Re: Work center in plant

i have no idea about Work centre, please explain about workcenter how to create?
what efforts in create a work center?

A work centre is a place where an activity takes place.
The usage of work centre shall depend upon your work place, i.e. factory, shop etc.
Usage of work centre is for scheduling, utilization, efficiency calculation etc..
work center is created in CR01...
But before starting the creation, the following are to be in the system, so that you can get a better result.
Defien work center category using OP40.
Define the person responsible in config or shoose the standard one if no specific person is not required.
Task lists to be defined using OP45.
Standard values using OP19.
In Basic data enter Work Cenetr Category, Person Responsible, Location, And usage of machine are to eb defined.
We can define standard vaue priority here. If we mention as should be enters, then that will be a compulsory field. .
In Default values as per requirement we can put values.
In capacities Processing fromual to be defined. Inside the subtab, we can give details of shift working, break times, capacity utilisation, factory calendar and all.
In scheduling the Process Formula to be given.
In costing field, we have to give the validity period of Machine, Cost center to which this machine attached, also teh relevant actvity types.
karthick

Similar Messages

  • BAPI_FUNCLOC_CREATE : Main work center and plant associated

    Hi,
      I'm trying to create Functional locations using BAPI BAPI_FUNCLOC_CREATE. I got almost all the fields except 'MAIN WORK CENTER' and 'PLANT  Associated with main work center'. Please advise me the relevant fields in the importing parameters of this BAPI so that I can upload the same.
    Thanks:
    Gaurav

    Hi,
      Thanks for your response. Actually after doing further R&D, I saw that work_ctr requires the object key of the work center. I fetched the OBJECTKEY from CRHD & passed. It automatically updated both work center & plant associated.
        Awarding you points for your help.
    Thanks buddy!!!

  • Selection of technical objects by work center and plant

    Hi there,
    I want to select functional locations and equipments that are diretly linked to a workcenter which you can see in the location tab in the standard-transactions.
    How can I select this data the way from work center (and plant) to the technical objects? Which tables I have to use??
    Kind regards
    Jens

    Try using Function Module ITOB_FUNCLOC_READ_SINGLE.

  • Network Activity - Timesheet: Work Center in plant does not exists

    Hi All,
    While doing Timesheet entry against Network and Activity in CAT2 transaction Code, I come across one scenario in which If I use copy function then one error message appears as " Work center XXXXXXX in Plant XXXX does not exists"
    But same combination gets worked if I put manually and do not use copy function.
    I think system checks copied entry plant with new entry Plant.
    Is this system inconsistency ? If so what may be the probable solution ? OSS Note ? Exit ?
    Please suggets to rectify this wrong validation message.
    Many thanks in advance.
    Swapnil Kharul

    Hi Swapnil,
    You can check following points once again.
    1.Check your Network Actvity details:
    Work Center/Plant : 1000/1300
    Work 10 (hrs)
    Activity Type :11000
    DistKeyCapRqlnt:SAP020
    Also Status of activity :whether it is in PCNF or CNF.
    and in Network Header: check Capacity Requirements.
    2.In CR02, check whether the work Center and Plant Combination.
    Plant:1300
    Work Center:1000
    Goto Costing Tab: Note the following:
    Cost Center: 4295
    Actvity Type Int Proc(Bottom Field):11000
    Formulae:SAP008
    3.Check in KP26/27, whether Cost center has been
    assigned to Activity Type for the period (or else entire Fiscal year).
    Version:0
    From Period:6
    ToPeriod:6
    Fiscal Year:2010
    Cost Center:4295
    Activity Type:11000
    with this combination whther rate has defined or not.
    Plan Actvity/Fixed Price/Variable Price
    4.And also CAC2, don't hide any field in all screen Groups of your data entry  profile.
    Now Pl. let us know the results.(all values considered here are for your understanding)
    Vemula

  • Could U Please Tell me the Link B/W  Work Center and Plant ?

    Urgent Issue ...

    Hi,
    The org structure is as follows-
    1 st - Company code
    2 nd - Plant
    3 rd - Work center
    First co code is created (by FICO) then Plant is created (by MM) then come s the creation of work center.
    When we create a Work center it will ask about the plant in which the WC is to be created. The work center is directly linked to the plant.
    Please revert with further details of your question if this answer is not satisfactory.
    Award points if satisfied.
    Thanks,
    Hemant

  • Plant Maintenance, work center & component.

    Hi, I have some question as below:-
    company code: 1000
    Plant A: 1100
    Plant B:1200
    Component storage location under 1100
    Q1: work center for plant B is under 1200, so if work center need the component for maintenance job, then they need do the STO to transfer component from plant 1100 to 1200?
    Q2: work center for plant B is under 1100, so they NOT need do the STO to transfer component to do the job at 1200?

