Dear Experts,
We have assigned costing sheet to valuation variant and valuation variant is assigned to costing variant.
This costing variant is assigned to order type for production orders. Now we have created new costing sheet and assigned to valuation variant, but at the time of creation of production order system is showing old costing sheet. Is there any another configuration whrere costing sheet is made default to valuation variant.
regards,
shashi

Hi Shashi,
There is specific config. step you are missing.Is it behaviour with single order or for all order in that plant? and are you sure new config has been transported to specified client.
Plz. do confirm.
Regards,
Ashok

Similar Messages

  • Change of Cost Center Assignment for Organization Unit in HR

    Hi,
    Recently my client is changing their cost center number from 6char to 5 char format. I have created customized mapping table to link between old cost center number and new ones.
    Create new cost center referencing to old cost center is done too.
    However, for each Personnel Number, i need to change the cost center assignment which link to org unit. I have done this too manually at t-code PPOM. How can I do this for mass change? I have a list of org unit number with me. Is there any standard program to do this or i should use LSMW ?
    How do I make sure for each Personnel number, their cost center assignment will change to new 5 char format in the end as required?
    I am new to HR module.
    Thank you for your help.

    Hi,
    As Sikandar said, you will have to write an LSMW or BDC ( where in you can check and validate the input Cost centers) using PP01 or Po10.
    Also I think if you use BDC or LSMW you will have to run the RHINTE30 report. Check the documentation on RHINTEXX reports to get better idea.
    Cheers..
    Ajay

  • Is it possible to change the cost centre assigned to profit centre?

    hi all ,
    We have a requirement to change the old profit centre which was assigned to cost centre , with the new profit centre ... is it possible ? ... is there any problem in doing so ?... what will be the effect of this ? ...
    thank u ... in advance

    Hi,
    u can only change the cost center assigned to profit center before any document posting,
    If even single document is posted or any other postings has done then u cannot change it.
    Regards,
    Pavan.

  • Costing sheet assignment to notification

    hi there
    i would like to know if it is possible to assign a CO costing sheet to a quality notification in quality management? this would be purely for analysis purpose. no real postings would be made.
    thanks

    hi ashok. thanks for getting back to me on this. the business case is rather long winded but basically they want to calculate costs for analysis/comparative purposes without making an actual posting. they dont want to use a quality order but the notification. so i just need to know if it is possible to use the costing sheet for this purpose to calculate costs without actually posting and secondly if it can be assigned to the quality notification as opposed to the quality order.
    thanks.

  • Mass change of cost center assignment

    in OKB9, we have around 1000 lines for different company code and cost center, we want to change around 300 cost center assignement, how can we effectively do mass change ? can we do txt file upload?
    in excel, we can do search and do mass replacment, but in okb9, my find button is greyed out
    also before/after I change the assignment, I export TK3A table into excel, my old/new cost center is in column A/B, so how to ensure every cost center in column A is not appaer in column B?

    Hi
    (1) may i know which table store this set id and relevant from and to cost center?
    Table SETLEAF
    (2) may I know the t-code to create additional set used in the FI substitution rule?
    t Code GS01
    Hope this addresses your query
    Regards
    Ajay M

  • Cost Sheet is not displaying condition values

    Hello All,
    When i am running the transaction code KGI2.
    System is calculating the Overhead values and updating the Actual Overhead cost for the Oder but it is not  displaying the values in the Cost Sheet, when we select Dialog display check box.
    Can any one help me out. do  have to do some thing in the Configuration to get this values displayed in the Dialog Display feild.
    Best Regards.
    Ravi

    Hi,
    First define the Costing sheet in SPRO
    Click new entries and select  define Costing sheet with Description
    Now select the costing sheet and double click on the Costing sheet rows, now click new entries
    enter row ,overhead  ,description and save
    Click Check to check the costing sheet
    Assign costing sheet to your Production order..Enter in the assigned costing sheet,r the overhead that have overhead key
    Assign overhead key to the overhead group
    Regards,
    Raj

