BAPI Project Budget

I'm looking for a BAPI or FM for creating or updating budget for WBS in projects (transaction cj30).
Can U help?

I have same question,can you tell me how to use BAPI or bdc to update Budget?
I have created wbs with BDC, i want to update budget with t-code :cj30, I don't know how to do .

Similar Messages

  • How To Load a Project Budget Line Through API in R12 ?

    Hello
    Could you please let me know how to load the project budget lines through API in R12 system, I am trying with below script but it is not working.
    Could you please let me know if you have any solution.
    =========================================================================================================================================================================
    Script
    DECLARE
    --––variables needed for API standard parameters
       l_api_version_number     NUMBER                                 := 1.0;
       l_commit                 VARCHAR2 (1)                           := 'T';
       l_return_status          VARCHAR2 (1);
       l_init_msg_list          VARCHAR2 (1);
       l_msg_count              NUMBER;
       l_msg_data               VARCHAR2 (2000);
       l_data                   VARCHAR2 (2000);
       l_msg_entity             VARCHAR2 (100);
       l_msg_entity_index       NUMBER;
       l_msg_index              NUMBER;
       l_msg_index_out          NUMBER;
       l_encoded                VARCHAR2 (1);
       i                        NUMBER;
       a                        NUMBER;
    --––variables needed for Oracle Project specific parameters
       l_pm_product_code        VARCHAR2 (100);
       l_pa_project_id          NUMBER;
       l_pm_project_reference   VARCHAR2 (100);
       l_budget_type_code       VARCHAR2 (30);
       l_change_reason_code     VARCHAR2 (30);
       l_description            VARCHAR2 (255);
       l_entry_method_code      VARCHAR2 (30);
       l_resource_list_name     VARCHAR2 (60);
       l_resource_list_id       NUMBER;
       l_budget_lines_in        pa_budget_pub.budget_line_in_tbl_type;
       l_budget_lines_in_rec    pa_budget_pub.budget_line_in_rec_type;
       l_budget_lines_out       pa_budget_pub.budget_line_out_tbl_type;
       l_line_index             NUMBER;
       l_line_return_status     VARCHAR2 (1);
       l_user_id                NUMBER;
       l_responsibility_id      NUMBER;
       API_ERROR                EXCEPTION;
    BEGIN
       -- SET GLOBAL INFO
       SELECT user_id,
              responsibility_id
         INTO l_user_id,
              l_responsibility_id
         FROM pa_user_resp_v
        WHERE user_name = 'RAJU';
       PA_INTERFACE_UTILS_PUB.SET_GLOBAL_INFO (p_api_version_number      => 1.0,
    p_responsibility_id       => l_responsibility_id,
    p_user_id                 => l_user_id,
                                               p_msg_count               => l_msg_count,
    p_msg_data                => l_msg_data,
    p_return_status           => l_return_status
       IF l_return_status != 'S'
       THEN
          RAISE API_ERROR;
       END IF;
    --––PRODUCT RELATED DATA
       l_pm_product_code        := 'GMS';
    --––BUDGET DATA
       l_pa_project_id          := 6271;
       l_pm_project_reference   := NULL;--'ABC';
       l_budget_type_code       := 'FC';
       -- l_change_reason_code := 'INITIAL';
       l_description            := 'New description –> 2';
       l_entry_method_code      := 'PA_TASKLVL_BASELINE';
       l_resource_list_id       := 1001;
    --––BUDGET LINES DATA
       a                := 1;
       FOR i IN 1 .. a
       LOOP
          l_budget_lines_in_rec.pa_task_id := 405156;
          l_budget_lines_in_rec.pm_task_reference       := NULL;
          l_budget_lines_in_rec.resource_alias          := 'Labor';
          l_budget_lines_in_rec.resource_list_member_id := '1034';
          -- l_budget_lines_in_rec.budget_start_date        := '01-Jan-13';
          -- l_budget_lines_in_rec.budget_end_date          := '31-Dec-14';
          -- l_budget_lines_in_rec.period_name          := 'JUL-10FY2011';
          l_budget_lines_in_rec.description             := 'Some Text';
          l_budget_lines_in_rec.quantity := 100.00;
          l_budget_lines_in_rec.raw_cost := 300.00;
          l_budget_lines_in (i)                         := l_budget_lines_in_rec;
       END LOOP;
    --––INIT_BUDGET
       pa_budget_pub.init_budget;
    --––LOAD_BUDGET_LINE
