Cotrol Budget on Plant section level

Hello Guys,
On plant section level they are allocating the xxxxx budget .Thet want to control the buget on Plant section wise.
For example:Plant - Plant Location - Plant Section....This the FL structure.
1.100 -Ref 1 -Neu
2.100 -Ref2 - Neu
3.100 -Ref3 -Neu....They are allocating the budget on Neu(Plant Section).
Can any one guide me when ever they are creating the maintenance order for the equipment which are under Neu for different plant section.Pop-up has to come when it exceeds the buget.
Regards
Kumar

Hi Sebastian,
I want to allocate the budget for section level in plant maintenance .Iam not using any WBS element.For Settlement iam using the cost center only.
For example i have 5 functional location where location is diferent but plant section is same for all the five FL's.I will allocate the budget for all the five sections xxx. suppose 100000.When ever i will create the Maintenance order for any of the five section and its corresponding equipments,when iam doing the material issue or PR system has to give the pop message when it exceeds the budget.
How can i control this scenerio.
Regards
Kumar

Similar Messages

  • Budget Control at top level WBS only

    Hello All,
    I have a requirement from client where I need to activate the Budget control (90% warning and 100% error). I have done the setting accordingly.
    Now the scenario is such that when client is doing budgeting, they are allocating the budget only at top level WBS (they have a different legacy, where they are doing there detail planning n budgeting, but since they want the feature of budget control in PS, they will do minimal budgeting in PS). As per my settings when I budget top level WBS and save the availabity control is activated (with no budget on lower level WBS). Now when I try to do some postings/or assign that WBS to PO, even with a value of 1 USD, i am getting an error of budget exceeded, which is fine as per the settings as that WBS is having 0 budget.
    The requirement from client side is such that they want AVAC to be activated only at top WBS and do postings to lower WBS. But if the total of lower WBS exceed the budget of top WBS, they should get an warning or error. For example:
    WBS level  BUDGET ACTUALS
      1               100
      2                              50
      2                              50
    so as soon as the actuals touch 100, the system should give an error/warning. Note that the 2nd level WBS are not budgeted in SAP, so budget is 0 on them.
    I have 2 questions:
    1.Is it possible to activate AVAC only for top WBS ?(without any enhancement/development)
    2.How the AVAC will work, if the total of 2nd level WBS exceeds the budget of top WBS (as explained in example above)?
    Awating your replies.
    Thanks
    Sarang

    Thanks Virendra, it was useful.
    I tried other way round also i.e. by not marking the release tab in OPS9 and activating AVAC in CJ30.It works in that way too.
    For my other question, regarding activating AVAC only at top level, we can achiebve that by using transaction control in user status.
    Thanks
    Sarang

  • Table for plant section field in equipment master.

    hi,experts,
    can anybody please tell me in which table data of plant section field gets updated? as I m developing one report where I need to pick up data from plant section field in equipment master.
    rgds
    rajib

    Hi,experts,
    many many thanks for your response.But whatever table you have given like ITOB,ILOA,or SO61 to SO71,nowhere I am getting my data means plant section field data.I am preparing one safety permit through smart form where I need to pick up data of plant section field .I have used it to for each department where the equipment belongs.please guid me exactly from which table I should pick this data.thnaks in advance
    rgds
    rajid

  • Entering budget data on different levels

    Dear experts,
    I have a question concerning posting budget data on different levels in BCS. In Former Budgeting there was an automatic check for budget entry which was not allowing greater amounts on lower level commitment items than on higher levels.
    Now with BCS there is not a hierarchical structure when entering budget data so you can enter a greater amount on subordinate commitment items than on superior ones.
    Do you have an idea if the budget entered on the lowest level can be totaled up automatically to the higher levels of the hierarchy or consistency checks should be defined in order to control budget amounts on the different levels???
    Thanks in advance.
    Best regards,
    sappsm

