU-internal deliveries)
          3. WIA3: Output tax in country of destination.
          The tax code for the tax determination procedure of departure country must agree with the tax code of the country of the company code. This is because the tax code is accessed via the company code country during forwarding to FI. The field 'reporting country' (that is - country of destination) must be maintained in the characteristics of the tax code.
    The total of the taxes has a value of 0. The total of the billing document also has a value of 0. The price is reduced by 100% using discount R100.
    Procedure for removing dataset errors
    Note:
    When you maintain the tax indicator, remember that the tax indicator must be maintained at the same time in different tax determination procedures, or that you have to create a general tax determination procedure containing the tax indicators of the different relevant countries.
    Please read the Release Note
    abroad.
    Dependent functions
    INTRASTAT declarations, combined declaration, Sales tax advance return
    http://sap.ittoolbox.com/groups/technical-functional/sap-acct/plant-abroad-functionalty-66840
    SHESAGIRI.G
    Message was edited by:
            SHESAGIRI.G

  • Shipment cost based on Value

    I need your valuable suggestion on how to create the Value based shipment cost.
    Our Process:
    Create POS - Create Inbound delivery - Create Shipment - Create Shipment cost - Post Inbound Delivery.
    So while posting the inbound delivery, the freight cost will post against the material. The invoice will be paid for the Vendor for the quantity purchased and freight charge will be paid for the freight Vendor(s).
    We are adding the Vendor in the Shipment and adding the cost against the Vendor in the Shipment Cost.
    Everything is working fine, but the shipment cost posting against the material was happening based on the delivery weight / quantity.
    The reason for this asking the question is - we are receiving high value items and low value items with the same weight.
    Question 1: Is it possible to have the shipment cost being split, calculated and posted against the material based on the PO Item received Value or PO Price
    Quesion 2: Is it possible to post the shipment cost at a later date? Currently, the shipment cost posts when the inbound delivery is received (I know the material value will be posted when there is stock changes or price changes).  But our issue is the invoice for the shipment cost will be received after a couple of days from the goods receipt. Right now we are entering couple of costs through assumption, then while postig the invoice, we adjust that value.
    Note: I cannot enter the condition directly in the PO, as the same PO item will be partially received by multiple inbound deliveries

    Freight carriers charges weight on the basis of Weight / volume of the items.SAP shipment works on the same principle.
    Cost of transporting ton of Potataoes  is same as transporting 10 ton of aluminium between two known destinations.
    Hence it is illogical to distributes cost on the basis of item value. However if still you want to distribute the same on value basis then maintain freight condition(%) in PO as per your prefined logic of distribution of freight cost.
    It is well known fact that cost of freight % is always higher in  Low value items & iis low in case of High value items.
    Regards,
    Sanjay Kohli

  • Shipment Cost - ERS (Evaluated receipt settlement)

    Hi,
    We are using Shipment cost documents to calculate the customer freight.
    In shipment cost document, we need to transfer the amount to accounting.
    In that case system will create PO automatically. This is all good.
    Now, We need to activate ERS for all the vendors, in that case when we transfer the shipment costs to accounting, system is asking to enter Tax code.
    We are not using Tax determination at all in shipment cost document.
    Can't we use ERS without Tax code?
    Where does this Tax code come from into shipment costing document? is it through Tax determination condition technique?
    is there any way we can deactivate Tax code?
    Please suggest.
    Thanks.

    Hi Sandra,
    For such issues there is a pro-active approach by way of tolerances in MM-LIV. If your tolerances are configured properly, the system won't go so far as posting an invoice in ERS. It would show you a red flag by raising an exception.
    ERS as a functionality entirely depends on the PO prices. There is no check as in the conventional LIV. Thus, I am afraid you won't have an audit trail straightforward.
    Regards,
    Vishal.

