Need info for COPA (Cost based profitability analysis)- Archiving objects

Hi All,
SAP have introduced new 2 Archiving objects COPAA_xxxx, and COPAB_xxxx instead of the old archiving object COPA1_xxxx.
Where xxxx = operating concern.
Can any one please give the document path how to archive the COPA data.
Means exactly i want the variant parameters for the 2 new archiving objects.
Please waiting for your reply...
Thanks,
Nagendra

Hi Chandra sekhar,
I need to Archive the data in R/3 system & ECC6.0 not in BW system.
I want the steps how to Archive the 2 objects COPAA_xxxx, COPAB_xxxx in ECC6.0 System.
Please if have any info please help me...
Thanks,
Nagendra

Similar Messages

  • Account Based Profitability Analysis

    Hi,
    I am mapping characteristic fields of account based profitability analysis. I have been given fields such as KMLAND to map into BI fields.My question is how do i map the key figures. What fields in account based profitability analysis are key figures, are they value fields? Do i need a list field names of value fields to map it into BI.Some one mentioned something about cost elements.
    Thanks
    TJ

    Hello Tee Jay,
    Cost Element is a key field in ECC. That means its char. in BW. What are the infoobjects that you have in your DSO or cube n BI.
    Do you have 0COSTELMNT or 0GL_ACCOUNT? If so, then you map Cost element field from SAP to one of the above char. in BW.
    By Revenue, do you mean a value field in R/3? If so, it will have to be mapped to key figure in BI.
    Hope that helps.

  • COPA cost based data source missing data in BI

    Hi All,
    We have a copa cost based datasource.User has complained that some data is missing in BI frrom R3.When we checked in Infopackage history no data loads got failed and all requests were succesful.
    Is there still a chance that data might get missed.
    I created a full infopackage and again ran the load .Again load is green and complete.Still the same data comes in PSA.
    Should i need to check repair full request flag.
    What could be the other reason.User sent the R3 COPA report screenshots highlighting the missing data.
    Regards,
    Sushant

    Hi,
    Please check if all the value fields from ECC have been mapped in BI system.
    May be the case that some value fields were not mapped & hence the data is missing.
    try & reconcile your data with the data from table CE1<OP Concern> from ECC side.
    u can Make use of transaction KE24 aswell.
    Thanks & Regards,
    VIraj Dhopavkar.

  • CAPTURING OF COST IN PROFITABILITY ANALYSIS FOR  BY PRODUCT

    Dear Team,
    We had a requirement when standard material cost estimate is executed we can get the standard price for main material as well as by product for which values are flowing to COPA (T.code KE30).
    The scenario works fine for Main Product, since the actuals as well as Costs are flowing to COPA. Where as only actuals are posting to byproduct as there are no separate cost estimate for Byproduct.
    So only acutals are caputured to Profitability analysis.
    At present we are manually changing the price of the byproduct material through MR21 which is constant through out the period.
    Our requirement:- Since Byproduct doesnt have any separate BOM and Routing, Is it possible to capture this byproducts price to COPA.
    or
    capturing of COGS for this byproducts price is also ok.
    Please anybody can guide me.
    Thanks & regards,
    Sandeep

    Dear Santosh,
    Thanks for your early reply.
    It might work, Please elaborate.
    Request you to send any document if you have any, since i am new in CO.
    it was availbale in my user profile.
    Thanks & regards,
    Sandeep

  • COPA -costing based accounting

    Hi,
    Could you please provide me configuration steps for costing based accounting?
    That could be gratefully
    Thank you

    HI,
    Please refer to the Thread posted today for COPA config.
    Re: COPA
    Basic config steps
    1. Maintain Characterstics
    IMG- CO-Profitablity Analysis - Structures -Define Operating Concern - Maintain char
    2. Maintain Value Fields
    3. Define Operating concern (Accouting based or costing based) , copy the standard operating concern settings provided by sAP
    4. Set operating concern (KEBC)
    5. Assign CO area to Operating concern
    6. define profibaility segment char
    2. Master Data
    2.1 Maintain char values
    2.2 Define char hierarchies
    2.3Define Char derivation
    2.4 Define and assign valuation strategy
    2.5Define keys for accessing material cost estimates
    2.6 Assign costing keys to any char
    2.7 Assign value fields
    3 Planning
    3.1 Define number ranges for planning data
    3.2 Maintain versions
    3.3 Assign quantity fields
    3.4 Setup planing framework
    3.5 Assign char groups to plan cycles
    3.6Assign receiver plan versions
    3.7Define structure of cost center assessment
    4.Flow of actual values
    4.1 Define number ranges for actual postings
    4.2Maintain value field groups
    4.3 Assign value field grops for line item screens
    4.4 Activiate transfer of incoming sales order
    4.5 transfer of biling doc
    4.6 Assign quantity fields
    4.7 Maintain PA transfer structure for direct posting FI.MM (KEI2)
    4.8 Automatic account assignment (OKB9)
    4.9 Define PA transfer structure for variance settlement
    4.10 Assign PA transfer structure to Settlement profile
    Activate profitability analysis (customizng req gets generated)
    All these can be accessed throug SPRO - Controlling - PA
    AFter maintain the configuraiton settings, you can develop custom defined COPA reports using Information ssytems.
    Hope this helps. Pls assign points as a way to say thanks
    Thanks and regards,
    RAdhika
    Thanks and Regards,
    Radhika

