I want to acticate the batch managmnet key in MM01(material master).
the problem is tht i have maintained stock and now its not allowing me to activate this.I have to reverse the stcok .
Plz explain me how to reverse the stock.
Cheers
shalsa007.....
Hi,
When you upload the stock against the matrial and after some require to active batch management then its not possible to activate as per standards because valuation goes wrong, so reverse the stock through MBST, VL09 and MB1C transactions and again upload the stock as per batches.
If helpful rewards plz
Regards
Goutham
Similar Messages
-
Date option in stock reversing program(SAP NOTE 175842)
Hi Gurus,
We have prepared a program with SAP NOTE 175842 for reversing stock posting.My client has done GR in march 09 and quality peoples have posted to unrestricted stock in same month.Now because of some reason stores person want to cancel GR. So we have reversed the posting for the lot in April using the programme.Now when stores person try to cancel GR in month of march system is giving error "Deficit of SL St.in QI prev. 14.800 MT ".Because we have reversed the posting from unrestricted to quality in april and we are trying to cancel GR in March system is giving above error.
Is there any settings such that in stock reversing program we can enter the date, so that on a particular date we can reverse the stock.Because in current situation we can enter lot no. only or is there any other solution to overcome this situation
Regards
Amithi amit
Yes system will not allow you to cancel GR for March when Reversal stock posting was done in April.
Because it will consider the status of stock when GR was made.
Which movement type you have used for reversal From Unrestricted to Quality.
Was it the activation of 08 & then 322.
If it is so then cancellation of GR will not take place through original GR document(as it is in unrestricted), It will give error msg if you give reference of same.
Even GR can not be cancelled based on 08 inspection lot as 08 is not wrt PO.
Just asuggetion explore User Exit
QEVA0008 Usage decision: Customer function key (e.g. to cancel UD)
Sujit -
Stock reversal : Unrestricted to restricted for Production GR/Purchage GR
We need help in fixing the client problemd on:
1. Inspection lot uses decision for GR for production order is rejeted client want the rejected qty in unrestricted stock. No intital stcok update option or additional qty confirmation for production order is acceptable.
2. Inspection lot uses decision for GR for purchase order is rejeted client want the rejected qty in unrestricted stock or if passes by mistake than have to take unrestricted stock to restricted stock.
Any suitable solution any consultant has applied in above two cases.
Thanks & regards
Rajiv K. Pandey , PMP
SAP SCM certified solution consultantI am able to solve this isues > Following are the steps .
1. Apply the note correction ( SAP note No 175842)
2. Create Z-Tr Code for reversal posting . This will create one simple screen for making entry for Inspection lot no.
3. Configure the table T158 B for making additional entry for Tr Code QA11 ( Quality Uses decision) allowed for reversal movement type 322 block stock to restricted stock. or any other posted stock to reversal movement type for taking it to quality restricted strock.
4. Run above Z -Tr for making it reversal in taking any stock to quality stock for all priviuos takeen uses decision.
Hope it will help all the user who made some mistake in taking uses decision & want to take posted stock in quality stock.
Rajiv Pandey , PMP
SCM solution consultant. -
Hi all,
In depot return scnerio, after PGR,
i delivered 10 qty in that 2 qty returned, in j1ij i i can cancel invoice 10 qty fully or i can create excise invoice for 2 qty, if i create invoice total qty delivered showing as 12 qty, how to do reverse only for 2 qty.
In J1Idepotstock1, challan status column shows information, either cancel or posted, what needs to be done for reversal of 2 qty?.
thanks.Hi Caprin,
return from customer to depot.
any solutions, suggestions?
thanks.
Edited by: mohan prabu on May 22, 2009 10:44 AM -
Stock Reversal - From Unrestricted to Quality
Hi All,
Our scenario is as follows,
Inspection takes place for a Inward material (101). Once the UD is given stock is moved from Quality Inspection to Un restricted.
Then the Raw Material is issued to Production. Some defects are observed at production Stage and they are returning it to Quality. How this can be done in SAP. I have tried to Transfer Posting (321 to 323), System says, as the Material is activated for QM Inspection, this is not possible.
Pease guide me, how to move the Material back from Unrestricted to Quality Inspection.
Regards
SamHello,
You can choose a line rejection process for this. Please activate 08 inspection type for the material.
