Disposal cost cost post directly to materials NOT cost centers.

Dear experts,
Currently we are posting the disposal cost to the cost center as a cost object.
Later the disposal cost posted in cost center will be allocated to material through cost center assessment (KSU5) and material level assessment (CON2).
However, our client said that they want the disposal cost to be directly posted to the material which is scrapped instead of sharing the cost among the relevant cost centers. 
Is there any good standard SAP solution?
*I don't want to develop any add-on programs.
Thanks!

Hi Jiro
If the material being disposed is a saleable material -> Post it directly to COPA at material level
For this,
- you need to default the Cost element in OKB9 to "Prof Segment"..
- Map the cost element to PA Transfer Structure FI in KEI2
If the material being disposed is not a saleable material, then what you are doing makes sense...
You can also follow the above process for Saleable material in this case for non-saleable material, if you wish
Br. Ajay M

Similar Messages

  • TEM - Cost Transfer Posting to CO(Business Event Cost)

    Dear All,
    Kindly suggest solution for the following issue
    I have maintained all the cost items with cost elements
    I have booked an empolyee for a business event with resources
    I have maintained receivers cost center in  SEMIN SCOST (T77S0)
    I have created the senders cost center while maintaining the Business Event type
    Event is also Firmly booked
    When i try to  post the cost  by PV1C - Cost Transfer Posting , the posting is neither complete nor giving error
    when i  click  Create cost transfer in Tcode PV1C i am getting this message"S BK 186 Document has no errors."
    But really the document is not created in CO.
    While transferring it is not giving the option of the traffic lights(Red,green and Amber).
    Thanks in Advance
    Shekar

    Hi Mr.Shekar,
    Can you please share the solution. I wanted details about how it is viewed in CO.
    Thanks in advance.
    Regards,
    Pavan

  • Direct GRN (non order items) to cost center for Non Stackable Materials

    Hi All,
    We can do direct GRN (non order items) to cost center for Non Stackable Materials.
    If it is possible.Please advice me
    Thanks In adance

    Hi,
    Your question is not clear.
    Ok.
    If you want to issue goods to cost center you can use 201 movement type.
    If you want do create automatic PO in back ground during goods receipt, you can do it with customization. For automatic PO creation during goods receipt, you can search in SDN, you can get the answer.
    Regards,
    Biju K

  • Report to know the Materials not yet costed

    Hi Experts,
    Can anyone suggest a standard Report to know the Materials not yet costed in ECC.5
    Thanks and Regards

    Dear Pradeep,
    There are 2 ways of addresing this issue,
    1.Either create a new material status in T Code OMS4 which throws an error message related to production order,purchase order
    creation and assign it to the materials(products) which does not have any released cost estimate.
    Once after taking the cost estimate you can remove this setting from the material master.
    2.The other way is using user exitrs which checks whether the material has a released cost estimate or not.
    Check and revert back.
    Regards
    Mangalraj.S

  • CO-PC Cost components are not assigned when actual cost was posted

    Hi Expert,
    I estimate material cost by Tcode CK11N, the result is cost components were assigned to plan cost. It's okay. But, I have a problem when posting actual cost.
    After actual cost was posted by confirming backflush, I run Tcode KKBC_PKO to check again, but Cost Component field is not assigned to actual cost.
    Please tell me the reason.
    Regard,

    Hi,
    Thank for your answer.
    I will check Cost component Structure, and ensure that all cost elements were assigned.
    Additional, cost components were assigned to PLAN cost, but not assigned to ACTUAL cost.
    Do I have to configure something more?
    Regard,

  • Materials not to be Costed

    Hi,
    Where in the material master status can I set so that it will not get costed when I run T-code:CK40N?
    Thanks,
    Teo

    Hi
    If you do not want to cost the material then in Material master MM02 Select view cost estimate 1 and select the option DO NOT COST. Then the said material will not be costed during cost run.
    Kindly check the same & if the answer is helpful kindly assign points
    Thanks & Regards
    Mahesh

  • Where do I define the automatic posting of goods issue to Cost Center?