       FOR i IN 1 .. a
       LOOP
          pa_budget_pub.load_budget_line
                            (p_api_version_number           => l_api_version_number,
    p_return_status                => l_return_status,
                             p_pa_task_id                   => l_budget_lines_in (i).pa_task_id,
    p_pm_task_reference            => l_budget_lines_in (i).pm_task_reference,
    p_resource_alias               => l_budget_lines_in (i).resource_alias,
    p_resource_list_member_id      => l_budget_lines_in (i).resource_list_member_id,
    p_budget_start_date            => l_budget_lines_in (i).budget_start_date,
                             p_budget_end_date              => l_budget_lines_in (i).budget_end_date,
    p_period_name                  => l_budget_lines_in (i).period_name,
    p_description                  => l_budget_lines_in (i).description,
                             p_raw_cost                     => l_budget_lines_in (i).raw_cost,
    p_burdened_cost                => l_budget_lines_in (i).burdened_cost,
    p_revenue                      => l_budget_lines_in (i).revenue,
    p_quantity                     => l_budget_lines_in (i).quantity
       END LOOP;
       IF l_return_status != 'S'
       THEN
          RAISE api_error;
       END IF;
    --––EXECUTE_CREATE_DRAFT_BUDGET
        pa_budget_pub.execute_create_draft_budget (p_api_version_number        => l_api_version_number,
    p_msg_count                 => l_msg_count,
    p_msg_data                  => l_msg_data,
    p_return_status             => l_return_status,
    p_pm_product_code           => l_pm_product_code,
                                                  p_pa_project_id             => l_pa_project_id,
    p_pm_project_reference      => l_pm_project_reference,
    p_budget_type_code          => l_budget_type_code,
    p_change_reason_code        => l_change_reason_code,
    p_description               => l_description,
                                                  p_entry_method_code         => l_entry_method_code,
    p_resource_list_name        => l_resource_list_name,
    p_resource_list_id          => l_resource_list_id
       IF l_return_status != 'S'
       THEN
          NULL; --––RAISE API_ERROR;
       END IF;
    --––FETCH_LINE
       FOR l_line_index IN 1 .. pa_budget_pub.g_budget_lines_tbl_count
       LOOP
          pa_budget_pub.fetch_budget_line (p_api_version_number      => l_api_version_number,
    p_return_status           => l_return_status,
    p_line_index              => l_line_index,
    p_line_return_status      => l_line_return_status
          IF l_return_status != 'S' OR l_line_return_status != 'S'
          THEN
             RAISE api_error;
          END IF;
       END LOOP;
    --––CLEAR_BUDGET
       pa_budget_pub.clear_budget;
       IF l_return_status != 'S'
       THEN
          RAISE api_error;
       END IF;
    --––HANDLE EXCEPTIONS
    EXCEPTION
       WHEN api_error
       THEN
          FOR i IN 1 .. l_msg_count
          LOOP
             pa_interface_utils_pub.get_messages (p_msg_data           => l_msg_data,
    p_data               => l_data,
    p_msg_count          => l_msg_count,
    p_msg_index_out      => l_msg_index_out
             DBMS_OUTPUT.put_line ('Error Mesg ' || l_data);
             DBMS_OUTPUT.put_line ('Error Mesg ' || l_msg_data);
          END LOOP;
       WHEN OTHERS
       THEN
          FOR i IN 1 .. l_msg_count
          LOOP
             pa_interface_utils_pub.get_messages (p_msg_data           => l_msg_data,
    p_data               => l_data,
                                                  p_msg_count          => l_msg_count,
    p_msg_index_out      => l_msg_index_out
             DBMS_OUTPUT.put_line ('error mesg ' || l_data);
          END LOOP;
    END;
    =========================================================================================================================================================================

    Not knowing how its embedded...  you will need to get the report instance from the dll and cast it as a ReportDocument object.
    Given the info so far, that is all we can say.
    Ludek
    Follow us on Twitter http://twitter.com/SAPCRNetSup
    Got Enhancement ideas? Try the [SAP Idea Place|https://ideas.sap.com/community/products_and_solutions/crystalreports]

  • Will Project Budget be available again after settlement to AUC/final asset?