  • Base plan object costing sheet

    Hi,
    Pls advice do v need of creating new costing sheet for base planning object separately.
    We used the existing costing sheet that v already have attached to our other pricing variants because there's no difference of OH calculation. But in base plan object, it doesn't calculate the OH automatical using the given costing sheet. This is our first time of using base plan object for our price simulations, pls advice how and what should we do to get solve this prob !!!
    Thanx

    HELLO
    IF OH ARE NOT GET CALCULATED , ITS BECAUSE OF YOUR COST SHEET AND NOT OF BASE PLAANING OBJECT .
    CHECK THE COST SHEET , HOW AND WHEN IT CALUCULATE OVEHEADS.
    BECAUSE BSAE PLANNING OBJECT REQUIRED ONLY COST SHEET ASSIGNEMENT BY MANUALLLY OR BY COSTING VARIANT.
    THANKS
    ALOK

  • Cost center assignment in subcontracting ??

    hi Experts
    i want to change the costcenter assignment in subcontracting scenario.
    Here my query,
    1.I have created subcontract PO
    2.GR done. accounting docs been gnerated.
    3.In GR document display , u can view line item1 as finished material, then in 2nd line item the consumption of raw material will be generated automatically with 543 movement type.
    In this 2nd line item i want to change costcenter assignment for consumption of raw material account .
    Where trhis configuration setting been done ??
    How and where i can change this cost center assignment ??
    Thanks
    SAP-MM

    Hi,
    Use t.code OKB9 and assign G/L ACCt to cost object with ur company code and save.
    Now try ur transaction.
    OR
    Check the field status of the account  in FS00. If this account requires CO object as mandatory then check whether a cost element is created or not , this error normally occurs when CO object is mandatory but relevant cost element is not created.
    Example: CO object may be cost center, cost element, WBS element
    OR
    Use transaction code: KA02: enter(Cost element) and in default acct assinmt TAB,assign the Cost Center and save.
    For more check the link
    http://www.sap-img.com/financial/requires-an-assignment-to-a-co-object.htm
    Vipin

  • How to test costing sheet

    I am new to CO, I have made some changes in costing sheet, now want to test if its working as expected.
    What are the steps to calculate OH, settle and then display the result/ posting? What are the T.Codes involved?

    Hi,
    Go to bellow Link
    http://www.sap-topjobs.com/SpecialPP/ProductcostingECC6.pdf
    Thanks,
    Raviteja.

  • Costing Sheet Overhead Rate Change Mid Month

    Does SAP Support a mid month overhead rate change in a costing sheet?  I have an overhead rate change effective 5/12/2007, but my PM Order is not recognizing the change unless the Basic Start Date of the order is 6/1/2007.

    hi
    it will not support mid month overhead. it should be either period basis or yearly basis.
    regards,
    siva

  • Change to Base in costing sheet

    Hi Friends,
    If one base ( BA01) is included in 3 costing sheets , now I am chaging to base BA01 fo costing sheet (CS01) and adding 2 activity types , now my question is since BA01 is incuded for 3 costing sheets(CS01/CS02/CS03) so the new actvity types will be added automatically for other two costing sheet bases.
    Because bases are controlling area dependent and not specific to costing sheet.
    Any pointers, please clarify my doubt.
    Regards
    Ashu
    Edited by: ashutosh p on Jun 7, 2010 6:12 PM

    Hi,
    yes, thats what it is: "Because bases are controlling area dependent and not specific to costing sheet." So changing one base-definition will affect all costing sheets that use this base-definiton as well.
    The only thing is, you enter cost elements (or groups of them) in the base definition, not activity types.
    Best regards, Christian

  • Using Substitution (GGB1) to change Cost Center assigned in (OKB9)

    Dear all,
    SAP Platform: ECC6
    I've configured both VKOA (GL assignment) and OKB9 (auto acct assignment) for sales billing. In OKB9, I've mapped one cost center to one GL, i.e. GL-123456 = Cost-center-A.
    Alright, now that I've a specific condition that requires to change the cost center at ad-hoc basis, i.e. for material # 2345678 only, I need to assign to GL-123456 but Cost-center-B instead. So, I attempt to use the substitution rule - GGB1 to replace the cost center based on material #. I did the configuration under Cost Accounting | Line Item by creating a new substitution and defaulted the constant to Cost-center-B when material # = 2345678.
    So, I ran the billing in VF01 but the Cost-center-A was pickup instead of Cost-center-B. It appears that the substitution hasn't been triggered. Did I miss a step?
    Thanks.
    Steven

    Hi,
    Have you tried after removing the cost center assignment in OKB9? 
    Thanks,
    Krish.