  • COPA - costing based and accounting based

    Hi Expert,
    If the COPA implemented using acounting based and later can it change to costing based? 9 my client is using ECC6
    Please advice what will be the impact if the changes can be made or it is possible to do this way.
    Can any expert advice on this.
    Thanks & Regards

    Hi Sridhar,
    Thanks for your reply, can you explain if we want to stop one of the method, what is the steps that need to be done?
    thanks again!

  • COPA Cost Based

    Hi,
    Are Value fields in the Operating Concern mapped to key figures in a cost based COPA?
    Thanks

    Summarization levels for an operating concern have the same function as aggregates for an infocube
    CO/PA summarization levels are managed by the infocube, and always contain the same numbers as the infocube that they are based on.
    Characteristics in CO/PA correspond to the characteristics in infocubes.
    The value fields in CO/PA can be regarded as key figures with additional summarization in each characteristics
    Line items in CO/PA can be compared to line items in the ODS

  • COPA- Cost-Based Chagning KSTAR(Cost Element) from technical to fixed field

    In the PA module-
    What are the implications with modifying the COPA field catalog in table v_tkef. That is changing a technical field (T) into a fixed characteristic or alternatively modifying the function module rke_external_data_get to allow technical fields to do the same functionality as B, S, U, or V.
    B- Basic key figure
    D- Dimension (characteristic)
    F- Fixed characteristic
    K- Key figure
    S- Fixed basic key figure
    T- Technical field
    U- Unit
    V- Fixed unit
    Details of Issue-
    We are using Cost-based COPA and there a requirement to post actual and plan documents by cost element in PA. However Cost element (KSTAR) is a technical field in cost based COPA.
    We would like the implications of modifying the field characteristics of KSTAR from technical to Fixed characteristic and setup the KSTAR as a characteristic within the Operating Concern.
    Your answers will be helpful in knowing the implications, feasibility and recommendations.
    Thanks,
    Krishna

    Hi,
    YOu are making that kink on CJIC where you can assign fix asset to WBS , before doing that you needs to check procured items agaist that particular WBS(on CJI3) & get create fix asset. To my knowledge that is the standard way to link fix asset & WBS rather than having ABAP validation.
    Regards,
    SL

  • COPA Cost based datasource

    Hi ,
    Please read the scenario given below:
    One cost based DataSource  is existing in ECC6.0, because of business requirements we have configured account based copa  and created the account based copa DataSource  on same operating concern. Now the problem is while enhancing the operating concern, copa consultant deleted few fields from the operating concern, that fields are part of the cost based DataSource . Because of that reason cost based DataSource  is not working, the only way I know is to create new cost based DataSource  with  the available fields. the existing DataSource  is delta one working based on time stamp management. If I create a new DataSource , is it possible to reinitialize delta from that time onwards( for example in production we have loaded data till yesterday with existing DataSource  using delta update, next day onwards is it possible to load data using the new DataSource ).
    If I create a new datasource it will work based on generic delta, but the previous one is working based on time stamp management
    Will it create any problem to reintialize the delta with new datasource?
    Please give your inputs.
    If any additional details is required, I will provide..
    Regards
    Nivas

    Hi Sreekanth ,
    Thanks for the update .
    Coming to R/3 side Is it possible to build to COPA Datasources based on i.e 1) Account absed COPA Datasource and Cost based Datasource .
    Presenty we are using Account based COPA datasource .
    We are planning to configure Cost based COPA datasource in coming days .
    Can we do it if so what are impacts and suggestions from your side .
    Thanks
    venkat

  • COPA (Cost based & Account Based)

    Hi Gurus;
    Can some share me the documents for cost based & account based extraction of COPA.
    I am looking for differences and how exactly do you do extraction for the both(Step-by-step).
    I am also looking for which model should we use if COPA is not implemented in R/3 and otherwise.
    Thanks in advance!

    Hi,
    chk this:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20-%20retraction
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/fb07ab90-0201-0010-c489-d527d39cc0c6
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sapportals.km.docs/documents/a1-8-4/how%20to%20set%20up%20connection%20co-pa%20-%20extraction
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20upload%20co-pa%20hierarchies.pdf
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/com.sap.km.cm.docs/library/biw/g-i/how%20to%20co-pa%20extraction%203.0x
    Thanks,
    Raj

  • Define Flat Rate for Travel Cost based on location (Maximum points awarded)