    I would like to know if my project budget will become available again once I settle costs to AUC and to Final asset (or settle directly to final asset w/o AUC). 
    Letu2019s say my original budget for WBS is 5000, cost was posted to the WBS u2013 4000, now I settle the 4000 cost to AUC (and eventually from AUC to final asset).  Will this mean the entire 5000 will be available again since the cost has been settled from WBS to AUC (and eventually fixed asset)?
    Thanks!
    Vivian

    If you have Budgeted WBS element and than after  you does any cost postings against that WBS. you budget get consumed by that actual cost.
    however, WBS element is capturing cost for the period of project duration that cost has to transfer to FI/ CO , finally so, at the period-end we does the settlement & transfer taht cost to cost center , PA , asset etc....
    So, no point that after settlement your budget will be your initial budget.
    Regards
    Nitin

  • Project Budget Return Currency issues

    HI,
    my business has the following issue:
    The Investment Management happens in Controlling Area currency (USD), while distribution of budgets to projects, spend & budget return happens in Local Currency (say EUR). So when project has a left-over of a budget that they want to return, they take EUR balance, convert it using budget rate of the day to USD equivivalent & make return. This creates an artifitial USD balance.
    For example, 100 EUR were distributed to the project, 80 EUR spend, 20 EUR returned. EUR balnce is Zero, but USD will have some artificial balance arrised due to different rates applied on spend & return.
    So I wonder what other companies normaly do with it? My business came up with a requirement of the following report:
    Re: How to build Project Budget report with "IF-then" formula?
    Many thanks in advance,
    Daria

    Hi Daria,
    My recommendation is to align budget profile settings between IM and PS, means using the Object Currency for both.
    I do believe you have one IM program per country, therefore the Object Currency is possible to be used.
    Regards,
    Paulo

  • Customization of PROJECT BUDGET ACCOUNT GENERATOR

    Hi
    Anyone customized project budget account generator. Please breif how to configure the workflow as it creates accounts for budget lines How this workflow is triggered and what are the attributes top_tak_number and low_task_number.
    I need to develop plsql package to derive accounting segments please can u help me how to develop as there is no copy_code_combination in the predefined workflow process tree. Do I need to create a process n loop till all the lines accounts are generated.
    Please help.
    Thanks
    Varun

    Pl do not post duplicates - customization of PROJECT BUDGET ACCOUNT GENERATOR

  • Project Budget without GL Integration

    Hello Experts
    Can anyone provide step by step info for creating a Project Bbudget/Budgetory Controls without GL Integration.
    Thanks in Advance.
    Kind Regards
    John

    Steps required for Project Budget without GL Integration
    1) Enable the Budgetary control & flag for override at project level(this is required so that we can overide budgetary control setting at project level ) at the project type level
    2) In the Budget Entry Method enable the flag categorize by resources and define your resource list.
    3) Assign your Budget Entry Method and recourse list (previously defined ) in the budget option tab of the Project Type.
    4.Open the Project(for which u want to enable budgetary control)
    Navigation: Project -> Options-> budgetary control Options
    5) Check the following 2 things
    Amount Type - The starting point for the time interval. Examples: Period-to-Date, Year-to-Date, Project-to-Date
    Boundary Code - The end point for the time interval. Examples: Period, Year, Project
    6.Check that in the Purchasing , Encumbrance options is enabled
    Navigation is
    Purchasing ->Setup:Organizations->Financial Options
    Select Encumbrance Tab. Define for PO Encumbrance and Invoice Encumbrance.
    Cheers
    Hadi

