Requirement for Gate Pass Imprtent Requirement

Dear All,
the Customer is asking for the gate pass entries to be entered into the system . as you all know there is no std sap transaction for creation of gate entries in sap . this has to be customized . types of gate pass used here is both returnable and non-returnable .and the gate entries are made both when any material comes in or goes out ....
kindly suggest better way to customize the above requirement so that when pending Gate entry report is run ... it should tell us
1) which gate entry is related to which Purchase order or Sales order or any other reference
2) No duplication of gate entries
3) If a same material comes in and goes out , what should be the gate entry ( new gate entries can it be seen with reference to its old gate entry numbers ?? )
your valuable inputs eagerly awaited ..
Thanks ,
kiran

Hello Kiran,
In our business process,we have Returnable(RGP) and non Returnable goods pass(NRGP).we create RGP/NRGP  challan against a Vendor and here we don't give any reference like PO or SO for Returnable goods (Pass)/NRGP.
for Returnable we mention expected date of return.for non returnable there is no expected date.we can track the goods are received or not by return date/received date of material when we receive the goods.if we don't receive,its shows in pending.we we also maintain price of the material when we send the material.
while receiving the material,we enter the quantity and receiving date.hope helpful
Regards,
Varun

Similar Messages

  • Can anyone help me wid d codes for  Generated Program for gate pass

    can anyone help me wid d codes for  Generated Program for gate pass in MM
    Message was edited by:
            Ronei Shedi

    Hi
    There is no std business process in SAP for Gate pass for the Material entry
    before GR stock entry into the stores.
    You have to write a Z program based on the details of Purchase order tables EKKO and EKPO.
    This will mainly check whether the correct PO qty was delivered or not with proper quality.
    So use the PO tables EKKO and EKPO and fetch the data and use it
    Since this is client specific there is no feneralised program for it.
    Reward points if useful
    Regards
    Anji

  • Procedure for gate pass along with billing document?

    Hi
    any body know the procedure about "issueing gatepass along with billing document"  ..?
    anybody can suggest me ..regarding gatepass configuration procedure..?
    thanks and regards
    sesidhar

    this is not for excise materials
    for general materials  ....
    when PGI of materials ..automatically can issue the gate pass
    mean at delivery time
    regards
    seidhar

  • Help required for the users  report requirement

    Hello,
    User requirement is to get the report as follows
    Period            planned order     Production order      Backlog
    Feb2008          15                           3                      18
    March2008      4                            11                     15
    Backlog is the formula for planned order & production order.
    My problem is that, In the cube the data for planned order is the char value 'X' or a blank.
    It has to count the total of planned order for the entire month of feb,& print the value counting the number of 'X',here as shown as 15.
    Planned order, Production order are in rows & are chracteristics.
    Is thr any solution to count master data which has a char value(X).
    I have tried using the formula variable.I had created the new formula.Then using the data functions as count(Formula variable),using the replacment path.But it did not work
    Help me out to find the total for the char value of the master data.
    Help would be rewarded!

    Hello,
    For BACKEND:
    1) Create a normal KF say counter and include it in the cube.
    2) Now you can populate the value for this KF via end routine in transformation.
    3) You need to check whether the value for planned order is X. If yes then update KF with value 1.
    4) I hope you can take care of this routine part. Once this is done the data in the cube might look in below manner:
    Month Planned-Order Counter
    Feb 2007 | X | 1
    Feb 2007 | X | 1
    Feb 2007 |  | 0
    Feb 2007 | X | 1
    Feb 2007 |  | 0
    Mar 2007 |  | 0
    Mar 2007 | X | 1
    Mar 2007 |  | 0
    Mar 2007 |  | 0
    Mar 2007 | X | 1
    Now in the report if you include month and counter the report will look like
    Month Counter
    Feb 2007 | 3
    Mar 2007 | 2
    If you see the counter is getting aggregated to give you the sum against the value of planned order as X against month.
    I think this should work.
    If this dosent work let me know i will let you the alternate solution for frontend. but for that too you need to make the above backend changes.
    So do the backend changes and try to use counter KF for showing planned orders and i think it should work fine.
    Regds,
    Shashank

  • How many SLD's require for 2 solman system requirements?