    Hello,
    SPRO>Financial Accounting>Travel Management>Travel Expenses>Trip Reimbursement Amount>Reimbursement Amount Travel Costs>Define Flat rates for Travel Costs, in this path we can enter the reimbursement amount for trip country/ trip region. I created different reimbursement amounts for different locations(additional locations/regions can be created in table T702o for country US) for USA but in expense report its taking only default amount (0.36) that is already there for Country:US not the amount i gave (0.27) for different location even when I gave the location name in the expense report. Could anyone tell me what i am missing. Do i have create corresponding WT for these expense types based on location.
    Thanks,
    Latha

    got solved

  • Double actual cost in Profitability Analysis for cancelled billing doc

    Dear expert
    Say we have a billing doc posted in May, and we run ML closing and KE27 during month end closing, which transfered actual cost from material ledger to value field in PA.
    In June, we cancelled that billing document, the question is why the system automatically posted actual cost of cancelled billing docs to value field in PA right away (without KE27)?
    The reason I asked is because when we run KE27 for June closing, the SAP transfer again actual cost from material ledger to value field in PA. So we will have double posting of actual cost for cancelled billing document
    Please help, which setting did I missed to prevent SAP automatically posted actual cost of cancelled billing docs to value field in PA right away (without KE27)?
    Thx

    Hi
    Thats because you had double +ve also..
    Let me u/s your situation better
    1.PGI Posted COGS of Say, 100
    2. KE27 posted, say, addnl 20
    So, total COGS is now 120
    3. You posted a reversal now... It should post -100 and not -120.... Is it posting -120?
    Run KE27 for this month and see if it really posts -120 again... If it does, raise an OSS message to SAP... They are liable to help
    In my opinion, there is no Config set up for this... At best, you can try to assign different VF in KE4R for PV = 02 as compared to PV=01 and see if it helps
    br, Ajay M

  • Need info for Vi

    I have a ZEN Micro and I've recently purchased a new laptop with Vista. Yep, that old chestnut. I've read a few postings but feel I need some more info. I currently have the latest firmware on the Micro ..0 and I've uninstalled the CD software but still my Zen is not compatible. When I plug the usb in the Zen fires up and the computer wants to install the relevant software, it then searches for software to download, doesn't find it and suggests contacting Creative. So, why does it still not recognise my Zen and what software should I have on the computer to access the media files?

    Yves,
    One of the things that is great about instrument drivers is the context help on each of the controls. You can turn the context help on with Ctrl+H and then hover you mouse cursor over the control. If you open "Configure Measurement.vi" and look at the help for the absolute resolution control you'll see a good description that includes:
    Notes:
    (1) The instrument driver ignores this parameter if the Range parameter is set to AG34405A_VAL_AUTO_RANGE_ON (-1) .
    If you look at the help of the Range parameter you'll find see a similar discription with details and the following:
    Defined Values:
    AG34405A_VAL_AUTO_RANGE_OFF (-2)   (-2.0)  - Auto-Range Off
    AG34405A_VAL_AUTO_RANGE_ON (-1)    (-1.0)  - Auto-Range On
    Based on this, can you try setting the auto-range to -2 and specifying the absoulte resolution?
    Regards,
    Kamran

  • Need help for the web based project

    I am using netbeans 5.5 and Sql server for db.What is the full form for DAO and how is it going to help me in my project.U also talk about uml want ot know about it.
    and how is it coming to help me.Its a very wast topic i serached.what will be helpful to me of the UML.
    What should i start first --- jsp or db design.
    What should i use for web based project --- only use jsp(presentation)+dao or jsp+servlet+dao.What would be best ?
    provide some nice link based on dynamic fetching of values from the database and showing it at runtime.
    Message was edited by:
    java@mani

    As stated in http://forum.java.sun.com/thread.jspa?threadID=5167752 start reading the Java EE tutorial to get insights in the material.
    what will be helpful to me of the UML.UML generally visualizes the core functionality. See http://www.google.com/search?q=uml+tutorial for some tuts.
    What should i start first --- jsp or db design.Start with both and end with the best balance between both.
    What should i use for web based project --- only use
    jsp(presentation)+dao or jsp+servlet+dao.Depends on the business needs. Generally 3-tier webapplications are the best: web, business and data.
    provide some nice link based on dynamic fetching of values from the
    database and showing it at runtime.Check some SQL and JDBC tutorials how to fetch and process the data:
    http://www.google.com/search?q=sql+tutorial
    http://www.google.com/search?q=jdbc+tutorial
    How to process it in the business and web layer is stated in the Java EE tutorial I've linked in your former topic.
    For applying the patterns, check the http://java.sun.com/blueprints/corej2eepatterns/

  • Need info for Implementing Service Analytics

    Hi ,
    My clicnet is planing to implementing service analytics, i would like to know the procedure is that where to start what to needs to be install.
    We are going to use sibel applications and what are the things to taken care while installing a BI Apps for service analytics. We are plaing to instal 7.9.6.3
    Please do let me know the procedure.
    Regards,
    Malli

    2 corrections :
    a) Veera not verra
    b) What I sent you is bi apps config guide that will have info related ebs,siebel, People soft and jde, check this link which is from 11 chapter as I said earlier
    http://docs.oracle.com/cd/E20490_01/bia.7963/e19039/config_service_analytics.htm#BABBJFGB
    I appreciate if you mark as correct

Maybe you are looking for