Mandatory production version planned orders

Is it possible to block the launch of a planned order that does not contain a production version?

Hi
If you want block the field in order to prevent the user from inputting any values, you can also use the standard variant which can be created via transaction SHD0, this provides very filexible functionality what you want.
Steps.
1. Go to SHD0
2. Input the transaction code
3. Click the tab 'Standard variant'
4. Input the name of variant. e.g. Z123....please start with Z.
5. Click 'Create ' button F5.
5. Then the system will bring you to the transaction, please set the version as blank.
6. In the coming popup, please tick the check box 'W.content' in the
   line for 'Production version'. if you hope protect this field you can also tick the 'Output only'.
7. Exit the transaction and save the variant.
8. Activate the stanard variant in SHD0, please note that this will be
   valid for all users.
   You can also control other transactions this way in SHD0 by creating
   variants for them.
Best Regards.
Leon.

Similar Messages

  • How Can i Calculate The shortages against production or planned Order

    Dear All
    how can i get the shortages against production or plan order .
    condition is Egg.----ITEM  <b>X (available qty is 6000)</b>is using for three assembly .A,B,C
    I have created one order For <b>A--5000 qty</b>. At this time <b></b> item x is reserve for Order Created Of A.
    Now i have created one another order for<b> B--4000 qty</b>. then it would showing the shortage of  3000 Qty.
    And same Order of <b>C Qty 5000</b> Material x would be showing the shortage
    5000.
    <b>Bcoz Shortage of 3000 is for B And Now i want only Shortage Of C.</b>
    How can this procedure done.
    Rgds
    Pankaj Agarwal

    Hi Prasobh
    Don't mind
    Points is not so major issue for me.Till i m not getting right answer or near by sothat i cant concentrate on point .almost all answer was clarify by me already . then if i cant get the right solution then  i will take help from experts like u.nothing more.and  point of view we have already touched with this community and i have given points more of them.so don't mind . take it as a challenge definitely u will get superior point from me.
    Rgds
    Pankaj Agarwal

  • Copy Production Area Planned Orders to a corresponding processing plant

    Hi All,
       I am in need of design a dialog program which copy production area planned orders to a corresponding processing plant, In my requirement i am not able to find what are the tables involved and what is the bapi must be used to update the tables.
      I appreciate if anyone come with tips to start with this requirement.
    Thanks and Regards,
    Babu

    Hi folks,
          Thanks for the prompt reply, i have one basic doubt, whether the order no must be passed by us, if i am not giving order no it will returns the error.
    Thanks and Regards
    babu

  • Manual selection production version during order creation

    hello!
    i have setup production orders that during order creation the production version has to be selected manually. this works fine in CO01 and CO40. but in CO41 the production version is determined automatically - where would i change that setting?
    best regards,
    matthias

    Dear Matthias,
    In my understanding it is not possible in standard SAP.
    If you have manual selection of production version and if you have set the BOM selection method as 2 in
    MRP 4 view of the material master then,
    1.If you create a production order manually then the system displays the pop up to select a production
    version.
    2.If you are converting the planned order into a production order then it picks up the one which is
    present in the planned order.So obviously if 2 production versions are there with same lot size and
    validity dates,then the system picksup the first one only during MRP run.
    Even if it picks up the first prod.version in planned order,but while converting click on master data and
    change the production version if required.
    3.Otherwise what you can do is set the production version in MD61 itself ,so that its going to be
    considered during MRP run and same will be included in the planned order.
    Check and revert back.
    Regards
    Mangalraj.S

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller

  • Table name for work centers with production or planned orders

    dear gurus,
    can you please help me on what table names have the work centers with planned or production order

    For production Order
    1.AUFNR ---> AFKO ---> AFKO-PLAF
    2.AFKO-PLAF --> AFVC -
    >  for respective VORNR get AFVC-ARBID
    3.AFVC-ARBID --> pass as  OBJID into ---> CRHD --->ARBPL (Work Center)
    For planned orders
    1.PLNUM ---> PLAF ---> PLAF-BEDID
    2.PLAF-BEDID -
    > KBKO ---> PLAF-PLNNR, PLAF-PLNAL
    3.PLAF-PLNNR, PLAF-PLNAL -
    > PLPO -
    > for corresponding VORNR (Operation number) get ARBID pass as OBJID ---> CRHD --> ARBPL (Work Center).
    Regards
    soundar
    Edited by: Soundar on May 29, 2008 9:18 AM

  • Modeling dummy product and planned orders

    Hi SAP Gurus,
    I have requirement where i need to model particular business requirements on subcontracting and the same is resulting in need of modeling of dummy product and dummy planned orders. Please share your inputs on what would be impact of dummy product and dummy planned orders in ECC. and also how to make sure that it does cause any issues in costing.
    I am modeling subcontracting requirement and i need to create following master data.
    All the below products are at plant P.
    P has the components as Q_D
    Q_D has the components as Q
    Q has the components as R
    Where Q_D is the dummy product produced at plant P.
    P and Q are subcontracted items to the vendor V.
    P is the finished good, Q and Q_D are Semi finished goods, R is raw material.
    When we plan we are creating Purchase orders for P and Q. And Q_D is made inhouse and we need to create planned order for it. how do we handle the planned orders created for Q_D. we dont want them to convert to production orders. we want a way to clear off these dummy planned orders once we close the POs of P and Q.
    Please advise.
    Thanks.
    Jagadeesh

