Investment order settlement- assignment field with order number in GL code

We are settling the investment order to the concerned asset and in reco account of the concerned asset it has to update assignment field with Investment order number from which order settlement was happend.
For example I am booking all the expences to 1000 GL account code for investment order and I am settling to 2000 GL code.
Investment order number is coming in 1000 GL code in fbl3n and for 2000 asset class (Reco 2000 GL code) it it not showing IO number.
We want IO number in 2000 GL code line item.
Do the the need full.  It is very urgent..........
Edited by: sudhakara reddy jakku on May 31, 2008 8:09 AM

hi
when u are seeing gl line item .onse u enterd inthat screen change layout screen tab will be ther u plz see the  IO filed and select that . to next saide it will give urs IO no.also

Similar Messages

  • MTO Production Order settlement - assignment field filled incorrectly

    Dear All
    Normally, once our production orders are settled the assignment field in the accounting document that gets generated contains the production order.
    However, in the case of our MTO production orders that get automatically created from a sales order, the assignment field is getting populated with the sales order # and item # on the sales order that generates the production order.
    This is causing some difficulties for our accounting folks.
    I checked the Sort key assigned to the GL account and it is assigned 036 (AUFNR).
    Any ideas? Could the MTO functionality override this? Is the sales order and sales order item # being pulled in from somewhere else during the goods movement?
    Also, wondering where I can see this in the system and if it's coming off the production order itself, or the material document posted for the production order, or just from the order settlement?
    Many Thanks!

    We've found an alternative process for this.
    Thank you.

  • Populating Assignment Field with PO number

    Dear SAP Gurus,
    I have to clear CENVAT Clg account using PO number. I have tried all possibilities, ultimately was partially successful.
    I was able to bring in PO number for all SA Documents, but not for RE Documents (Value "00000" is getting populated in RE documents in Assignment field).
    To resolve this partial error, I took help of ABAPer, to replace values for CENVAL Clg account for Document Types RE with PO number.
    However, when I go to FBL3N / F-03 (For clearing) it shows me "00000" (the old value). Now, when I double click the line item or when I check the table values for this document, it shows me PO number.
    Requesting you help me solve this error.
    Table values updated but, FBL3N and F-03 not.
    Thanks in advance.
    Regards,
    Nirav

    Thank you Sanil for your Reply.
    I have already maintained Sort Key as "014" Purchasing Document and Open Item Managament in FS00.
    Thats the reason why I am able to get PO number in SA Document Types. But the problem was populating PO values in RE Documents getting generated during MIRO.
    Therefore, we developed one program (ABAP), to populate values in Table BSEG-ZUONR to be copied from BSEG-EBELN.
    Table is getting updated correctly.
    However, i am not able to see PO number in FBL3N and F-03.
    Kindly suggest, why is that so ?
    Regards,
    Nirav

  • Populate Assignment field with PO number& Line item in while invoicing

    Hi Gurus,
    My client wants to populate Purchase order number concatinating with line item (4500000000 0100 )in Assignment filed of accounting doument while doing MIRO.
    Thanks in Advance
    Best Regards
    Ashish Jain

    Hi Dominic,
    I want to populate Purchase order number concatinate with line item in Assignment filed of accounting document at time of MIRO. for all line items.
    Best Regards
    Ashish Jain

  • Service Order Settlement - assigned to PSG

    Hi,
    I need a help regarding Service Order Settlement assigned to Profitability Segment.
    Currently, in our system every item of SD Invoice posts revenues and COGS to profitability segment (PSG).
    Main characteristic of PSG are: Customer, Product, Division, Profit Center.
    We have implemented CS module using in Car maintenance service.
    And now in CS module it is not possible to get PA document automatically after an invoice posting so we have to settle Service Order to PSG.
    But Settlement rule for Service Order is not on item level (per every material-product separately).
    We wants to have the same rules (per Product char.) for Service Order as we had so far in SD.
    Is it possible to customize Settlement rule of Service Order on item level?
    For instance according to an Invoice items from document flow:
    Thanks,
    Zoran

    Resolved

  • Order Settlement  (Ko88) Vs. Sales Order Settlement (VA88)

    We would like to know what are the advantages and disadvantages of Production Order Settlement versus Sales Order Settlement.
    What are the benefits between one and the other?
    Please advice,
    Thanks in advance,
    Rio