    Scenario1:
    One solman system for entire landscape->One SLD is required.
    Is this SLD should be a seperate system or can be within solman?
    Scenario2:
    One solman system for DEV/QAS and other solman system for PRD.
    How many SLDs are required? Can we manage with single SLD?
    If two SLDs, Then both should be seperate systems. i.e, One SLD -> DEV/QAS Solman, Another SLD ->PRD Solman.
    If only one SLD, Then it should be seperate system or can be within solman?
    We do have EP in client enviroinment. Can we use SLD of EP?

    Hi,
    you can use one SLD for all your systems if you want. You can either use an existing one or the one which comes with Sol Man. That's up to you.
    Any scenario is possible.
    /cheers

  • System Requirements for SAP All-In-One

    Hi experts
    I am going to install SAP All-in-One for one of my client. I want to know about the system requirements for this, like hardware requirements and specifications, software required (OS and database).
    I was searching for the best practice set-up document in the portal,but i could not locate one.
    Kindly help
    Regards
    Louis

    Check
    Note 1331527 - AiO fast-start program:Questionnaire pre-installation info
    (and related notes)
    Markus

  • Help - just got message "The installed graphics card does not meet the minimum requirements for Aperture"

    Help - just got message "The installed graphics card does not meet the minimum requirements for Aperture"

    Please click Profile Update and follow the directions for updating your profile. Your computer may be too old to support Aperture however without knowing anything about your iMac it's impossible to say. Also there is an Aperture forum to use and you can look at Aperture's System Requirements below to see if you have the minimum.
    System Requirements
    Minimum
    One of the following Intel-based Mac computers:
    Mac Pro
    MacBook Pro
    MacBook
    MacBook Air
    iMac
    Mac mini
    Operating system:
    Mac OS X v10.5.8 or v10.6.2 or later
    Memory:
    1GB of RAM
    2GB of RAM required for Mac Pro
    Other requirements:
    DVD drive for installation
    1GB of disk space for application and documentation
    7GB of disk space for Sample Library

  • Gate pass for external processing

    Hi,
    please guide me for this ,
    damaged equipments are sent out side the company for a repairing ,and store people issue gate pass for the same while handing over to vendor,
    i understand that this processing can be done using control key,
    but how the gate pass in the system will be created ,is ther any provision for that in PM area,
    Thanks in Advance
    Vishal

    Sending the equipment to vendor for repair you can use the following process
    1.     Create out going equipment as UNBW material type
    2.     Generate service PR (Control key PM03)
    3.     Generate service PO
    4.     Create stock in MB1C transaction with movement type 561
    5.     Transfer to vendor in MB1B with movement type 341
    6.     Receive from vendor with movement type 342 in MB1B
    7.     Transfer to you storage location with movement type 311
    8.     Create service entry sheet
    For gate pass, I hope you need to develop custom report.
    Thanks
    Amitabh

  • Design Suggestions Required for Message Center functionality

    Hi All,
    I am looking for some suggestion, for one of the requirement for my customer.
    Requirement is as below.
    Customer wants to have a Message Center, where in, user will be able to send a message to another another user with some content and with or without attachment. they should be able to send multiple attachment as well.
    The message which users are sharing with each other should be in the conversation mode. Like for One topic or subject if a users ha sent a message to another user, the same content should be in the conversation mode and an email should be sent to other users
    with he content and attachments.
    In addition to above, all the messages exchanged should be stored below in the tabular format.

    Discussion board does serves the purpose. But how we can control the item level permission. For example, if we wantto show items which are relevant to user who is logged in, i mean show items based on the logged in user ?

  • Service procuremnt:gate pass issue

    Hi,
    we want to send the motor for rewinding outside the company.
    as the repairing charges will be confirmed by vendor only when the motor is opened and checked by vendor at vendor site. so we need to send the motor with gate pass to vendor and after the check we wiil make po with respect to given quotation.
    how sap system can issue and print the gate pass.
    how we can check the report like moter sent ,motor received and the balance motor at vendor.
    regards
    raman