  • Funds management and project budgeting

    Hi
    We have funds managment activated for operational expenses(OPEX).
    Project budget will be used for all CAPEX requirements. However, there will be common G/L accounts used in both operational expenses and capital expenses. For eg. steel could be issued both for projects as well as maintenance activities.
    Please clarify on the following:
    1) How to avoid duplication of budgets in PS and FM.
    2) Can we forego PS budgetings and depend on only FM budgeting to meet the above issue. Can't we achieve the PS budgeting functionality in FM.
    3) What differentiates or advantages we get in PS budget over FM budget.
    Regards
    Srikrishna

    Srikrishna,
    I am not aware of FM, but for the point mentioned by you
    However, there will be common G/L accounts used in both operational expenses and capital expenses. For eg. steel could be issued both for projects as well as maintenance activities.
    You can over come this by using valuation class in the material master Acoounting1 view. There you have 2 valuation classes
    1. Valuation class - this is used for operational purposes  and this valuation class will have set of G/L accounts mentioned in IMG for determining different process like, inventory, consumption etc...
    2. Project Valuation Class - This is used for Project (when you mention account assignment as Q in PR or PO) system will read this valuation class, if no value exists in this field, it reads Valuation class. Again if the value in this field is different than the Valuation class, then it will contain different set of G/L account, with help of this you can distinguish the operative and Project G/L accounts and inventory / consumption separately.
    Hope this may help you.
    Regards,
    Praveen

  • On-line funds checking with respect to project budgets

    Hi Friends,
    Does Purchasing check, in addition to available funds in GL, the funds available in a project if at PO level, the project number is set up and an expenditure type is attached and a Project Budget is setup for the expenditure type.
    What are the setups involved?
    How does one specify at the project budget level whether the budget checking, if possible, will be absolute and advisory.
    Thanks and regards
    null

    Oracle Projects is not designed to support budgetary control for Purchasing and Payables.
    This is an enhancement Oracle is planning to deliver on one of the next releases, on top of 11i. Unformally scheduled for the second half of year 2001.
    Dina

  • Project Budget conversion rate - change to quarterly P rate (value date?)

    Hi All,
    We have both Plan and budget profile for project set as blank for value date and exchange rate as P rate.  There are quarterly P rates maintained for a Fiscal Year in OB09.     For the plan, it gets the correct P rate based on the period/month of plan.  However, I noticed that for project budget, it is always getting the P rate defined for first date of fiscal year -  I am not sure if this is due to value date (which is always defaulted to first date of fiscal year)
    Could you advise if there is a way for the system to pick the correct P rate for budget (quarterly P rate in OB08) - if this is due to value date, is there a way to change it (not by defaulting a value date in budget profile config)
    Thanks!

    Right.
    There are 3 ways to use CSS:
    Inline: styles applied to the  HTML code between the <body> tags.  This is not usually recommended.
    Embedded:  inside  <style> and </style> tags between the  <head> tags in your HTML document. This code is applied to only one page.
    External: a physical file that contains nothing but CSS code and applies to all site pages that are linked to it.
    If you have a unique style you want to use on a single page, either use embedded CSS (in the HTML document itself) or set up a unique class in your external stylesheet.
    CSS classes:
    .center {text-align:center}
    .right {text-align:right}
    .left {text-align:left}
    HTML:
    <p class="center"> this is centered text</p>
    Nancy O.
    Alt-Web Design & Publishing
    Web | Graphics | Print | Media  Specialists
    www.alt-web.com/
    www.twitter.com/altweb
    www.alt-web.blogspot.com

  • IMCCP3 - Transfer Plan to Project Budget  - WBS Elements

    Dear all
    Is it possible to execute a similar report as IMCCP3 - Transfer Plan to Project Budget based on a range of WBS Elements. Can a new report be created to allow this. The standard transaction only allows this based on Project.
    Thank you
    PRG

    yes, you could always create Z tcode as you required.
    Please make a functional spec and discuss with your abaper.

  • Project Budgeting

    Hi,
    Can any body explain me the procedure to create a user status in status profile for project budgeting.
    Thanks,
    Prasad

    Hi
    I doubt if you could update the original budget using budget updates such as supplement, return or transfer.
    When ever you do budget updates, only the current budget would get updated but not the original budget.
    Regards
    Amal

  • BAPI for budget change and update

    Hi,
    I am looking for a BAPI which can update the SUPLLEMENT field(budget change) for transaction CJ37.
    The importing parameters are the following : Project Definition, WBS element, period and supllement value.
    The BAPI  BAPI_EXPENDITUREPROGTREE_CHVAL  doesnt have the importing parameter (definition, WBS element).
    Please help.