    Hello,
    Thank you for replying.
    We are an MTO Semiconductor manufacturing shop, High volume. somewhat repetitive but not frequent.
    We have two clients:
    Client 1 - Uses Standard Costing and Settles Production Orders to the Material itself.
    Client 2 - Uses Actual Costing and Settles Production Orders to Sales Orders (automatic) then Settles Sales Orders to Profitability Analysi.
    I'm hearing SAP does not recommend the process from Client 2 "Sales Order Settlement"  because of the high volume of sales documents. still can't confirm this.
    I would like to find out the following:
    What are the Pros and Cons of Production order Settlement vs. Sales Order Settlement.  
    What are the reasons why one type of settlement is chosen over the other?
    Also, I found some data from SAP Labs which relates to an Old Version of SAP, so I would like to know if this process is still current with Version 6.0
    "...Settlement of the production order to the sales order is normally not required.  The sales order item automatically picks up the cost incurred on the production order.
    The production order must only be settled when:
    - The production order is in a different company code than the sales order.
    - The production order is a collective order
         The sales order product  cost processing will only pick up the cost on the top-level of a collective order, so the costs of the lower-level production orders      must be settled to the highest level of the collective order..."
    Please advice,
    Rio

  • How to Create Business Partner with  fix number in t-code :BP

    Dear SIr,
    Normally I will set number range for auto  to create Business Partner. In case , If we would like to crea How to Create Business Partner with  fix number in t-code :BP , howe to do?
    Please kindly advise.
    THnak you and best regards,
    Vimol

    Dear Shobhit,
    How to put the thread as you mentioned.
    Best regards,

  • In VA01 Item detail screen tab Account assignment field  Internal order ???

    Dear Experts,
    In T.code VA01
    item level data tab Account assignment there is field internal order , here if i created internal order that internal order should come automatically into that field
    e.g. i have one article / material for that i created one internal order where i put all expenses through T.code FB50 and i want to add sales revenue for that while creation of sale order i am putting internal order manually in T.code VA01
    so my question is  the same task can be possible automatically or not
    i have two thoughts
    1) either that internal order should assign to article or material master data or
    2) status profile has some link with internal order type (so by default link with internal order ) and there is provision in T.code VOV8 and VOV7 we can add status profile .
    Question
    IS IT POSSIBLE INTERNAL ORDER SHOULD COME AUTOMATICALLY IN SALES ORDER ITEM DATA ACCOUNT ASSIGNMENT TAB AS PER ARTICLE / MATERIAL
    PLEASE GUIDE

    Hi Ravi,
    it is due to profit centre accounting / costing is active, it is better to get it clearified from a FICO consultant
    regards,
    Santosh

  • Purchase Orders replicated in BE with wrong number

    Hello,
    Recently we've observed that in our dev system Purchase Orders are being replicated from SRM to R/3 System with numbers used for POs created in R/3,
    Let say, for example,  that in SRM the PO number starts with 33 and once the PO is replicated it's created with a number that starts with 45.
    Once POs are replicated, there are no links between this PO and the one in SRM shown in bbp_pd.
    So we want to know what checks (transactions) we must check in order to detect what could the reason for this behaviour.
    Any advice is welcome.

    Dear Elias,
    please check number ranges which was defined in SRM for PO's.
    The number ranges for PO's in SRM should be defined as internal, the same number range should be define as external in R/3.
    The number ranges for PO's in SRM which was defined in SRM already defined in R/3 previously and in use.
    Regards
    vasanth

  • FI Assignment field with settlement from PS

    When I'm doing a setllement from me WBS to the AUC I'm getting in the assignment field the WBS element number. In the G/L account I have filled in a sort key to get there the asset(sub) number.
    It looks if the assignment field is already filled in from the settlement and when there is text in it will ignore the sort code in the G/L account.
    Is there a simple solution for to get asset(sub) number in it or do I have to create a Substitution for this?

    hi
    when u are seeing gl line item .onse u enterd inthat screen change layout screen tab will be ther u plz see the  IO filed and select that . to next saide it will give urs IO no.also

  • Refference field with SO number in accounting doc. in FB03

    Hello!
    Does anybody know if it is possible to display in FB03 in accounting document a refference field with sales order number?
    Can parameter AUN be used for this purpose? If so, how can it be set up?
    Thank you in advance for every help,
    Sylwia.

    Hi Sylwia,
    What you could do is to talk with you Sales & Distribution folks. They could set up a copy control strategy that drives transfer of information from Sales order to billing and/or from delivery to billing (Tcode: VTFL). Either the header reference field or the allocation field (Assignment field at line item) can be set up to capture the sales order number when the financial document is released to accounting.
    Hope this helps, if it does please grant points.
    Thanks,
    GG

  • EBS - fill assignment field with bank reference

    Hi,
    We are trying to fill the bank reference for incoming payments in the assignment field for the GL postings. For the 2 banks it is working fine, since they send it in 88 record and we have defined search string to fill in assignment field. We use BAI2 format
    But for 1 bank, the bank reference is sent in 16 record, and search string does not work for 16 record. But i do see the bank reference filled in FEBEP-VGREF.
    With userexit i can probably populate this in the assignment field but is it possible using standard algorithm?