    Dear Experts,
    I found out that all the raw material consumed each time I do the confirmation of process order via CORK did not post to Cost Center.
    Where do I define the automatic posting to Cost Center for Goods issue for consumption?
    regards,
    Abraham

    Hi,
    I found out the default movement type has been predefined to 261 (GI for Order, in which it doesn't post to Cost Center).  I guess the standard system has a valid reason to set it as 261 instead of 201 (GI for cost center). 
    As far as I understand, the Process order will accumulate all the costs (direct cost - material, labour and machine hour and also indirect cost) during the confirmation (material is backflushed and fnished goods is auto-GR).  And at the end of the period, this process order will be settled its variance if there is (between the total cost credited - based on standard cost of the finished goods and actual total accumulated costs debited).
    So, my question is, by right should there be any CO posting being made to Cost Center for material consumption in the above process flow as I checked in the standard system, the material movement for raw material and finished goods have no Cost Center posting at all?
    regards,
    Abraham

  • Posting error..mid month cost cenre chenged

    Hi All
    One employee transferred (18.04.2011) mid month. So i have changed position (cost centre also), then employee have one cost centre in 01.04.2011 to 17.04.2011 and from 18.04.2011 onwards in another cost centre. While doing posting (PC00_M99_CIPE) system is showing below error.
    u201CBalancing field "Profit Centre" in line item 009 not filledu201D Message no. GLT2201u201D
    Here, line item 009 is /559(bank transfer wage type)
    Thanks and Regards
    Madhu Bijjala

    Hello Madhu,
    Please check with the Finance team.  Some of the settins related to cost center and profit center needs to be changed.
    Check the below thread for your reference.
    Balancing field "Profit Center" in line item 001 not filled
    GLT2201 - Balancing field profit center in line item 001 not filled
    Hope this helps.
    Best Regards.
    Karan.

  • KE350_We ticked "do not cost" in MM03 with KE4J setting, error in billing.

    Hi Experts,
    Most of materials need to be done costing run before creating billing in our company; therefore, we set "KE4J costing key for Type of Material (FERT) " to check if mat. already done cost estimate or not.
    But some of FERT mat. from old sys. and will not be produce anymore. Therefore, we tick "do not cost" in MM03, and transfer STD at accounting view 1 from old sys. by LSMW.
    When we've done billing, there's no accounting doc. produced.
    In VF02, release to accounting, we got these error msg.
    How do we solve this Q? (If we ticked "do not cost" and no need to check if cost estimates have been done or not.)
    Thanks in advance.
    *********Valuation with material cost estimate: error with product "1-EM-001COPY"*******************************************
    Message no. KE350
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate a line item using the current standard cost estimate.
    In order to determine the current plan period, the system needs to read the valuation segment of the material master.
    The system has found that the current plan period is not filled forproduct "1-EM-001COPY" in plant "1010".
    Display material (View: Costing)
    The system looked for the material cost estimate using costing key "001", as defined in the Customizing settings for CO-PA.
    System Response
    The document cannot be processed.
    Procedure
    Contact your system administrator.

    Hi
    Either release a Std price from CK11N
    OR
    Remove the check box in KE40 "issue error msg if no cost estimate found" for the time being
    br, Ajay M

  • Settlement to cost center posted for statistical WBS element

    We have the following scenario
    Statistical WBS elements with assigned Cost center posted for actual postings
    Network assigned to statistical WBSE and settlement rule on the same WBSE
    On settlement run CJ88  the network costs are transferred from network to Cost Center posted in the WBSE.
    Issue:
    While analysing the active availability control the assigned value is doubled. This happens only of the networks are settled. System considers the Actual values from network + Statistical value from WBSE to caculate the assigned values.
    Simulation details as under.
    SP-SET-02-3  (wbs element)
        COSS 2011 11 0007101000     0001240704 KOAO D INR                 100.00  INR
        NWA 500000002408 0010
            COSS 2011 04 0007101000     0001240704 KOAO O INR                 100.00- INR   S  -- does not contribute to assigned value
            COSP 2011 04 0007101000     0001240704 COIN D INR                 100.00  INR
            COSP 2011 01 0007101000     0001240704 KPPP D INR                 100.00  INR   M   -- does not contribute to assigned value
    Hence the assigned value gets doubled and eating up the budget.
    Anyone encountered similar issues pls share the possible solutions.

    Hi Mohit
    It is against SCN's rules to post the same discussion thread twice. You have already posted a similar question in the below thread. Please refrain from doing this and close one of the threads.
    Initial balance upload of revenue GL accounts with wbs
    Regards
    Sowmya

  • I downloaded A software to your computer. And I connected with my iPhone. Main page does not work. I can not see it. Iitnos Store does not cost me why?

    I downloaded A software to your computer. And I connected with my iPhone. Main pagedoes not work. I can not see it. Iitnos Store does not cost me why?

    Your posting makes no sense in the English language.  Please post in your native language.

  • Invoic01 cost center / posting key

    Hello gurus.
    We are implementing a new process which requires us to use inbound IDoc INVOIC01.  These invoices don't go against any purchase order or other pre-existing documents -- they're expense reports from our various employees.  I think I have everything setup correction but I'm having two issues:
    1) Posting keys:  In transaction F-43, we use posting key '31' for the first item and '40' for all others.  Where should this be in the IDoc?
    2) Cost center: Similar to posting keys.  We have a cost center on our inbound application for each line.  Where should this be in the IDoc to map properly?
    Thanks in advance for any help!!