    Hello Dear,
                       Can you please tell which is the Maintenance Plant,
    if the maintenance Plant is different from the main Plant then you need to do the STO for the Main Plant(B),
    if you have assigned both the Maintenance plants to the main plant then no need for the STO.
    Hope it helps
    Regards,
    Yawar Khan

  • HOW TO CHANGE PLANT IN WORK CENTER

    Dear All
                can anyone suggest me how to change the plant of work center in plant maintenance?
    Regards
    Jitender

    Hi,
    You cannot just change it, it is unique to the plant. If the plant is wrong then you need to create the work centre again to the correct plant.
    Thanks.

  • Work Center Capacity Intervals

    HI,
    Where can I get the work center capacity interval dates i.e. valid from, valid to and corresponding week days that are being populated in the table control when you follow the following path in transaction IR03->Enter Work Center and Plant-> Press Enter->Go to Capacity Tab-> Press Capacity Button on the lower left hand corner->Press Intervals and shifts
    My requirement is to calculate the weekly capacity of a work center. I have to find the valid interval for current date then find the number of working days in this interval so that I can use it in calculating the weekly capacity.
    Regards,
    Bharat.

    I de-bugged the main program behind IR03 and found out that the Valid-from-date is being calculated during runtime for all the records from table KAPA for given work center KAPID.
    Anyway thank you all who cared to check the thread.
    Regards,
    Bharat.

  • Update Routing data after change in Work Center

    Hello All,
    I have just modified the Costing Data for 100 Work Centers CR02, setting a new "Activity Type" and "Activity Unit".  But the Routing Data CA02 does not get updated correspondingly.  I would like to ask is there any standard program which can help me to do the mass processing as to update the data to the corresponding routing?
    Thanks.

    1) You can change as per Mr Anupam sharma Said
    or
    2) YOU can also Update the data IN CA85N
    In selection criteria enter the respective work center and Plant
    and In new Value Give
    Same work center, Plant,  activity value , Unit  and activity type
    execute
    select the all the work center  and then click mass change
    Edited by: Sundaresan . E. V on Nov 12, 2010 10:25 AM

  • Work center creation in PP

    Please guide me step by step procedure to create work center in PP module so that if i reference the same in Poduction order it will generate all costs (estimated, planned , actual costs).
    Thanking you in advance.

    Hi,
    you can go to transaction CR 01 to create work center put plant work center name and then category of ur work center i.e. machine ,labour,production line 
    1. Basic data - general details of ur work center. -- category person responsible and with that standard value key with six parameters
    2 default values -- put ur control key,and unit of measurement for ur parameters like min. hour ,second.
    3. capacity - here you mention all the details of ur standard capacity details header details and capacity calculation formula
    4. scheduling - here you mention ur scheduling formula and standard queue time
    5. costing - here you put ur cost center and controlling area with validity period dates and activity types and formula for it
    Then save.
    reward points if you find it useful .
    regards
    pradeep

  • Read work center details for a notification

    Hello All,
    Is there an FM that I can use to read the work center that is assigned to a service / maintenance notification?
    The problem that I have is that I use BAPI_ALM_NOTIF_GET_DETAIL to read the notification header.
    In case of service notifications of type S1, I get the PP_WORKCENTER information but for notifications of type S3, i get the PM_WORCENTER.
    I need one FM which will get the work center and plant for me so that I do not have to check the notification types.
    Does anybody know of one?
    Best Regards,
    Mithun

    Hi;
    Did you see:
    http://www.aboutoracleapps.com/2007/08/oracle-general-ledger.html
    Information Center : Oracle Cost Management [ID 1417659.2]
    Regard
    Helios

  • HR assigment in Work center

    Hello!
             I have a problem. I want to assign a person which have been jus created in PA40 into work center on plant level (ir02/cr02). I have a question. Is in SAP any BAPI, or FM to do this automaticaly?
    Best regards
    BL

    Its grouping the person in Organisational units w.r.t HRMS. Both will appera during work force planning under different groupings.
    Regards
    soundar

  • Could not found any usage key in the work center WC001(Use T-CODE CR02)?