    Dear SAPPSM,
    In the Budget Control System (BCS) there exists no hierarchical budget structure which would take into account some funds center hierarchy, for example.
    This was standard function in Former (or Classical) Budgeting, but is not available in BCS only from EhP 603 on, you will be able to have multi-level budget structure but still in development phase.
    As a consequence, when you enter budget, budget values are only created at the level of budget entry (for example, at the 3rd level). Furthermore, BCS does not provide functions like "Distribute budget"
    or "Total up budget".
    However, you can "simulate" a totalling up of budget values via reporting. For example, for Report Writer reports like FMRP_RW_BUDGET you can use funds center groups (FM menu, Master Data, Funds Center), created by transaction FM_SETS_FICTR1. You can use such funds center groups with the Report Writer reports, which then automatically sum up the budget values according to the funds center group.
    BCS is a complete system with more possibilities than FB and you will be able to define strategy derivation for controling budget or posting address according to business process. Please check the documentation available in help.sap.com and in BCS node from SPRO configuration.
    I hope I could help you
    Kind Regards,
    Vanessa.

  • Budgeting at cost center level

    Dear All,
    Can anyone please tell me how to go about activating availability control for cost centers.I want to do budgeting at cost center level for each cost element.
    Pls Its urgent
    mail me to : [email protected]
    Regards
    besri

    Hi
    In transaction code KP06 you have the facility for to enter the plan data for cost centre and cost element but no availability control i.e. it will allow to do further transaction even if the actual exceeds Plan.
    For budgeting you can use KPZ2 which is also for cost centre only (without cost element)budgeting without availability of control.
    Both these you can maintain peridically.
    Report S_ALR_87013611 - Cost Centers: Actual/Plan/Variance  which will give plan vs actual and variance
    S_ALR_87013648 - Range: Actual/Budget/Commitments
    If the above answer is helpful kindly assign points
    Thanks & Regards
    Mahesh

  • How can we define plant section field as a authorization object?

    Hi Expert
                    I checked plant section field by t-code S_BCE_68001412( By Field, Text ) and confirm it isn't a authorization object, But in real business we have defined different plant sections and we want to control user actions by this field, how can we  get to this point, Pls show me some lights.
    Best regards
    George

    George,
      You could potentially achieve the same with the help of the "Authorization group" field on the equipment master.You could create Authorization groups equivalent to plant sections and assign the same to the equipment master, whenever the plant section is populated. You could then use the standard Auth object "I_BEGRP Authorization group"  to control the access to that specific record.
    Regards
    Narasimhan

  • Plant Section in SAP

    Below is SAP definition of Plant section.
    Define Plant Sections (PS)
    You define your plant sections in this step.
    The plant section enables you to subdivide the maintenance plant from the point of view of production responsibility. The person responsible for the plant section is the contact for coordination between production and plant maintenance.
    The plant section can be used for evaluation purposes.
    Every piece of equipment and functional location can be assigned to a plant section.
    Note
    You can also specify a plant section when processing maintenance tasks.
    Q1- What is the mean of " subdivide the maintenance plant from the point of view of production responsibility" ?
    Q2- What we achieve by the statement "The person responsible for the plant section is the contact for coordination between production and plant maintenance."
    Q3- for what tye of report or KPI it will help ?
    Scenario: In on Plant Location there are 3 different lines of production , exm (JUICE, JAM and Biscuit)
    For Juice line there is Filling --- Printing ---Packing  --- Out 
    For Jam line there is  Filling --- Printing ---Packing  --- Out
    For Biscuit there is   Backing ----- Packing ---- Out
    Individual process line have individual process supervisor under once maintenance department as mechanical, electrical etc...
    As per the above scenario please help me what will be the best to go for Plant section.