First pls do 344 movement type (MB1B) and post the material from unrestricted to block.
Then do 349 movement type for posting the material to quality from Block.
Lot will get created and you can reject the material by giving the UD and posting it to return delivery.
Please make sure that quality is active for 349 movement type in SPRO > Inspection for good movement.
Please revert back for any more doubts.
Regards
gajesh -
Dear All,
Is it possible to create a material with requisition as a project stock and issue the same material to the vendor for execution of works and reconcile the same when doing GR.
If yes please let me know the process and also if possible the movement tyoesHi
MB1b is for transfer posting
301 Transfer posting plant to plant (one-step) 301
301 E Transfer posting plant to plant (one-step) 301E
301 O Transfer posting plant to plant (one-step) 301O
301 Q Transfer posting plant to plant (one-step) 301Q
301 V Transfer posting plant to plant (one-step) 301V
301 W Transfer posting plant to plant (one-step) 301W
302 Transfer posting plant to plant (one-step) - reversal 302
302 E Transfer posting plant to plant (one-step) - reversal 302E
302 O Transfer posting plant to plant (one-step) - reversal 302O
302 Q Transfer posting plant to plant (one-step) - reversal 302Q
302 V Transfer posting plant to plant (one-step) - reversal 302V
302 W Transfer posting plant to plant (one-step) - reversal 302W
303 Transfer posting plant to plant - remove from storage 303
304 Trfr posting plant to plant - remove fm storage - reversal 304
305 Transfer posting plant to plant - place in storage 305
306 Trfr posting plant to plant - place in storage - reversal 306
309 Transfer posting material to material 309
309 E Transfer posting sales order - material to material 309E
309 O Transfer posting SC stock material to material 309O
309 Q Transfer posting project material to material 309Q
309 V Transfer posting cust. return. packaging mat. to mat. 309V
309 W Transfer posting cust. consgmt material to material 309W
310 Transfer posting material to material - reversal 310
310 E Transfer order sales order material to material - reversal 310E
310 O Transfer posting SC stock material to material - reversal 310O
310 Q Transfer posting project material to material - reversal 310Q
310 V Transfer posting cust. consgmt mat. to mat. - reversal 310V
310 W Transfer posting cust. consgmt mat. to mat. - reversal 310W
311 Transfer posting storage location (one-step) 311
311 E Transfer posting storage location (one-step) - sales order 311E
311 K Transfer posting storage location (one-step) - consignment 311K
311 M Transfer posting storage location (one-step) - RTP 311M
311 Q Transfer posting storage location (one-step) - project 311Q
312 Transfer posting storage location (one-step) - reversal 312
312 E Transf. posting stor.loc.(one-step) - sales order - reversal 312E
312 K Transf. posting stor.loc.(one-step) - consignment - reversal 312K
312 M Transfer posting storage loc. (one-step) - RTP - reversal 312M
312 Q Transfer posting stor. loc. (one-step) - project - reversal 312Q
313 Transfer posting SLoc to SLoc - remove from storage 313
314 Trfr posting SLoc to SLoc - remove from storage - reversal 314
315 Transfer posting SLoc. to SLoc. - place in storage 315
316 Transfer posting SLoc to SLoc - place in storage - reversal 316
317 Creation of a structured material 317
318 Creation of a structured material - reversal 318
319 Split structured material into components 319
320 Split structured mat. into components - reversal 320
321 Transfer posting quality inspection to unrestricted 321
321 E Transfer posting QI sales order to unrestricted sales order 321E
321 K Transfer posting QI consignment to unrestr. consignment 321K
321 O Transfer posting QI SC stock to unrestricted SC stock 321O
321 Q Transfer posting QI project to unrestr. project stock 321Q
321 W Transfer posting QI customer consignment to unrestr. stock 321W