  • How Assign Costing sheet to Purchase Order?

    Dear MM,
    Please Guide me How Assign Costing sheet to Purchase Order?

    Hello,
    For costing sheet please refer the link below:
    http://help.sap.com/saphelp_45b/helpdata/en/7e/cb815e43a311d189ee0000e81ddfac/content.htm
    These Costing sheets are assigned to cost elements and then to the cost center.
    By using Account determination field in PO you can assign the category for cost center and assign your costing to PO.
    Please refer the below link for Account determination for a PO:
    http://help.sap.com/saphelp_470/helpdata/en/75/ee0de955c811d189900000e8322d00/content.htm
    Hope the solution is useful
    Regards,
    Swetha

  • Cost center change makes the Org Assignment infotype go blank

    Hi Experts.
    Am trying to change the cost center of an org unit. What happens is, the Infotype 0001 records of all the employees in that Org Unit are delimited and go blank. Can you please suggest a solution for this. Org Re-assignment action helps, but this is a tedious task.
    kindly help.
    Regards,
    Shweta Thakkar

    I don't see any other solution . Anyway why u want to do org-reaasignmmet.
    Yogesh

  • Changes to Profit center assigned to cost center

    Hi
    We have a scnario in which the profit center assigned to the cost center master has to be changed. We have been advised also to  change the validity period of the same from the date of change of the profit center .However, the cost center has been used to for some data postings with the old profit center maintained in the cost center master. Now my query is:
    1. What is the impact of changing the profit center in cost center master? In our case, some data has been posted to the cost center when the old profit center was maintained.
    2. Why should we change the validity period of the cost center after changing the profit center assigned to the cost center?
    3. Also, what is the way to transfer the entries which have been posted to the old profit center to the new profit center?
    Regards
    Sanil Bhandari

    hi,
    1) The impact of profit center is more in the cost center. when ever we assign profit center to cost center. the cost will be updated automatically. so there is no direct posting in profit center only statstical posting are generated.
    2) second one when we want to create profit center first chek it out profit center valid and upto. if same is not maintained in creation of cost center . so u must have to change the validity periods
    3) i am not sure this one i thing 7KEH OR 1KEF TC is there any way tommorow i will give the answer this questions.
          if my answers are wrong plz correct and replay to my id [email protected]
    thank you

Maybe you are looking for

  • Real Instruments Tracks Not Playing

    In one of my songs, the real instruments do not play. However, I can hear the reverb and echo for these tracks. The tracks still respond to editing. The drum loop and Software Piano play just fine. Last night, all tracks worked properly, even after d

  • Payment summary shows only single smartform for multiple entries

    Hi All, When an employee (whose cost center was changed in between the year) uses ESS - Payment Details - Display Payment Summary which uses the program 'rpcpspq0' in backend to show the payment summary, system shows single smartform(first smartform

  • Adobe issues with lion 10.7.4

    Adobe will not run since my update. I cannot even install Adobe properly. Anyone else having same issue?  I keep seeing blocked plugin when needing to use flash player. Help.

  • Audigy 2 prob

    Having a strange problem with my soundcard. With eax enabled in several games (Call of Duty, Halo, etc) sound positioning is all wrong. For example if I am shooting a rifle over my shoulder in Call of Duty, the gun sounds like it's really far away. A

  • JDK 64k byte code limitation for methods

    Concerning the JDK 64k byte code limitation for methods (actually 65535 bytes): While the Java compiler doesn�t care for that problem, the Java VM does. Hence, an violation of the 64k limit is dedected at run time, too late, of cource. Is it possible