    Your maintenance plant can be 1000 under which you have 3 plant sections (Juice, Jam and Biscuit lines). Individual supervisor can be the Person responsible. His role as told in the definition indicates the integration activities between PM and PP (production) modules. Like the SAP maintenance objects (Maint Order) and SAP production objects (Prod Order) can not go simultaneously or with overlaps on Equipments/FLocns.  SAP keeps provisions for industrial processes integration between funtions for fool-proofing, but many users do not make use of them. The PP work Center field given in the Location tab of Technial Objects play a role in the integration in the PM and PP processes.
    At our implementation we used Plant sections as I mentioned above. 14 production lines so 14 Plant sections, but did not make use of Person Responsible field, because we have coordination outside SAP. These things have wide scope of interpretation as per their usages by different users. So wait for more expert opinions.
    KJogeswaraRao

  • How to define Budget on Profit Center level

    Hi All,
    is it possible to define a budget on profit center level in SBO 2005A SP01.
    My understanding ist, that a budget can only be defined on account level (if marked as 'relevant for budget).
    If not possible - any idea/solution how to do it?
    Thank you
    E. Ambauen

    As this is not a standard feature in SAP Business One, the best alternative is to add a User Defined Table with a column for Profit Center and Distribution Rule and/or G/L account. Bear in mind that the profit center totals are not stored in a table in SAP Business One, but rather calculated from the JDT1 (journal rows) table each time you request a report for a profit center/(s).
    By writing your own query you could join the JDT1 table with your UDT and get the comparisons, etc. The table JDT1 contains a link only to distribution rules and not profit centers and would therefor have to be represented somehow in the UDT.
    The only other alternative is an SDK add-on custom written for this.
    Kind regards
    Peter Juby

  • Plant Revision Level in QP01 Selection

    Hi,
    We have a requirement to add 'Plant Revision Level' field in the selection screen of QP01. Do we have any configuration steps to select that field, so that it will appear in the transaction selection screen.
    It is critical requirement for business. Please share your solution options.
    Thanks & Best Regards
    Lakshmi

    Dear,
    Go to OP5A and select  task list header then select PP/QM task lists: header screens--here active redio button PLKOD-WERKS for plant. and PLKOD-AENAM change number
    SPRO--> Logistics - General> Engineering Change Management ( ECM) -> Revision Levels--> Define Revision Levels .
    SPRO--> Logistics - General> Engineering Change Management ( ECM) -> Set Control Data--> Revision Level Tab 5 check boxes so you can get idea of Revision Level Assignment
    Please check this come back.
    Regards,
    R.Brahmankar

  • OLM : Can we define Budgeting at learning center level

    Hi All,
    1. Can we define budget at Training center level and when defining the course based budget amount need to validate the course amount should not exceed defined budget
    amount at training center level ?
    2. Also whenever we define the course budget amount under the training organization. The course budgeted amount should be deducted from training center over all budget and validated when defining the next course
    How to achieve this ? is any workaround can be suggested
    Thanks

    Just with reference to the user guide, got the below statement
    "Develop and Budget for Courses
    You can assign budgets both for the development of new courses and for the running
    costs of all classes scheduled for a course. You can assign instructors and other
    resources for course development."
    "Price courses: create budgets and create price lists, if appropriate".
    Believe we can do the budgeting cost at the class & course level. Or with price list functionality we can capture the cost for course.
    Please advice
    thanks
    Siva

  • Plant Section Creation

    Hello,
    I have a query regarding plant section creation.
    I wanted to create a Plant Section which i did from SPRO>Plant Maintenance & Cus service> Maintenance plan orders, work cntres task lists> Basic Setting>Define Plant Section and then added Plant - ABCD , Plant Section - 300 and Person Responisble.
    Just wanted to know apart from process mentioned above,  any thing we need to do more in terms of connfig setting or any other impact we need to analyse. Or this is the only setting we require for plant section creation
    Best Regards
    Himanshu