    Hi,
    it is possible through new development only,
    here is one possible solution,
    maintain the split valuation for the material with different valuation types as damaged & reapaired,
    create one BOM (recursive allowed ) indicator,
    maintain one info record with the sub contracting vendor,
    1.create one one new screen for gate pass entry with the input options of vendor,material no,quantity,valuation type and date,
    if required print the gate pass with above details,
    2. create one Z table to store the all above data
    3. create one new movement type with replica of 541.
    4.restrict the new movement type for MIGO transaction only
    5.impliment the BADI MB_MIGO_BADI to get the new tab for MIGO screen with the point 1 input details,
       (logic as new tab shuold only reflect for the new mvt )
    6.if the user enters the point 1 details in the new tab of MIGO transaction ,system need to check the customised table ,and allow the posting after the validation only
    7.at the time of MIGO with new mvt type enter the material with batch.
    8. now the material issued to the sub contractor with valuation type as a 'damaged',
    9.create one sub contracting PO for the material with bacth 'repaired'
    10. as per the normal , receive the goods against PO.
    at any point of time you can trace the material with batch wise.
    hope this is helpful
    regards
    chenna

  • Gate Pass Scenario

    Dear SAP Guru,
    What is the scenario for Gate pass without PO.
    Thanks
    Babu

    Dear Babu,
    Gate entries can be done without purchase order in below scenarios
    Suppose we issued a contract to a vendor for any services like painting etc.
    And  If contractor brings his own equipment(like brush etc), then provision should be provided to add equipment details without purchase order.
    Once work done finished, then equipment which comes through contractor should be having option to make outward entry without any SAP document.
    Hope this will clear to you.
    Regards,
    Sandesh Sawant

  • Gate Pass input - urgently required

    Dear All,
    the Customer is asking for the gate pass entries to be entered into the system . as you all know there is no std sap transaction for creation of gate entries in sap . this has to be customized . types of gate pass used here is both returnable and non-returnable .and the gate entries are made both when any material comes in or goes out ....
    kindly suggest better way to customize the above requirement so that when pending Gate entry report is run ... it should tell us
    1) which gate entry is related to which Purchase order or Sales order or any other reference
    2) No duplication of gate entries
    3) If a same material comes in and goes out , what should be the gate entry ( new gate entries can it be seen with reference to its old gate entry numbers ?? )
    your valuable inputs eagerly awaited ..
    Thanks ,
    Rohan

    Hello,
    As you said their is no any std gate pass formats avaialable in SAP, 
    103 and 105 movement type are very useful while gate pass entry, you first receive the goods through 103 movement type an take the print of material document treat it as gate pass. and after that receive that through 105 movement type.
    While issue of material out side the gate then while 351 , 641 take the material document print out and treat it as out going  gate pass.
    If you want to go for Z'
    Then create a Z program and check MSEG table and check EBELN field if EBELN field is available then that is Purchas order, check which movement types are their , if it is 101, 103, 105, 561,etc  then it means these are IN gate pass.
    if Movemen type's are 351, 641, etc then these are OUT going gate pass, like that build your own loigc.
    Regards
    Mahesh Naik.

  • Requirements for phantoms to not pass down to components

    I have this requirement where the requirements at the phantom level should not be passed down to the components but the Planned orders at the phantom level need to be created.
    Is this even possible? If so then what planning strategy needs to be used and what type of independent requiremnets should be used. Please advise.

    You can use any stg like 11, 10, 40 to phantom assembly, but see that following setting is done in MRP4 view of product material master
    MRP dep. requirement = 1- Materials for dependent requirements are not planned.
    <b>Explanation</b>
    <u>MRP relevancy for dependent requirements</u>
    This indicator controls whether dependent requirements are relevant to MRP or not. Dependent requirements include dependent reservations and stock transfer requirements.
    You only use this indicator in connection with planning strategies for make-to-stock production, assembly planning. Note that the indicator Dependent requirements not relevant to MRP should only be used when, for example, planned independent requirements exist for an assembly. In this case, no receipt elements for the dependent requirements in MRP should be created as receipts have already been created for the planned independent requirements.