    Hi senthil,
    Check if the forecast date is beyond PPDS horizon.
    Also in product master on PPDS tab, you should maintain 4 in PP Planning procedure.
    Bye.
    Nitin

  • Production and planned order not scheduling

    Dear Experts,
    Created new plant ,scheduling parameters,order type parameters ,confirmation parameters.
    Scheduling parameters: Detailed Scheduling ,Forward etc.
    created BOM, Routing,WC.
    Maintained Work center Scheduling Tab formulas entered,Routing Machine,setup time entered.
    System showing at the of creating production order Scheduling Start time and end time is same.
    scheduling not done in production order.
    Anyone explain process for scheduling
    Regards,
    Naresh Reddy.

    Hi Naresh,
               The problem is mainly due to the work center scheduling formulas only. Maintain the scheduling formulas as SAP001 for setup and SAP002 for machine. In OPU3 check the automatic scheduling check box, adjust dates as 'adjust basic dates , adjust basic requirements to operation date' and recreate the production order.
    Let me know if u are still facing the same problem after doing these settings.
    Regards,
    Krishna Chandra

  • How to see planned orders for P3 mrp type products in APO?

    Dear experts,
    I have materials with P3 MRP type (not planned in APO but in R/3 using MRP)
    I have active integration models with P3 and X0 mrp type products for planned orders
    however I can not see in APO product view the planned orders for P3 materials,
    is this normal or should I see those planned orders in APO?
    Thanks for your answer,
    best regards
    Elynn

    Hi,
    The following prerequisites must be met so that planned orders can be transferred from SAP R/3 to SAP APO
    and vice versa:
    1.The material masters must be transferred to SAP APO.
    2. PPMs must exist for planning in SAP APO.
    3. The relevant integration models must be active.
    4. An active integration model for planned orders must exist in SAP R/3.
    5.An active integration model must also exist for materials, so that the components of the planned order are transferred.
    6.The relevant distribution definitions must be maintained in SAP APO, so that planning results can be
       transferred from SAP APO to SAP R/3.
    Thanks,
    nandha

  • Function with production/planned orders of a work center or capacity

    Hi,
    does anybody know if a function exists which we could use in a tailor made report, which will list all production and planned orders for a given work center or capacity ?  The aim should be to create a report which is more or less equal to the capacity evaluation overviews in CM01-CM07, but then in ALV and with customer specific fields in it.
    Many thanks for any valuable feedback !
    Kristof Wylin.

    Will be done in another way.  Orders will be collected via KBED.

  • Processing with Production Version

    We have planned order with one level BOM (Discrete Mfg. Scenario).
    FERT and ROH . in production version 1.
    While converting this planned order to production we are choosing production version 2 which consist of two level BOM.
    FERT - HALB and ROH.
    When we choose production version 2,  Order reservation are generated in system for HALB.
    How to process this HALB  if it is to be
    1) Processed inhouse.
    2) Given to Subcontracting.

    Dear
    In your Senario U have choosen Two Production version PV-1 &PV-2 inorder to clear reservation happen in HALB u need to select the Production version -2 because from roh you are making semifin then fg first u need to get ROH in Unrestricted then Create SFG and Issue ROH to sfg then GR SFG unrestesticed Stock issue To FG while confirmation then Do GR of FG
    then there wont be any Reservation.
    And For Subcontracting U need To decide Which Operation And which Material is going
    Operatin subcontarcting for Material Keeping PP02 in ca02  As external Key then Create a Purchase Info Record
    Issue this material To Subconctarcting With Movement type  541 with refrence to PO
    and receive this Through 101 GR
    Please Follow This Link for more Steps
    [http://help.sap.com/saphelp_46c/helpdata/en/f4/7d322744af11d182b40000e829fbfe/content.htm]
    [http://wiki.sdn.sap.com/wiki/display/SCM/Subcontracting+Process]
    with regards
    pushpalas

  • Automatic Plan Order Creation on Sales Order save

    Hi friends,
    We are having an requirement where Automatic Plan Order should be created on Sales Order saving.
    We have Material A in Plant 1000 & Plant 5000.
    Plant 5000 in plant where Manufacturing is carried out & Plant 1000 is service Plant.
    We are using Special Procurement key for Material A in 1000 Plant which triggers procurement from Plant 5000.
    When Sales Order is entered in Service Plant 1000, after saving Order Plan Order should be created in both Service Plant 1000 & Manufacturing Plant 5000 along with Sales order reference.
    I have tried using Strategy Type 81 but Plan Order is created while saving Order only in Service plant (1000), but with Procurement Type (E - In-house Production) & No Plan Order created in Plant 5000.
    Can you please guide me how to meet requirement?
    Thanks in advance.