    Hi
    Better way if You can define Plant Section in SPRO - Master Data which is more logical path (However what you hv done is also correct )
    The Path in SPRO - Master Data in Plant Maintenance & CS ---Technical Objects --General Data - Define Plant Section
    Apart from that you don't need to do anything in SPRO for plant section.
    Your created Plant section are ok for using in other transactions.
    Regards
    Sameer

  • Master Data Text for Infoobject Plant Section

    Hi Experts,
    I've changed the standard Infoobject of Plant Section (0PLANTSECTN), so the master data (text & attribute) is active now.
    My question is: Does SAP BW provide the standard business content for master data of 0PLANTSECTN?
    Coz i've checked it on RSA5, but the datasource is not exist.
    Thanks for helping, hope you could give me some enlightenment
    Warm Regards,
    Tika

    Thanks for ur answer Swapnil..
    So the only thing i can do is create a custom DS and load the data (text) via Flat File? Or is there any way else to load the master data text?
    As I know, loading data from flat file is only can be done manually. The problem is, i have to make sure, that data in BW is always relevance with data in ECC. Hence, i need the standard DS. So i could load it directly from ECC.
    Am very appreciate, if any of u could share the best way.
    Thanks

  • Budget control at top level Wbs

    Dear PS experts,
    we have a requirement to have budgets distributed from top level wbs to level 2 wbs and all transactions to happen at level 2 wbs, but only budget availability check to happen at top level. can you please let us know if this can be aceived.
    Thanks a lot.
    Regards,
    Veera

    Try this:
    Exclude the level 2 WBS elements from the availability control by creating a user status profile (i.e., availability control business transaction is not allowed) and assigining the status to all WBS elements except your top level.
    Please search the forum if you need help on creating the user profile for Object Type WBS (T code OK02).
    Regards
    Sreenivas

  • Implement Budget check at SC level against Fund Management(ECC)

    Hello,
    We would like to implement Budget check at SC level against Fund Management(ECC) .
    We are planning to use Extended classic scenario with SRM 7.0
    Could please confirm that it is feasible, I know that there were some problems integrating SC and Fund Management with previous SRM version in Extended Classic Scenario..
    Best regards,
    Lina

    Hi,
    I think it is standard function and no development is required.
    Regards,
    Masa

  • Budget check at SC level against Fund Management

    Hello,
    We would like to implement Budget check at SC level against Fund Management(ECC) .
    We are planning to use Extended classic scenario with SRM 7.0
    Could please confirm that it is feasible, I know that there were some problems integrating SC and Fund Management with previous SRM version.
    Best regards,
    Lina

    Hi,
    I think it is standard function and no development is required.
    Regards,
    Masa

Maybe you are looking for

  • Multiple Apple ID's needed to maintain privacy on home Mac?

    At home I have a family Mac. I have just bought an iPhone. At home we are signed in to iTunes etc using my Apple ID. I was wondering if there is any way to control what is transferred to the Mac via iCloud - I don't necessarily want to share all my w

  • Safari falling over due to JavaScript?

    Hi Folks, I was wondering if anyone on these discussions knew why Safari keeps crashing on me. It originally started on one website (Facebook) that could consistently keep bringing Safari down. I looked around and saw that many people were blaming th

  • Is it possible to interface a USB Gamepad to a RT PXI system?

    We currently use a RT PXI system to control a subsea ROV. We would like to interface a Logitech Wingman Gamepad with USB interface to our RT PXI system as a Human Interface Device (HID) to control the ROV. Is it possible? The gamepad supplier has inf

  • Portals Development - roles & responsiblities

    Hello - Wanted to ask the group how they define roles & responsibilities in regards to Portals development. We have a team of people that manage the portal.  In terms of importing Business Packages, Configuring the Portal, managing security groups &

  • HT4906 how do i import photos fom my iphone to my iPhoto

    I just upgrated to the OS X Mountain Lion on my MacBook Pro to have the iCloud on my computer how can I make sure my iPhone 4s photos upload to the computer automatically best, Sigga