  • Development of Form for Returnable and Non-returnable material Gate pass

    Dear Experts,
    I am working with an Indian client impementing SAP PM. I need help in developing a form for Returnable and Non Returnable Gatepass. Requirements are below;
    RGP/NRGP should be made for all materials going out of the factory, irrespective of it being coded or not
    It should be plant specific
    It should have reference to material movement document for tracking purpose
    It should have details of vendor, transport company, vehicle number, permits if required, etc
    A Z report should give details of all RGP/NRGP based on material document number and date
    Please guide me based on your experience.
    Thanks,
    Boby

    Boby,
    This can be met. But before developing this, have you implemented the refurbishment process of PM module? This will really help in tracking the equipment and also for the development of RGP/NRGP.
    First you have to create a form for the gate pass  and have to create an enhancement in MIGO for triggering the RGP/NRGP, else you can also create a separate Z transaction code for printing the Gate pass. You will get all the fields like vendor, material, QTY, movement type from the MIGO GI document. 
    For the gate pass the MIGO document will be the reference all the times, you can also develop a Z report for the records for the gate pass.
    Regards,
    Praveen

  • List of Manual Setup required for iSetup to work

    Hi All,
    This is Mugunthan from iSetup development. Based on my interaction with customers and Oracle functional experts, I had documented list of manual setups that are required for smooth loading of selection sets. I am sharing the same. Please let me know if I anyone had to enter some manual setup while using iSetup.
    Understanding iSetup
    iSetup is a tool to migrate and report on your configuration data. Various engineering teams from Oracle develop the APIs/Programs, which migrates the data across EBS instances. Hence all your data is validated for all business cases and data consistency is guarantied. It requires good amount of setup functional knowledge and bit of technical knowledge to use this tool.
    Prerequisite setup for Instance Mapping to work
    ·     ATG patch set level should be same across all EBS instances.
    ·     Copy DBC files of each other EBS instances participating in migration under $FND_SECURE directory (refer note below for details).
    ·     Edit sqlnet.ora to allow connection between DB instacnes(tcp.invited_nodes=(<source>,<central>))
    ·     Make sure that same user name with iSetup responsibility exists in all EBS instances participating in migration.
    Note:- iSetup tool is capable of connecting to multiple EBS instances. To do so, it uses dbc file information available under $FND_SECURE directory. Let us consider three instances A, B & C, where A is central instance, B is source instance and C is target instances. After copying the dbc file on all nodes, $FND_SECURE directory would look like this on each machine.
    A => A.dbc, B.dbc, C.dbc
    B => A.dbc, B.dbc
    C => A.dbc, C.dbc
    Prerequisite for registering Interface and creating Custom Selection Set
    iSetup super role is mandatory to register and create custom selection set. It is not sufficient if you register API on central/source instance alone. You must register the API on all instances participating in migration/reporting.
    Understanding how to access/share extracts across instances
    Sharing iSetup artifacts
    ·     Only the exact same user can access extracts, transforms, or reports across different instances.
    ·     The “Download” capability offers a way to share extracts, transforms, and loads.
    Implications for Extract/Load Management
    ·     Option 1: Same owner across all instances
    ·     Option 2: Same owner in Dev, Test, UAT, etc – but not Production
    o     Extract/Load operations in non-Production instances
    o     Once thoroughly tested and ready to load into Production, download to desktop and upload into Production
    ·     Option 3: Download and upload into each instance
    Security Considerations
    ·     iSetup does not use SSH to connect between instances. It uses Concurrent Manager framework to lunch concurrent programs on source and target instances.
    ·     iSetup does not write password to any files or tables.
    ·     It uses JDBC connectivity obtained through standard AOL security layer
    Common Incorrect Setups
    ·     Failure to complete/verify all of the steps in “Mapping instances”
    ·     DBC file should be copied again if EBS instance has been refreshed or autoconfig is run.
    ·     Custom interfaces should be registered in all EBS instances. Registering it on Central/Source is not sufficient.
    ·     Standard Concurrent Manager should up for picking up iSetup concurrent requests.
    ·     iSetup financial and SCM modules are supported from 12.0.4 onwards.
    ·     iSetup is not certified on RAC. However, you may still work with iSetup if you could copy the DBC file on all nodes with the same name as it had been registered through Instance Mapping screen.
    Installed Languages
    iSetup has limitations where it cannot Load or Report if the number and type of installed languages and DB Charset are different between Central, Source and Target instances. If your case is so, there is a workaround. Download the extract zip file to desktop and unzip it. Edit AZ_Prevalidator_1.xml to match your target instance language and DB Charset. Zip it back and upload to iSetup repository. Now, you would be able to load to target instance. You must ensure that this would not corrupt data in DB. This is considered as customization and any data issue coming out this modification is not supported.
    Custom Applications
    Application data is the prerequisite for the most of the Application Object Library setups such as Menus, Responsibility, and Concurrent programs. iSetup does not migrate Custom Applications as of now. So, if you have created any custom application on source instance, please manually create them on the target instance before moving Application Object Library (AOL) data.