  • Freight capitalization for STO process using shipment cost document

    Dear MM experts
    I have been testing and trying to charge freight to material using transportation module. I know how to do it in simple STO process without SCD (shipment cost document) but I am not able to do it with SCD.
    I have searched and tried every link I found on SCN. Unfortunately there are many open threads and non of them is answered or giving complete solution. For example I have tried this link where Ajit Kumar has explained the scenario in detail I am but unable to achieve my result. I have also tried other links and SAP note 427944 as well.
    Now what thing confusing me is accounting entries and documents/steps where these accounting entries will be posted.
    My current process is like this in plant to plant transfer under same company code
    STO > OBD > Shipment Document > PGI > Accouting Entry with 641 movement type. Material account debit and same account credit. > Shipment Cost document > GR with 101 without any accounting entry > Transfer freight cost to FI using Freight Service PO determination > Accounting Entry Freight Outward Expense Debit and Freight Clearing Account Credit > MIRO > Accounting Entry Freight Clearing Debit and Vendor Credit
    As you can see we are booking freight as an expense and not charging to material. Now what I want is that freight should be charged to material. If I am sending material from plant P000 to plant P201 under same comapny code then freight charges should be added in material cost in plant P201.
    I have done FRB1 condition type with accrual and copy shipment cost tick mark and other stuff suggested in all those threads but it is not working.
    My requirement is to understand the points where and what accounting entries will be created as per my new scenario which is same as old one except one difference which is to charge freight to material instead of booking expense in freight service PO.
    Lets take an example that material cost price is 100 and freight charges is 50. Now as per old threads at the time of GR against OBD system will create accounting document with 150 debiting the stock in plant P201. What about credit? If we have added freight here then what about 2nd accounting entry in my first scenario in which freight expense is debited and clearing account is credited? Could anyone please explain accounting entries and points where these entries will be posted?
    Another thing is that is it only possible with moving average price to charge freight to material or can we do this with standard price as well using some standard or customized solution?
    Detailed and easy to understand answer will be highly appreciated.
    Thank$

    Hi Moazzam ;
    Firstly, you can benefit Badi/s in package VTRA which is given belowed.
    Secondly , i think that  shipping method --> create sto with delivery --> create shipment document and shipment cost document (problem is starting so system will be create PO and service entry sheet automatically , can you try shipment document is non-related with cost document.
    Thirdly , you can post invoices charge to material with miro , if you success to direct freight costs to stock account (BSX).
    Also , you can benefit doc. sap behaviours for Std price/ Map --> Planned & unplanned delivery costs in mm
    I hope , you can manage your process ; for me standart way is the best.
    Regards.
    M.Ozgur Unal

Maybe you are looking for

  • Report Not Working

    Hi Everyone, Installed Application Express and I am having some trouble in getting some basic reporting functionality working. Setup Tables: client Definition: Col1 = client_id, Col2 = client_name, Col3 = suburb I also created a sequence, client_seq.

  • Download excel file to PC in background

    Hi All, I need to write a report to local PC as an excel file. The program is working fine in foreground using cl_gui_frontend_services=>gui_download. However since the report data is very large, when the user runs the program in foreground, it alway

  • Sales Order Stock (For Repair Returns) - Valuated & Non-Valuated

    Greetings All, We are currently using sales order stock as quantity only for customer returns for repair (RMA Sales Order). As long as we do not give a credit to our customer, this is working. My problem is that some of our customers are requesting c

  • Registry key 'Software\JavaSoft\Java Runtime Environment\CurrentVersion'

    Server and client are compiled under jsdk 1.3. After a crash on NT workstation installed jsdk 1.4 on it alone. (Did not recompile client to 1.4) All has been well for first few times I ran client on the machine with 1.4 installed. Then client refused

  • Using Search Help from another client?

    HI guys, I have a requirement where I have to use a search help available in another client in one of my input parameters on a selection screen. My report is in SRD system but the search help is in ECC. The search help is actually PRPM <== Matchcode