322 Trfr posting qual. inspection to unrestricted - reversal 322
322 E Transfer posting QI sales ord. to unr. sales ord. - reversal 322E
322 K Transfer posting QI consgmt to unrestr. consgmt - reversal 322K
322 O Transfer posting QI SC stock to unrestr. SC stock - revers. 322O
322 Q Transfer posting QI project to unrestr. project - reversal 322Q
322 W Transfer posting QI cust. consgmt to unrestr. stck - revers. 322W
323 Transfer posting quality to quality within plant 323
323 E Trfr posting QI sales order to QI sales order within plant 323E
323 K Transfer posting QI consgmt to QI consgmt within plant 323K
323 Q Transfer posting QI project to QI project within plant 323Q
324 Transfer posting quality to quality within plant - reversal 324
324 E Trfr pstng QI sales ord. to QI sales ord. in plnt - reversal 324E
324 K Trfr pstng QI consgmt to QI consgmt within plant - reversal 324K
324 Q Transfer posting QI project to QI project in plant - revers. 324Q
325 Transfer posting blocked stock to blocked stock within plant 325
325 E Transfer posting blkd sales ord. to blkd sales ord. in plant 325E
325 K Transfer posting blkd consgmt to blkd consgmt within plant 325K
325 Q Transfer posting blocked project to blocked project in plant 325Q
326 Trfr posting blkd stock to blkd stock in plant - reversal 326
326 E Trfr pstng blkd sales ord. to blkd sales ord. in plnt - rev. 326E
326 K Trfr pstng blkd consgmt to blkd consgmt in plant - reversal 326K
326 Q Transfer posting blkd project to blkd proj. in plant - rev. 326Q
343 Transfer posting blocked stock to unrestricted-use stock 343
343 E Transfer posting blkd sales order to unrestr. sales order 343E
343 K Transfer posting blkd consigment to unrestr. consigment 343K
343 Q Transfer posting blkd project to unrestr. project stock 343Q
344 Transfer posting blocked stock to unr.-use stock - reversal 344
344 E Trfr pstng blkd sales ord. to unrestr. sales ord. - reversal 344E
344 K Transfer posting blkd consgmt to unrestr. consgmt - reversal 344K
344 Q Transfer posting blocked project to unrestr. proj. - revers. 344Q
349 Transfer posting blocked stock to quality inspection stock 349
349 E Transfer posting blocked sales order to QI sales order 349E
349 K Transfer posting blocked consignment to QI consignment 349K
349 Q Transfer psoting blocked project to QI project 349Q
350 Transfer posting blocked stock to QI stock - reversal 350
350 E Transfer posting blkd sales ord. to QI sales ord. - reversal 350E
350 K Transfer posting blkd consgmt to QI consgmt - reversal 350K
350 Q Transfer posting blocked project to QI project - reversal 350Q
351 Transfer posting to stock in transit from unrestricted-use 351
352 Trfr pstng to stock in transit from unrestr.-use - reversal 352
411 Transfer posting storage location (one-step) 411
411 E Transfer posting sales order to own 411E
411 K Transfer posting consignment to own 411K
411 Q Transfer posting project to own 411Q
412 Transfer posting storage location (one-step) - reversal 412
412 E Transfer posting sales order to own - reversal 412E
412 K Transfer posting consignment to own - reversal 412K
412 Q Transfer posting project to own - reversal 412Q
413 Transfer posting sales order in one step 413
413 E Transfer posting sales order to sales order 413E
413 K Transfer posting consignment to sales order 413K
413 Q Transfer posting project to sales order 413Q
414 Transfer posting sales order in one step - reversal 414
414 E Transfer posting sales order to sales order - reversal 414E
414 K Transfer posting consignment to sales order - reversal 414K
414 Q Transfer posting project to sales order - reversal 414Q
415 Transfer posting project in one step 415
415 E Transfer posting sales order to project 415E
415 K Transfer posting consignment to project 415K
415 Q Transfer posting project to project 415Q
416 Transfer posting project in one step - reversal 416
416 E Transfer posting sales order to project - reversal 416E