    Hi,
    There is no BAPI for FM9K.
    Regards
    Abhii...

  • BAPI for Budget

    Hi,
    Which is the BAPI to create Budget?
    Regards,

    Hi afzal it means its better to create open projects by manual entries. I am also going thru same problem i am having 250 projects as open and i have to uplaod in SAP. There is no legacy system as open ps or primevera. Kindly suggest me the option which i have.
    With Regards
    Abhihsek Sinha

  • Project budget and forecast tables in R12

    Hi All,
    I had to extract the budget and forecast amounts for each project in the below format.
    Project number, budget/forecast, task, resource, PA period, burden cost..etc.+
    We are on R12. Can I use below tables to extract the above information. or should i depend on PJI% tables. please suggest.
    pa_budget_versions
    pa_budget_lines
    below is the full query i built:
    SELECT pp.NAME project_name, pp.segment1 project_number,
    haou.NAME project_organization, pp.project_type,
    pp.project_status_code, pp.start_date project_start_date,
    pp.completion_date project_completion_date,
    pfpt.NAME fin_plan_type, pfpt.description fin_plan_description,
    pfpt.plan_class_code, pbv.budget_version_id, pbv.budget_type_code, pbv.version_number,
    pbv.budget_status_code, pbv.version_name, pbv.baselined_date,
    pbv.labor_quantity project_level_labor_quantity,
    pbv.labor_unit_of_measure, pbv.raw_cost project_level_raw_cost, pbv.burdened_cost project_level_burdened_cost,
    pbv.revenue project_level_revenue, pbv.version_type,pbv.current_planning_period, pt.task_number, pt.task_name,
    prlm.alias resource_alias, prlm.expenditure_type, prlm.event_type,
    prlm.expenditure_category, prlm.resource_class_code,
    prlm.unit_of_measure, pbl.start_date, pbl.end_date, pbl.period_name,
    pbl.quantity, pbl.raw_cost, pbl.burdened_cost, pbl.revenue, prlm.resource_list_member_id,
    prlm.resource_type_code
    FROM apps.pa_projects_all pp,
    hr_all_organization_units haou,
    apps.pa_budget_versions pbv,
    apps.pa_fin_plan_types_vl pfpt,
    apps.pa_budget_lines pbl,
    pa_resource_assignments pra,
    pa_tasks pt,
    pa_resource_list_members prlm
    WHERE 1 = 1
    AND pp.project_id = pbv.project_id
    AND pp.carrying_out_organization_id = haou.organization_id
    AND pbv.fin_plan_type_id = pfpt.fin_plan_type_id
    AND pbv.budget_status_code = 'B'
    AND pbv.budget_version_id =
    (SELECT MAX (budget_version_id)
    FROM pa_budget_versions pbv1
    WHERE 1 = 1
    AND pbv1.project_id = pp.project_id
    AND pbv1.budget_status_code = 'B'
    AND pbv1.version_type = pbv.version_type)
    --AND version_type = 'COST'
    AND pbl.budget_version_id = pbv.budget_version_id
    AND pbl.resource_assignment_id = pra.resource_assignment_id
    AND pra.resource_list_member_id = prlm.resource_list_member_id
    AND pt.task_id(+) = pra.task_id
    and pp.name = 'TEST_XX'
    order by pp.segment1, pbl.period_name, pt.task_number, pbl.start_date

    Can any body please help on this note..
    thanks in advance..

  • BAPI project systems actuals versus planned

    Hello,
    I am looking for a BAPI/Idoc for displaying planned versus actuals similar to report s_alr_87013532. I have looked everywhere but cannot find anything. Also checked in OPENPS if there where any BAPI's for getting the information, but also not.
    Can anyone help me?
    Kind regards,
    Nick

    Hi
    Try this
    SAP Project System - A ready Reference ( Part 2 )
    Thanks
    S.Murali