    General Foundation Selection Set
    Setup objects in General foundation selection set supports filtering i.e. ability to extract specific setups. Since most of the AOL setup data such as Menus, Responsibilities and Request Groups are shipped by Oracle itself, it does not make sense to migrate all of them to target instance since they would be available on target instance. Hence, it is strongly recommended to extract only those setup objects, which are edited/added, by you to target instance. This improves the performance. iSetup uses FNDLOAD (seed data loader) to migrate most of the AOL Setups. The default behavior of FNDLOAD is given below.
    Case 1 – Shipped by Oracle (Seed Data)
    FNDLOAD checks last_update_date and last_updated_by columns to update a record. If it is shipped by Oracle, the default owner of the record would be Oracle and it would skip these records, which are identical. So, it won’t change last_update_by or last_updated_date columns.
    Case 2 – Shipped by Oracle and customized by you
    If a record were customized in source instance, then it would update the record based on last_update_date column. If the last_update_date in the target were more recent, then FNDLOAD would not update the record. So, it won’t change last_update_by column. Otherwise, it would update the records with user who customized the records in source instance.
    Case 3 – Created and maintained by customers
    If a record were newly added/edited in source instance by you, then it would update the record based on last_update_date column. If the last_update_date of the record in the target were more recent, then FNDLOAD would not update the record. So, it won’t change last_update_by column. Otherwise, it would update the records with user who customized the records in source instance.
    Profiles
    HR: Business Group => Set the name of the Business Group for which you would like to extract data from source instance. After loading Business Group onto the target instance, make sure that this profile option is set appropriately.
    HR: Security Profile => Set the name of the Business Group for which you would like to extract data from source instance. After loading Business Group onto the target instance, make sure that this profile option is set appropriately.
    MO: Operating Unit => Set the Operating Unit name for which you would like to extract data from source instance. After loading Operating Unit onto the target instance, make sure that this profile option is set if required.
    Navigation path to do the above setup:
    System Administrator -> Profile -> System.
    Query for the above profiles and set the values accordingly.
    Descriptive & Key Flex Fields
    You must compile and freeze the flex field values before extracting using iSetup.
    Otherwise, it would result in partial migration of data. Please verify that all the data been extracted by reporting on your extract before loading to ensure data consistency.
    You can load the KFF/DFF data to target instance even the structures in both source as well as target instances are different only in the below cases.
    Case 1:
    Source => Loc1 (Mandate), Loc2 (Mandate), Loc3, and Loc4
    Target=> Loc1, Loc2, Loc3 (Mandate), Loc4, Loc5 and Loc6
    If you provide values for Loc1 (Mandate), Loc2 (Mandate), Loc3, Loc4, then locations will be loaded to target instance without any issue. If you do not provide value for Loc3, then API will fail, as Loc3 is a mandatory field.
    Case 2:
    Source => Loc1 (Mandate), Loc2 (Mandate), Loc3, and Loc4
    Target=> Loc1 (Mandate), Loc2
    If you provide values for Loc1 (Mandate), Loc2 (Mandate), Loc3 and Loc4 and load data to target instance, API will fail as Loc3 and Loc4 are not there in target instance.
    It is always recommended that KFF/DFF structure should be same for both source as well as target instances.
    Concurrent Programs and Request Groups
    Concurrent program API migrates the program definition(Definition + Parameters + Executable) only. It does not migrate physical executable files under APPL_TOP. Please use custom solution to migrate executable files. Load Concurrent Programs prior to loading Request Groups. Otherwise, associated concurrent program meta-data will not be moved even through the Request Group extract contains associated Concurrent Program definition.
    Locations - Geographies
    If you have any custom Geographies, iSetup does not have any API to migrate this setup. Enter them manually before loading Locations API.
    Currencies Types
    iSetup does not have API to migrate Currency types. Enter them manually on target instance after loading Currency API.
    GL Fiscal Super user--> setup--> Currencies --> rates -- > types
    Associating an Employee details to an User
    The extract process does not capture employee details associated with users. So, after loading the employee data successfully on the target instance, you have to configure them again on target instance.
    Accounting Setup
    Make sure that all Accounting Setups that you wish to migrate are in status “Complete”. In progress or not-completed Accounting Setups would not be migrated successfully.
    Note: Currently iSetup does not migrate Sub-Ledger Accounting methods (SLA). Oracle supports some default SLA methods such as Standard Accrual and Standard Cash. You may make use of these two. If you want to use your own SLA method then you need to manually create it on target instances because iSetup does not have API to migrate SLA. If a Primary Ledger associated with Secondary Ledgers using different Chart of Accounts, then mapping rules should be defined in the target instance manually. Mapping rule name should match with XML tag “SlCoaMappingName”. After that you would be able to load Accounting Setup to target instance.
    Organization API - Product Foundation Selection Set