416 K Transfer posting consignment to project - reversal 416K
416 Q Transfer posting project to project - reversal 416Q
441 Transfer posting unrestricted-use to tied empties 441
442 Transfer posting tied empties to unrestricted-use 442
453 Transfer posting to own stock from returns from customer 453
454 Trfr pstng to own stck from returns from customer - reversal 454
455 Stock transfer returns to returns 455
456 Stock transfer returns to returns - reversal 456
457 Stock transfer returns to QI 457
458 Stock transfer returns to QI - reversal 458
459 Stock transfer returns to blocked 459
460 Stock transfer returns to blocked - reversal 460
541 Trfr pstng to stock with subcontractor from unrestr.-use st. 541
542 Trfr pstg to stock w. subcontr. from unrestr.-use - reversal 542
Mb1c for goods receipt
305 Transfer posting plant to plant - place in storage 305
306 Trfr posting plant to plant - place in storage - reversal 306
315 Transfer posting SLoc. to SLoc. - place in storage 315
316 Transfer posting SLoc to SLoc - place in storage - reversal 316
451 Returns from customer 451
452 Returns from customer - reversal 452
501 Receipt w/o purchase order into warehouse 501
501 E Receipt w/o purchase order into unrestr. sales order stock 501E
501 K Receipt w/o purchase order into consignment 501K
501 M Receipt w/o purchase order into unrestricted RTP 501M
501 Q Receipt w/o purchase order into unrestricted project 501Q
502 Receipt w/o purchase order into warehouse - reversal 502
502 E Receipt w/o purch. order into unrestr. sales ord. - reversal 502E
502 K Receipt w/o purchase order into consignment - reversal 502K
502 M Receipt w/o purchase order into unrestricted RTP - reversal 502M
502 Q Receipt w/o purchase order into unrestr. project - reversal 502Q
503 Receipt w/o purchase order into quality inspection stock 503
503 E Receipt w/o purchase order into QI sales order stock 503E
503 K Receipt w/o purchase order into QI consignment 503K
503 Q Receipt w/o purchase order into QI project 503Q
504 Receipt w/o purchase order into QI stock - reversal 504
504 E Receipt w/o purchase order into QI sales order - reversal 504E
504 K Receipt w/o purchase order into QI consignment - reversal 504K
504 Q Receipt w/o purchase order into QI project - reversal 504Q
505 Receipt w/o purchase order into blocked stock 505
505 E Receipt w/o purchase order into blocked sales order stock 505E
505 K Receipt w/o purchase order into blocked consignment 505K
505 Q Receipt w/o purchase order into blocked project stock 505Q
506 Receipt w/o purchase order into blocked stock - reversal 506
506 E Receipt w/o purchase order into blkd sales order - reversal 506E
506 K Receipt w/o purchase order into blocked consgmt - reversal 506K
506 Q Receipt w/o purchase order into blocked project st. - rev. 506Q
511 Receipt of delivery without charge 511
511 M Receipt of delivery w/o charge RTP (ret. transp. packaging) 511M
512 Receipt of delivery without charge - reversal 512
512 M Receipt of delivery w/o charge RTP - reversal 512M
521 Receipt w/o production order into unrestr.-use stock 521
521 E Receipt w/o production order into unrestricted sales order 521E
521 Q Receipt w/o production order into unrestr. project stock 521Q
522 Receipt w/o prod. order into unrestr.-use st. - reversal 522
522 E Receipt w/o prod. order into unrestr. sales order - reversal 522E
522 Q Receipt w/o production order into unrestr. project - revers. 522Q
523 Receipt w/o production order into quality inspection stock 523
523 E Receipt w/o production order into QI sales order stock 523E
523 Q Receipt w/o production order into QI project stock 523Q
524 Receipt w/o prod. order into qual. inspec. stock - reversal 524
524 E Receipt w/o prod. order into QI sales order stock - reversal 524E
524 Q Receipt w/o production order into QI project st. - reversal 524Q
525 Receipt w/o production order into blocked stock 525
525 E Receipt w/o production order into blocked sales order stock 525E