    my question:
    (1) I have created one Work Center WC001 and one Plant HJW1.
    (2) I have created one Routing with T-CODE CA01.
    (3) Then I use T-CODE CA02 to change this Routing.
    (4) When I enter the Head details screen,I click the Operations button to enter the Operations Overview screen.
    (5) In the Operations Overview screen list,I input the Work Center WC001 and the Plant HJW1 at the first line and press enter.Then the sap raise error message like below.
    (6) The question was: I could not found any usage key in the work center WC001(Use T-CODE CR02)! Could any one tell me the answer or give me some advice to resolve the problem?Thank you so much.
    error message:
    Work center WC001 plant HJW1 does not exist for task list type N
    Message no. CR084
    Diagnosis
    You want to allocate the work center WC001 to a task list of the type N . However this work center is not intended to be used in a task list of the type N.
    Procedure
    The usage of a work center in task lists is restricted via the usage key. You define this key in work center customizing and allocate to it those task list types in which a work center with this usage key can be used.
    Proceed as follows:
    Check the usage key for the work center WC001 in work center maintenance.
    If necessary change the usage key in the work center or change the allocation of task list types to the usage key in customizing or
    allocate to the task list a work center which is valid for use in a task list of the type N.

    Hi
    1) Check what task list usage key you entered for the work center in the basic data . If it is 009 then the work center can be used in all task list type.
    2) If you have defined and used any other usage key , ensure that  for this key , the routing type N is allowed in OP45.
    Regards,
    Ramasamy

  • Issue - CIF Work Center

    Dear Sirs,
    While creating IM for work centers only (with selection criteria - work centers & plant), system checks and prompts a warning message that 'Capacity xxxxxxxx: Model does not contain plant'.
    (Plant is ciffed to SCM system ahead)
    What it's supposed to check and to fix it please?
    Your kind advice is appreciated,
    Thank you
    Mandy

    Hi Mandy,
    Please check on the following:-
    1) Check whether the work center/capacity/plant is assigned to model 000
    2) Check whether the work center/capacity is maintained in ECC in all respects including capacity tab/scheduling tab
    3)  Check whether work center/capacity/plant has time zone maintained
    4) Check whether capacity is maintained CR12 transaction in ECC and same is assinged while maintainng in CR02 transaction while maintaining work center
    Regards
    R. Senthil Mareeswaran.

  • Factory Calender assigned to Plant & resource/Work center

    Hello,
    If we have assigned the Factory Calender "XX" which has 5 working day(Monday to Friday) with no Special rules & no Holiday Calender to Plant & "YY" Factory Calender to Work center which has 365 days working with no no Special rules & no Holiday Calender.Now, when MRP creates Planned Orders for FERT material It did not create it on Weekends(i.e. on Saturday & Sunday) though the factory calender assigned is  "YY" (which has 365 days working )in work center.Why?
    Actually it should have consider the Work center assigned Calender for Capacity planning & Schedulling purpose.
    If I assign the Factory Calender "YY"  to plant then it will create the procurement proposal on weekends which is not acceptable to external procurement MRP Controller as plant office works only 5 days.
    Please guide.

    Dear
    Goto CR02/03 , select the Capacity tabe "hat" and u will fined there is tabe "Available Capacity " .U have to maintain the Active version ok.
    Basically , the active version is used for scheduling and capacity planning. If you have not entered an active version, the standard available capacity is used, even if an available capacity version has been entered.
    At the same u have to check out the below requirement :
    you must maintain the following data in the capacity header:
    1.The grouping, that defines which shift sequences and shift definitions can be used to maintain the available capacity
    2.The number of the active version of available capacity
    3.The base unit of measure of the available capacity
    3.The factory calendar, that is the basis of the available capacity-Workcentre
    If you do not enter a factory calendar , the system uses the default calendar for the plant.
    I hope in your case , u have the shift sequence of 5 work days for the calander you have assinged in work centre .
    Please check all those n come back .
    Reward points if usefull.
    Regards
    Jia

Maybe you are looking for

  • Help! I need to upgrade my Dell Optiplex GX260 (tower) power supply!

    Hi, I plan on taking a trip to Best Buy today to purchase a video card and power supply for my Dell Optiplex GX260 (tower).  I am looking to get at least a 500W power supply.  Can you tell me the BEST power supply that will work/fit that Best Buy sel

  • Problem with Admin access to downloaded apps in Mountain Lion

    I am using a full admin account on my MacBook, running Mountain Lion Version 10.8.2. I have downloaded 2 applications and installed them. When I try to open the applications, I keep getting the following message: Cannot install required resources. Yo

  • How to fix blocked plugins in safari on a Mac OS X

    How to fix blocked plugins in Safari on my Mac OS X?

  • Publisher property?

    hello, thanks a lot for the help so far. I have created my webHelp and .chm files, but I have come up with two issues 1- what should I do with the "publisher unknown" when opening the chm file. I have put the file on our ftp server so it can be downl

  • How can I remove old mount points?

    Hi, I created mount points under Tiger using NetInfo Manager. These are still active but don't show up in Directory Utility. How Do I remove thos old mount points? All the best Christoph