    Also check note 1409628.
    Unfortunately Algorithm 015 is limited to a 13 character reference.
    Note 1409628
    There are dependencies (if you
    use algorithm 015) between the fields FEBEP-/(BSEG-)ZUONR, FEBEP-CHECT
    and FEBEP-/(BSEG-)SGTXT.
    The behavior should be as follows:
    If you enter only a check number the result will be stored in
    FEBEP-CHECT. The algorithm 015 will move this content also to
    FEBEP-ZUONR and creates a record in table FEBCL with this value.
    Later in the program flow the report RFEBBU00 fills SGTXT with
    this value.
    Since FEBEP-CHECT has only 13 charactes, ZUONR is truncated.
    The search string works if you need to remove undesired characters
    from FEBEP-CHECT, but the lenght will always be 13.
    The Note 1409628 doesn't enchange the field, but instead it uses ZUONR
    for the search.
    So in your case I suggest you to use exit 1 FEB00001 as per note 494777.
    Then you can move all 16 characters which are available in FEBRE to
    field FEBCL-SELVON
    You need to program the exit with a LOOP in FEBRE, then move the
    content to FEBCL.
    Kind Regards,
    Fernando Evangelista

  • Production order settlement to statistical internal order

    If you would like to settle a production order to a statistical internal order, could you at the same time settle to COPA ?

    Hi,
    principally its possible to add a real settlement receiver and a statistical settlement receiver. If you have entered the real acount assignment (CO-PA = PSG) in the settlement rule mark the line, tick the "detail" button (F2) and enter the statistical account assignment.
    The settlement receivers (PSG and ORD) must be allowed in the settlement profile and in the allocation structure there must be a settlement cost element assigned to receiver type "PSG and ORD" (or it is settled cost element wise).
    Please try!
    Best regards, Christian

  • Internal order settle to another internal order

    dear all,
    for internal order group have 2 order,and i want to settle by hierachy:
    A order settle to B order,then B order settle to GL account, how to config the settlement rule for
    this 2 orders?
    this purpose is to simulate PS WBS/activity if internal order can be collect cost then settle to a final GL acct..

    maybe i have make more detail for my question:
    a  order group contain internal order A/B,and order B under A like follow structure:
    order group
      - order A
         -- order B
    order A have plan/actual revenue/cost
    order B only have plan cost
    the settlement is try to settle order group: as my RA key is set as POC way to calculate revenue/cost,
    the formula of POC = actual cost / plan cost * plan revenue
    so i want the settle result of this group = actual cost of A / plan cost of A+B * plan revenue of A
    now the settle result = actual cost of A / plan cost of A * plan revenue of A,not include plan cost of B
    how to make it possible?

  • VPRS Costs From Purchase Order Account Assignment To Sales Order

    Hi,
    If i assign a purchase order costs to a sales order using the account assignment category C or E, can the purchase order costs be passed on to VPRS condition type of the sales order?
    This is different from third party order processing. I know for third party order processing the VPRS costs can be passed from the purchase order, but my above scenario is different from third party order function whereby i create a purchase order and a sales order separately and then link them using the account assignment category of the purchase order and need to know if the VPRS cost can be updated from the purchase order.
    Has anyone tried this?

    Has anyone tried this?
    I never tried this, but looks like similar to third party scenario only. You can just test the scenario to understand the system behavior. For details on how the VPRS is calculated by the system, you can refer OSS Note 372772 - How is the cost determined?
    Regards,

Maybe you are looking for

  • Down Payment in PS

    Dear Experts, I want to bring "Down Payment to Vendor" in PS Reports against some WBS Element. But it gives the below error message: Maintain default cost element in controlling area KGCA     Message no. FI660 Diagnosis     CO down payment update is

  • Export import - using TOAD FOR ORACLE  and ORACLE DATABASE 10G EXPRESS or s

    Hi all, Could you please kindly help me? I am using TOAD FOR ORACLE to export a table to flat file A. The tool just supports to distinguish fields by "spaces". And the web page of ORACLE DATABASE 10G EXPRESS to import the data from flat file A to ano

  • Query vlan in cisco ACE

    I've configured query vlan FT internface as follow: class-map type management match-any query_VLAN   2 match protocol icmp any policy-map type management first-match query_VLAN_MGT   class query_VLAN     permit interface vlan 11   description ##query

  • Installing Office 2007 or 2010 on Windows Embedded 7

    Can Office 2007 or 2010 be installed on a Windows Embedded 7 OS? I looked at the embedded software compatibility site and do not see Office 2007 or 2010 listed on it, only the viewers.  I have not found any documentation online as to why Office isn't

  • Lumia 720 Jumping and Vibration issue.

    Hi, my Lumia 720, bought 10 days back is automatically vibrating and jumping between windows, to bing and home screen, and stopping at app switcher screen or home screen, and touch stops working(display and 3 keys).  It works only after I press power