525 Q Receipt w/o production order into blocked project stock 525Q
526 Receipt w/o production order into blocked stock - reversal 526
526 E Receipt w/o prod. order into blkd sales order st. - reversal 526E
526 Q Reveipt w/o production order into blocked project st. - rev. 526Q
531 Receipt of by-product into unrestricted-use stock 531
531 E Receipt of by-product into unrestr. sales order stock 531E
531 Q Receipt of by-product into unrestricted project stock 531Q
532 Receipt of by-product into unrestricted-use stock - reversal 532
532 E Receipt of by-product into unrestr. sales order - reversal 532E
532 Q Receipt of by-product into unrestr. project stck - reversal 532Q
561 Receipt per initial entry of stock balances into unr.-use 561
561 E Receipt per init. entry of stck balances to unr. sales ord. 561E
561 K Rcpt per init. entry of stock balances to unrestric. consgmt 561K
561 M Receipt per initial entry of stock balances to unrestr. RTP 561M
561 O Rcpt per init. entry of stck balances to unr. stck w. subc. 561O
561 Q Receipt per initial entry of stock balances to unrestr.proj. 561Q
561 V Rcpt per init. entry of st. bal. to unr. ret. pack. at cust. 561V
561 W Rcpt per init. entry of st. bal. to unr. consgmt at customer 561W
562 Receipt per init. entry of st. bal. to unrestr. - reversal 562
562 E Rcpt per init. entry of st. bal. to unr. sales ord. - rev. 562E
562 K Receipt per init. entry of st. bal. to unr. consgmt - rev. 562K
562 M Receipt per init. entry of st. bal. to unr. consgmt - rev. 562M
562 O Rcpt per init. entry of st. bal. to unr. st. w. subc. -rev. 562O
562 Q Receipt per init. entry of st. bal. to unrestr. proj. - rev. 562Q
562 V Rcpt per init. entry of st.bal.to unr.re.pck.at cust. - rev. 562V
562 W Rcpt per init. entry of st. bal. to unr.cons.at cust. - rev. 562W
563 Receipt per init. entry of stock balances into qual. inspec. 563
563 E Receipt per init. entry of stock balances to QI sales order 563E
563 K Receipt per init. entry of stock balances to QI consignment 563K
563 O Receipt per init. entry of st. bal. to QI st. w. subcontrac. 563O
563 Q Receipt per initial entry of stock balances to QI project 563Q
563 V Receipt per init. entry of st. bal. to QI ret. pck. at cust. 563V
563 W Receipt per init. entry of st. bal. to QI consgmt at custom. 563W
564 Receipt per init. entry of stock balances to QI - reversal 564
564 E Receipt per init. entry of st. bal. to QI sales order - rev. 564E
564 K Receipt per init. entry of st. bal. to QI consgmt - reversal 564K
564 O Rcpt per init. entry of st. bal. to QI st. w. subc. - rev. 564O
564 Q Receipt per initial entry of stock bal. to QI project - rev. 564Q
564 V Rcpt per init.entry of st.bal. to QI re.pck. at cust. - rev. 564V
564 W Rcpt per init.entry of st. bal. to QI cons.at cust. - rev. 564W
565 Receipt per init. entry of st. balances into blocked stock 565
565 E Receipt per init. entry of st. balances to blkd sales order 565E
565 K Receipt per init. entry of st. bal. to blocked consignment 565K
565 Q Receipt per initial entry of stock bal. to blocked project 565Q
566 Receipt per init. entry of stock balances to blocked - rev. 566
566 E Receipt per init. entry of st. bal. to blkd sales or. - rev. 566E
566 K Receipt per init. entry of st. bal. to blkd consgmt - rev. 566K
566 Q Receipt per initial entry of stock bal. to blkd proj. - rev. 566Q
581 Receipt by-product from network 581
581 E Receipt by-product to unrestricted sales order from network 581E
581 Q Receipt by-product to unrestricted project from network 581Q
582 Receipt by-product from network - reversal 582
582 E Receipt by-product to unrestr. sales order from netw. - rev. 582E
582 Q Receipt by-product to unrestr. project from network - rev. 582Q -
Movement types in valuated stock
Hi experts,
What are the Standard movement types considered by SAP for extraction of Valuated Stock ( Inventory data ) in MB5B on R/3 side.
Full points will be assigned.