    Ok, I figured out the cost center issue (thanks to OSS note [150120|https://websmp230.sap-ag.de/sap%28bD1lbiZjPTAwMQ==%29/bc/bsp/spn/sapnotes/index2.htm?numm=150120]).  Now I just need to figure out how to handle the posting key.  I have setup transaction 'OBCE' but I'm still missing the first value (from first screen of transaction 'F-43' for example).
    Thanks in advance for any help!

  • Costs posted through FB01 to General Cost Element in TECO Status

    A general cost element whose system status was changed to TECO on 10/16/2009 has had costs posted from our Travel System in PR1 and also tested posting from FB01 to the same general cost element in a test client sucessfully.  Costs were posted on 12/5/2009  (PR1) and 12/10/2009 (test system).  This seems inconsistent with the logic that PS typically follows, that TECO does not allow cost postings.  The environment is ECC6 with Enhancement pack 4.
    Edited by: Rebecca Poling on Jan 11, 2010 11:11 PM

    Only system status CLSD (Closed) and account assignment locked don't allow actual post against WBS
    Here's the explanation on TECO status from SAP Help
    You use this status for WBS elements that are completed from a technical point of view, but where you still expect costs to accrue.

  • Landed costs: actual duty proportioned on value not quantity

    Hello experts,
    When using the landed costs form, our client types in the value of their duty in the actual duty (actual customs) field. SAP Business One then says do you wish to spread the costs proportionately. They select YES and the duty is proportioned based on quantity. If they say NO it does not.
    They say that duty needs to be spread across the items based on value and not quantity. They would like this functionality to be added to future versions if possible. I am therefore posting this thread as a suggestion.
    Currently they are manually calculating the duty based on value and adding this in to SAP Business One.
    Kind regards,
    Andy

    Hi,
    Are you using the Projected Duty field which is just above the 'Actual Duty' field?
    Actual Customs
    Actual customs are calculated as follows:
    Actual customs = (FOB + included for customs landed costs) x fixed customs rate %.
    Note
    The fixed customs rate is defined in the Customs Group field on the Purchasing Data tab of the item master data.
    Specify the actual customs amount. If the data in SAP Business One is accurate, this amount equals the value in the Proj. Customs field. If the amounts are different, SAP Business One displays a window with an option to divide different amounts equally.
    May be you can check that upon having the Proj. Duty field populated, you still have the issue or not. Check in Demo for its working.
    Kind Regards,
    Jitin
    SAP Business One Forum Team

  • Error in Cost center posting

    Dear All,
    We have created Autopumps Export A/c as a revenue element catagory 11.
    In cost element we had given cost center 100 as a default account assignment.
    We have not created any other cost object such as profit center or business segement.
    While releasing sales order accounting doqument has been generated but cost center report for 100 does not showing any revenue postings.
    what is the cause??
    please suggest

    As you may be well aware, revenue is normally posted to cost centers. If posted this is regarded as a statistical posting so you need to check the report you are running if it is displaying statistical posting.
    Also check that the cost center master control allows posting of revenue to it.
    Hope this helps
    Siva

Maybe you are looking for

  • Photoshop CC really bad lagging on new rMBP

    I resently bought a new Retina MacBook Pro 13" with a nice fast 2,8 i7 proccesor and a big chunk of 16 Gb ram. After using it on my older iMac I was exited to use it on my new MacBook. But its lagging really bad. It makes it unusable for me. I don't

  • BPC - "Error occurs during UpdateRemainData. Invalid column name formula4

    Hi All, After creating a new dimension, I am trying to add members in it. I am not sure why, but first I got message to include FORMULAH1 and FORMULAH2 as properties to the dimesion. I added those two properties although I do not have any formula for

  • Error when turning on Match on Phone, even with the same ID

    Like many of you, I keep getting the "You are not currently subscribed to iTunes Match" error when attempting to activate the service on my iPhone and iPad. Initially the ID's were different; it was the confusion for those of us who had both .mac adr

  • I need to move a whole screen at a time and not see the scrolling movement.

    When I hit the space bar to screen down, the motion of everything sliding up makes me carsick. I don't want to see it, I want to just jump down. Isn't there any way to do that in Firefox? I have a visual and neurological disability, so this is not so

  • Change Locale

    Hi all, is it possible to change the locale of an WebDynPro applicatin after it was loaded? What I want is something like a dropdown-box with available locales, the user can then select one and the webdynpro gets reloaded. After that reload the whole