    Hi Jiaul,
    Thanx for reply.
    I have already assigned the Special Procurement Key to Material A in Plant 1000.
    In Plant 1000 procurement type is F (External procurement)
    But when Plan Order is created after saving Sales Order it is created with Procurement type E (In house production).
    If I delete Firm Plan Order generated & run MRP for Sales Order / Item. It gives me required output generating Plan Order in both Plants.
    Regards,
    Rameshvar

  • Planned order changes

    Dear All,
    which t code i can use to see the changes done in a planned order?
    Please ex[plain.

    We were asking about this topic before. Actually when planned order is converted to the order production, the planned order is deleted. One option is activating log for tables PLAF (Planned Order Header) RESB (Planned Order Detail) in SE13 tx and set rec/client parameter to "ALL" or the "client number" in system profile (As to BASIS people) where you want activate logs and re-start the system to obtain the history in these tables.
    The transaction where you can see the logs about changes (Planned Order Header and Details Changes) is AUT10.
    Check with Basis people if there aren't problems with the system performance to activate the logs in this tables, the reason is because the RESB table has a lot of changes with the normal operations in the system in planning.
    Regards,
    Donald Tatun

  • Conversion of one planned independent reuirements into many planned orders

    Hello all,
    The planned independent requirements are collected in a weekly bucket. But I want to have the planned orders in the following way:
    For some products five planned orders are to be generated in equal distribution in a week of 5 days.
    For some products one planned order to be generated on a specific day of week, say Tuesday of every week.
    So what are the settings required to achieve the above conditions.
    Request your expertise on this subject.
    Thank you.

    Dear ,
    I think you should create the PIR in daily spliting .If you enter a weekly period, you can split the planned quantity into the weeks of the period or into the days of the period.Select the planned independent requirement item, and choose Split per.online.You can follow the belwo steps to do this :
    The Period for Splitting dialog box appears.
    Enter the period indicator, and the start and the end of the requirements period.
    Enter the quantity to be split in the Planned quantity field.
    In the Splt field, enter the period indicator for the split.
    If you want to round up or down the schedule line quantity, enter the rounding value, and choose Continue.
    Select the item, and choose the Schedule lines tab title.
    Now Run MRP in MD02-NETCH , 2,1,3,3,3 and look up the result in MD04 .Now , convert the Planned Order to Production Order partially with your frist requirement .
    In the secodn requirement , you can make use of Individual /Collective Indicator -2  in MRP4 view  and generate one planned order .
    Try and wait for experts to comment
    Regards
    JH

  • No Automatic Dispatching Of Planned Order to new Production Version

    Dear Sir,
    When rescheduling an operation from one line to another, the system
    checks whether a production version exists for the material to be
    produced that contains the new production line as the preferred work
    center. If such a production version is found, this version is taken
    over into the planned order. The planned order is scheduled again based
    on the production version.
    The second function allows you to automatically search for an
    alternative work center in the case of a capacity overload of a work
    center, and to dispatch the operations to it. The predefined
    prioritization of the alternative work centers is considered in this
    case.
    The indicator Reschedule with production version must be set in the
    strategy profile.
    My issue is sytem does not making automatic Dispatch to the second
    Production version for the material at the time of insufficient capacity
    Best Regards
    Rami Abd El Fattah Mohamed,PPQM Functional & Technical Application
    Consultant

    In the dispatching control u can remove operation date check indicator and regarding the termination indicator SAP help says"
    "if you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line."
    Please check if it works now.
    thanks

Maybe you are looking for

  • Word docs from pc to iPad

    I can't figure out how to share a word doc from my pc to the iPad. I went through the steps in the manual but can't find the file share option they talk about in the app tab on iTunes. Any ideas?

  • Anyone who has the src of JavaTM Look and Feel Design (second edition)?

    Anyone who has the src of JavaTM Look and Feel Design (second edition)? It would be really appreciated to let me know. Thanks -

  • Install Oracle Application Server 10.1.3 on OpenSuse 10 SP2

    Hi, I am trying to install Oracle Application Server 10.1.3 on OPENSUSE 10 SP2 and the install is failing when trying to start HTTP Server. OAS 10.1.3 has been installed on another OPENSUSE 10 SP2 however this was done by a previous colleague that ha

  • Alternatives to Final Cut Pro (the new version is a disaster)

    Okay, like millions of others that have been setting your hair on fire since the bizarre version of iMovie Pro, or sorry, I mean Final Cut Pro, I will need to migrate my work to a different editing application. I will obviously use Final Cut Studio 3

  • Premiere Elements 11 won't start anymore ...

    ... after chashing the system, software asks to update the display driver - haven't change anything (Lenovo T500, win7). Windows say that the proper driver is used. Do I still have to change the driver? How to proceed? uninstall/reinstall the softwar