Thanks & Regards,
Naveen V.Hi,
101 Goods receipt for purchase order into warehouse/stores
102 Goods receipt for purchase order into warehouse - reversal
103 Goods receipt for purchase order into GR blocked stock
104 Goods receipt for purchase order -> GR blkd stock - reversal
105 Release GR blocked stock for warehouse
106 Release GR blocked stock for warehouse - reversal
107 Goods receipt to valuated blocked stock
108 Goods receipt to valuated blocked stock - reversal
109 Goods receipt from valuated blocked stock
110 Goods receipt from valuated blocked stock - reversal
122 Return delivery to vendor
123 Reversal of ret. delivery
161 Returns for purchase order
241 Consumption for asset from warehouse
242 Consumption for asset from warehouse - reversal
251 Consumption for sales from warehouse
351 Transfer posting to stock in transit from unrestricted-use
351 K Transfer posting to stock in transit from unrestricted-use
352 Trfr pstng to stock in transit from unrestr.-use - reversal
451 Customer returns
452 Returns from customer - reversal
561 Receipt per initial entry of stock balances into unr.-use
411 Trnasfer Strorage to storage location
412 Trnasfer retun storage to storage
311 Transfer posting storage location (one-step)
321 Transfer posting quality inspection to unrestricted
322 Trfr posting qual. inspection to unrestricted - reversal
343 Transfer posting blocked stock to unrestricted-use stock
344 Transfer posting blocked stock to unr.-use stock - reversal
349 Transfer posting blocked stock to quality inspection stock
350 Transfer posting blocked stock to QI stock - reversal
411 K Transfer posting consignment to own
455 Stock transfer returns to returns
456 Stock transfer returns to returns - reversal
632 GI consgmt:ret.delvy
633 GI iss: cust.consgmt
634 GI rcpt:cust.consgmt
651 GD ret.del. returns
652 GD ret.del. retn rev
653 GD returns unrestr.
654 GD returns unr. rev.
Assign Points if it helps.
Regards,
sandeep -
Dear All,
Material transferred to GR blocked stock against purchase order thereby for clearance from QM. QM rejected Lot & Lot remain in GR Blocked Stock. Now how it can be moved to unrestricted stock as it shows meassage " Good Receipt Blocke for Purchasing Document by QM only" while doing Mov. 105 i.e. GR Blocked Stock Reversal.
PravinLet me repeat what I understand. You received the material via GR from purchase order. The material is QM-activated, therefore inspection lot was created. After inspection, you made UD to reject and move the stock to block stock. Now you want to return the material to vendor.
There are two movement types that you can use for this scenario - 104 (Goods receipt for purchase order -> GR blkd stock - reversal) in case you still don't get the credit memo from vendor; or 124 (Return delivery from GR blocked stock) if you got one.
Movement type 105 is used for another purpose.
Try this out and revert back.
Rgrds, -
Unrestrected use stock to quality inspection stock
Hi,
plz tell me how can transfer Unrestrected use stock to quality inspection stock for same material and same palntHi Prasad, Make sure that inspection type 08 is assigned and activated in Material Master's QM view. Then you would be able to move the stock from unrestricted to quality using MB1B (Mvt/Type 322).
Also check : Stock Reversal - From Unrestricted to Quality
Edited by: m_n_novice on Sep 5, 2009 2:02 PM -
GR Cancellation after stock posting
Hi Gurus,
QM persons have done result recording and posted the stock to unrestricted stock.Now the production person want to cancel the GR. But system is not allowing cancellation of GR.Is there any way to cancel GR after stock posting.
Regards
AmitDear,
T. Code MB1B & movement type 344, you can transfer the Material from Unrestricted use to Block Stock.
Or MBST and reverse the GR you have done , then use movement type 102 in the MIGO or MB31.
Please check SAP note note 33924 Reversing the UD and 175842-QM lot stock reversal.
Regards,
R.Brahmankar -
Search for a reversed material document
Hi all,
how can I find if a material document is reversed?
thank you
Gino BonfiglioliThrough movement type you can find a material document is reversed.
For example :
102 GR with reference to p.o reversal for movement type 101,
562 intial stock reversal for movement type 561.
202 Good issue against cost centre reversal for movment type 201
In purchase order history,you can find reversed material document.
Using MBSM,You can find canceled material document for orginal material document.
From table MKPF for material doc. cancelled through t.code MBST. -
Unrestricted stock to restricted and retricted stock to unrestricted
Dear Experts,
What movement type to use for below transfer posting?
1) unrestricted stock to restricted
2) retricted stock to unrestricted
Thank you.341 Transfer posting unrestricted-use stock to restricted-use stock
342 Transfer posting unrestricted-use stock to restricted-use stock - reversal
343 Transfer posting blocked stock to unrestricted-use stock
344 Transfer posting blocked stock to unrestricted-use stock u2013 reversal
Hope this will help you
Enjoyyyyyyyyyyyyyy
Akshit -
Movement Type and Its Reversal
Hi all,
In Sub contracting scenario-
541- Transfer posting to Stock with Sub contractor from unrestricted stock.
542- Transfer posting to Stock with Sub contractor from unrestricted stock Reversal
I want to know does 542 means TP from subcontracting stock to Unrestricted stock.