    All Organizations which are defined in HR module will be extracted by this API. This API will not extract Inventory Organization, Business Group. To migrate Inventory Organization, you have to use Inventory Organization API under Discrete Mfg. and Distribution Selection Set. To extract Business Group, you should use Business Group API.
    Inventory Organization API - Discrete Mfg & Distribution Selection Set
    Inventory Organization API will extract Inventory Organization information only. You should use Inventory Parameters API to move parameters such as Accounting Information. Inventory Organization API Supports Update which means that you can update existing header level attributes of Inventory Organization on the target instance. Inventory Parameters API does not support update. To update Inventory Parameters, use Inventory Parameters Update API.
    We have a known issue where Inventory Organization API migrates non process enabled organization only. If your inventory organization is process enabled, then you can migrate them by a simple workaround. Download the extract zip file to desktop and unzip it. Navigate to Organization XML and edit the XML tag <ProcessEnabledFlag>Y</ProcessEnabledFlag> to <ProcessEnabledFlag>N</ProcessEnabledFlag>. Zip it back the extract and upload to target instance. You can load the extract now. After successful completion of load, you can manually enable the flag through Form UI. We are working on this issue and update you once patch is released to metalink.
    Freight Carriers API - Product Foundation Selection Set
    Freight Carriers API in Product Foundation selection set requires Inventory Organization and Organization Parameters as prerequisite setup. These two APIs are available under Discrete Mfg. and Distribution Selection Set. Also,Freight Carriers API is available under Discrete Mfg and Distribution Selection Set with name Carriers, Methods, Carrier-ModeServ,Carrier-Org. So, use Discrete Mfg selection set to load Freight Carriers. In next rollup release Freight Carriers API would be removed from Product Foundation Selection Set.
    Organization Structure Selection Set
    It is highly recommended to set filter and extract and load data related to one Business Group at a time. For example, setup objects such as Locations, Legal Entities,Operating Units,Organizations and Organization Structure Versions support filter by Business Group. So, set the filter for a specific Business Group and then extract and load the data to target instance.
    List of mandatory iSetup Fwk patches*
    8352532:R12.AZ.A - 1OFF:12.0.6: Ignore invalid Java identifier or Unicode identifier characters from the extracted data
    8424285:R12.AZ.A - 1OFF:12.0.6:Framework Support to validate records from details to master during load
    7608712:R12.AZ.A - 1OFF:12.0.4:ISETUP DOES NOT MIGRATE SYSTEM PROFILE VALUES
    List of mandatory API/functional patches*
    8441573:R12.FND.A - 1OFF:12.0.4: FNDLOAD DOWNLOAD COMMAND IS INSERTING EXTRA SPACE AFTER A NEWLINE CHARACTER
    7413966:R12.PER.A - MIGRATION ISSUES
    8445446:R12.GL.A - Consolidated Patch for iSetup Fixes
    7502698:R12.GL.A - Not able to Load Accounting Setup API Data to target instance.
    Appendix_
    How to read logs
    ·     Logs are very important to diagnose and troubleshoot iSetup issues. Logs contain both functional and technical errors.
    ·     To find the log, navigate to View Detail screens of Extracts/ Transforms/Loads/Standard/Comparison Reports and click on View Log button to view the log.
    ·     Generic Loader (FNDLOAD or Seed data loader) logs are not printed as a part of main log. To view actual log, you have to take the request_id specified in the concurrent log and search for the same in Forms Request Search Window in the instance where the request was launched.
    ·     Functional errors are mainly due to
    o     Missing prerequisite data – You did not load one more perquisite API before loading the current API. Example, trying to load “Accounting Setup” without loading “Chart of Accounts” would result in this kind of error.
    o     Business validation failure – Setup is incorrect as per business rule. Example, Start data cannot be greater than end date.
    o     API does not support Update Records – If the there is a matching record in the target instance and If the API does not support update, then you would get this kind of errors.
    o     You unselected Update Records while launching load - If the there is a matching record in the target instance and If you do not select Update Records, then you would get this kind of errors.
    Example – business validation failure
    o     VONAME = Branches PLSQL; KEY = BANKNAME = 'AIBC‘
    o     BRANCHNAME = 'AIBC'
    o     EXCEPTION = Please provide a unique combination of bank number, bank branch number, and country combination. The 020, 26042, KA combination already exists.
    Example – business validation failure
    o     Tokens: VONAME = Banks PLSQL
    o     BANKNAME = 'OLD_ROYAL BANK OF MY INDIA'
    o     EXCEPTION = End date cannot be earlier than the start date
    Example – missing prerequisite data.
    o     VONAME = Operating Unit; KEY = Name = 'CAN OU'
    o     Group Name = 'Setup Business Group'
    o     ; EXCEPTION = Message not found. Application: PER, Message Name: HR_ORG_SOB_NOT_FOUND (Set of books not found for ‘Setup Business Group’)
    Example – technical or fwk error
    o     OAException: System Error: Procedure at Step 40
    o     Cause: The procedure has created an error at Step 40.
    o     Action: Contact your system administrator quoting the procedure and Step 40.
    Example – technical or fwk error
    o     Number of installed languages on source and target does not match.
    Edited by: Mugunthan on Apr 24, 2009 2:45 PM
    Edited by: Mugunthan on Apr 29, 2009 10:31 AM
    Edited by: Mugunthan on Apr 30, 2009 10:15 AM
    Edited by: Mugunthan on Apr 30, 2009 1:22 PM
    Edited by: Mugunthan on Apr 30, 2009 1:28 PM
    Edited by: Mugunthan on May 13, 2009 1:01 PM