Which scenario i can used 542 to movmnt type?
How the GR and Byproducts, scraps are is handled in Sub contracting.
Regards,
AshuHi
3 diff scenarios you may use 542 movement type...
1)You are sending some component to SC-vendor...for assembling against SC-PO...
Now the Order has been cancelled...you want to cancel the SC-PO, and take back the Component from SC-Vendor...Now you have to take back the Components from SC-Vendor in T.Code:MB1B,useing 542 movement type only....
2)Suppose you have issued some Components to SC-Vendor against SC-PO for making one assemble....Now the SC-Vendor has consumed the Component less compare to our Estimation(what we maintained in BOM)...
So Now you have to take back the Bal.qyt. of component fron Sc-vendor....for this purpose...First you have to Do regulr GR for the Finished assembly....and separately, you have to do Sub.Adjustment in MIGO, with ref.doc.as Your SC-PO....the Under consumed component will be adjusted in 544 O+ movement type automatically....and this Under Consumed bal.qty.Components you have to get back into Company stock in MB1B,useing 542movent type...
3)If you want to get By product from SC-Vendor.....then you can get back by useing 542movement type only...
If you want to get By product from SC-Vendor.....you have to maintain while creating BOM itself...
For eg) you give Product "A" to SC Vendor and getting back Product "B"...and By product "C"....
Then Create BOM for Product "B" in CS01...and in Components list...you give Product "A" , and maintain Product "C" as a negative component(ie) By product..)
Then Create PO for Product "B" in ME21N with Item Category "L"....
Then Issue Product"A" to SC-Vendor in ME2O///
After completion of product "B"....you do GR for Product "B"...in MIGO 101+ movement type....
At this time, the Component, Product"A"...will be automatically consumed in 543 O-- movement type...and your By Product will be generated in 545 O+ movement type and it will be lying at SC-vendor's Place....
Then separately, you can Get back this By product in to Company's stock in MB1B movement type....useing movement type 542....
I think I have clarified all your questions...
Reward if useful
Regards
S.Baskaran -
How to move unrestricted to GR blocked stock
Is there any way to move the material from unrestricted to GR blocked stock ?
Regards
Sureshpls follow:
105 Release GR blocked stock for warehouse
106 Release GR blocked stock for warehouse - reversal
344 Transfer posting blocked stock to unr.-use stock - reversal
regrads,
indranil -
Changing result Recorded after UD and Insp Stock posted.
Hi,
Is it possible to revoke or change the result recorded after UD is given and also stock posted for material.
In inspection plan i have activated the long term inspection check box for that particular MIC for which i want to change the results.
I have done UD reversal, stock reversal etc.
Then
I hv tried through QE02 but its showing:
Short term Inspection Completed.
All Insp.Completed.
UD has been Made.
pls suggest the possible solution on this.
Rgds,
YogeshDear sujit,
We have Ztcode developed for Stock posting reversal not for UD reversal.
Just want to know inspite of checking box for Long term planning in MIC also in Inspection plan.
Is there any provision for reentering results for already closed MICs.
User has made wong input entry while recording results.
Rgds,
Yogesh
Maybe you are looking for
-
When I click "save" or "save as", Appleworks freezes and I have to force quit just to get back to my document. Any help? Thanks, Teri
-
That's the way the ThinkPad crumbles...
My ThinkPad crumbles I had my R61 since two years and all this time the case has been slowly crumbling. Even when doing nothing, various parts of it just fall off. I occasionally find bits and pieces of it either in my bag or around it on the desk. I
-
SQL FORMATING ERROR in E-Business suite
Hi, I've been notificing following issue in one server. OS=RHEL 5.3 DB=10.2.3 Application=Oracle E-bis 12.0.6 One instance result: select Substr(first_name, 1, 1) AA , Substr(last_name, 1, 30) LastN from per_all_people_f where employee_number = '111'
-
Why will my license for acrobat no longer work?
I am installing to my new computer from the original cs4 disks with the correct license that works fine for the rest of the suite and won't work for acrobat! does anyone know why or how to fix? they have told me the activation server is now closed...
-
HT201316 i accidentally changed the name of my hd on the desktop
Hi everyone, glad to be here, and glad you might be able to help me. I can't remember what the original name was on my desktop hardrive icon, how can I find out the original name so I can change it back? Thanks All.