    Mugunthan
    Yes we have applied 11i.AZ.H.2. I am getting several errors still that we trying to resolve
    One of them is
    ===========>>>
    Uploading snapshot to central instance failed, with 3 different messages
    Error: An invalid status '-1' was passed to fnd_concurrent.set_completion_status. The valid statuses are: 'NORMAL', 'WARNING', 'ERROR'FND     at oracle.apps.az.r12.util.XmlTransmorpher.<init>(XmlTransmorpher.java:301)
         at oracle.apps.az.r12.extractor.cpserver.APIExtractor.insertGenericSelectionSet(APIExtractor.java:231)
    please assist.
    regards
    girish

Maybe you are looking for

  • Issue in Invoking an Updatable View with Instead of Trigger

    Hi, I am trying to insert a record using Updatable View with Instead of Trigger. When i try to save the data, i get the below error: java.sql.SQLException: ORA-01403: no data found ORA-06512: at line 1 at oracle.jdbc.driver.T4CTTIoer.processError(T4C

  • Excise invoice issue for non stock orders

    Hi, We are unable to create excise invoice for non stock materials. When we try to create excise invoice with refernce to the billing document, the following error appears (message no 81681: reference document of 2917 is not delivery document). This

  • Trying to Connect Wireless Epson Printer with Time Capsule

    Greetings. I am a regular Mac user and using Mac for several years now. However, I am a new to network administration. I have a Linksys wireless router that syncs our 5 Macs (one iPad-1 iMac and three MacBook Pros), plus 4 Windows PC's we have in our

  • Spry Horizontal Menu Bar in IE

    Hello, I had looked at the forums for a possible solution to this, and none of the answers I have found work for me. I have a spry horizontal menu bar with a background image. It works in Safari, Chrome, and Firefox but on IE the background image doe

  • Close Sale Orders via DTW